CN105565220B - A kind of aerial work platform - Google Patents

A kind of aerial work platform Download PDF

Info

Publication number
CN105565220B
CN105565220B CN201510966244.XA CN201510966244A CN105565220B CN 105565220 B CN105565220 B CN 105565220B CN 201510966244 A CN201510966244 A CN 201510966244A CN 105565220 B CN105565220 B CN 105565220B
Authority
CN
China
Prior art keywords
workbench
supporting rack
aerial work
base
electric pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510966244.XA
Other languages
Chinese (zh)
Other versions
CN105565220A (en
Inventor
周杰
梅莎莎
孙亚红
刘舰石
解峰
张红伟
毛卫东
金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510966244.XA priority Critical patent/CN105565220B/en
Publication of CN105565220A publication Critical patent/CN105565220A/en
Application granted granted Critical
Publication of CN105565220B publication Critical patent/CN105565220B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The present invention provides a kind of aerial work platform, it includes the workbench that supporting rack of the cuff on electric pole, the base being fixed above supporting rack and erection are placed on base, the workbench is the circular platform being made of polylith fanning strip, it is connected between wherein two pieces of fanning strips by removable fixing screws, it is connected between remaining adjacent fanning strip by hinge, the bottom surface of workbench is fixedly installed cylinder, and the ending vertical of the piston rod of the cylinder penetrates the lifting platform that top surface on workbench is fixedly connected with after workbench.The present invention is used for the working drawing review of transmission line of electricity, ensures construction safety, reduces labor intensity.

