CN106099747A - 带电作业导线提升器 - Google Patents
带电作业导线提升器 Download PDFInfo
- Publication number
- CN106099747A CN106099747A CN201610473048.3A CN201610473048A CN106099747A CN 106099747 A CN106099747 A CN 106099747A CN 201610473048 A CN201610473048 A CN 201610473048A CN 106099747 A CN106099747 A CN 106099747A
- Authority
- CN
- China
- Prior art keywords
- support rod
- anchor ear
- insulating support
- hook
- ear body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/04—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
- B66D3/06—Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610473048.3A CN106099747B (zh) | 2016-06-24 | 2016-06-24 | 带电作业导线提升器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610473048.3A CN106099747B (zh) | 2016-06-24 | 2016-06-24 | 带电作业导线提升器 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106099747A true CN106099747A (zh) | 2016-11-09 |
CN106099747B CN106099747B (zh) | 2018-02-16 |
Family
ID=57253692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610473048.3A Active CN106099747B (zh) | 2016-06-24 | 2016-06-24 | 带电作业导线提升器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106099747B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109368488A (zh) * | 2018-11-09 | 2019-02-22 | 国网山东省电力公司枣庄供电公司 | 一种吊车提升导线辅助器及方法 |
CN110086118A (zh) * | 2019-05-24 | 2019-08-02 | 国家电网有限公司 | 一种超高压大档距直线塔带电更换绝缘子的工器具 |
CN110255414A (zh) * | 2019-05-22 | 2019-09-20 | 陈思尚 | 一种方便安装电线的电线杆设备 |
CN110790172A (zh) * | 2019-10-13 | 2020-02-14 | 国网山东省电力公司宁阳县供电公司 | 一种便携式柱上开关装卸装置 |
CN113991524A (zh) * | 2021-11-18 | 2022-01-28 | 国网四川省电力公司广安供电公司 | 一种用于带电更换绝缘子导线的提升装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5076449A (en) * | 1990-02-26 | 1991-12-31 | A. B. Chance Company | Load measurement system for boom mounted auxiliary arm |
CN201766313U (zh) * | 2010-09-07 | 2011-03-16 | 福建省电力有限公司福州电业局 | 双回路用绝缘横担 |
CN102403674A (zh) * | 2011-11-02 | 2012-04-04 | 辽宁省电力有限公司葫芦岛供电公司 | 一种带电作业绝缘横担 |
CN202797769U (zh) * | 2012-09-14 | 2013-03-13 | 国家电网公司 | 110kV线路门型杆边相带电更换绝缘子工具 |
CN103545751A (zh) * | 2013-10-16 | 2014-01-29 | 国家电网公司 | 架空输电线路地线光缆金具更换支架 |
CN105375389A (zh) * | 2015-11-30 | 2016-03-02 | 国网北京市电力公司 | 导线固定装置 |
CN205811418U (zh) * | 2016-06-24 | 2016-12-14 | 国网山东省电力公司济南供电公司 | 带电作业导线提升器 |
-
2016
- 2016-06-24 CN CN201610473048.3A patent/CN106099747B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5076449A (en) * | 1990-02-26 | 1991-12-31 | A. B. Chance Company | Load measurement system for boom mounted auxiliary arm |
CN201766313U (zh) * | 2010-09-07 | 2011-03-16 | 福建省电力有限公司福州电业局 | 双回路用绝缘横担 |
CN102403674A (zh) * | 2011-11-02 | 2012-04-04 | 辽宁省电力有限公司葫芦岛供电公司 | 一种带电作业绝缘横担 |
CN202797769U (zh) * | 2012-09-14 | 2013-03-13 | 国家电网公司 | 110kV线路门型杆边相带电更换绝缘子工具 |
CN103545751A (zh) * | 2013-10-16 | 2014-01-29 | 国家电网公司 | 架空输电线路地线光缆金具更换支架 |
CN105375389A (zh) * | 2015-11-30 | 2016-03-02 | 国网北京市电力公司 | 导线固定装置 |
CN205811418U (zh) * | 2016-06-24 | 2016-12-14 | 国网山东省电力公司济南供电公司 | 带电作业导线提升器 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109368488A (zh) * | 2018-11-09 | 2019-02-22 | 国网山东省电力公司枣庄供电公司 | 一种吊车提升导线辅助器及方法 |
CN110255414A (zh) * | 2019-05-22 | 2019-09-20 | 陈思尚 | 一种方便安装电线的电线杆设备 |
CN110255414B (zh) * | 2019-05-22 | 2021-03-26 | 广州奕极机电科技有限公司 | 一种方便安装电线的电线杆设备 |
CN110086118A (zh) * | 2019-05-24 | 2019-08-02 | 国家电网有限公司 | 一种超高压大档距直线塔带电更换绝缘子的工器具 |
CN110790172A (zh) * | 2019-10-13 | 2020-02-14 | 国网山东省电力公司宁阳县供电公司 | 一种便携式柱上开关装卸装置 |
CN113991524A (zh) * | 2021-11-18 | 2022-01-28 | 国网四川省电力公司广安供电公司 | 一种用于带电更换绝缘子导线的提升装置 |
CN113991524B (zh) * | 2021-11-18 | 2024-05-28 | 国网四川省电力公司广安供电公司 | 一种用于带电更换绝缘子导线的提升装置 |
Also Published As
Publication number | Publication date |
---|---|
CN106099747B (zh) | 2018-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106099747A (zh) | 带电作业导线提升器 | |
CN201263063Y (zh) | 更换直线单联双串悬垂绝缘子的工具 | |
CN107069562B (zh) | 带电更换绝缘子方法及载荷转移装置 | |
CN201323409Y (zh) | 带电更换高压输电线路v型绝缘子串的工具 | |
CN207339088U (zh) | 输电线路直线杆架空地线检修支架 | |
CN205811418U (zh) | 带电作业导线提升器 | |
CN202094528U (zh) | 一种送电线路施工提线器 | |
CN102255261A (zh) | 输电线路双回路带电作业转入装置 | |
CN102237654B (zh) | 使用双角钢挂点更换跳线串的工具来更换跳线串的方法 | |
CN104022459A (zh) | 一种10kv配电线路杆上吊线器 | |
CN203850726U (zh) | 一种10kV配电线路杆上吊线器 | |
CN205265149U (zh) | 一种应用于输电线路作业的分裂导线提线器 | |
CN202197048U (zh) | 一种塔用双角钢挂点起重连接工具 | |
CN203392738U (zh) | 线盘吊装设备 | |
CN103318745A (zh) | 一种轻便型专用吊具及其安装方法 | |
CN104143783B (zh) | 10kV带电立杆绝缘吊具及采用该吊具的作业方法 | |
CN205882560U (zh) | 配电带电作业地电位专用循环绳架装置 | |
CN210065018U (zh) | 一种双联l型悬垂合成绝缘子串旋转吊臂装置 | |
CN204131004U (zh) | 四回路直线钢管塔圆横担卡具 | |
CN212809976U (zh) | 一种便于稳定吊接的电力变压器 | |
CN202353095U (zh) | 直路塔上8分裂导线提线布置结构 | |
CN105060154A (zh) | 吊载式变压器悬吊安装器械 | |
CN106115504A (zh) | 一种吊具 | |
CN103738860A (zh) | 一种小型间隔二用起吊装置 | |
CN202616664U (zh) | 绝缘抬线器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Yuanbai Inventor after: Chen Pengbo Inventor after: Wu Zhenyu Inventor after: Lin Donghao Inventor after: Sun Zhangong Inventor after: Zhu Guojun Inventor after: Jin Bao Inventor after: Ma Jian Inventor after: Yu Guanghai Inventor after: Wang Huiyun Inventor after: Fang Zhen Inventor before: Chen Yuanbai Inventor before: Chen Pengbo Inventor before: Lin Donghao Inventor before: Sun Zhangong Inventor before: Zhu Guojun Inventor before: Jin Bao Inventor before: Ma Jian Inventor before: Yu Guanghai Inventor before: Wang Huiyun Inventor before: Fang Zhen |
|
GR01 | Patent grant | ||
GR01 | Patent grant |