CN202353095U - 直路塔上8分裂导线提线布置结构 - Google Patents

直路塔上8分裂导线提线布置结构 Download PDF

Info

Publication number
CN202353095U
CN202353095U CN 201120489336 CN201120489336U CN202353095U CN 202353095 U CN202353095 U CN 202353095U CN 201120489336 CN201120489336 CN 201120489336 CN 201120489336 U CN201120489336 U CN 201120489336U CN 202353095 U CN202353095 U CN 202353095U
Authority
CN
China
Prior art keywords
line
conductors
tower
steel wire
forthright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120489336
Other languages
English (en)
Inventor
彭世建
方伟
邹俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
Hubei Electric Transmission & Transformation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Electric Transmission & Transformation Engineering Co filed Critical Hubei Electric Transmission & Transformation Engineering Co
Priority to CN 201120489336 priority Critical patent/CN202353095U/zh
Application granted granted Critical
Publication of CN202353095U publication Critical patent/CN202353095U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型涉及输变电电力线路施工中附件安装布置结构,具体是直路塔上8分裂导线提线布置结构,它主要是在直路塔的两个横担上分别设有施工孔,每个横担上的施工孔上分别通过保险钢丝绳套连接有吊装带,并且每个横担上的施工孔分别通过第一钢丝绳套连接有四线提线器,所述第一钢丝绳套和四线提线器之间还连接有手扳葫芦。本实用新型通过启动手扳葫芦提升8分裂导线,使导线悬空而不压在放线滑车上,在不伤导线的条件下,方便地拆除放线滑车,并将8分裂导线通过悬垂金具连接于绝缘子串上,完成附件安装,具有结构简单、易于实现的优点。

Description

直路塔上8分裂导线提线布置结构
技术领域
本实用新型涉及输变电电力线路施工中附件安装布置结构,具体是直路塔上8分裂导线提线布置结构。
背景技术
根据全国特高压电网的发展规划,我国将构建由1000kV的特高压电网组成的主干网架。1000kV特高压电网对我国来说是前所未有的项目,属于世界先进水平电网。特高压输电线路中8分裂导线的紧线、挂线、附件施工没有现成的经验可供参考,在8分裂导线展放的过程中,直线塔附件的安装过程中,需要设计出合理的导线提线布置结构,以便能在不伤导线的条件下,方便地拆除放线滑车,并将8分裂导线附件安装的8分裂导线提线布置结构。
发明内容
本实用新型的目的在于解决上述存在的问题,而提供一种结构简单、易于实现,能够在不伤导线的条件下,方便地拆除放线滑车的直路塔上8分裂导线提线布置结构。
为实现上述目的,本实用新型设计的一种直路塔上8分裂导线提线布置结构,它是在直路塔的两个横担上分别设有施工孔,每个横担上的施工孔上分别通过保险钢丝绳套连接有吊装带,并且每个横担上的施工孔分别通过第一钢丝绳套连接有四线提线器,所述第一钢丝绳套和四线提线器之间还连接有手扳葫芦。
在上述技术方案中,所述两个五轮放线滑车通过滑车联板悬挂在直路塔上。
在上述技术方案中,所述保险钢丝绳套的上端通过100KN级或以上的卸扣悬挂在施工孔上。
在上述技术方案中,所述四线提线器的下端通过第二钢丝绳套悬挂8分裂导线。
采用上述技术方案的本实用新型具有以下优点:
将8分裂导线按照排列顺序编号为1#、2#、3#、4#、5#、6#、7#、8#子导线,本实用新型采用两个四线提线器,其中一个四线提线器提1#、2#、3#、4#子导线,另一个四线提线器提5#、6#、7#、8#子导线,并将一个四线提线器挂在2#和4#子导线中线正上方,另一个四线提线器挂在5#和7#子导线中线正上方,从而保证将悬垂线夹顺利安装到相应挂线点,在直路塔的两个横担上分别设有施工孔,以悬挂四线提线器和吊装带,通过启动手扳葫芦提升8分裂导线,使导线悬空而不压在放线滑车上,在不伤导线的条件下,方便地拆除放线滑车,并将8分裂导线通过悬垂金具连接于绝缘子串上,完成附件安装,具有结构简单、易于实现的优点。
附图说明
图1为本实用新型的实施例整体结构示意图;
图中:1、横担,2、施工孔,3、保险钢丝绳套,4、吊装带,5、第一钢丝绳套,6、四线提线器,7、手扳葫芦,8、放线滑车,9、第二钢丝绳套,10、卸扣。
具体实施方式
下面结合附图和实施例对本实用新型作进一步的详细说明。
如图1所示的直路塔上8分裂导线提线布置结构,在直路塔的两个横担1上分别设有施工孔2,每个横担1上的施工孔2上分别通过保险钢丝绳套3连接有吊装带4,并且每个横担1上的施工孔2分别通过第一钢丝绳套5连接有四线提线器6,第一钢丝绳套5和四线提线器6之间还连接有手扳葫芦7。两个五轮放线滑车8通过滑车联板悬挂在直路塔上。保险钢丝绳套3的上端通过100KN级或以上的卸扣10悬挂在施工孔2上。四线提线器6的下端通过第二钢丝绳套9悬挂8分裂导线。
本实用新型采用双四线提线器6进行,其中一个四线提线器6提1#、2#、3#、4#子导线,另一个四线提线器6提5#、6#、7#、8#子导线,为了保证将悬垂线夹顺利安装到相应挂线点,将其中一个四线提线器6挂在2#和4#子导线中线正上方,另一个四线提线器6挂在5#和7#子导线中线正上方,而导线横担施工孔2距离适当,使得四线提线器6可以分别挂在相应的横担施工孔上2。
保险钢丝绳套3一般用Φ17.5×13.0m的钢丝绳套,保险钢丝绳套3和吊装带4组成保险组合,每个吊装带4套两根子导线。保险钢丝绳套3上端用100kN级卸扣分别打在横担1上的左右施工孔上,四根保险绳保证相对独立;启动手扳葫芦7向上提升八根子导线约80-100mm,使导线悬空,不压在放线滑车8上;滑车不受力后,拆除放线滑车,将水平展放的八根子导线按1#下、2#上、3#下、4#上、5#上、6#下7#上,8#下的顺序放置成正八边形。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (4)