Description

A kind of aerial work platform
Technical field
The present invention relates to a kind of aerial work platform, belongs to the high-altitude working safety instrument that power industry line construction uses Technical field.
Background technology
In the maintenance maintenance construction of power industry transmission line of electricity, since the setting height(from bottom) of equipment is higher, staff is frequent Need to carry out operation on shaft tower.
At present in operation on shaft tower, construction personnel puts on climbers and steps on bar, climbs to operating position, and people stands in climbers On, recycling lap belt to be coupled with the body of rod and fix body, in order to ensure that climbers are not fallen off, it is necessary to a foot is high, a foot is low, or Two climbers of person interlock with height, form the working status of supported at three point, these methods must all keep both feet while exert oneself, slightly Just there is the danger that hair dirt climbers come off accidentally, the body of construction personnel and the body of rod are at an angle at this time, and bipod is pedaled all the time Stepping on can not move on climbers, and not only constructing operation is extremely difficult, and labor intensity is larger, and stability is poor, and it is hidden to there is safety Suffer from, cause psychological impact to construction personnel, add difficulty of construction.
In addition, on bar during operation sometimes for some materials, instrument, equipment etc. nowhere place, usually need to be by working Personnel carry with shaft tower up and down, some heavier equipment are then that construction personnel puts down a rope with the personnel coordinated on the ground, After cooperation personnel bundle required article, then once pulled on by construction personnel on shaft tower, several staff coordinate Fixed at lifting to construction, waste the construction time, work efficiency is low, while also increases the workload of construction personnel.
The content of the invention
It is an object of the invention to the drawback for the prior art, there is provided a kind of aerial work platform, for transmission line of electricity Working drawing review, ensure construction safety, reduce labor intensity.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of aerial work platform, it includes supporting rack of the cuff on electric pole, the bottom being fixed above supporting rack Seat and erection are placed on the workbench on base, and the workbench is the circular platform being made of polylith fanning strip, its In be connected by removable fixing screws between two pieces of fanning strips, be connected between remaining adjacent fanning strip by hinge, worked The bottom surface of platform is fixedly installed cylinder, and the ending vertical of the piston rod of the cylinder is fixedly connected with work after penetrating workbench The lifting platform of top surface on platform.
Above-mentioned aerial work platform, the cross section of the piston rod of the cylinder is square.
Above-mentioned aerial work platform, the upper top surface border of lifting platform set protrusion.
Above-mentioned aerial work platform, support frame as described above is mutually equipped with including two, the semicircle anchor ears of cuff electric pole, and described half Circle anchor ear includes middle part arc panel corresponding with electric pole periphery and two pieces of transverse slats for being connected to arc panel both ends, the arc The installing plate flexed outward is set on the outside of the middle part of plate, the tune for setting and being used for adjusting supporting rack levelness is extended vertically through on arc panel Whole jackscrew.
The side of above-mentioned aerial work platform, the side of the installing plate and the wherein side transverse slat of semicircle anchor ear is horizontal The level meter of the detection supporting rack levelness of fixed setting one.
Above-mentioned aerial work platform, the link of base including lower floor arranged in parallel, the bracket on upper strata and vertical The connector sleeve of the setting axially open of connecting bracket and link, the both ends of axially open are radially set by connecting spiral shell Fixed fixed ear is followed closely, the opposite side opposite with opening axially sets the spring leaf for keeping axially open to draw close on connector sleeve, The link includes two pieces of connecting plates being mutually equipped with installing plate, and the bracket is including flexing outward, the polylith of circumference uniform distribution Supporting plate.
Above-mentioned aerial work platform, ribs is set between the bracket and connector sleeve.
The beneficial effects of the invention are as follows:
Aerial work platform of the present invention, for the maintenance of electric pole eminence power system transmission line, ensure that work Make the personal safety of personnel, reduce labor intensity, prevent security incident.When in use by lifting device by the present invention Supporting rack is fixed on electric pole to suitable position, breaks base into two with one's hands afterwards by base sheath to supporting rack by lifting first On the electric pole of side, base is fixedly connected with supporting rack.Finally workbench is opened, is connected fanning strip by fixing screws It is fixedly linked into annulus, then with base.The height that operator station can be needed on lifting platform by the flexible arrival of cylinder Degree.
The cross section for selecting piston rod is square cylinder, can prevent that rotation occurs for lifting platform when piston rod stretches, Lifting process is operated steadily, while protrusion is set in the border of lifting platform, can effectively ensure the safety of staff.
Adjustment jackscrew is set on supporting rack, level meter is set respectively in same level different angle, passes through level meter Levelness, afterwards precession or back-out adjustment jackscrew are measured to adjust levelness, ensures the level of workbench, prevents personnel and work Tool drops, and ensures safety.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings.
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the front view of supporting rack;
Fig. 3 is the front view of base;
Fig. 4 is the front view of workbench.
Each list of reference numerals is in figure:1st, supporting rack, 1-1, semicircle anchor ear, 1-2, installing plate, 1-3, fastening bolt, 2, bottom Seat, 2-1, link, 2-2, bracket, 2-3, ribs, 2-4, spring leaf, 2-5, attachment screw, 2-6, connector sleeve, 2-7, fixation Ear, 3, workbench, 3-1, fanning strip, 3-2, fixing screws, 3-3, hinge, 3-4, mounting screw, 4, level meter, 5, adjustment top Silk, 6, cylinder, 7, lifting platform, 8, electric pole.
Embodiment
Referring to Fig. 1, aerial work platform of the present invention includes supporting rack 1, base 2, workbench 3 and lifting platform 7. When in use, supporting rack 1, base 2 and 3 equal cuff of workbench are on electric pole 8.Wherein supporting rack 1 is fixedly connected with electric pole 8; Base 2 is fixed at the top of supporting rack 1;Workbench 3 fixes the top for being erected at base 2.The extreme lower position of lifting platform 7 exists On workbench 3, it can ramp up when needed.
The structure of support frame as described above 1 as depicted in figs. 1 and 2, including two semicircle anchor ear 1-1 and two pieces of installing plate 1-2.Institute Stating semicircle anchor ear 1-1 includes arc panel and transverse slat, and the arc panel is in the stage casing of semicircle anchor ear 1-1, shape and the electricity of arc panel The periphery of bar 8 is corresponding.The transverse slat sets two pieces, is connected to the both ends of arc panel.Two semicircle anchor ear 1-1 phase interworkings Dress, arc panel is set on electric pole 8, and fastening bolt 1-3 is installed on the transverse slat at both ends, by fastening bolt 1-3 by two semicircles Anchor ear 1-1 is closely coupled, and fixation holds electric pole 8.
The installing plate 1-2 is fixed on the outside of the middle part of arc panel, is vertically flexed outward.It is vertical on installing plate 1-2 Down-set through hole, for the connection with base 2.Level meter 4 laterally also is fixedly installed on supporting rack 1, it is horizontal to ensure The measurement of degree is accurate, level meter 4 set it is multiple, respectively in different angles, in the present embodiment set two, pacifying respectively The side of the side of loading board 1-2 and semicircle anchor ear 1-1 are wherein on the side of side transverse slat.On the arc panel of semicircle anchor ear 1-1 Ecto-entad extends vertically through setting adjustment jackscrew 5, and adjustment jackscrew 5 acts against the periphery of electric pole 8, for adjusting the water of supporting rack 1 Pingdu.
As shown in figures 1 and 3, base 2 includes link 2-1, bracket 2-2 and connector sleeve 2-6 to the structure of the base 2. Lower leaf is arranged in parallel on link 2-1 and bracket 2-2, in use, bracket 2-2, on upper strata, link 2-1 is in lower floor. Connector sleeve 2-6, which is arranged on, to be connect between bracket 2-2 and link 2-1, vertical with link 2-1 and bracket 2-2.The connector sleeve 2-6 is provided with axially open, and spring leaf 2-4 is set in the opposite opposite side of axially open, toward electric pole 8 on when being set with, overcome The restoring force of spring leaf 2-4 by the position of axially open into two with one's hands can be broken connector sleeve 2-6, on cuff to electric pole 8.In axially open Both ends set fixed ear 2-7, the fixed ear 2-7 radially to set, by connector sleeve 2-6 cuffs on electric pole 8 after, two Attachment screw 2-5 is vertically installed between block fixed ear 2-7 to be allowed to be fixedly linked.
The link 2-1 is located at the bottom of connector sleeve 2-6, and link 2-1 includes two pieces of connecting plates, runs through on connecting plate Connecting hole is set, and the connecting hole is corresponding with the through hole that installing plate 1-2 is set, by connecting bolt by link 2-1 and peace Loading board 1-2 is connected, and completion base 2 is fixedly connected with supporting rack 1.The bracket 2-2 is located at the top of connector sleeve 2-6, bracket 2-2 includes polylith supporting plate, and the equal vertical connection set 2-6 of supporting plate is flexed outward, and circumferentially equal by the center of circle of connector sleeve 2-6 Cloth.Eight blocks of supporting plates are provided with the present embodiment altogether.Mounting hole is provided through downward vertically on every block of supporting plate, is used for and work Make platform to be mutually equipped with.To strengthen the firm of base, prolong the service life, supporting plate bottom surface and connector sleeve 2-6 excircle it Between be provided with a plurality of ribs 2-3.
The structure of the workbench 3 includes polylith fanning strip 3-1, whole fanning strips referring to Fig. 1 and Fig. 4, workbench 3 3-1 surrounds a circular platform jointly.Eight pieces of fanning strips are set in the present embodiment, two pieces of adjacent fans are chosen in all fanning strips Shape plate, does not have interconnected relationship between them, is vertically arranged one upwards in the position of being abutted against of this two pieces of fanning strips by plate face and erects Plate, installs fixing screws 3-2 between two pieces of risers, this two pieces of fanning strips is connected by fixing screws 3-2.In addition, its In remaining fanning strip, it is connected between adjacent fanning strip by hinge 3-3, i.e., fanning strip can overturn folding, dismounted When conveniently get out of the way electric pole 8.The outside round edge of the fanning strip 3-1 is both provided with boss, prevents instrument and personnel from accident occurs and falls Fall.Fanning strip 3-1 upper vertical plates set multiple mounting screw 3-4, the mounting hole phase of the mounting screw 3-4 and supporting plate downwards Equipped, completion workbench 3 is fixedly connected with base 2.
Cylinder 6 is provided with the bottom surface of workbench 3, the cylinder body of cylinder 6, which is fixed by the bracket, is arranged on workbench 3 Bottom surface, the piston rod of cylinder 6 penetrate the plate face of workbench 3 vertically upward, and the end of piston rod is fixedly connected with lifting platform 7.For Prevent from rotating when piston rod is flexible, the cross section of the piston rod of selection is square.The lifting platform 7 is inlaid in workbench The upper top surface of 3 fanning strips, is risen or fallen by the flexible drive lifting platform 7 of piston rod, is set in the upper top surface border of lifting platform 7 Protrusion is put, prevents staff from dropping, ensures safety.
The present invention process of installing and using be:
Supporting rack 1, base 2 and workbench 3 are lifted to suitable position by lifting device first when in use.It After installed:Two semicircle anchor ear 1-1 cuffs of supporting rack 1 are passed through into fastening bolt 1-3 phase fixeds on electric pole 8 first Surely it is arranged on electric pole 8, the levelness precession measured according to level meter 4 or back-out adjustment jackscrew 5, ensure that supporting rack 1 is in water Level state.
The connector sleeve 2-6 of base 2 is broken into two with one's hands afterwards, by base sheath to electric pole, positioned at the top of supporting rack 1.Pass through connection Connector sleeve 2-6 is wound on electric pole by screw 2-5, installs connection bolt and link 2-1 is connected with installing plate 1-2, complete base 2 With being fixedly connected for supporting rack 1.
It is finally that the fanning strip of workbench 3 is fully open, form circular platform in 8 border of electric pole.Pass through fixed spiral shell Fanning strip is connected and fixed by nail.Mounting screw 3-4 and the mounting hole of supporting plate are mutually equipped with, and complete the fixation of workbench 3 and base 2 Connection.
So far, installation process of the invention is completed.Operator station can pass through cylinder piston rod on lifting platform 7 It is flexible, adjust the position of lifting platform 7, reach the height of needs, complete the maintenance of transmission line of electricity.

