CN106118757A - There is the biomass gasifying furnace of the equipment of supplying gas - Google Patents

There is the biomass gasifying furnace of the equipment of supplying gas Download PDF

Info

Publication number
CN106118757A
CN106118757A CN201610521153.XA CN201610521153A CN106118757A CN 106118757 A CN106118757 A CN 106118757A CN 201610521153 A CN201610521153 A CN 201610521153A CN 106118757 A CN106118757 A CN 106118757A
Authority
CN
China
Prior art keywords
air inlet
pipe
inlet pipe
combustor
loop draught
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610521153.XA
Other languages
Chinese (zh)
Other versions
CN106118757B (en
Inventor
温洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baise Rongxing Chemical Co.,Ltd.
Original Assignee
温洲
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 温洲 filed Critical 温洲
Priority to CN201610521153.XA priority Critical patent/CN106118757B/en
Publication of CN106118757A publication Critical patent/CN106118757A/en
Application granted granted Critical
Publication of CN106118757B publication Critical patent/CN106118757B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/72Other features
    • C10J3/82Gas withdrawal means
    • C10J3/84Gas withdrawal means with means for removing dust or tar from the gas
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/02Fixed-bed gasification of lump fuel
    • C10J3/20Apparatus; Plants
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0913Carbonaceous raw material
    • C10J2300/0916Biomass

Abstract

The invention discloses a kind of biomass gasifying furnace with the equipment of supplying gas, including: the body of heater being vertically arranged, it includes vaporizer, combustor and collection chamber;Second pyrolysis room, it is circumferentially positioned at the outside of combustor;Loop draught pipe, it is circumferentially positioned at the outside of second pyrolysis room, and the lateral wall that the medial wall of loop draught pipe is second pyrolysis room, the medial wall of loop draught pipe offers multiple pore, and the direction, duct of adjacent two pores differs, loop draught pipe is communicated to a high temperature air feedway;Multiple fans, are arranged in described loop draught pipe, and the rotating speed of each fan all differs;Multiple air inlet pipe, one end of air inlet pipe stretches to combustion chamber along the tangential direction of combustor, and the other end of air inlet pipe is communicated to the combustion-supporting gas feedway being arranged on outside body of heater;Airway, its one end is communicated to collection chamber, other end connection second pyrolysis room.Present invention reduces the tar content of fuel gas.

