CN106097661A - A kind of meter and the power equipment method for prewarning risk of meteorological disaster and system - Google Patents

A kind of meter and the power equipment method for prewarning risk of meteorological disaster and system Download PDF

Info

Publication number
CN106097661A
CN106097661A CN201610596732.0A CN201610596732A CN106097661A CN 106097661 A CN106097661 A CN 106097661A CN 201610596732 A CN201610596732 A CN 201610596732A CN 106097661 A CN106097661 A CN 106097661A
Authority
CN
China
Prior art keywords
early warning
information
hidden danger
power grid
meteorological disaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610596732.0A
Other languages
Chinese (zh)
Other versions
CN106097661B (en
Inventor
张炜
吴秋莉
郭丽娟
邬蓉蓉
邓雨荣
吕泽承
陶松梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201610596732.0A priority Critical patent/CN106097661B/en
Publication of CN106097661A publication Critical patent/CN106097661A/en
Application granted granted Critical
Publication of CN106097661B publication Critical patent/CN106097661B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B31/00Predictive alarm systems characterised by extrapolation or other computation using updated historic data

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of meter and the power equipment method for prewarning risk of meteorological disaster and system, comprise the following steps: obtain current weather disaster early-warning information;Obtain current electric grid potential safety hazard information;Judge whether power grid security hidden danger region exists meteorological disaster early warning;Judge type and the degree of the region early warning of power grid security hidden danger;Issue potential safety hazard early warning.The present invention is based on geographical location information matching technique, expertise, by carrying out location matches research between the region of Public meteorology disaster alarm, type, the order of severity and the position of electric power facility potential safety hazard, type and the order of severity, association analysis etc., realize the accurate and timely early warning to electric power facility potential safety hazard, under the conditions of effectively can promoting special weather, ageing and the specific aim of electric power facility potential safety hazard early warning, and then accomplish early warning hidden danger accurately and timely, improve thinking and means that hidden danger processes.

