CN106114757B - A kind of fore body three dimensional unit construction technology - Google Patents

A kind of fore body three dimensional unit construction technology Download PDF

Info

Publication number
CN106114757B
CN106114757B CN201610741136.7A CN201610741136A CN106114757B CN 106114757 B CN106114757 B CN 106114757B CN 201610741136 A CN201610741136 A CN 201610741136A CN 106114757 B CN106114757 B CN 106114757B
Authority
CN
China
Prior art keywords
fore body
dimensional unit
scaffold
construction
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610741136.7A
Other languages
Chinese (zh)
Other versions
CN106114757A (en
Inventor
邢江浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN SOUTHEAST SHIPBUILDING Co Ltd
Original Assignee
FUJIAN SOUTHEAST SHIPBUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN SOUTHEAST SHIPBUILDING Co Ltd filed Critical FUJIAN SOUTHEAST SHIPBUILDING Co Ltd
Priority to CN201610741136.7A priority Critical patent/CN106114757B/en
Publication of CN106114757A publication Critical patent/CN106114757A/en
Application granted granted Critical
Publication of CN106114757B publication Critical patent/CN106114757B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/46Stems

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to shipbuilding field, and it is an object of the present invention to provide a kind of fore body three dimensional unit construction technology, the fore body three dimensional unit construction technology, include the following steps:Step 1 makes four support feets using pipe;Step 2, be open fore body three dimensional unit placed face down, sets up scaffold, and four support feets are averagely mounted on the three-dimensional surface at the top of fore body three dimensional unit;Step 3 removes scaffold, and by fore body three dimensional unit, transversely rib bit line overturns 180 °, and fore body three dimensional unit on the ground, fixation is raised, and set up scaffold by support feet to support feet by support downwards.The beneficial effects of the present invention are:The technique effectively reduces construction cost, raising construction continuity terminates only to need to set up scaffold three times, and the position after turn for fillet welding in the vertical position can all be constructed as flat fillet weld from construction to construction is started, the production efficiency of hull construction personnel is improved, reduces labor intensity.