Description

There is the biomass gasifying furnace of the equipment of supplying gas
Technical field
The present invention relates to a kind of biomass gasifying furnace with the equipment of supplying gas.
Background technology
Biomass include the plant of nature, feces and town and country debirs, are a kind of non-fossil regenerative resources.With The energy utilization patterns that biomass are directly burnt are compared, and have extended use, minimizing carrying out utilization after biomass pyrogenation gasification Pollution, the advantage of clean and effective.But China's biomass pyrogenation gasification technology is the most backward, current biomass pyrogenation gasification processes Equipment mainly uses fixed-bed gasification furnace and the normal pressure fluidized bed gasification furnace, and wherein fixed-bed gasification furnace is owing to can produce in production process Raw a large amount of phenol water, tar content is high, and secondary pollution is more serious, and single stove gas production is little, and the combustible gas calorific value of output is low, is limited Use;The in-furnace temperature fluctuation range of the normal pressure fluidized bed gasification furnace is big, and controlling of production process difficulty, operational reliability is poor, heat waste Consumption is big, and deslagging carbon content is high, and many containing nitrogen amount in the fuel gas produced, calorific value is low, and combustion gas dust content height purifies difficulty etc. Deficiency, fails to be used widely the most so far.Further, owing to biological lignin containing tar, raw after biomass combustion The content that the fuel gas of one-tenth is coal-tar middle oil is the highest, causes the fuel gas generated to have abnormal flavour, pollutes environment during use, the most unfavorable In conveying and storage.The backwardness of biomass pyrogenation gasification technology, the clean and effective hindering China's biomass energy utilizes.
Summary of the invention
The present invention has designed and developed a kind of biogas with the equipment of supplying gas lowering the coal-tar middle oil content of fuel gas Change stove.
The technical scheme that the present invention provides is:
A kind of biomass gasifying furnace with the equipment of supplying gas, including:
The body of heater being vertically arranged, it includes that vaporizer, combustor and collection chamber, described combustor are arranged on described vaporizer Lower section, communicate with described vaporizer, described collection chamber is arranged on the top of described vaporizer, communicates with described vaporizer;
Second pyrolysis room, it is circumferentially positioned at the outside of described combustor, and described second pyrolysis room is filled coke tar cracking and urged Agent;
Loop draught pipe, it is circumferentially positioned at the outside of described second pyrolysis room, and the medial wall of described loop draught pipe For the lateral wall of described second pyrolysis room, the medial wall of described loop draught pipe offers multiple pore, and multiple pore Skewness, the direction, duct of adjacent two pores differs, so that the airflow direction of adjacent two pores ejection is not With, described loop draught pipe is communicated to a high temperature air feedway;
Multiple fans, are arranged in described loop draught pipe, and the rotating speed of each fan all differs;
Multiple air inlet pipe, one end of described air inlet pipe stretches in described combustor along the tangential direction of described combustor Portion, the other end of described air inlet pipe is communicated to the combustion-supporting gas feedway being arranged on outside body of heater, and multiple air inlet pipe is relative Being uniformly arranged in described combustor, the mouth of pipe of described air inlet pipe is flat mouth shape, and the length direction of the mouth of pipe of described air inlet pipe with Described combustor axially in parallel, the width of the described mouth of pipe is 0.3~0.5cm;
Airway, it is arranged on the outside of described body of heater, and one end is communicated to described collection chamber, and the other end connects described secondary Cracking room.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, described tar cracking catalyst is Calx Stone and magnesium carbonate.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, the plurality of air inlet pipe is along described combustion The axial distribution burning room becomes multilamellar, every layer of air inlet pipe to include several air inlet pipe, adjacent two layers air inlet pipe interval 2~3cm.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, the aperture of described pore be 0.2~ 0.5cm。
The biomass gasifying furnace with the equipment of supplying gas of the present invention provides a second pyrolysis room, second pyrolysis room It is circumferentially positioned at the outside of combustor, in combustor, is provided with multiple air inlet pipe, and one end of air inlet pipe is along combustor Tangential direction stretch to combustion chamber, and the mouth of pipe of air inlet pipe is flat mouth shape, the width design of the mouth of pipe be 0.3~ 0.5cm, thus the temperature near the inwall of combustor is significantly higher than combustion chamber, makes the tar in fuel gas at secondary Second pyrolysis is occurred to react in cracking room more fully.The present invention is provided with loop draught pipe in the outside of second pyrolysis room, logical Cross loop draught pipe and send into the multichannel air-flow of high temperature air to second pyrolysis room, to upset the fuel gas in tar at second pyrolysis Indoor flow path, improves containing the coke tar cracking efficiency in tar fuel gas.The present invention is provided with in loop draught pipe Multiple fans, the rotating speed of each fan all differs, hence into making to enter, by each pore, the air-flow that second pyrolysis is indoor Flow is the most different, increases the disturbance containing tar fuel gas.Present invention reduces the tar content of fuel gas, improve can The quality of combustion gas body.
Accompanying drawing explanation
Fig. 1 is the structural representation of the biomass gasifying furnace with the equipment of supplying gas of the present invention.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
As it is shown in figure 1, the present invention provides a kind of biomass gasifying furnace with the equipment of supplying gas, including: the stove being vertically arranged Body 1, it includes vaporizer 8, combustor 3 and collection chamber 2, and described combustor 3 is arranged on the lower section of described vaporizer, with described gas Changing room to communicate, described collection chamber is arranged on the top of described vaporizer, communicates with described vaporizer;Second pyrolysis room, its cincture Being arranged on the outside of described combustor 3, tar cracking catalyst is filled in described second pyrolysis room 5;Loop draught pipe 9, its cincture It is arranged on the outside of described second pyrolysis room, and the lateral wall that the medial wall of described loop draught pipe is described second pyrolysis room, The medial wall of described loop draught pipe offers multiple pore 10, and the skewness of multiple pore 10, adjacent two The direction, duct of pore differs, so that the airflow direction of adjacent two pores ejection is different, described loop draught pipe connects To a high temperature air feedway;Multiple fans 11, are arranged in described loop draught pipe 9, and the rotating speed of each fan are equal Differ;Multiple air inlet pipe 6, one end of described air inlet pipe stretches in described combustor along the tangential direction of described combustor Portion, the other end of described air inlet pipe is communicated to the combustion-supporting gas feedway being arranged on outside body of heater, and multiple air inlet pipe is relative Being uniformly arranged in described combustor, the mouth of pipe 7 of described air inlet pipe is flat mouth shape, and the length direction of the mouth of pipe of described air inlet pipe with Described combustor axially in parallel, the width of the described mouth of pipe is 0.3~0.5cm;Airway 4, it is arranged on outside described body of heater Portion, one end is communicated to described collection chamber, and the other end connects described second pyrolysis room.