Description

A kind of meter and the power equipment method for prewarning risk of meteorological disaster and system
Technical field
The present invention relates to power equipment state monitoring and fault diagnosis technology field, concretely relate to a kind of meter and gas Power equipment method for prewarning risk and system as disaster.
Background technology
Public meteorology disaster alarm plays increasingly key player, state in resident living, enterprise's production activity at present Weather bureau of family also to the meteorological disaster specification of the orders of severity dissimilar, different mark, issue flow process and counter-measure, typical case Meteorological disaster type have heavy rain, high temperature, cooling strong wind, strong convective weather, sandstorm, Strong Breezes Over, dense fog, haze, cold wave, sudden and violent Snow and 11 types such as typhoon, grade has indigo plant, Huang, orange and red represent general, heavier, serious and especially severe respectively.Meteorological calamity Evil early warning information generally comprises city, area, type, grade, state, issuing time, renewal time and early warning text.
Electrical network and equipment thereof run among environment, are necessarily affected by environment, especially become when meteorological condition During change.Power equipment, because of differences such as its type, local environment, self-conditions, is affected the most different by different meteorological conditions; At electric power facility potential safety hazard management aspect, electric power enterprise the specification issue of hidden danger, the flow process of process.Electric power facility safety is hidden Suffering from and can be divided into building, construction, screen of trees, side slope, mountain fire, Bird's Nest, flare thing according to its type, stack the types such as foreign material, it describes Information generally comprises affiliated company, title, place, description, hidden danger source, type, discovery date, state, grade, consequence etc..
Currently, meteorological disaster early warning and the impact on power equipment thereof are mainly by GIS-Geographic Information System, by gas Image data, including forecast data, real time data and the location sets application of power equipment, mainly has two aspects: (1) shows electricity The weather circumstance condition of net, there are what power equipment or facility in such as certain region, its current or meteorological condition of history How;(2) can be according to the meteorological condition of history, it is judged that when current meteorological condition reaches certain rank, the shadow that electrical network is produced Ring;By by the data fusion of these two aspects, bring possibility to the more application of exploitation.But due to electrical network larger time, only Analyze meteorological not accurate enough on the impact of whole electrical network, it is impossible to electrical network existence needs the point paid close attention to carry out selective analysis.
Along with the arriving in intelligent grid epoch, grid company needs to make full use of electrical network, there is hidden danger The Public meteorology environmental data of electrical network and facility thereof, it is achieved development and change accurate, reflection electric power facility hidden danger in time, with reply Manpower and electrical network scale constantly expand between unmatched contradiction, more preferably monitoring and process hidden danger.
Summary of the invention
The present invention in order to precisely, the outside weather environmental change of reflection electric power facility potential safety hazard in time and difference Meteorological condition hidden danger affected level, a kind of meter and the power equipment method for prewarning risk of meteorological disaster and system are proposed, Can realize comprehensively analyzing whether electric power facility hidden danger under DIFFERENT METEOROLOGICAL CONDITIONS exists the possibility that development deteriorates, and be entered by system Row hidden danger early warning is issued, thus effectively promotes the grid company regulatory level to potential safety hazard.
For solving above-mentioned technical problem, the technical scheme is that
A kind of meter and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that comprise the following steps:
S1: obtain current weather disaster early-warning information;
S2: obtain current electric grid potential safety hazard information;
S3: judge whether power grid security hidden danger region exists meteorological disaster early warning;
S4: judge type and the degree of the region early warning of power grid security hidden danger;
S5: issue potential safety hazard early warning.
Preferably, in described step S1 obtain current weather disaster early-warning information mode be meteorological system active push or It is acquired from public network, information that disaster early-warning information that described meteorological disaster early warning information includes increasing newly, early warning eliminate and pre- The information of alert change.
Preferably, in described step S2, the step obtaining current electric grid potential safety hazard information is:
S21: power worker scene make an inspection tour, it may be found that power grid security hidden danger information be registered in safety production system;
S22: when having hidden danger to produce, eliminating or change, described safety production system active push power grid security hidden danger information;
The potential safety hazard information that S23: described safety production system identification is not disposed or increases newly, and will be disposed Potential safety hazard information filtering fall.
Preferably, in described step S3, it is judged that whether power grid security hidden danger region exists the side of meteorological disaster early warning Method is by comparing, the geographical location information of power grid security hidden danger and meteorological disaster alarm to judge meteorological disaster early warning Whether region contains the position of hidden danger point, concretely comprises the following steps:
