CN106098315B - A kind of power equipment installing mechanism - Google Patents

A kind of power equipment installing mechanism Download PDF

Info

Publication number
CN106098315B
CN106098315B CN201610635664.4A CN201610635664A CN106098315B CN 106098315 B CN106098315 B CN 106098315B CN 201610635664 A CN201610635664 A CN 201610635664A CN 106098315 B CN106098315 B CN 106098315B
Authority
CN
China
Prior art keywords
rod
channel
pole
section steel
upper beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610635664.4A
Other languages
Chinese (zh)
Other versions
CN106098315A (en
Inventor
孟令举
王耀庭
史殿江
姜红
栾红梅
于慧
张志刚
全斐
袁鹏
姜义通
徐爱君
杨志
邹玉颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610635664.4A priority Critical patent/CN106098315B/en
Priority to CN201711298486.1A priority patent/CN108039265B/en
Publication of CN106098315A publication Critical patent/CN106098315A/en
Application granted granted Critical
Publication of CN106098315B publication Critical patent/CN106098315B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/06Mounting, supporting or suspending transformers, reactors or choke coils not being of the signal type

Abstract

The invention discloses a kind of power equipment installing mechanism,Including four bodies of rod and the transformer body being arranged between the described body of rod,Described transformer body lower end is provided with installing plate,Fixed plate is provided with the outside of described transformer body upper end,Pole is respectively arranged with the inside of the body of rod described in 4,Described pole lower end is hinged on the described body of rod,4 T-slots are provided with described installing plate lower surface,Described pole upper end is provided with T-shaped sliding block,Described sliding block can slide along described T-slot,Screwed hole is provided with described T-slot side wall,Bolt is provided with described screwed hole,Described bolt is threaded in the screwed hole on described T-slot,Counterbore is provided with described sliding block,Described bolt end is plugged in described counterbore,The present invention is by using the angle steel on the inside of mounting plates structure,Realize the restriction to position resolver,With more preferable anti-seismic performance.

