A kind of sandstone pulp-water high efficiente callback device for building
Technical field
The present invention relates to a kind of retracting device, particularly relate to a kind of sandstone pulp-water high efficiente callback device for building.
Background technology
Building is the general name of building and structures, be people in order to meet social life needs, utilize the thing grasped
Matter technological means, and use certain scientific law, edema due to wind pathogen theory and the artificial environment of aesthetic principle creation.
Sandstone refers to the loose blend of sand grains and rubble, if sandstone medium stone mostly is gravel, and referred to as sand gravel, daily life
Also having people that sandstone is referred to as sandstone in work, sandstone slurry then refers to the mixture of sandstone and water.Reclaim and refer to realize resource
Recycle, by a series of method, use a series of instrument, by reusable resources circulation profit in defective work
With, such as ironwork resource, paper products resource and water resource etc., to reach the purpose of energy-conserving and environment-protective.
There is the shortcoming that organic efficiency is low in the retracting device of sandstone pulp-water at present, therefore needs a kind of organic efficiency of design badly high
Sandstone pulp-water high efficiente callback device for building.
Summary of the invention
(1) to solve the technical problem that
The present invention is for the low shortcoming of the retracting device organic efficiency overcoming current sandstone pulp-water, and the technology that the invention solves the problems that is asked
Topic is to provide the sandstone pulp-water high efficiente callback device for building that a kind of organic efficiency is high.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides such a sandstone for building pulp-water high efficiente callback device, including
There are collection box, bracing frame, impurity removal baffle plate, electric rotating machine, drain pipe, electrically-controlled valve, second collect frame, the second screen plate, first lead
Flitch, the first fixed pulley, feed pipe, the second fixed pulley, the 3rd fixed pulley, the first slide rail, the first spring, the first slide block, first
Stay cord, electronic reel, the first screen plate, the second stay cord, first collect frame, the second slide rail, the second spring, the second slide block, the
Four fixed pulleys, the 5th fixed pulley and the second stock guide;Bracing frame top is provided with collection box, has impurity outlet bottom collection box,
Being provided with electric rotating machine on support, electric rotating machine top is provided with impurity removal baffle plate, and impurity removal baffle plate is positioned at immediately below impurity outlet, collection box
Left side is sequentially provided with the second fixed pulley, feed pipe, the first fixed pulley, the second collection frame and drain pipe from top to bottom, on drain pipe
Being provided with electrically-controlled valve, collection box left wall has the first through hole and the second discharging opening, and the first through hole is positioned at above the second discharging opening, and first
Through hole and the second discharging opening are collected between frame at the first fixed pulley and second, are sequentially provided with the 3rd on the right side of collection box from top to bottom
Fixed pulley, the first collection frame and the 4th fixed pulley, reclaim right wall of box and have the first discharging opening and the second through hole, the first discharging opening position
Above the second through hole, the first discharging opening is collected between frame at the 3rd fixed pulley and first, and it is fixed sliding that the second through hole is positioned at the 4th
Below wheel, collection box inner left wall is sequentially provided with the first slide rail, electronic reel and the first stock guide from top to bottom, the first slide rail and
Electronic reel between feed pipe and the first through hole, the first stock guide between the second discharging opening and the first through hole,
One slide rail is provided with the first slide block, is provided with the first spring, on the right side of the first slide block between the first slider top and the first slide rail top
It is provided with the first screen plate, electronic reel is wound with the first stay cord and the second stay cord, the first stay cord end and the first slider bottom
Connecting, collection box inner right wall is sequentially provided with the second slide rail, the 5th fixed pulley and the second stock guide from top to bottom, the second slide rail and the
Five fixed pulleys are between the first discharging opening and the second through hole, and the second stock guide is positioned at below the second through hole, and the second slide rail sets
There is the second slide block, be provided with the second spring between the second slider top and the second slide rail top, on the left of the second slide block, be provided with the second mistake
Filter plate, the second stay cord sequentially passes through the first through hole and the second through hole, and the second stay cord walks around the first fixed pulley, the second fixed cunning successively
Wheel, the 3rd fixed pulley, the 4th fixed pulley and the 5th fixed pulley, the second stay cord end and the second slider bottom connect.