In the present invention, enter collection chamber containing tar fuel gas, and it is indoor to enter second pyrolysis by airway.Two secondary fissures Solve room and be circumferentially positioned at the outside of combustor, in it, fill tar cracking catalyst.Containing tar fuel gas in second pyrolysis room In, by heating of the heat in combustor, under the catalytic action of tar cracking catalyst, there is second pyrolysis reaction, thus Reduce tar content.
Especially for the heat made full use of in combustor, the present invention is provided with multiple air inlet pipe, one end of air inlet pipe Being to stretch in combustor along the tangential direction of combustor, the other end of air inlet pipe is communicated to be arranged on helping outside body of heater On combustion gas body feeding, so, air inlet pipe will supply combustion-supporting gas along tangential direction to combustor.And due to air inlet pipe Caliber the least, only 0.3~0.5cm, the air film of a combustion-supporting gas can be formed at the inwall of combustor.Due to depositing of air film , the combustion case near the inwall of combustor more preferably more fully, and then can make the temperature near the inwall of combustor higher, So that the temperature of second pyrolysis indoor is the highest, the fuel gas containing tar promoting second pyrolysis indoor fully reacts.
In order to promote to be internally formed uniform combustion-supporting gas air film at combustor, the mouth of pipe of air inlet pipe is designed to flat mouth Shape, and the width design of the mouth of pipe is 0.3~0.5cm.Uniform combustion-supporting gas air film can ensure that near Inner Wall of Combustion Chamber Evenly, i.e. the temperature near Inner Wall of Combustion Chamber is the most evenly in burning, and then ensures the second pyrolysis reaction that second pyrolysis is indoor The most uniformly occur.
Gas cell distribution on loop draught pipe is uneven, and the direction, duct of adjacent two pores differs, so that The airflow direction of adjacent two pores ejection also differs, the air-flow of these different directions can in the little scope of disturbance can containing tar The flow path of combustion gas body so that the eddy current that is internally formed containing tar fuel gas, thus promote containing in tar fuel gas Tar ingredients constantly contacts with tar cracking catalyst, and then accelerates the lysis efficiency of tar.
Improve lysis efficiency highly useful when gasification furnace stops.Generally, terminate, if gasification furnace produces in combustor also The most no longer have combustible material, then the temperature of combustor can be gradually lowered, and finally can not meet second pyrolysis room to temperature The requirement of degree.And in gasification furnace stops a period of time producing, still suffer from gradually arranging in body of heater containing tar fuel gas Go out, in order to ensure that this last part also is able to be removed containing the tar in tar fuel gas, it is necessary in chamber temperature Be reduced to undesirable before, complete the process containing tar fuel gas to this last part in second pyrolysis indoor. The present invention improves the lysis efficiency that the fuel gas containing tar is coal-tar middle oil, therefore, is reduced to undesirable in chamber temperature Before, can complete last part is contained the process of tar fuel gas.
Pore number in the number of loop draught pipe and each loop draught pipe can be adjusted as required.
Loop draught pipe integral coating, in the outside of second pyrolysis room, on the one hand can play the effect of insulation, reduces two The heat of secondary cracking room scatters and disappears, thus improves the lysis efficiency that the fuel gas in tar is coal-tar middle oil;On the other hand loop draught pipe By pore to second pyrolysis room feeding high temperature air, thus disturbance fuel gas in tar.Further, in loop draught pipe It is additionally provided with multiple fan, i.e. fan and can cause the disturbance of the high temperature air in loop draught pipe, make high temperature air enter Pore, and the disturbance when pore flows into second pyrolysis room is more violent.Especially when the rotating speed of each fan all differs, The disturbance of high temperature air can be more complicated, presents turbulent flow, thus strengthens the disturbing containing tar fuel gas indoor to second pyrolysis Dynamic effect, improves the catalytic efficiency containing the tar in tar fuel gas.
The present invention takes full advantage of existing thermal source, improves the utilization ratio to the energy.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, described tar cracking catalyst is Calx Stone and magnesium carbonate.In this embodiment, burning indoor temperature can select 800~1000 DEG C.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, the plurality of air inlet pipe is along described combustion The axial distribution burning room becomes multilamellar, every layer of air inlet pipe to include several air inlet pipe, adjacent two layers air inlet pipe interval 2~3cm.This is real Execute example and be more conducive to the uniform air film being formed about combustion-supporting gas at Inner Wall of Combustion Chamber, improve the uniformity of air film, so that Burning near Inner Wall of Combustion Chamber the most evenly, and then makes the more uniform temperature near Inner Wall of Combustion Chamber, and second pyrolysis is indoor Heating temperature the most evenly.
Preferably, in the described biomass gasifying furnace with the equipment of supplying gas, the aperture of described pore be 0.2~ 0.5cm.When aperture within the range, can to second pyrolysis room spray multiply air-flow, play and disturb containing tar fuel gas Effect.When the flow velocity of high temperature air or flow are excessive, then may affect the lysis efficiency of tar.
The present invention tar removal efficiency containing tar fuel gas can reach 99.99%.
Although embodiment of the present invention are disclosed as above, but it is not restricted in description and embodiment listed Using, it can be applied to various applicable the field of the invention completely, for those skilled in the art, and can be easily Realizing other amendment, therefore under the general concept limited without departing substantially from claim and equivalency range, the present invention does not limit In specific details with shown here as the legend with description.