Description

A kind of fore body three dimensional unit construction technology
Technical field
The present invention relates to shipbuilding field, more particularly to a kind of fore body three dimensional unit construction technology.
Background technology
Fore body three dimensional unit is the class triangle of the three-dimensional surface composition with opening face and including two inclined-planes, applying before this Work method is that respectively overturning is primary on the basis of opening face and two inclined-planes, and four foot hands need to be set up altogether to end from construction is started Frame, cost is higher, and all fillets welding in the vertical position in position of welding, and construction is inconvenient, and difficulty of processing is high.
Invention content
It is an object of the invention to overcome drawbacks described above, a kind of simplified step, fore body solid point easy to process are provided Section construction technology.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
A kind of fore body three dimensional unit construction technology, includes the following steps:
Step 1 makes four support feets using pipe;
Step 2, be open fore body three dimensional unit placed face down, sets up scaffold, four support feets are averagely mounted on On three-dimensional surface at the top of fore body three dimensional unit;
Step 3 removes scaffold, and by fore body three dimensional unit, transversely rib bit line overturns 180 °, and support feet is supported on downwards On ground, fore body three dimensional unit is raised, and set up scaffold by fixation by support feet;
Step 4 carries out fore body three dimensional unit weld job, and scaffold is removed after the completion of operation;
Step 5 sets up scaffold after fore body three dimensional unit is overturn 180 °, carry out reconditioning and painting operation, and operation is completed After remove scaffold.
The beneficial effects of the present invention are:The technique effectively reduces construction cost, improves construction continuity, from starting to construct Terminate only to need to set up scaffold three times, and the position after turn for fillet welding in the vertical position can all be applied as flat fillet weld to construction Work improves the production efficiency of hull construction personnel, reduces labor intensity.
Description of the drawings
Fig. 1 is the Construction State figure of fore body three dimensional unit construction technology of the embodiment of the present invention.
Label declaration:
1st, fore body three dimensional unit;2nd, support feet;11st, be open face;12nd, three-dimensional surface;21st, VERTICAL TUBE;22nd, horizontal tube.
Specific embodiment
In order to describe the technical content, the structural feature, the achieved object and the effect of this invention in detail, below in conjunction with embodiment And attached drawing is coordinated to be explained in detail.
The design of most critical of the present invention is:The technique effectively reduces construction cost, improves construction continuity, improves ship The production efficiency of body construction personnel, reduces labor intensity.
Refering to Figure 1, the fore body three dimensional unit construction technology of the present embodiment, includes the following steps:
Step 1 makes four support feets 2 using pipe;
Step 2, face 11 that fore body three dimensional unit 1 is open are placed downward, set up scaffold, and four support feets 2 are averagely pacified On the three-dimensional surface 12 at 1 top of fore body three dimensional unit;
Step 3 removes scaffold, and by fore body three dimensional unit 1, transversely rib bit line overturns 180 °, and support feet 2 supports downwards On the ground, fore body three dimensional unit 1 is raised, and set up scaffold by fixation by support feet 2;
Step 4 carries out fore body three dimensional unit 1 weld job, and scaffold is removed after the completion of operation;
Step 5 sets up scaffold after fore body three dimensional unit 1 is overturn 180 °, carry out reconditioning and painting operation, and operation is completed After remove scaffold.
As can be seen from the above description, the beneficial effects of the present invention are:The technique effectively reduces construction cost, improves construction and connects Continuous property terminates only to need to set up scaffold three times from construction to construction is started, and all can be with for the position of fillet welding in the vertical position after turning over It constructs as flat fillet weld, improves the production efficiency of hull construction personnel, reduce labor intensity.
Further, the support feet 2 includes VERTICAL TUBE 21 and horizontal tube 22, and 21 end of VERTICAL TUBE is three-dimensional with fore body 1 connection of segmentation, described 22 one end of horizontal tube are connect with 21 middle part of VERTICAL TUBE, 22 other end of horizontal tube and fore body three dimensional unit 1 connection.
Seen from the above description, the support feet 2 includes VERTICAL TUBE 21 and horizontal tube 22, and rational in infrastructure, stability is good.
Further, the support feet 2 is fixed by welding on fore body three dimensional unit 1.
Seen from the above description, support feet 2 is fixed by welding on fore body three dimensional unit 1, sound construction, construction party Just.
It please refers to shown in Fig. 1, the embodiment of the present invention one is:
A kind of fore body three dimensional unit construction technology, includes the following steps:Step 1 makes four support feets 2 using pipe, The support feet 2 includes VERTICAL TUBE 21 and horizontal tube 22, and 21 end of VERTICAL TUBE is connect with fore body three dimensional unit 1, the water Flat 22 one end of pipe is connect with 21 middle part of VERTICAL TUBE, and 22 other end of horizontal tube is connect with fore body three dimensional unit 1, the support feet 2 are fixed by welding on fore body three dimensional unit 1;Step 2, face 11 that fore body three dimensional unit 1 is open are placed downward, set up foot hand Four support feets 2 are averagely mounted on the three-dimensional surface 12 at 1 top of fore body three dimensional unit by frame;Step 3 removes scaffold, by bow Transversely rib bit line overturns 180 ° to portion's three dimensional unit 1, and the support downwards of support feet 2 is on the ground, three-dimensional by fore body by support feet 2 Segmentation 1 raises fixation, and set up scaffold;Step 4 carries out fore body three dimensional unit 1 weld job, and foot is removed after the completion of operation Hand cradle;Step 5 sets up scaffold after fore body three dimensional unit 1 is overturn 180 °, reconditioning and painting operation are carried out, after the completion of operation Remove scaffold.
In conclusion fore body three dimensional unit construction technology provided by the invention, the technique effectively reduce construction cost, improve It constructs continuity, terminates only to need to set up scaffold three times from construction to construction is started, and the position after turning over for fillet welding in the vertical position is complete Portion can construct as flat fillet weld, improve the production efficiency of hull construction personnel, reduce labor intensity, the support feet Rational in infrastructure including VERTICAL TUBE and horizontal tube, stability is good, and support feet is fixed by welding on fore body three dimensional unit, structure Securely, it is easy for construction.
The foregoing is merely the embodiment of the present invention, are not intended to limit the scope of the invention, every to utilize this hair The equivalent structure or equivalent flow shift that bright specification and accompanying drawing content are made directly or indirectly is used in other relevant skills Art field, is included within the scope of the present invention.

Claims (3)