Preferably, also including arc filter screen, collection box inner left wall is provided with arc filter screen, and arc filter screen is just being positioned at drain pipe
Right, arc filter screen is connected for fixing with collection box, and the three-dimensional shape of arc filter screen is hemispherical, and the material of arc filter screen is not
Rust steel.
Preferably, also including projection, the first screen plate and the second screen plate top and be equipped with projection, the material of projection is
Rustless steel, the three-dimensional shape of projection is semiellipse ball, and the surface of projection is non-finished surface, projection and the first screen plate and second
Screen plate is fixing connection.
Preferably, also include swash plate, between collection box inner left wall and collection box inner bottom part, be provided with swash plate, the material of swash plate
For rustless steel, swash plate is connected for fixing with collection box, and the inclined shape of swash plate, between lower surface and the collection box inner bottom part of swash plate
Angle is 45 °.
Preferably, also include on front side of vibrating motor, the first slide block and the second slide block and be equipped with vibrating motor, vibrating motor
Be fixing connection with the first slide block and the second slide block, the rated voltage of vibrating motor is 220V, the rated power of vibrating motor
For 200W.
Preferably, also including illuminating lamp, collection box inner top is provided with illuminating lamp, illuminating lamp for being vertically arranged, illuminating lamp
For LED, the rated voltage of illuminating lamp is 220V, and the rated power of illuminating lamp is 30W, and illuminating lamp connects for fixing with collection box
Connect.
Preferably, also include reinforcement, on the right side of collection box outer bottom and collection box between be provided with reinforcement, reinforcement
Material is Q275 steel, the inclined shape of reinforcement, bottom the lower surface of reinforcement and collection box between angle be 45 °, reinforcement
Surface be finished surface.
Preferably, the material of collection box is Q235 steel, is connected for fixing with bracing frame, the left wall of collection box bottom collection box
Shape of cross section is rectangle, a length of 75cm of collection box left wall cross section, and the width of collection box left wall cross section is
3.5cm, the height of collection box is 95cm, and the surface of collection box is finished surface.
Preferably, the first material collecting frame and the second collection frame is high hardness alloy steel, and first collects frame and second
Collecting frame and be fixing connection with collection box, first collects frame and the second collection frame is and is horizontally disposed with, the first collection frame and the
Two surfaces collecting frame are finished surface.
Operation principle: when needing the recycling carrying out sandstone pulp-water, pours pending sandstone pulp-water into feed pipe
In, and start electronic reel and replace rotating, pending sandstone pulp-water flow on the first screen plate along feed pipe, and particle diameter is big
Material stay on the first screen plate, and collect in frame along tumbling on the first screen plate to first, material that particle diameter is little and water
Then falling on the first stock guide through the first screen plate, and flow on the second screen plate along the first stock guide, particle diameter is little
Material stay on the second screen plate, and tumble to second along the second screen plate and collect in frame, remaining water and impurity are the most saturating
Crossing the second screen plate to fall on the second stock guide, and flow to collection box inner bottom part along the second stock guide, electronic reel is alternately
Positive and negative then alternately folding and unfolding the first stay cord and the second stay cord, so that the first slide block and the second slide block move up and down, make the first mistake
Filter plate and the second screen plate teetertotter, it is possible to accelerate the little material of particle diameter and water passes through the first screen plate, and impurity
With water through the second screen plate, it is possible to making the processing speed of sandstone pulp-water faster, recovery operation is in hgher efficiency, when the most past
When pouring sandstone pulp-water in feed pipe into, electronic reel quits work, and the impurity of collection box inner bottom part the most slowly precipitates, and works as impurity
Precipitation completely, opens electrically-controlled valve, just can obtain the water after precipitation at drain pipe, starts electric rotating machine afterwards and rotates forward 90 °, uses
Miscellaneous baffle plate rotates forward 90 ° and opens impurity outlet, can release the impurity after precipitation, and electric rotating machine quits work, when impurity is all released
After, start electric rotating machine and invert 90 °, after impurity removal baffle plate resets, electric rotating machine quits work, and also needs to carry out sandstone when next time
During the high efficiente callback process work of pulp-water, can be operated again according to above-mentioned principle.