Claims (4)

1. a kind of aerial work platform, it is characterized in that, it includes supporting rack (1) of the cuff on electric pole (8), is fixed at branch Base (2) and erection above support (1) are placed on the workbench (3) on base (2), and the workbench (3) is by more The circular platform of block fanning strip (3-1) composition, wherein passing through removable fixing screws (3-2) phase between two pieces of fanning strips Even, it is connected between remaining adjacent fanning strip by hinge (3-3), the bottom surface of workbench (3) is fixedly installed cylinder (6), institute The ending vertical for stating the piston rod of cylinder (6) penetrates the lifting platform that top surface on workbench (3) is fixedly connected with after workbench (3) (7);
Support frame as described above (1) includes two mutually equipped, semicircle anchor ears (1-1) of cuff electric pole (8), the semicircle anchor ear (1- 1) middle part arc panel corresponding with electric pole (8) periphery and two pieces of transverse slats for being connected to arc panel both ends, the arc are included The installing plate (1-2) flexed outward is set on the outside of the middle part of plate, setting is extended vertically through on arc panel and is used to adjust supporting rack (1) water The adjustment jackscrew (5) of Pingdu;
The cross section of the piston rod of the cylinder (6) is square;
The upper top surface border of the lifting platform (7) sets raised.
2. a kind of aerial work platform according to claim 1, it is characterized in that, the side of the installing plate (1-2) and half The level meter of detection supporting rack (1) levelness is laterally fixedly installed in the side of the wherein side transverse slat of circle anchor ear (1-1) (4)。
3. a kind of aerial work platform according to claim 1, it is characterized in that, base (2) includes arranged in parallel The link (2-1) of lower floor, the bracket (2-2) on upper strata and vertical connection bracket (2-2) and the setting of link (2-1) are axially opened The connector sleeve (2-6) of mouth, the both ends of axially open are radially set by the fixed fixed ear (2- of attachment screw (2-5) 7), opposite side opposite with opening on connector sleeve (2-6) axially sets the spring leaf (2-4) for keeping axially open to draw close, institute Two pieces of connecting plates that link (2-1) includes mutually being equipped with installing plate (1-2) are stated, the bracket (2-2) is including flexing outward, circle The polylith supporting plate of Zhou Junbu.
4. a kind of aerial work platform according to claim 3, it is characterized in that, the bracket (2-2) and connector sleeve (2-6) Between set ribs (2-3).
CN201510966244.XA 2015-12-22 2015-12-22 A kind of aerial work platform Expired - Fee Related CN105565220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510966244.XA CN105565220B (en) 2015-12-22 2015-12-22 A kind of aerial work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510966244.XA CN105565220B (en) 2015-12-22 2015-12-22 A kind of aerial work platform

Publications (2)

Publication Number Publication Date
CN105565220A CN105565220A (en) 2016-05-11
CN105565220B true CN105565220B (en) 2018-04-24

Family

ID=55875948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510966244.XA Expired - Fee Related CN105565220B (en) 2015-12-22 2015-12-22 A kind of aerial work platform

Country Status (1)