S31: the meteorological disaster information pushed according to meteorological system determines the longitude and latitude of the closed area that meteorological disaster early warning covered Degree border;
S32: the station location marker in each potential safety hazard information in obtaining step S23;
S33: obtain the longitude and latitude numerical value corresponding to above-mentioned each station location marker one by one by correlation inquiry;
S34: whether each longitude and latitude numerical value obtained in comparison step S33 one by one is comprised in longitude and latitude determined by step S31 In degree border.
Preferably, described step S4 judging, the type of power grid security hidden danger region early warning and the method for degree are as closing Connection analysis method, it is judged that standard is set up based on expertise and pertinent arts, refinement draws;Concretely comprise the following steps:
S41: according to the result of step S34, judge one by one to be included in longitude and latitude border determined by meteorological disaster early warning is every Between individual power grid security hidden danger point and meteorological disaster early warning, if there is interactional relation, if there is relative influence Relation, then be associated power grid security hidden danger point with meteorological disaster early warning;
S42: determine coming into force, cancel, demote and upgrading of power grid security hidden danger early warning, root according to the effect duration of meteorological disaster early warning Dissimilar according to meteorological disaster early warning information, it is judged that the mode of process is:
(1) meteorological disaster early warning comes into force, it is judged that whether the power grid security hidden danger being associated with meteorological disaster early warning exists, and if Draw after judgement and there is power grid security hidden danger, then power grid security hidden danger early warning validation message produces;
(2) when the grade of meteorological disaster early warning changes, the power grid security hidden danger being associated with meteorological disaster early warning etc. Level, it can also happen that change, if it is determined that the power grid security hidden danger grade of association changes, then needs to issue power grid security hidden Suffer from early warning change message;
(3) meteorological disaster early warning was lost efficacy, then previous meteorological disaster early warning come into force of its association and according to this meteorological calamity The power grid security hidden danger early warning that evil early warning judges all was lost efficacy, and needed to issue power grid security hidden danger early warning thrashing message.
Preferably, the channel that in described step S5, early warning is issued is the one or many in short message, mail and wechat mode Kind, concretely comprise the following steps:
S51: assemble early warning information according to different requirement of used publication channel;Described early warning information breath includes that power grid security is hidden Suffer from early warning validation message, power grid security hidden danger early warning change message and power grid security hidden danger early warning thrashing message;
Configuration information relevant in S52: reading system as required, is packaged above-mentioned early warning information;
S53: send early warning information by the channel selected;
S54: receive the acknowledgement information that the other side sends;
S55: early warning information and acknowledgement information are saved in memorizer.
A kind of meter and the power equipment Warning System of meteorological disaster, it is characterised in that: include data acquisition subsystem, Subsystem and memorizer are issued in data analytics subsystem, early warning;Described data analytics subsystem respectively with described data acquisition System and described early warning are issued subsystem and are connected, and described early warning is issued subsystem and is connected with described memorizer;Described data acquisition Subsystem is used for obtaining current weather disaster early-warning information and current electric grid potential safety hazard information;Described data analytics subsystem is used Judge whether power grid security hidden danger region exists meteorological disaster early warning and judge power grid security hidden danger location in analyzing The type of territory early warning and degree;Described early warning is issued subsystem and is used for issuing potential safety hazard early warning information and receiving acknowledgement information. Described memorizer is used for storing early warning information and acknowledgement information.
Preferably, described data acquisition subsystem obtains the mode of current weather disaster early-warning information is meteorological system active Pushing or be acquired from public network, the mode obtaining current electric grid potential safety hazard information is safety production system active push.
Preferably, described data analytics subsystem is used for analyzing whether power grid security hidden danger region exists meteorological disaster The way of early warning is by comparing the geographical location information of described power grid security hidden danger with described meteorological disaster early warning, uses Be association analysis method in analyzing the method for the type of power grid security hidden danger region early warning and degree, it is judged that standard be based on Expertise and pertinent arts are set up, refinement draws.
Preferably, described early warning issues subsystem for issuing the channel of potential safety hazard early warning information is short message, mail With one or more in wechat mode.