Because also including arc filter screen, collection box inner left wall is provided with arc filter screen, and it is the rightest that arc filter screen is positioned at drain pipe
Side, arc filter screen is connected for fixing with collection box, and the three-dimensional shape of arc filter screen is hemispherical, and the material of arc filter screen is stainless
Steel, so arc filter screen is possible to prevent impurity to pass drain pipe.
Because also including projection, the first screen plate and the second screen plate top are equipped with projection, and the material of projection is not
Rust steel, the three-dimensional shape of projection is semiellipse ball, and the surface of projection is non-finished surface, projection and the first screen plate and the second mistake
Filter plate is fixing connection, and projection can reduce water velocity, so projection can make the material in sandstone pulp-water fully to divide
From.
Because also including swash plate, being provided with swash plate between collection box inner left wall and collection box inner bottom part, the material of swash plate is
Rustless steel, swash plate is connected for fixing with collection box, the inclined shape of swash plate, the folder between lower surface and the collection box inner bottom part of swash plate
Angle is 45 °, and swash plate can make precipitated impurities gather, it is possible to the removing making impurity is convenient.
(3) beneficial effect
Invention achieves sandstone pulp-water recovery operation efficiency height, the simple in construction of device, device cost of manufacture is low and device
Effect simple to operate, and there is not high-power electricity consumption instrument in whole device, and main mask work is mainly by pulp-water
Gravity and flow force are carried out, so more saving the energy, comprehensive benefit is high.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present invention.
Fig. 2 is the second main TV structure schematic diagram of the present invention.
Fig. 3 is the third main TV structure schematic diagram of the present invention.
Fig. 4 is the 4th kind of main TV structure schematic diagram of the present invention.
Fig. 5 is the 5th kind of main TV structure schematic diagram of the present invention.
Being labeled as in accompanying drawing: 1-collection box, 2-bracing frame, 3-impurity removal baffle plate, 4-impurity outlet, 5-electric rotating machine, 6-goes out
Liquid pipe, 7-electrically-controlled valve, 8-second collects frame, 9-the second screen plate, 10-the second discharging opening, 11-the first through hole, 12-the first guide
Plate, 13-the first fixed pulley, 14-feed pipe, 15-the second fixed pulley, 16-the 3rd fixed pulley, 17-the first slide rail, 18-the first bullet
Spring, 19-the first slide block, 20-the first stay cord, the electronic reel of 21-, 22-the first screen plate, 23-the second stay cord, 24-first goes out
Material mouth, 25-first collects frame, 26-the second slide rail, 27-the second spring, 28-the second slide block, 29-the 4th fixed pulley, 30-the 5th
Fixed pulley, 31-the second stock guide, 32-the second through hole, 33-arc filter screen, 34-projection, 35-swash plate, 36-vibrating motor, 37-
Illuminating lamp, 38-reinforcement.
Detailed description of the invention
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Embodiment 1
A kind of sandstone pulp-water high efficiente callback device for building, as Figure 1-5, includes collection box 1, bracing frame 2, impurity removal baffle plate
3, electric rotating machine 5, drain pipe 6, electrically-controlled valve 7, second collect frame the 8, second screen plate the 9, first stock guide the 12, first fixed pulley
13, feed pipe the 14, second fixed pulley the 15, the 3rd fixed pulley the 16, first slide rail the 17, first spring the 18, first slide block 19, first draw
Rope 20, electronic reel the 21, first screen plate the 22, second stay cord 23, first collect frame the 25, second slide rail the 26, second spring 27,
Second slide block the 28, the 4th fixed pulley the 29, the 5th fixed pulley 30 and the second stock guide 31;Bracing frame 2 top is provided with collection box 1, returns
Receiving and have impurity outlet 4 bottom case 1, bracing frame 2 is provided with electric rotating machine 5, electric rotating machine 5 top is provided with impurity removal baffle plate 3, impurity removal
Baffle plate 3 is positioned at immediately below impurity outlet 4, is sequentially provided with the second fixed pulley 15, feed pipe 14, first on the left of collection box 1 from top to bottom
Fixed pulley 13, second collects frame 8 and drain pipe 6, and drain pipe 6 is provided with electrically-controlled valve 7, and collection box 1 left wall has the first through hole 11