Country Link
CN (1) CN105565220B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108039265B (en) * 2016-08-05 2019-06-07 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism
CN106522532A (en) * 2016-12-19 2017-03-22 国网河北省电力公司衡水供电分公司 Operation platform overhauling power transmission tower pole cross beams
CN107762240A (en) * 2017-10-20 2018-03-06 河海大学 A kind of data-adjustable transmits the arranging device of wire
CN111266877A (en) * 2020-01-21 2020-06-12 北京优备加科技有限公司 Synchronous lifting platform and tray receiver
CN113931426A (en) * 2021-10-26 2022-01-14 中国电建集团贵州电力设计研究院有限公司 Antenna support maintenance platform based on shared tower and use method thereof
CN114772511B (en) * 2022-05-10 2023-12-15 杭州电力设备制造有限公司 Lifting type power equipment overhauling device and using method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20205799U1 (en) * 2002-04-12 2002-09-12 ALUMATEC Transport- und Hebegeräte GmbH & Co. KG, 49632 Essen Lifting platform for delimbing trees
CN101013803A (en) * 2007-01-05 2007-08-08 宁波天弘电力器具有限公司 Omnidirectional rotary workbench for pole mounted operation
CN201623400U (en) * 2009-10-20 2010-11-03 上海市电力公司宝山供电分公司 Hydraulic lifting insulating platform for distribution line live-wire work
CN103840392A (en) * 2012-11-21 2014-06-04 国家电网公司 Concrete pole operation platform
CN104466787A (en) * 2013-09-22 2015-03-25 国家电网公司 Shielding device
CN204464867U (en) * 2015-04-13 2015-07-08 国家电网公司 Staged insulated platform
CN204675785U (en) * 2015-05-15 2015-09-30 上海安伯工业技术有限公司 A kind of adjustable platform
CN204876775U (en) * 2015-06-26 2015-12-16 国家电网公司 Cross arm for pole
CN205421884U (en) * 2015-12-22 2016-08-03 国家电网公司 Safety device that pole aerial work used

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20205799U1 (en) * 2002-04-12 2002-09-12 ALUMATEC Transport- und Hebegeräte GmbH & Co. KG, 49632 Essen Lifting platform for delimbing trees
CN101013803A (en) * 2007-01-05 2007-08-08 宁波天弘电力器具有限公司 Omnidirectional rotary workbench for pole mounted operation
CN201623400U (en) * 2009-10-20 2010-11-03 上海市电力公司宝山供电分公司 Hydraulic lifting insulating platform for distribution line live-wire work
CN103840392A (en) * 2012-11-21 2014-06-04 国家电网公司 Concrete pole operation platform
CN104466787A (en) * 2013-09-22 2015-03-25 国家电网公司 Shielding device
CN204464867U (en) * 2015-04-13 2015-07-08 国家电网公司 Staged insulated platform
CN204675785U (en) * 2015-05-15 2015-09-30 上海安伯工业技术有限公司 A kind of adjustable platform
CN204876775U (en) * 2015-06-26 2015-12-16 国家电网公司 Cross arm for pole
CN205421884U (en) * 2015-12-22 2016-08-03 国家电网公司 Safety device that pole aerial work used

Also Published As

Publication number Publication date
CN105565220A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105565220B (en) A kind of aerial work platform
CN204118585U (en) A kind of installation cross-arm auxiliary support apparatus
EP2505834A2 (en) Maintenance platform
CN107263416A (en) A kind of portable power power tool case with built-in cat ladder
CN104638553A (en) 180-degree rotary reinforced concrete pole lazy arm
CN103792136A (en) Connecting device for drawing detection of expansion bolt special for suspended ceiling and detection method
CN105840087A (en) Electric power overhaul folding ladder
CN105442827A (en) Chimney beacon paint surrounding rope type construction basket and method
CN201157157Y (en) Operation chair for line rod
CN208448461U (en) A kind of portable high-building finishing guard
CN205421884U (en) Safety device that pole aerial work used
KR101530887B1 (en) Vertical installing device for movable mast and installing method thereoof
CN106246094A (en) A kind of novel mounting attachment and using method thereof
CN102627246B (en) Multifunctional three-dimensional-rotating aerial work platform
CN208970901U (en) A kind of ground line fast assembling-disassembling device
CN207913034U (en) A kind of escaping descent control device holder and escaping descent control device
CN208921553U (en) Color steel tile and photovoltaic fixture drawing force detector and detection system
CN110159066B (en) Fence upright post with locking function
CN209434602U (en) Put formula lightning rod in side
CN209413251U (en) Electromechanics installs dedicated scaffold
CN221664394U (en) High-strength steel power steel pipe pole tower
CN202696011U (en) Maintenance platform of transformer substation
CN105500322B (en) A kind of operating platform with Active foot plate
CN205637533U (en) A quick scaffold frame for inspection of mixed -flow runner
CN110094455A (en) Method and device for adjusting balance weight

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424

Termination date: 20211222