Description

A kind of power equipment installing mechanism
Technical field
The present invention relates to a kind of power equipment installing mechanism.
Background technology
Transformer is generally fixedly mounted on utility poles, makes it relatively vacantly in electric wire thick stick using the support of multiple fixations Portion.Existing transformer installation will not generally install buffer structure, make electric pole impaired or easily influence transformation when being given a shock The structural stability of device.
The content of the invention
It is an object of the invention to provide a kind of power equipment installing mechanism, the problem of prior art is present can be improved, By using the angle steel on the inside of mounting plates structure, the restriction to position resolver is realized, while makes it have more preferable shock resistance Energy.
The present invention is achieved through the following technical solutions:
A kind of power equipment installing mechanism, including four bodies of rod and the transformer body that is arranged between the described body of rod, Described transformer body lower end is provided with installing plate, fixed plate is provided with the outside of described transformer body upper end, 4 Pole is respectively arranged with the inside of the individual described body of rod, described pole lower end is hinged on the described body of rod, in described installation 4 T-slots are provided with plate lower surface, are provided with T-shaped sliding block in described pole upper end, described sliding block can be along Described T-slot slides, and is provided with screwed hole in described T-slot side wall, positioning spiral shell is provided with described screwed hole Bolt, described bolt are threaded in the screwed hole on described T-slot, and counterbore is provided with described sliding block, Described bolt end is plugged in described counterbore, and through hole, described installation are provided with the middle part of described installing plate Plate is bent to form kink for 90 ° downwards close to a side end face of through hole, and the described outside of kink 109 is provided with angle steel 110, described 110 1 end faces of angle steel are bolted to connection on described kink 109, described transformer body 102 above the inner side of kink 109 and the other end of angle steel 110, in the described other end of angle steel 110 and described change High strong spring 111 is provided between the bottom surface of depressor body 102;
Further, for the present invention is better achieved, described pole is that the top body of rod and the combination of the bottom body of rod are formed, institute The sliding block stated is rotatably connected on the described top body of rod, and the described top body of rod is bolted to connection in described bottom On the inside of the body of rod.
In the present invention, high strong spring can be set on the inside of kink, be located at transformer body side wall and kink Between, when making the body of rod by active force in horizontal direction, the active force that transformer body is subject to can be reduced.It is sharp in the present invention Installing plate is supported with the branching rod structure being arranged on the body of rod, due to pole is hinged on the body of rod, makes sliding block from T-slot It after skidding off, can be hung directly from the body of rod, just pole is holded up when needing to install installing plate, makes sliding block along T-slot Slip into inside T-slot, sliding block is fixed using bolt, you can realize the fixation of installing plate, when needed, Ke Yiyan T-slot sliding slider, by the position of adjusting slider, realizes the regulation of pole angle, and then realize the height to installing plate Regulation.In the present invention, pole is inclined to set, it is formed triangular structure of right angle with the body of rod, have what is more stablized Support effect.By setting attachment structure on the body of rod, the fixed plate on top and the body of rod are connected with each other, you can realize transformer The fixation of body upper end.
After transformer body is arranged on into the space formed on the inside of angle steel, under the restriction of angle steel and kink, make Transformer body can not be mounted opposite plate movement, and it can be made to keep stable in the horizontal direction.When the body of rod vibrates, Under the resilient force of high strong spring, transformer body is set not there is higher stabilization by violent vibration Property.
Further, the present invention is realized to be more preferable, upper beam is respectively arranged with the body of rod described in 4, in described upper beam On be respectively arranged with vertical rod, described upper beam is run through in described vertical rod upper end, and described upper beam is stretched out in described vertical rod upper end Outside be provided with steady pin, described vertical rod lower end is connected with described fixed plate.
Further, for the present invention is better achieved, described steady pin is threaded in described vertical rod, described Steady pin and described upper beam upper surface between the vertical rod on be set with high strong spring.
Further, for the present invention is better achieved, described upper beam is run through in described vertical rod lower end, at vertical rod end End is provided with disk, and high strong spring is set with the described vertical rod between described disk and described upper beam lower surface.
Further, for the present invention is better achieved, channel-section steel, the length of described channel-section steel are provided with the described body of rod The length direction of the described body of rod is oriented parallel to, described channel-section steel length direction is provided with least 2 on described channel-section steel Group through hole, described upper beam through the bolt of the through hole by being fixedly connected on described channel-section steel.
Further, for the present invention is better achieved, it is provided with the described body of rod relative with described pole position The channel-section steel answered, the length direction of described channel-section steel is parallel to the length direction of the described body of rod, and described pole is away from described Sliding block one end is hinged on described channel-section steel.
Further, for the present invention is better achieved, the described top body of rod and the described bottom body of rod are channel-section steel system Into being respectively arranged with least 2 groups of through holes, described through hole on the described top body of rod and the described bottom body of rod and extend through The described bottom body of rod and the through hole on the described top body of rod are simultaneously fixed by nut.
The present invention compared with prior art, has the advantages that:
The present invention realizes the fixation to transformer body bottom by using the cooperation of installing plate and pole, utilizes angle steel energy Enough realize is defined to the displacement in transformer body horizontal direction, meanwhile, using high-strength spring structure, make it have More preferable anti-seismic performance.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is branching rod structure schematic diagram of the present invention.
Wherein:101. the body of rod, 102. transformer bodies, 103. installing plates, 104. fixed plates, 105. poles, 106.T shapes Groove, 107. sliding blocks, 108. bolts, 109. kinks, 110. angle steel, 111. high strong springs, 112. upper beams, 113. vertical rods, 114. steady pin, 115. disks, 116. channel-section steels, the 117. top bodies of rod, the 118. bottom bodies of rod.