With the second discharging opening 10, the first through hole 11 is positioned at above the second discharging opening 10, and the first through hole 11 and the second discharging opening 10 are positioned at
One fixed pulley 13 and second is collected between frame 8, is sequentially provided with the 3rd fixed pulley 16, first from top to bottom and collects on the right side of collection box 1
Frame 25 and the 4th fixed pulley 29, the right wall of collection box 1 has the first discharging opening 24 and the second through hole 32, and the first discharging opening 24 is positioned at
Above two through holes 32, the first discharging opening 24 is collected between frame 25 at the 3rd fixed pulley 16 and first, and the second through hole 32 is positioned at the
Below four fixed pulleys 29, collection box 1 inner left wall is sequentially provided with the first slide rail 17, electronic reel 21 and the first guide from top to bottom
Plate 12, the first slide rail 17 and electronic reel 21 are between feed pipe 14 and the first through hole 11, and the first stock guide 12 is positioned at
Between two discharging openings 10 and the first through hole 11, the first slide rail 17 is provided with the first slide block 19, and the first slide block 19 top is sliding with first
It is provided with the first spring 18 between rail 17 top, is provided with the first screen plate 22 on the right side of the first slide block 19, electronic reel 21 is wound with
First stay cord 20 and the second stay cord 23, connects bottom the first stay cord 20 end and the first slide block 19, and collection box 1 inner right wall is from up to
Under be sequentially provided with the second slide rail the 26, the 5th fixed pulley 30 and the second stock guide 31, the second slide rail 26 and the 5th fixed pulley 30 are positioned at
Between first discharging opening 24 and the second through hole 32, the second stock guide 31 is positioned at below the second through hole 32, and the second slide rail 26 is provided with
Second slide block 28, is provided with the second spring 27, sets on the left of the second slide block 28 between the second slide block 28 top and the second slide rail 26 top
Having the second screen plate 9, the second stay cord 23 to sequentially pass through the first through hole 11 and the second through hole 32, the second stay cord 23 walks around first successively
Fixed pulley the 13, second fixed pulley the 15, the 3rd fixed pulley the 16, the 4th fixed pulley 29 and the 5th fixed pulley 30, the second stay cord 23 end
It is connected with bottom the second slide block 28.
Also including arc filter screen 33, collection box 1 inner left wall is provided with arc filter screen 33, and arc filter screen 33 is positioned at drain pipe 6
Front-right, arc filter screen 33 is connected for fixing with collection box 1, and the three-dimensional shape of arc filter screen 33 is hemispherical, arc filter screen 33
Material be rustless steel.
Also including projection 34, the first screen plate 22 and the second screen plate 9 top are equipped with projection 34, the material of projection 34
For rustless steel, the three-dimensional shape of projection 34 is semiellipse ball, and the surface of projection 34 is non-finished surface, and projection 34 and first filters
Plate 22 and the second screen plate 9 are fixing connection.
Also include swash plate 35, between collection box 1 inner left wall and collection box 1 inner bottom part, be provided with swash plate 35, the material of swash plate 35
Matter is rustless steel, and swash plate 35 is connected for fixing with collection box 1, the inclined shape of swash plate 35, in the lower surface of swash plate 35 and collection box 1
Angle between Di Bu is 45 °.
Also include vibrating motor 36, on front side of the first slide block 19 and the second slide block 28, be equipped with vibrating motor 36, vibration electricity
Machine 36 is fixing connection with the first slide block 19 and the second slide block 28, and the rated voltage of vibrating motor 36 is 220V, vibrating motor
The rated power of 36 is 200W.
Also including illuminating lamp 37, collection box 1 inner top is provided with illuminating lamp 37, illuminating lamp 37 for being vertically arranged, illuminating lamp
37 is LED, and the rated voltage of illuminating lamp 37 is 220V, and the rated power of illuminating lamp 37 is 30W, illuminating lamp 37 and collection box 1
For fixing connection.
Reinforcement 38, reinforcement 38 it is provided with between also including on the right side of reinforcement 38, collection box 1 outer bottom and collection box 1
Material be Q275 steel, the inclined shape of reinforcement 38, bottom the lower surface of reinforcement 38 and collection box 1 between angle be 45 °,
The surface of reinforcement 38 is finished surface.