1.一种直路塔上8分裂导线提线布置结构,其特征在于:在直路塔的两个横担(1)上分别设有施工孔(2),每个横担(1)上的施工孔(2)上分别通过保险钢丝绳套(3)连接有吊装带(4),并且每个横担(1)上的施工孔(2)分别通过第一钢丝绳套(5)连接有四线提线器(6),所述第一钢丝绳套(5)和四线提线器(6)之间还连接有手扳葫芦(7)。
2.根据权利要求1所述的直路塔上8分裂导线提线布置结构,其特征在于:所述两个五轮放线滑车(8)通过滑车联板悬挂在直路塔上。
3.根据权利要求1或2所述的直路塔上8分裂导线提线布置结构,其特征在于:所述保险钢丝绳套(3)的上端通过100KN级或以上的卸扣(10)悬挂在施工孔(2)上。
4.根据权利要求1或2所述的直路塔上8分裂导线提线布置结构,其特征在于:所述四线提线器(6)的下端通过第二钢丝绳套(9)悬挂8分裂导线。
CN 201120489336 2011-11-30 2011-11-30 直路塔上8分裂导线提线布置结构 Expired - Lifetime CN202353095U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120489336 CN202353095U (zh) 2011-11-30 2011-11-30 直路塔上8分裂导线提线布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120489336 CN202353095U (zh) 2011-11-30 2011-11-30 直路塔上8分裂导线提线布置结构

Publications (1)

Publication Number Publication Date
CN202353095U true CN202353095U (zh) 2012-07-25

Family

ID=46542060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120489336 Expired - Lifetime CN202353095U (zh) 2011-11-30 2011-11-30 直路塔上8分裂导线提线布置结构

Country Status (1)

Country Link
CN (1) CN202353095U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106058740A (zh) * 2016-07-28 2016-10-26 郑州东辰科技有限公司 架空线架线方法
CN111064125A (zh) * 2020-02-13 2020-04-24 河南牛帕力学工程研究院 一种装配式架线分布施工方法及提线滑车

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106058740A (zh) * 2016-07-28 2016-10-26 郑州东辰科技有限公司 架空线架线方法
CN111064125A (zh) * 2020-02-13 2020-04-24 河南牛帕力学工程研究院 一种装配式架线分布施工方法及提线滑车

Similar Documents

Publication Publication Date Title
CN201263063Y (zh) 更换直线单联双串悬垂绝缘子的工具
CN201323409Y (zh) 带电更换高压输电线路v型绝缘子串的工具
CN104143782B (zh) 一种±800kV线路耐张绝缘子串的带电更换工具及方法
CN201812956U (zh) 线路检修用便携式接地线夹
CN102882153B (zh) 带电更换线路多回塔中相绝缘子串更换方法
CN205178393U (zh) 一种超高压输电线路等电位带电作业装置
CN103979403B (zh) 使用线缆终端头提升卡具提升线缆的方法
CN106410662A (zh) 一种停电更换220kv线路双串耐张绝缘子串的方法
CN202094528U (zh) 一种送电线路施工提线器
CN202353095U (zh) 直路塔上8分裂导线提线布置结构
CN203536860U (zh) 一种更换耐张绝缘子的吊架
CN202474703U (zh) 架空地线提升器
CN104836156A (zh) 合成绝缘子简易爬梯
CN203839885U (zh) 10kV/35kV双回路直线带电更换电杆的装置
CN216774076U (zh) 10千伏配电线路柱上开关的带电安装系统
CN102237654B (zh) 使用双角钢挂点更换跳线串的工具来更换跳线串的方法
CN211456516U (zh) 高压架空裸导线绝缘包胶机器人带电上下线装置
CN107324235A (zh) 一种风力发电机组塔筒马鞍平台用电缆吊装装置
CN201332246Y (zh) 大吨位导线提线器
CN204858412U (zh) 配电线路电缆和集束导线架设用直线杆穿越器
CN205873669U (zh) 一种用于更换直线耐张电杆的吊具
CN203553744U (zh) 超特高压交直流架空输电线路地线光缆金具更换装置
CN103532046B (zh) 一种直线杆改耐张段加装柱上开关的作业方法及装置
CN106081873A (zh) 一种用于更换直线耐张电杆的吊具及更换方法
CN209081319U (zh) 一种便于使用的电缆盖板起重小车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130118

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130118

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Patentee after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120725