1. a kind of fore body three dimensional unit construction technology, which is characterized in that include the following steps:
Step 1 makes four support feets using pipe;
Step 2, be open fore body three dimensional unit placed face down, sets up scaffold, and four support feets are averagely mounted on fore body On three-dimensional surface at the top of three dimensional unit;
Step 3 removes scaffold, and by fore body three dimensional unit, transversely rib bit line overturns 180 °, and support feet is supported on downwards ground On, fore body three dimensional unit is raised, and set up scaffold by fixation by support feet;
Step 4 carries out fore body three dimensional unit weld job, and scaffold is removed after the completion of operation;
Step 5 sets up scaffold after fore body three dimensional unit is overturn 180 °, carry out reconditioning and painting operation, torn open after the completion of operation Except scaffold.
2. fore body three dimensional unit construction technology according to claim 1, it is characterised in that:The support feet includes VERTICAL TUBE And horizontal tube, the vertical pipe end are connect with fore body three dimensional unit, are connect in the middle part of described horizontal tube one end and VERTICAL TUBE, it is described The horizontal tube other end is connect with fore body three dimensional unit.
3. fore body three dimensional unit construction technology according to claim 1, it is characterised in that:The support feet is solid by welding It is scheduled on fore body three dimensional unit.
CN201610741136.7A 2016-08-26 2016-08-26 A kind of fore body three dimensional unit construction technology Active CN106114757B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610741136.7A CN106114757B (en) 2016-08-26 2016-08-26 A kind of fore body three dimensional unit construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610741136.7A CN106114757B (en) 2016-08-26 2016-08-26 A kind of fore body three dimensional unit construction technology

Publications (2)

Publication Number Publication Date
CN106114757A CN106114757A (en) 2016-11-16
CN106114757B true CN106114757B (en) 2018-06-19

Family

ID=57271854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610741136.7A Active CN106114757B (en) 2016-08-26 2016-08-26 A kind of fore body three dimensional unit construction technology

Country Status (1)

Country Link
CN (1) CN106114757B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101181926A (en) * 2007-09-07 2008-05-21 沪东中华造船(集团)有限公司 Sectionalized assembling method for ship bow luff part
CN202879739U (en) * 2012-10-16 2013-04-17 沪东中华造船(集团)有限公司 Supporting tool for fore peak segmented carry positioning in ship construction
CN104760662A (en) * 2014-12-19 2015-07-08 华泰重工(南通)有限公司 Process for manufacturing ice zone bulbous bow reinforcing structure by sections
CN204548395U (en) * 2015-01-22 2015-08-12 启东丰顺船舶重工有限公司 A kind of band thruster stem sectional making technique
CN105539769A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101588716B1 (en) * 2014-03-13 2016-01-26 삼성중공업 주식회사 Ship construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101181926A (en) * 2007-09-07 2008-05-21 沪东中华造船(集团)有限公司 Sectionalized assembling method for ship bow luff part
CN202879739U (en) * 2012-10-16 2013-04-17 沪东中华造船(集团)有限公司 Supporting tool for fore peak segmented carry positioning in ship construction
CN104760662A (en) * 2014-12-19 2015-07-08 华泰重工(南通)有限公司 Process for manufacturing ice zone bulbous bow reinforcing structure by sections
CN204548395U (en) * 2015-01-22 2015-08-12 启东丰顺船舶重工有限公司 A kind of band thruster stem sectional making technique
CN105539769A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold

Also Published As

Publication number Publication date
CN106114757A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106114757B (en) A kind of fore body three dimensional unit construction technology
CN204545736U (en) A kind of assembling unit peculiar to vessel
CN110254623A (en) A kind of production method of submerged body segmentation
CN202377693U (en) Auxiliary welding tooling for special semitrailer
CN104526123B (en) Passenger vehicle back wall assembly assembling-welding fixtures and use it to carry out the technique of back wall assembly welding equipment
CN203992859U (en) A kind of for being interrupted the welding position scoring tool of fillet welding
CN203767025U (en) Turnable cabin observation platform
CN202295224U (en) Embedded bracket tool for positioning and mounting tail fin of ship
CN205147687U (en) Supporting base
CN202879739U (en) Supporting tool for fore peak segmented carry positioning in ship construction
CN203698610U (en) Marine crane base
CN206883079U (en) Code frock is drawn in a kind of board material splice positioning
CN201864019U (en) Temporary scaffold device used in broadside subsection closure
CN206500783U (en) A kind of industrial automatic soldering device
CN204075536U (en) A kind of for boats and ships vertical electro-gas welding process servicing unit
CN205186469U (en) Pitch ship stand alone type cargo hold structure of half UNICOM's type
CN206309032U (en) A kind of plain form translation device
CN205259636U (en) Combined pavilion
CN205324884U (en) Processingequipment of hull bottom assembly pipe
CN107052668A (en) Code frock and board joint method are drawn in board material splice positioning
CN202336861U (en) Supporting tooling for linear section of bottom side tank
CN204978842U (en) Concrete mixing semitrailer after -poppet structure
CN204279505U (en) A kind of pigment bucket trammer dedicated
CN203936275U (en) The pipe fitting jacking apparatus of automatic tube expanding machine
CN201589012U (en) Device convenient for pipeline to pass through wall surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant