CN106099936B - Load adjusting method applied to cement factory isolated network power supply system - Google Patents

Load adjusting method applied to cement factory isolated network power supply system Download PDF

Info

Publication number
CN106099936B
CN106099936B CN201610437028.0A CN201610437028A CN106099936B CN 106099936 B CN106099936 B CN 106099936B CN 201610437028 A CN201610437028 A CN 201610437028A CN 106099936 B CN106099936 B CN 106099936B
Authority
CN
China
Prior art keywords
load
round
adjusts
time limit
cutting load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610437028.0A
Other languages
Chinese (zh)
Other versions
CN106099936A (en
Inventor
徐刚
周金波
张彦杰
刘明同
王其辉
周湘
谢林坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Conch Construction Materials Design Institute Co Ltd
Anhui Conch Cement Co Ltd
Anhui Conch Holdings Co Ltd
Original Assignee
Anhui Conch Construction Materials Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Conch Construction Materials Design Institute Co Ltd filed Critical Anhui Conch Construction Materials Design Institute Co Ltd
Priority to CN201610437028.0A priority Critical patent/CN106099936B/en
Publication of CN106099936A publication Critical patent/CN106099936A/en
Application granted granted Critical
Publication of CN106099936B publication Critical patent/CN106099936B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)

Abstract

Present invention is disclosed a kind of load adjusting methods applied to cement factory isolated network power supply system:If power shortage or brownout occur for power grid, four-wheel cutting load is taken to adjust according to this, after round cut Load Regulation, carries out next round cutting load adjusting again if there are still power shortage or brownout;First round cutting load is adjusted:Cut off the 13.5 14.5% of load total amount;Second round cut Load Regulation:Cut off the 12.8 13.5% of load total amount;Third round cutting load is adjusted:Cut off the 12 12.8% of load total amount;Fourth round cutting load is adjusted:Cut off the 10 11% of load total amount.The present invention is according to the electricity consumption particularity of cement factory, it can be achieved that the reliability of supply network, safety, economical.

Description

Load adjusting method applied to cement factory isolated network power supply system
Technical field
The present invention relates to isolated networks for electrical domain.
Background technology
With the Strategy for economic development paces of national the Belt and Road, China was large-scale ripe in country in Southeast Asia's construction in recent years Cement producing line is expected, because built cement plant area does not have enough power supplys to supply, using power plant for self-supply's (scale:3 × 18MW) to water Mud production provides electric power, to meet needs of the manufacture of cement to electric power.Private station is isolated power grid mode, and private station starts Power supply is provided by diesel-driven generator, but is a lack of a kind of stability that can ensure entire isolated network power supply system, is improved electricity consumption matter Amount is suitble to the control technology of novel power grid operational mode.
Invention content
Load fluctuation problem caused by numerous switching that the invention solves cement factories because of big load start and stop, and ensure entire The stability of isolated network power supply system.
To achieve the goals above, the technical solution adopted by the present invention is:Applied to cement factory isolated network power supply system Load adjusting method:
If power shortage or brownout occur for power grid, four-wheel cutting load is taken to adjust according to this, after round cut Load Regulation, Carry out next round cutting load adjusting again if there are still power shortage or brownout;
First round cutting load is adjusted:Cut off the 13.5-14.5% of load total amount;
Second round cut Load Regulation:Cut off the 12.8-13.5% of load total amount;
Third round cutting load is adjusted:Cut off the 12-12.8% of load total amount;
Fourth round cutting load is adjusted:Cut off the 10-11% of load total amount.
Power grid occurs power shortage and adjusts the time limit:
First round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.2s;
Second round cut Load Regulation operating frequency/operation time limit:45-50Hz/0.2s
Third round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Fourth round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Power grid occurs brownout and adjusts the time limit:
First round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s;
Second round cut Load Regulation operation voltage/operation time limit:0.5-0.9Un/1.5s
Third round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s;
Fourth round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s.
If after completing four-wheel Load Regulation, there are still power shortage or brownouts, then carry out the special cutting load tune of two-wheeled Section;
The first round, special cutting load was adjusted:Cut off the 13.5-14.5% of load total amount;
The second special cutting load of wheel is adjusted:Cut off the 6-7% of load total amount;
Power grid occurs power shortage and adjusts the time limit:
The first round, special cutting load adjusted operating frequency/operation time limit:45-50Hz/15s;
The second special cutting load of wheel adjusts operating frequency/operation time limit:45-50Hz/15s;
Power grid occurs brownout and adjusts the time limit:
The first round, special cutting load adjusted operation voltage/operation time limit:0.5-0.9Un/15s;
The second special cutting load of wheel adjusts operation voltage/operation time limit:0.5-0.9Un/15s.
First round cutting load adjusts excision load:Limestone crushing area equipment, lime stone conveyor zones equipment, water Mud grinds transformer;
Second round cut Load Regulation cuts off load:Account for the cement grinding mill main motor and its cement of cement factory sum half Grind exhaust blower;
Third round cutting load adjusts excision load:Account for the other half total cement grinding mill main motor and its water of cement factory Mud grinds exhaust blower;
Fourth round cutting load adjusts excision load:Clinker warehouse transformer, packet transformer in bulk;
The first round special cutting load adjusts excision load:Raw material grinds main motor, raw material grinds circulating fan;
The second special cutting load of wheel adjusts excision load:Material allocation transformer.
The power shortage is that mains frequency is less than 48.5Hz.
The present invention is according to the electricity consumption particularity of cement factory, it can be achieved that the reliability of supply network, safety, economical.
Specific implementation mode
The characteristics of big load start and stop are often had according to cement factory is asked for load fluctuation caused by solution frequent switching Topic, ensures the stability of entire isolated network power supply system, and when Power Plant Design considers to be configured with 1 set of electric power load regulating system, reduces Impact to power grid.
In addition, when private station generating set generated output therein is insufficient or catastrophic failure off-the-line, to ensure , there is not large-area power-cuts in the stability of entire power grid, considers that a set of load low frequency load shedding equipment is arranged, to full factory's load income Classification, orderly cutting load is realized according to parameters such as supply voltage, frequencies automatically.
Isolated network Load Regulation control system capacity is the important link of scheme facility, and the size of capacity directly determines that isolated network is transported Capable success or failure and project investment size.Therefore, how to determine that the pondage of isolated power grid complex control system just seems particularly It is important.The size of isolated network Load Regulation complex control system pondage is mainly dashed forward by the total capacity of electrical equipment with electrical equipment Varying capacity two large divisions determines.For the generating set of off-the-line operation, ∑ generating set=∑ stablizes electrical equipment+∑ mutation Electrical equipment.Ensure that the electricity consumption for being mutated electrical equipment is adjusted in the crucial of generating set stable operation, i.e.,:Isolated network load Adjust the electricity consumption that complex control system pondage should be slightly bigger than mutation electrical equipment.
For electricity generation system, when load fluctuation is less than 8%, Turbo-generator Set can be born, and will not cause vapour The action of machine emergency trip system will not cause the special voltage of generating set to change.
Cutting load total value and each round cut load value
Cutting load total value:Power shortage caused by being shut down by a generator failure calculates.
Normal operation system total load:18 × 2=36MW
Power shortage caused by one generator emergency stop valve trip:18MW
Cutting load value is calculated by 18MW, accounts for total load:
Frequency stability when isolated power grid is relatively poor, and the frequency variation of normal operation can use 48.5~50.5Hz, institute Power shortage has occurred to be believed that when f < 48.5Hz.
If power shortage or brownout occur for power grid, four-wheel cutting load is taken to adjust according to this, after round cut Load Regulation, Carry out next round cutting load adjusting again if there are still power shortage or brownout;
First round cutting load is adjusted:Cut off the 13.5-14.5% of load total amount;
Second round cut Load Regulation:Cut off the 12.8-13.5% of load total amount;
Third round cutting load is adjusted:Cut off the 12-12.8% of load total amount;
Fourth round cutting load is adjusted:Cut off the 10-11% of load total amount.
Preferred embodiment:
First round cutting load is adjusted:14% i.e. 14% × 36=5.04MW (joins cutting load) containing generator tripping
Second round cut Load Regulation:13% i.e. 13% × 36=4.68MW
Third round cutting load is adjusted:12.5% i.e. 12.5% × 36=4.5MW
Fourth round cutting load is adjusted:10.5% i.e. 10.5% × 36=3.78MW
1st, 2 wheel cutting loads are slightly more, and the validity of low frequency Automatic Load can be improved.
Mains frequency transformation period constant is related with power shortage, net capacity, when 40% that power shortage is total load When~50%, which is about 1~1.5s.To improve the validity of low frequency automatic load-reducing, respectively Wheel action delay should not be grown, the operation time limit of the especially the 1st, the 2nd wheel.
Power grid occurs power shortage and adjusts the time limit:
First round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.2s;
Second round cut Load Regulation operating frequency/operation time limit:45-50Hz/0.2s
Third round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Fourth round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Preferred embodiment:
First round cutting load adjusts operating frequency/operation time limit:48.4Hz/0.2s
First round cutting load adjusts operating frequency/operation time limit:48.1Hz/0.2s
First round cutting load adjusts operating frequency/operation time limit:47.8Hz/0.3s
First round cutting load adjusts operating frequency/operation time limit:47.5Hz/0.3s
Power grid occurs brownout and adjusts the time limit:
First round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s;
Second round cut Load Regulation operation voltage/operation time limit:0.5-0.9Un/1.5s
Third round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s;
Fourth round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s.
Preferred embodiment:
First round cutting load adjusts operation voltage/operation time limit:80%Un/1.5s;
Second round cut Load Regulation operation voltage/operation time limit:76%Un/1.5s;
Third round cutting load adjusts operation voltage/operation time limit:72%Un/1.5s;
Fourth round cutting load adjusts operation voltage/operation time limit:68%Un/1.5s;
Un is to adjust voltage value.
If after completing four-wheel Load Regulation, there are still power shortage or brownouts, then carry out the special cutting load tune of two-wheeled Section;
The first round, special cutting load was adjusted:Cut off the 13.5-14.5% of load total amount;
The second special cutting load of wheel is adjusted:Cut off the 6-7% of load total amount;
Power grid occurs power shortage and adjusts the time limit:
The first round, special cutting load adjusted operating frequency/operation time limit:45-50Hz/15s;
The second special cutting load of wheel adjusts operating frequency/operation time limit:45-50Hz/15s;
Power grid occurs brownout and adjusts the time limit:
The first round, special cutting load adjusted operation voltage/operation time limit:0.5-0.9Un/15s;
The second special cutting load of wheel adjusts operation voltage/operation time limit:0.5-0.9Un/15s.
For the particularity of cement factory, often wheel excision load needs to cut off different equipment, to make cement factory Damage minimizes, and by reasonable analysis, excision load sequence is as follows:
First round cutting load adjusts excision load:Limestone crushing area equipment, lime stone conveyor zones equipment, water Mud grinds transformer;
Second round cut Load Regulation cuts off load:Account for the cement grinding mill main motor and its cement of cement factory sum half Grind exhaust blower;(cement grinding mill of cement factory of the present invention, if cement grinding mill is odd number, cuts off cement at least provided with two groups Factory's sum half adds one cement grinding mill main motor and its cement grinding mill exhaust blower)
Third round cutting load adjusts excision load:Account for the cement grinding mill main motor of cement factory total the other half (residue) And its cement grinding mill exhaust blower;
Fourth round cutting load adjusts excision load:Clinker warehouse transformer, packet transformer in bulk;
The first round special cutting load adjusts excision load:Raw material grinds main motor, raw material grinds circulating fan;
The second special cutting load of wheel adjusts excision load:Material allocation transformer.