Compared to the prior art, what the present invention produced has the beneficial effects that: the present invention mates skill based on geographical location information Art, expertise, by the region of Public meteorology disaster alarm, the position of type, the order of severity and electric power facility potential safety hazard Put, between type and the order of severity, carry out location matches research, association analysis etc., it is achieved accurate to electric power facility potential safety hazard With timely early warning, under the conditions of effectively can promoting special weather, the ageing and specific aim of electric power facility potential safety hazard early warning, accomplish Early warning hidden danger accurately and timely, thus improve thinking and the means that hidden danger processes.Concrete advantage is as follows:
1) present invention researches and develops, applies a kind of meter and the power equipment Warning System of meteorological disaster, overcomes power transmission and transformation and sets The standby difficult problem mated with coordinate position between special weather region, improves the ageing and pin of electric power facility potential safety hazard early warning To property.
2) present invention proposes a kind of meter and the power equipment method for prewarning risk of meteorological disaster, solves identification location The type of power transmission and transforming equipment potential safety hazard and a difficult problem for degree in territory, improve thinking and hands that power equipment safety hidden danger processes Section.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, in embodiment being described below required for make Accompanying drawing be briefly described, it should be apparent that, below describe in accompanying drawing be only some embodiments of the present invention, for From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing, wherein:
Fig. 1 is the method flow schematic diagram of the present invention;
Fig. 2 is the system structure schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe wholely.Obviously, described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under not making creative work premise Execute example, broadly fall into the scope of protection of the invention.
Fig. 1 is the schematic flow sheet of the power equipment method for prewarning risk of a kind of meter of the present invention and meteorological disaster, such as Fig. 1 institute Show, said method comprising the steps of:
S1: obtain current weather disaster early-warning information;
S2: obtain current electric grid potential safety hazard information;
S3: judge whether power grid security hidden danger region exists meteorological disaster early warning;
S4: judge type and the degree of the region early warning of power grid security hidden danger;
S5: issue potential safety hazard early warning
In step sl, obtain current weather disaster early-warning information can by signing by the way of professional service with weather bureau, by Weather bureau provides to native system, it is also possible to obtains, by internet, the Public meteorology data that weather bureau externally issues, compares For, sign the mode safety of Professional Services Agreement, data reliability is the most secure.The acquisition mode of weather warning information It is usually by meteorological system active push, and is changing push, when i.e. having disaster early-warning information to occur or change, meteorological system Native system will be pushed to.
In the present embodiment, the meteorological disaster early warning information obtained by meteorological system has three kinds:
(1) newly-increased disaster early-warning information, form is: [cold yellow early warning of XX city] meteorological observatory of city in 26 days 17 time in land, the whole city Cold yellow early warning is issued on ground, it is contemplated that the 27 Wo city lowest temperatures will drop to less than 10 DEG C, and signal may continue 3-4 days, notes Warming, place of temporarily going to a winter resort is open.
(2) information that early warning eliminates, form is: [XX city cancel Lightning Warning] thunderstorm cloud cluster weakens, meteorological observatory of city in When 29 days 15 55 points the whole city cancel Lightning Warning.
(3) information of early warning change, general format is: [the cold orange early warning in XX city is downgraded to yellow] meteorological observatory of city is in 20 During day 10, cold for the whole city orange early warning is downgraded to yellow by 10 points, represents that temperature gos up, but the lowest temperature still will be less than 10 sooner or later DEG C, note warming.
After early warning information obtains, for above-mentioned three kinds of different types of early warning information, it is carried out different subsequent treatment, For newly-increased disaster early-warning information, follow-up need to judge whether its region exists hidden danger, and judge final early warning etc. Level;For the early warning information eliminated, need to judge the most corresponding electric power safety hidden danger early warning of the meteorological disaster early warning of its correspondence, If it has, then the early warning of electric power safety hidden danger is also required to issue the message eliminated, without then need not process;Become for early warning The information changed, needs according to the most corresponding potential safety hazard early warning of original early warning of its correspondence, and rejudge early warning grade, The change of type.
In step s 2, when the acquisition of power grid security hidden danger information is to carry out on-the-spot tour by work about electric power personnel, send out After existing hidden danger, registration hidden danger and report realize.Generally Recognized as safe hidden danger information can be registered in safety production system, therefore In the present embodiment, power grid security hidden danger information is by safety production system active push, i.e. when there being hidden danger to produce, eliminate or become During change, just by this information pushing to native system.
The form of hidden danger information is generally: XX power supply administration, 110kVXX line N44-N45 tower, and under line and line limit is planted high bar and planted Thing, headroom 5 meters, quantity about 60, discovery time on January 7th, 2013, grade is general, and hidden danger consequence is to be likely to result in Pyatyi Event, the most untreated.
After getting potential safety hazard information, the process that native system does be identify state therein in processing, the table such as newly-increased The information that bright hidden danger still exists, and the hidden danger being disposed is filtered out.Because only that the hidden danger currently still existed just needs The analysis of weather disaster early warning to be carried out, the most treated complete hidden danger represents that it no longer affects the safe operation of electrical network, the most not Need further analyzing and processing.
Step S3 is on the basis of obtaining meteorological disaster early warning information and power grid security hidden danger information, it is judged that occurring The region at the electrical network facilities place of potential safety hazard, if there is weather warning disaster.Owing to power grid security hidden danger is mainly with hidden danger Presented in Dian, and meteorological disaster early warning information is issued with the form in region, is therefore mainly by power grid security hidden danger Compare with the geographical location information of meteorological disaster alarm, to judge whether meteorological disaster prewarning area contains hidden danger point Position and determine.
In weather monitoring field, typically a city is divided into the rectangular area of some closings, and by weather monitoring system The meteorological disaster information that system obtains is as it was previously stated, contain the region of this closing of administrative region and meteorological system division. In order to precisely early warning, the present embodiment directly applies closed area to judge.The longitude and latitude contour description of closed area is as follows:
Region 1: longitude range (114.5833,114.5933) dimensional extent (25.54,25.55)
In power system, the positional information of hidden danger is then determined by the longitude and latitude of the electric power facility of its occurred position, such as goes up In the potential safety hazard information stated, home position is XX power supply administration 110kV XX line N44-N45 tower.At this point it is possible to correlation inquiry is above-mentioned Obtaining the information Registration Module about this shaft tower in the information system of potential safety hazard, obtain its longitude and latitude numerical value, then judging should In the range of whether the longitude and latitude of shaft tower is comprised in the longitude and latitude of meteorological disaster early warning information.
It is to be noted that
(1) scope of meteorological disaster early warning is often much larger than the position of power grid security hidden danger, therefore pre-a meteorological disaster In the range of police, it is understood that there may be multiple potential safety hazard early warning, need to judge one by one;
(2) hidden danger is affected by meteorological disaster scope, within such as 1 kilometer radius of circle, or in line corridor;
(3) the affected region of hidden danger is incessantly on point, but in the range of one, it is therefore desirable to introduce line corridor radius and come Judging, line corridor radius refers to the direction along circuit, and the region in the much radius in its both sides is also involved area.
The association analysis of step S4 refers to after having analyzed the position of hidden danger and meteorological disaster alarm, then judge this two Between the information of type, if there is interactional relation, impact is front or negative.Such as transmission line of electricity Contamination hidden danger is negative impact relation with the dense fog of weather, sandstorm and haze early warning, i.e. dense fog, sandstorm and haze can promote to amass Dirt is more seriously, develop more quickly.The relation criterion of both is set up based on expertise and pertinent arts, is refined Drawing, simple correlation model can be described as: when there is haze early warning, and what the existence of transmission line of electricity contamination class potential safety hazard deteriorated can Can, wherein II level (namely red scale) and above haze early warning produce II to contamination class potential safety hazard more than general type Level early warning.
When incidence relation judges, in addition it is also necessary to determine the coming into force of early warning according to effect duration of meteorological disaster early warning, cancel, demote With upgrading etc., according to the several types of meteorological disaster early warning information, it is judged that the mode of process has following several:
(1) meteorological disaster early warning comes into force, it is judged that whether the power grid security hidden danger being associated with meteorological disaster early warning exists, and if Draw after judgement and there is power grid security hidden danger, then power grid security hidden danger early warning validation message produces;
(2) when the grade of meteorological disaster early warning changes, the power grid security hidden danger being associated with meteorological disaster early warning etc. Level, it can also happen that change, if it is determined that the power grid security hidden danger grade of association changes, then needs to issue power grid security hidden Suffer from early warning change message;
(3) meteorological disaster early warning was lost efficacy, then previous meteorological disaster early warning come into force of its association and according to this meteorological calamity The power grid security hidden danger early warning that evil early warning judges all was lost efficacy, and needed to issue power grid security hidden danger early warning thrashing message.
The complexity of the criterion between hidden danger and meteorological disaster is between hidden danger and meteorological disaster it is not one to one Relation, but the complex relationship coexisted of mutually promoting and prevent of multi-to-multi.Such as when there is haze early warning, except paying close attention to it Outside the impact of contamination class hidden danger, also to judge whether there occurs the early warning of arid or heavy rain, and duration, because of Play for arid is the effect increasing the weight of hidden danger, and the effect of heavy rain is the most contrary.According to expertise in the present invention, and always Knot historical data, arranges and draws all kinds of meteorological disaster early warning and the order of severity thereof and power grid security hidden danger type and the order of severity thereof Between incidence relation standard, as the foundation judged, and according to the service conditions actually occurred that recorded, conclude renewal and sentence Disconnected standard.
Step S5 has been the issue of electric power facility potential safety hazard early warning.The effect that early warning is issued is to make predetermined user lead to Cross different channel reception to early warning information, the such as mode such as short message, mail and wechat.Early warning information is produced in previous step On the basis of, by means of different channels, the form such as short message, Email that is assembled into by early warning information stores data base In, the assembling of early warning information needs to meet the requirement of two aspects: one is the restriction meeting different types of message format, such as Every 70 Chinese characters of short message are a message, then require more than 70 to split message;Two are intended to according to default message format group Dress, such as starting consolidation form at short message is " [early warning platform] ".
After early warning information assembles, in addition it is also necessary to the message of configuration, the recipient information of mail, such as hands in reading system Plane No. code or addresses of items of mail.Utilize system and SMS platform, the interface of mailing system, send messages to recipient and by right Method, system obtains message and sends receipt.The result of pre-alert notification is also stored in data base the promoter's feedback to issue to early warning The result of notice.
In sum, by five basic steps, complete the potential safety hazard early warning considering weather warning factor judgement, Identify and issue.
Fig. 2 is the structural representation of the power equipment Warning System of a kind of meter of the present invention and meteorological disaster.Such as Fig. 2 Shown in, described system includes: subsystem and memorizer are issued in data acquisition subsystem, data analytics subsystem, early warning;Described number Issuing subsystem with described data acquisition subsystem and described early warning respectively according to analyzing subsystem to be connected, subsystem is issued in described early warning System is connected with described memorizer;Described data acquisition subsystem is used for obtaining current weather disaster early-warning information and current electric grid peace Full hidden danger information;Described data analytics subsystem is used for analyzing and judges whether power grid security hidden danger region exists meteorological disaster Early warning and judge type and the degree of the region early warning of power grid security hidden danger;Described early warning is issued subsystem and is used for issuing peace Full hidden danger early warning information and reception early warning information send acknowledgement information;Described memorizer is used for storing early warning information and receipt letter Breath.
Data acquisition subsystem obtains disaster early-warning information that the kind of current weather disaster early-warning information includes increasing newly, pre- The alert information eliminated and the information etc. of early warning change, acquisition mode is meteorological system active push or is acquired from public network, one As take by the mode of meteorological system active push, and be changing push, i.e. have disaster early-warning information to occur or during change, gas As system will active push to native system, thus can guarantee that ageing, accuracy, the safety and reliability of information.And When the mode of acquisition current electric grid potential safety hazard information is to carry out on-the-spot tour by work about electric power personnel, after scenting a hidden danger, Registration hidden danger and report realize, and Generally Recognized as safe hidden danger information can be registered in safety production system in time, therefore this enforcement In example, power grid security hidden danger information is by safety production system active push, i.e. when having hidden danger to produce, eliminating or change, i.e. Active push is to native system.
Data analytics subsystem is for analyzing whether power grid security hidden danger region exists the way of meteorological disaster early warning It is by the geographical location information of power grid security hidden danger and meteorological disaster alarm being compared, being used for analyzing power grid security hidden danger The type of region early warning and the method for degree are association analysis method, it is judged that standard is based on expertise and association area Knowledge is set up, refinement draws.
It is in short message, mail and wechat mode that early warning issues subsystem for issuing the channel of potential safety hazard early warning information One or more.After early warning information assembles, in addition it is also necessary to recipient's letter of the message of configuration, mail in reading system Breath, such as phone number or addresses of items of mail.Utilize system and SMS platform, the interface of mailing system, send messages to receive Person also sends acknowledgement information by method, system is obtained message.The result of pre-alert notification be also stored in the data base of memorizer with To the result of promoter's feedback notification that early warning is issued.
Above example only in order to technical scheme to be described, is not intended to limit;Although with reference to previous embodiment The present invention is described in detail, it will be understood by those within the art that: it still can be to aforementioned each enforcement Technical scheme described in example is modified, or wherein portion of techniques feature is carried out equivalent;And these amendment or Replace, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (10)