Claims (4)

1. a biomass gasifying furnace with the equipment of supplying gas, it is characterised in that including:
The body of heater being vertically arranged, it includes that vaporizer, combustor and collection chamber, described combustor are arranged under described vaporizer Side, communicates with described vaporizer, and described collection chamber is arranged on the top of described vaporizer, communicates with described vaporizer;
Second pyrolysis room, it is circumferentially positioned at the outside of described combustor, and tar cracking catalyst is filled in described second pyrolysis room;
Loop draught pipe, it is circumferentially positioned at the outside of described second pyrolysis room, and the medial wall of described loop draught pipe is institute State the lateral wall of second pyrolysis room, the medial wall of described loop draught pipe offer multiple pore, and multiple pore point Cloth is uneven, and the direction, duct of adjacent two pores differs, so that the airflow direction of adjacent two pores ejection is different, and institute State loop draught pipe and be communicated to a high temperature air feedway;
Multiple fans, are arranged in described loop draught pipe, and the rotating speed of each fan all differs;
Multiple air inlet pipe, one end of described air inlet pipe stretches to described combustion chamber, institute along the tangential direction of described combustor State the combustion-supporting gas feedway that the other end of air inlet pipe is communicated to be arranged on outside body of heater, and multiple air inlet pipe is relative to described Combustor is uniformly arranged, and the mouth of pipe of described air inlet pipe is flat mouth shape, and the length direction of the mouth of pipe of described air inlet pipe and described combustion Burning the axially in parallel of room, the width of the described mouth of pipe is 0.3~0.5cm;
Airway, it is arranged on the outside of described body of heater, and one end is communicated to described collection chamber, and the other end connects described second pyrolysis Room.
There is the biomass gasifying furnace of the equipment of supplying gas the most as claimed in claim 1, it is characterised in that described coke tar cracking is catalyzed Agent is limestone and magnesium carbonate.
There is the biomass gasifying furnace of the equipment of supplying gas the most as claimed in claim 1, it is characterised in that the plurality of air inlet pipe edge The axial distribution of described combustor becomes multilamellar, every layer of air inlet pipe to include several air inlet pipe, adjacent two layers air inlet pipe interval 2~ 3cm。
There is the biomass gasifying furnace of the equipment of supplying gas the most as claimed in claim 1, it is characterised in that the aperture of described pore is 0.2~0.5cm.
CN201610521153.XA 2016-06-29 2016-06-29 Biomass gasifying furnace with equipment of supplying gas Active CN106118757B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610521153.XA CN106118757B (en) 2016-06-29 2016-06-29 Biomass gasifying furnace with equipment of supplying gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610521153.XA CN106118757B (en) 2016-06-29 2016-06-29 Biomass gasifying furnace with equipment of supplying gas

Publications (2)

Publication Number Publication Date
CN106118757A true CN106118757A (en) 2016-11-16
CN106118757B CN106118757B (en) 2018-12-18

Family

ID=57469265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610521153.XA Active CN106118757B (en) 2016-06-29 2016-06-29 Biomass gasifying furnace with equipment of supplying gas

Country Status (1)