Embodiment
The present invention is described in further detail with reference to specific embodiment, but embodiments of the present invention are not limited to This.
Embodiment 1:
As shown in figure 1, a kind of power equipment installing mechanism, including four bodies of rod 101 and be arranged on the described body of rod 101 it Between transformer body 102, the described lower end of transformer body 102 is provided with installing plate 103, in described transformer body Fixed plate 104 is provided with the outside of 102 upper ends, pole 105, described pole are respectively arranged with the inner side of the body of rod 101 described in 4 105 lower ends are hinged on the described body of rod 101,4 T-slots 106 are provided with the described lower surface of installing plate 103, in institute The upper end of pole 105 stated is provided with T-shaped sliding block 107, and described sliding block 107 can slide along described T-slot 106, Screwed hole is provided with the described side wall of T-slot 106, bolt 108 is provided with described screwed hole, described determines Position bolt 108 is threaded in the screwed hole on described T-slot 106, is provided with counterbore on described sliding block 107, institute The end of bolt 108 stated is plugged in described counterbore, and the described middle part of installing plate 103 is provided with through hole, described Installing plate 103 is bent to form kink 109 for 90 ° downwards close to a side end face of through hole, is set in the described outside of kink 109 Angle steel 110 is equipped with, described 110 1 end faces of angle steel are bolted to connection on described kink 109, described change Depressor body 102 is located above the inner side of kink 109 and the other end of angle steel 110, the described other end of angle steel 110 with High strong spring 111 is provided between the described bottom surface of transformer body 102;
The present invention makes transformer body have stronger anti-seismic performance, it is not easy in bar by setting high strong spring Body is by the stability that its operation by strenuous vibration, is helped to maintain during applied external force.
Preferably, upper beam 112 is respectively arranged with the body of rod 101 described in 4, is set respectively on described upper beam 112 Vertical rod 113 is equipped with, described upper beam 112 is run through in the described upper end of vertical rod 113, described in the described upper end of vertical rod 113 stretching The outside of upper beam 112 is provided with steady pin 114, and the described lower end of vertical rod 113 is connected with described fixed plate 104.
In the present embodiment, upper beam is vertically arranged with respect to the body of rod, by using upper beam and vertical rod, realize to fixed plate and bar Interconnection between body.When mounted, steady pin is threaded in vertical rod, vertical rod lower end is connected in fixed plate, Vertical rod upper end is set to be relatively fixed by steady pin and upper beam.
Embodiment 2:
The present embodiment is on the basis of embodiment 1, it is preferable that described steady pin 114 is threaded in described vertical rod On 113, high strong spring is set with the vertical rod 113 between described steady pin 114 and the described upper surface of upper beam 112 111。
By using the high-strength spring structure, make there is certain space between steady pin and upper beam, utilize high strong spring Row buffering is entered to the active force of upper beam to the body of rod, makes vertical rod lower end under the resilient force of the high strong spring, will not be in upper beam Drive under it is relative rock, so as to make it have more preferable stability, while utilize the high strong spring, there is transformer body The bigger space being moved upward.
In the present embodiment, it is further preferred that described upper beam 112 is run through in the described lower end of vertical rod 113, in the vertical rod 113 ends are provided with disk 115, the described vertical rod 113 between described disk 115 and the described lower surface of upper beam 112 On be set with high strong spring 111.
Embodiment 3:
In the present embodiment, in order to facilitate the installation of upper beam, it is preferable that channel-section steel 116 is provided with the described body of rod 101, The length direction of described channel-section steel 116 parallel to the described body of rod 101 length direction, along described on described channel-section steel 116 The length direction of channel-section steel 116 be provided with least 2 groups of through holes, the bolt that described upper beam 112 passes through through the through hole, which is fixed, to be connected It is connected on described channel-section steel 116.In the present embodiment, reinforcing rib structure can be set in the lower section of upper beam, make reinforcement and upper beam, The body of rod forms leg triangular structure.
It by using channel-section steel, can conveniently be installed on the body of rod, make two end faces that it is parallel to each other as installation The supporting construction of upper beam, using two opposite end faces of multigroup bolt-through channel-section steel, upper beam is fixed and supported.
Embodiment 4:
In the present embodiment, pole is installed for convenience, it is preferable that be provided with the described body of rod 101 and institute The corresponding channel-section steel 116 in the position of pole 105 stated, the length of the length direction of described channel-section steel 116 parallel to the described body of rod 101 Direction is spent, described pole 105 is hinged on away from described one end of sliding block 107 on described channel-section steel 116.
The underrun bolt of channel-section steel is arranged on the body of rod, make two opposite end faces of channel-section steel as supporting construction, Using bolt arrangement run through channel-section steel two opposite end faces, by pole away from sliding block one end by the bolted splice in channel-section steel Side.
Embodiment 5:
As shown in Fig. 2 in the present embodiment, in order to facilitate the processing of pole, it is preferable that described pole 105 is upper bar Body 117 and the combination of the bottom body of rod 118 are formed, and described sliding block 107 is rotatably connected on the described top body of rod 117, described The top body of rod 117 is bolted to connection in the described inner side of the bottom body of rod 118.
In the present embodiment, the top body of rod is plugged in lower pole body, both are bolted.Pass through Combine to form pole using two parts, can conveniently set the length of pole as needed, make its installation more firm.
It is further preferred that in the present embodiment, in order to move the top body of rod, the described top body of rod 117 as needed It is that channel-section steel is made with the described bottom body of rod 118, on the described top body of rod 117 and the described bottom body of rod 118 respectively At least 2 groups of through holes are provided with, described through hole is extended through on described the bottom body of rod 118 and the described top body of rod 117 Through hole is simultaneously fixed by nut.Along the length direction of the top body of rod and the bottom body of rod, multigroup through hole is set, for installation bolt, Make the lead to the hole site on the top body of rod and the bottom body of rod corresponding, alongst move the top body of rod, you can realize to branch The regulation of the length of bar, make its regulation more convenient.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (7)