The material of collection box 1 is Q235 steel, is connected for fixing with bracing frame 2 bottom collection box 1, and the left wall of collection box 1 is horizontal
Cross sectional shape is rectangle, a length of 75cm of collection box 1 left wall cross section, and the width of collection box 1 left wall cross section is
3.5cm, the height of collection box 1 is 95cm, and the surface of collection box 1 is finished surface.
First material collecting frame 25 and the second collection frame 8 is high hardness alloy steel, and first collects frame 25 and second receives
Collection frame 8 is fixing connection with collection box 1, and the first collection frame 25 and the second collection frame 8 are and are horizontally disposed with, and first collects frame 25
It is finished surface with the second surface collecting frame 8.
Operation principle: when needing the recycling carrying out sandstone pulp-water, pours pending sandstone pulp-water into feed pipe
In 14, and starting the alternately rotating of electronic reel 21, pending sandstone pulp-water flow to the first screen plate 22 along feed pipe 14
On, the material that particle diameter is big is stayed on the first screen plate 22, and tumbles to the first collection frame 25 on the first screen plate 22, grain
Material and water that footpath is little then fall on the first stock guide 12 through the first screen plate 22, and flow to along the first stock guide 12
On second screen plate 9, the material that particle diameter is little is stayed on the second screen plate 9, and tumbles to the second collection frame along the second screen plate 9
In 8, remaining water and impurity then fall on the second stock guide 31 through the second screen plate 9, and flow to along the second stock guide 31
Collection box 1 inner bottom part, electronic reel 21 is the most positive and negative transfers alternately folding and unfolding the first stay cord 20 and the second stay cord 23, so that the
One slide block 19 and the second slide block 28 move up and down, and make the first screen plate 22 and the second screen plate 9 teetertotter, it is possible to accelerate
Material and water that particle diameter is little pass through the first screen plate 22, and impurity and water are through the second screen plate 9, it is possible to make sandstone starch
Faster, recovery operation is in hgher efficiency for the processing speed of water, when no longer toward when pouring sandstone pulp-water in feed pipe 14, and electronic reel
21 quit work, and the impurity of collection box 1 inner bottom part the most slowly precipitates, and when contamination precipitation is complete, open electrically-controlled valve 7, at drain pipe 6
Just can obtain the water after precipitation, start electric rotating machine 5 afterwards and rotate forward 90 °, make impurity removal baffle plate 3 rotate forward 90 ° and open impurity outlet 4,
Can release the impurity after precipitation, electric rotating machine 5 quits work, and after impurity is all released, starts electric rotating machine 5 and inverts 90 °,
After impurity removal baffle plate 3 resets, electric rotating machine 5 quits work, and also needs to carry out science and engineering at the high efficiente callback of sandstone pulp-water when next time
When making, can be operated again according to above-mentioned principle.
Because also including arc filter screen 33, collection box 1 inner left wall is provided with arc filter screen 33, and arc filter screen 33 is positioned at liquid
Pipe 6 front-right, arc filter screen 33 is connected for fixing with collection box 1, and the three-dimensional shape of arc filter screen 33 is hemispherical, arc filter screen
The material of 33 is rustless steel, so arc filter screen 33 is possible to prevent impurity to pass drain pipe 6.
Because also including projection 34, the first screen plate 22 and the second screen plate 9 top are equipped with projection 34, projection 34
Material is rustless steel, and the three-dimensional shape of projection 34 is semiellipse ball, and the surface of projection 34 is non-finished surface, projection 34 and first
Screen plate 22 and the second screen plate 9 are fixing connection, and projection 34 can reduce water velocity, so projection 34 can make sandstone
Material in pulp-water can be sufficiently separated.
Because also including swash plate 35, between collection box 1 inner left wall and collection box 1 inner bottom part, it is provided with swash plate 35, swash plate 35
Material be rustless steel, swash plate 35 and collection box 1 is connected for fixing, the inclined shape of swash plate 35, the lower surface of swash plate 35 and recovery
Angle between case 1 inner bottom part is 45 °, and swash plate 35 can make precipitated impurities gather, it is possible to the removing making impurity is more square
Just.
Embodiment described above only have expressed the preferred embodiment of the present invention, and it describes more concrete and detailed, but also
Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that, for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into this
Bright protection domain.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.