Country Link
CN (1) CN106118757B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108865286A (en) * 2018-07-17 2018-11-23 南华大学 Based on interactive double-fluidized-bed combustion gas providing device
CN110404926A (en) * 2019-07-05 2019-11-05 上海齐耀热能工程有限公司 A kind of corona treatment organic waste system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201354358Y (en) * 2009-02-16 2009-12-02 熊天东 Non-pressure biological substance gasification boiler
CN201473503U (en) * 2009-06-24 2010-05-19 张宝根 Tar catalytic cracker of gasifier
CN101781579A (en) * 2010-04-07 2010-07-21 王治刚 Biomass gasification method and biomass gasification furnace
JP2015059159A (en) * 2013-09-18 2015-03-30 株式会社Ihi Apparatus for reforming tar in gasified-gas
CN104791848A (en) * 2014-11-25 2015-07-22 西北工业大学 Combustion chamber flame cylinder wall face with blade grid channel multi-inclined-hole cooling manner adopted
CN205279155U (en) * 2015-10-10 2016-06-01 上海交通大学 Ran shao shi cui puts out pore structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201354358Y (en) * 2009-02-16 2009-12-02 熊天东 Non-pressure biological substance gasification boiler
CN201473503U (en) * 2009-06-24 2010-05-19 张宝根 Tar catalytic cracker of gasifier
CN101781579A (en) * 2010-04-07 2010-07-21 王治刚 Biomass gasification method and biomass gasification furnace
JP2015059159A (en) * 2013-09-18 2015-03-30 株式会社Ihi Apparatus for reforming tar in gasified-gas
CN104791848A (en) * 2014-11-25 2015-07-22 西北工业大学 Combustion chamber flame cylinder wall face with blade grid channel multi-inclined-hole cooling manner adopted
CN205279155U (en) * 2015-10-10 2016-06-01 上海交通大学 Ran shao shi cui puts out pore structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108865286A (en) * 2018-07-17 2018-11-23 南华大学 Based on interactive double-fluidized-bed combustion gas providing device
CN110404926A (en) * 2019-07-05 2019-11-05 上海齐耀热能工程有限公司 A kind of corona treatment organic waste system
CN110404926B (en) * 2019-07-05 2024-04-12 上海齐耀热能工程有限公司 System for treating organic waste by plasma

Also Published As

Publication number Publication date
CN106118757B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN103224234B (en) Process for producing active carbon by cyclic utilization of high temperature flue gas
CN203960143U (en) Utilize the biomass gasifying furnace of furnace sandwich structure decoking
CN101475814A (en) Multi-directional air distribution fixed bed biomass gasification stoves
CN213707754U (en) External heating type activation furnace
CN104087342A (en) Biomass gasification furnace capable of decoking by utilizing furnace body sandwich structure
CN106118757A (en) There is the biomass gasifying furnace of the equipment of supplying gas
CN202214340U (en) Continuous gasification and tar removing device for biomass moving bed
CN102443445B (en) Process and device for continuously gasifying biomass and simultaneously removing tar in moving bed
CN105733685B (en) Biomass gasifying furnace
CN106010653B (en) Biomass gasifying furnace
CN106118745B (en) The biomass gasifying furnace of cleavable tar
CN105969425B (en) Biomass gasifying furnace with metal hose
CN104804752A (en) Timber continuous carbonization and gasification method and device
CN210945494U (en) Anaerobic middle-temperature downdraft type pyrolysis device
CN213803653U (en) Downdraft biomass gasification furnace
CN211521606U (en) Sterpu activation furnace system with stable and controllable furnace temperature
CN210945516U (en) Updraft type pyrolysis gasification system
CN108728172A (en) A kind of aditus structure and the biomass gasifying furnace containing the aditus structure
CN104119937B (en) Biomass material is converted into biological energy sources unit
CN207811690U (en) A kind of segmented pyrolysis gasifying device
CN105969426B (en) Biomass gasifying furnace with cracking room
CN202613917U (en) Drying furnace
CN206266225U (en) Active carbon from coal carries out the device of oxygen charing with regenerative rotary hearth furnace in preparing
CN105737373A (en) Small and medium sized environment-friendly biomass water heater
CN102634375B (en) Steam spraying device of biomass gasification furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181101

Address after: 315012 room 1025, Liyuan North Road, Haishu District, Ningbo, Zhejiang, China, 755

Applicant after: Ningbo Polygala cubic Energy Technology Co Ltd

Address before: 536000 the Guangxi Zhuang Autonomous Region Beihai Yinhai District North Sichuan Road Tian Bi garden 12 stories 08 rooms.

Applicant before: Wen Zhou

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191212

Address after: 215100 Building 1, No.38, beiguandu Road, Yuexi street, Wuzhong District, Suzhou City, Jiangsu Province

Patentee after: Suzhou Fuyang Automation Technology Co., Ltd

Address before: 315012 Zhejiang Province, Ningbo city Haishu District Liyuan Road No. 755 room 1025

Patentee before: Ningbo Polygala cubic Energy Technology Co Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211227

Address after: 533000 huati Road, Liutang Aluminum Industrial Park, Youjiang District, Baise City, Guangxi Zhuang Autonomous Region

Patentee after: Baise Rongxing Chemical Co.,Ltd.

Address before: No. 2151, building 38, North Guandu street, Suzhou City, Jiangsu Province

Patentee before: Suzhou Fuyang Automation Technology Co.,Ltd.