  1. A kind of 1. power equipment installing mechanism, it is characterised in that:Including four bodies of rod (101) and it is arranged on the described body of rod (101) transformer body (102) between, described transformer body (102) lower end is provided with installing plate (103), in institute Fixed plate (104) is provided with the outside of transformer body (102) upper end stated, is set respectively on the inside of the body of rod (101) described in 4 There is pole (105), described pole (105) lower end is hinged on the described body of rod (101), under described installing plate (103) 4 T-slots (106) are provided with end face, described pole (105) upper end is provided with T-shaped sliding block (107), it is described Sliding block (107) can be slided along described T-slot (106), and screwed hole is provided with described T-slot (106) side wall, Bolt (108) is provided with described screwed hole, described bolt (108) is threaded in described T-slot (106) in the screwed hole on, counterbore is provided with described sliding block (107), described bolt (108) end is plugged on In described counterbore, be provided with through hole in the middle part of described installing plate (103), described installing plate (103) close to through hole one Side is bent to form kink (109) for 90 ° downwards, and angle steel (110), institute are provided with the outside of described kink (109) (110) end faces of the angle steel stated are bolted to connection on described kink (109), described transformer body (102) positioned at kink (109) inner side and angle steel (110) other end above, described angle steel (110) other end with High strong spring (111) is provided between described transformer body (102) bottom surface;
    Described pole (105) is that the top body of rod (117) and the bottom body of rod (118) combination are formed, and described sliding block (107) rotates It is connected on the described top body of rod (117), the described top body of rod (117) is bolted to connection in described lower pole On the inside of body (118).
  2. A kind of 2. power equipment installing mechanism according to claim 1, it is characterised in that:In the body of rod (101) described in 4 On be respectively arranged with upper beam (112), vertical rod (113), described vertical rod (113) are respectively arranged with described upper beam (112) Described upper beam (112) is run through in upper end, stretches out on the outside of described upper beam (112) and is provided with described vertical rod (113) upper end Steady pin (114), described vertical rod (113) lower end are connected with described fixed plate (104).
  3. A kind of 3. power equipment installing mechanism according to claim 2, it is characterised in that:Described steady pin (114) spiral shell Line is connected in described vertical rod (113), the institute between described steady pin (114) and described upper beam (112) upper surface State and high strong spring (111) is set with vertical rod (113).
  4. A kind of 4. power equipment installing mechanism according to Claims 2 or 3, it is characterised in that:Under described vertical rod (113) Described upper beam (112) run through at end, and the vertical rod (113) end is provided with disk (115), in described disk (115) and High strong spring (111) is set with described vertical rod (113) between described upper beam (112) lower surface.
  5. A kind of 5. power equipment installing mechanism according to claim 2, it is characterised in that:On the described body of rod (101) Be provided with channel-section steel (116), the length direction of described channel-section steel (116) parallel to the described body of rod (101) length direction, in institute Described channel-section steel (116) length direction is provided with least 2 groups of through holes on the channel-section steel (116) stated, described upper beam (112) passes through Bolt through the through hole is fixedly connected on described channel-section steel (116).
  6. A kind of 6. power equipment installing mechanism according to claim 1, it is characterised in that:On the described body of rod (101) Be provided with the channel-section steel (116) corresponding with described pole (105) position, the length direction of described channel-section steel (116) parallel to The length direction of the described body of rod (101), remote described sliding block (107) one end of described pole (105) are hinged on described On channel-section steel (116).
  7. A kind of 7. power equipment installing mechanism according to claim 1, it is characterised in that:The described top body of rod (117) It is that channel-section steel is made with the described bottom body of rod (118), in the described top body of rod (117) and the described bottom body of rod (118) On be respectively arranged with least 2 groups of through holes, described through hole extends through the described bottom body of rod (118) and the described top body of rod (117) through hole on is simultaneously fixed by nut.
CN201610635664.4A 2016-08-05 2016-08-05 A kind of power equipment installing mechanism Expired - Fee Related CN106098315B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610635664.4A CN106098315B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism
CN201711298486.1A CN108039265B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610635664.4A CN106098315B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201711298486.1A Division CN108039265B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism

Publications (2)

Publication Number Publication Date
CN106098315A CN106098315A (en) 2016-11-09
CN106098315B true CN106098315B (en) 2017-12-22

Family

ID=57453555

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711298486.1A Active CN108039265B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism
CN201610635664.4A Expired - Fee Related CN106098315B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201711298486.1A Active CN108039265B (en) 2016-08-05 2016-08-05 A kind of power equipment installing mechanism

Country Status (1)

Country Link
CN (2) CN108039265B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107527717A (en) * 2017-08-26 2017-12-29 南通鑫源电器制造有限公司 A kind of roof suspension type transformer
CN108376603B (en) * 2017-09-08 2020-01-07 江西鑫固电气有限公司 Transformer convenient to adjust installation angle
CN108806929A (en) * 2018-09-12 2018-11-13 长兴盛强电子器材股份有限公司 A kind of transformer mounting bracket
CN109411194A (en) * 2018-10-22 2019-03-01 魏赛尔 A kind of transformer mounting rack that applicability is wide
CN111943081B (en) * 2020-07-27 2021-11-26 国网江苏省电力有限公司徐州供电分公司 Lifting auxiliary device for electric power equipment installation and use method thereof
CN112885569B (en) * 2021-01-15 2022-08-16 济南弘业百成建设工程有限公司 Distribution transformer fixing device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4102651A1 (en) * 1991-01-23 1992-10-08 Reinhausen Maschf Scheubeck SWITCHING ARRANGEMENT
KR100733574B1 (en) * 2006-12-05 2007-06-28 (주)우전엔지니어링 Auto-connect transformer
CN103985509B (en) * 2014-05-30 2016-03-09 国家电网公司 A kind of placing frame of transformer
CN204006429U (en) * 2014-07-25 2014-12-10 丁少华 A kind of equipment mounting bracket for building
CN105139996B (en) * 2015-08-06 2017-03-08 晶龙实业集团有限公司 Self-locking transformer
CN105206383B (en) * 2015-11-05 2017-05-10 山东华驰变压器股份有限公司 Multifunctional transformer mounting rack
CN105565220B (en) * 2015-12-22 2018-04-24 国家电网公司 A kind of aerial work platform
CN205862938U (en) * 2016-08-05 2017-01-04 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism

Also Published As

Publication number Publication date
CN108039265A (en) 2018-05-15
CN108039265B (en) 2019-06-07
CN106098315A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106098315B (en) A kind of power equipment installing mechanism
CN205862937U (en) A kind of transformator installing mechanism
CN208329288U (en) A kind of building curtain wall support construction
CN106057414B (en) A kind of transformer installing mechanism
CN208898245U (en) A kind of municipal works cable pay-off rack
CN202586171U (en) Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator
CN103626033A (en) Cable pulley for crane
CN205862938U (en) A kind of power equipment installing mechanism
CN2871718Y (en) Telescopic stand
CN107425457A (en) A kind of power equipment installing mechanism
CN208024051U (en) A kind of electric power tower pedestal
CN205596061U (en) Solar energy power supply unit of angularly adjustable
CN108150724A (en) A kind of New anti-loose single tube antidetonation branch device for hoisting
CN207766199U (en) A kind of photovoltaic bracket convenient for adjusting
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN103407906A (en) Setting-up device and setting-up leg
CN212078774U (en) Load-bearing tripod
CN207724281U (en) Engineering pipe fitting rack that is a kind of easy to remove and adjusting
CN207883754U (en) Energy storage cabinet battery modules fixing device and energy storage cabinet
CN207131092U (en) Floor concrete casting operation platform is built in a kind of room
CN203034369U (en) Flexibility compensation device of bridge cable
CN204624886U (en) The attachment device of diagonal brace rod-type building hoist
CN220116048U (en) Pipeline installation equipment for building construction
CN202359810U (en) Building template system
CN205087707U (en) Dismantled and assembled cable drum support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Meng Lingju

Inventor after: Jiang Yitong

Inventor after: Xu Aijun

Inventor after: Yang Zhi

Inventor after: Zou Yuying

Inventor after: Wang Yaoting

Inventor after: Shi Dianjiang

Inventor after: Jiang Hong

Inventor after: Luan Hongmei

Inventor after: Yu Hui

Inventor after: Zhang Zhigang

Inventor after: Quan Fei

Inventor after: Yuan Peng

Inventor before: Meng Lingju

Inventor before: Diao Xunling

Inventor before: Zhang Deqi

Inventor before: Zou Yuefeng

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

Termination date: 20200805

CF01 Termination of patent right due to non-payment of annual fee