1. a meter and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that comprise the following steps:
S1: obtain current weather disaster early-warning information;
S2: obtain current electric grid potential safety hazard information;
S3: judge whether power grid security hidden danger region exists meteorological disaster early warning;
S4: judge type and the degree of the region early warning of power grid security hidden danger;
S5: issue potential safety hazard early warning.
A kind of meter the most according to claim 1 and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that: institute Stating in step S1, the mode obtaining current weather disaster early-warning information is meteorological system active push or is acquired from public network, Described meteorological disaster early warning information includes disaster early-warning information, the information of early warning elimination and the information of early warning change increased newly.
A kind of meter the most according to claim 2 and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that: institute Stating in step S2, the step obtaining current electric grid potential safety hazard information is:
S21: power worker scene make an inspection tour, it may be found that power grid security hidden danger information be registered in safety production system;
S22: when having hidden danger to produce, eliminating or change, described safety production system active push power grid security hidden danger information;
The potential safety hazard information that S23: described safety production system identification is not disposed or increases newly, and will be disposed Potential safety hazard information filtering fall.
A kind of meter the most according to claim 3 and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that: institute State in step S3, it is judged that whether power grid security hidden danger region exists the method for meteorological disaster early warning is by power grid security The geographical location information of hidden danger and meteorological disaster alarm is compared, to judge whether meteorological disaster prewarning area contains hidden danger The position of point, concretely comprises the following steps:
S31: the meteorological disaster information pushed according to meteorological system determines the longitude and latitude of the closed area that meteorological disaster early warning covered Degree border;
S32: the station location marker in each potential safety hazard information in obtaining step S23;
S33: obtain the longitude and latitude numerical value corresponding to above-mentioned each station location marker one by one by correlation inquiry;
S34: whether each longitude and latitude numerical value obtained in comparison step S33 one by one is comprised in longitude and latitude determined by step S31 In degree border.
A kind of meter the most according to claim 4 and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that: institute State and step S4 judging, the type of power grid security hidden danger region early warning and the method for degree are association analysis method, it is judged that mark Standard is set up based on expertise and pertinent arts, refinement draws;Concretely comprise the following steps:
S41: according to the result of step S34, judge one by one to be included in longitude and latitude border determined by meteorological disaster early warning is every Between individual power grid security hidden danger point and meteorological disaster early warning, if there is interactional relation, if there is relative influence Relation, then be associated power grid security hidden danger point with meteorological disaster early warning;
S42: determine coming into force, cancel, demote and upgrading of power grid security hidden danger early warning, root according to the effect duration of meteorological disaster early warning Dissimilar according to meteorological disaster early warning information, it is judged that the mode of process is:
(1) meteorological disaster early warning comes into force, it is judged that whether the power grid security hidden danger being associated with meteorological disaster early warning exists, and if Draw after judgement and there is power grid security hidden danger, then power grid security hidden danger early warning validation message produces;
(2) when the grade of meteorological disaster early warning changes, the power grid security hidden danger being associated with meteorological disaster early warning etc. Level, it can also happen that change, if it is determined that the power grid security hidden danger grade of association changes, then needs to issue power grid security hidden Suffer from early warning change message;
(3) meteorological disaster early warning was lost efficacy, then previous meteorological disaster early warning come into force of its association and according to this meteorological calamity The power grid security hidden danger early warning that evil early warning judges all was lost efficacy, and needed to issue power grid security hidden danger early warning thrashing message.
A kind of meter the most according to claim 5 and the power equipment method for prewarning risk of meteorological disaster, it is characterised in that: institute Stating the channel that in step S5, early warning is issued is one or more in short message, mail and wechat mode, concretely comprises the following steps:
S51: assemble early warning information according to different requirement of used publication channel;Described early warning information breath includes that power grid security is hidden Suffer from early warning validation message, power grid security hidden danger early warning change message and power grid security hidden danger early warning thrashing message;
Configuration information relevant in S52: reading system as required, is packaged above-mentioned early warning information;
S53: send early warning information by the channel selected;
S54: receive the acknowledgement information that the other side sends;
S55: early warning information and acknowledgement information are saved in memorizer.
7. a meter and the power equipment Warning System of meteorological disaster, it is characterised in that: include data acquisition subsystem, number Subsystem and memorizer is issued according to analyzing subsystem, early warning;Described data analytics subsystem respectively with described data acquisition subsystem System and described early warning are issued subsystem and are connected, and described early warning is issued subsystem and is connected with described memorizer;Described data acquisition System is used for obtaining current weather disaster early-warning information and current electric grid potential safety hazard information;Described data analytics subsystem is used for Analyze and judge whether power grid security hidden danger region exists meteorological disaster early warning and judge power grid security hidden danger region The type of early warning and degree;Described early warning is issued subsystem and is used for issuing potential safety hazard early warning information and receiving acknowledgement information;Institute State memorizer for storing early warning information and acknowledgement information.
A kind of meter the most according to claim 7 and the power equipment Warning System of meteorological disaster, it is characterised in that: institute The mode stating data acquisition subsystem acquisition current weather disaster early-warning information is meteorological system active push or carries out from public network Gathering, the mode obtaining current electric grid potential safety hazard information is safety production system active push.
A kind of meter the most according to claim 7 and the power equipment Warning System of meteorological disaster, it is characterised in that: institute State data analytics subsystem whether there is the way of meteorological disaster early warning for analyzing power grid security hidden danger region is to pass through The geographical location information of described power grid security hidden danger with described meteorological disaster early warning is compared, is used for analyzing power grid security hidden The type suffering from region early warning and the method for degree are association analysis method, it is judged that standard is based on expertise and relevant neck Domain knowledge is set up, refinement draws.
A kind of meter the most according to claim 7 and the power equipment Warning System of meteorological disaster, it is characterised in that: It is in short message, mail and wechat mode that described early warning issues subsystem for issuing the channel of potential safety hazard early warning information Plant or multiple.
CN201610596732.0A 2016-07-27 2016-07-27 It is a kind of meter and meteorological disaster power equipment method for prewarning risk Active CN106097661B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610596732.0A CN106097661B (en) 2016-07-27 2016-07-27 It is a kind of meter and meteorological disaster power equipment method for prewarning risk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610596732.0A CN106097661B (en) 2016-07-27 2016-07-27 It is a kind of meter and meteorological disaster power equipment method for prewarning risk