Claims (3)

1. the load adjusting method applied to cement factory isolated network power supply system, it is characterised in that:
If power shortage or brownout occur for power grid, four-wheel cutting load is taken to adjust according to this, after round cut Load Regulation, if still There are power shortage or brownouts then to carry out next round cutting load adjusting again;
First round cutting load is adjusted:Cut off the 13.5-14.5% of load total amount;
Second round cut Load Regulation:Cut off the 12.8-13.5% of load total amount;
Third round cutting load is adjusted:Cut off the 12-12.8% of load total amount;
Fourth round cutting load is adjusted:Cut off the 10-11% of load total amount;
Power grid occurs power shortage and adjusts the time limit:
First round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.2s;
Second round cut Load Regulation operating frequency/operation time limit:45-50Hz/0.2s;
Third round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Fourth round cutting load adjusts operating frequency/operation time limit:45-50Hz/0.3s;
Power grid occurs brownout and adjusts the time limit:
First round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un/1.5s;
Second round cut Load Regulation operation voltage/operation time limit:0.5-0.9Un /1.5s
Third round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un /1.5s;
Fourth round cutting load adjusts operation voltage/operation time limit:0.5-0.9Un /1.5s;
If after completing four-wheel Load Regulation, there are still power shortage or brownouts, then carry out the special cutting load of two-wheeled and adjust;
The first round, special cutting load was adjusted:Cut off the 13.5-14.5% of load total amount;
The second special cutting load of wheel is adjusted:Cut off the 6-7% of load total amount;
Power grid occurs power shortage and adjusts the time limit:
The first round, special cutting load adjusted operating frequency/operation time limit:45-50 Hz/15s;
The second special cutting load of wheel adjusts operating frequency/operation time limit:45-50 Hz/15s;
Power grid occurs brownout and adjusts the time limit:
The first round, special cutting load adjusted operation voltage/operation time limit:0.5-0.9Un /15s;
The second special cutting load of wheel adjusts operation voltage/operation time limit:0.5-0.9Un /15s.
2. the load adjusting method according to claim 1 applied to cement factory isolated network power supply system, it is characterised in that:
First round cutting load adjusts excision load:Limestone crushing area equipment, lime stone conveyor zones equipment, cement grinding mill Transformer;
Second round cut Load Regulation cuts off load:Account for cement grinding mill main motor and its cement grinding mill row of cement factory sum half Wind turbine;
Third round cutting load adjusts excision load:Account for the other half total cement grinding mill main motor and its cement grinding mill of cement factory Exhaust blower;
Fourth round cutting load adjusts excision load:Clinker warehouse transformer, packet transformer in bulk;
The first round special cutting load adjusts excision load:Raw material grinds main motor, raw material grinds circulating fan;
The second special cutting load of wheel adjusts excision load:Material allocation transformer.
3. the load adjusting method according to claim 1 applied to cement factory isolated network power supply system, it is characterised in that: The power shortage is that mains frequency is less than 48.5 Hz.
CN201610437028.0A 2016-06-18 2016-06-18 Load adjusting method applied to cement factory isolated network power supply system Active CN106099936B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610437028.0A CN106099936B (en) 2016-06-18 2016-06-18 Load adjusting method applied to cement factory isolated network power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610437028.0A CN106099936B (en) 2016-06-18 2016-06-18 Load adjusting method applied to cement factory isolated network power supply system

Publications (2)

Publication Number Publication Date
CN106099936A CN106099936A (en) 2016-11-09
CN106099936B true CN106099936B (en) 2018-08-28

Family

ID=57236734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610437028.0A Active CN106099936B (en) 2016-06-18 2016-06-18 Load adjusting method applied to cement factory isolated network power supply system

Country Status (1)

Country Link
CN (1) CN106099936B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107382109B (en) * 2017-09-04 2022-04-08 中材建设有限公司 Electric energy self-maintaining dry cement sintering process and power supply and distribution system thereof
CN107492913A (en) * 2017-09-21 2017-12-19 哈尔滨广瀚燃气轮机有限公司 Isolated network power station PMS power management systems
CN109638972B (en) * 2019-02-01 2021-04-30 国网江苏省电力有限公司 Network load interaction control method adaptive to load characteristics, terminal and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094904A (en) * 2013-01-04 2013-05-08 南京南瑞继保电气有限公司 Low-frequency low-voltage load shedding calculation method
CN103532147A (en) * 2013-10-24 2014-01-22 国家电网公司 Stable, real-time and emergent voltage and power angle control method based on response message
CN104505840A (en) * 2014-12-19 2015-04-08 西安交通大学 Low-frequency low-voltage combined load shedding method
CN104917291A (en) * 2015-05-05 2015-09-16 国家电网公司 Low-frequency and low-voltage load reduction system based on distributed hierarchical control framework

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094904A (en) * 2013-01-04 2013-05-08 南京南瑞继保电气有限公司 Low-frequency low-voltage load shedding calculation method
CN103532147A (en) * 2013-10-24 2014-01-22 国家电网公司 Stable, real-time and emergent voltage and power angle control method based on response message
CN104505840A (en) * 2014-12-19 2015-04-08 西安交通大学 Low-frequency low-voltage combined load shedding method
CN104917291A (en) * 2015-05-05 2015-09-16 国家电网公司 Low-frequency and low-voltage load reduction system based on distributed hierarchical control framework

Also Published As

Publication number Publication date
CN106099936A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
Ding et al. A review on China׳ s large-scale PV integration: Progress, challenges and recommendations
Fan et al. Analysis and countermeasures of wind power curtailment in China
CN102354992B (en) Reactive-power control method of wind power field
CN106099936B (en) Load adjusting method applied to cement factory isolated network power supply system
CN108736500B (en) Optimized tripping method and device for regional power grid surplus power direct current delivery system
CN102518560B (en) Method for regulating active power of wind power field
CN104319775A (en) Reactive power voltage control method applicable to large-scale wind power integration
CN104836254A (en) Power grid black start-up system and black start-up participation method of photovoltaic power station
CN105896617B (en) It is a kind of meter and the active active control of wind turbine wind-powered electricity generation adjust spare capacity appraisal procedure
CN103078326A (en) Optimization method for improving safety and stability of grid frequency
CN101741083A (en) Method for breaking through bottleneck of fast development of wind power and power supply system thereof
CN105391050A (en) Checking method and system of high-cycle cutting machine configuration scheme
CN105720585A (en) Reactive power control method and reactive power control system for wind farm clusters
CN106410845A (en) Peak regulation method for receiving-end grid after feed-in of UHV high-power direct current
CN105281366A (en) Method for simultaneously realizing low-voltage ride through and island detection
CN105896550A (en) Monitoring method of intelligent reactive power compensation system
CN202749834U (en) Low-voltage ride through device of photovoltaic grid-connected inverter
CN105703375A (en) Third defense line configuration method adaptive to scale of isolated power grid
CN104348162A (en) Voltage control method of 330kV wind farm collection substation
CN104714443A (en) Polycrystalline silicon reduction power regulation power source and electrical control system thereof
CN107359619A (en) The load shedding control method of system voltage stability after a kind of meter and photovoltaic access
Liu et al. Typical island micro-grid operation analysis
Kumar et al. A case study on self healing of smart grid with islanding and inverter volt-var function
Shen et al. Study on the Impact of Renewable Energy Power Generation Transient Characteristics on System Stability in Weak Grid
Liu et al. Analysis of the Influence of AVC Reactive Power Optimization on Line Loss in High Proportion New Energy Area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 241000 South Jiuhua Road 1017, Yijiang District, Wuhu City, Anhui Province

Patentee after: Anhui Conch Building Materials Design and Research Institute Co., Ltd.

Address before: 241000 South Jiuhua Road 1017, Yijiang District, Wuhu City, Anhui Province

Patentee before: Anhui Conch Design & Research Institute of Building Materials

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190604

Address after: No. 39 Cultural Road, Jinghu District, Wuhu City, Anhui Province, 241000

Co-patentee after: Anhui Conch Building Materials Design and Research Institute Co., Ltd.

Patentee after: Anhui Hailuo Group LLC

Co-patentee after: anhui conch cement company limited

Address before: 241000 South Jiuhua Road 1017, Yijiang District, Wuhu City, Anhui Province

Patentee before: Anhui Conch Building Materials Design and Research Institute Co., Ltd.

TR01 Transfer of patent right