Publications (2)

Publication Number Publication Date
CN106097661A true CN106097661A (en) 2016-11-09
CN106097661B CN106097661B (en) 2019-02-01

Family

ID=57449487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610596732.0A Active CN106097661B (en) 2016-07-27 2016-07-27 It is a kind of meter and meteorological disaster power equipment method for prewarning risk

Country Status (1)

Country Link
CN (1) CN106097661B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107248251A (en) * 2017-07-06 2017-10-13 国家电网公司 A kind of anti-mountain fire external force destruction management-control method of transmission line of electricity
CN107464058A (en) * 2017-08-07 2017-12-12 平顶山学院 A kind of engineering management geographic information check system
CN109446289A (en) * 2018-10-18 2019-03-08 国网山东省电力公司应急管理中心 A kind of fine early warning system of power grid GIS based on environmental risk
CN112330061A (en) * 2020-11-25 2021-02-05 广东省气象公共安全技术支持中心 Service object-oriented differential meteorological disaster risk early warning system
CN115223336A (en) * 2022-06-23 2022-10-21 中核核信信息技术(北京)有限公司 Disaster early warning analysis system and method based on location service

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103679296A (en) * 2013-12-24 2014-03-26 云南电力调度控制中心 Grid security risk assessment method and model based on situation awareness
CN204089886U (en) * 2014-09-24 2015-01-07 国网山东省电力公司泰安供电公司 Based on the electrical network dynamic monitoring early warning system of weather information
CN104484348A (en) * 2014-11-27 2015-04-01 国家电网公司 Data display method and device
CN104680260A (en) * 2015-03-17 2015-06-03 云南电力调度控制中心 Method and system for establishing power grid visualized perceptual model
CN105448154A (en) * 2015-09-21 2016-03-30 中国南方电网有限责任公司 Integrated-platform-based substation operation training cabin

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103679296A (en) * 2013-12-24 2014-03-26 云南电力调度控制中心 Grid security risk assessment method and model based on situation awareness
CN204089886U (en) * 2014-09-24 2015-01-07 国网山东省电力公司泰安供电公司 Based on the electrical network dynamic monitoring early warning system of weather information
CN104484348A (en) * 2014-11-27 2015-04-01 国家电网公司 Data display method and device
CN104680260A (en) * 2015-03-17 2015-06-03 云南电力调度控制中心 Method and system for establishing power grid visualized perceptual model
CN105448154A (en) * 2015-09-21 2016-03-30 中国南方电网有限责任公司 Integrated-platform-based substation operation training cabin

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107248251A (en) * 2017-07-06 2017-10-13 国家电网公司 A kind of anti-mountain fire external force destruction management-control method of transmission line of electricity
CN107464058A (en) * 2017-08-07 2017-12-12 平顶山学院 A kind of engineering management geographic information check system
CN109446289A (en) * 2018-10-18 2019-03-08 国网山东省电力公司应急管理中心 A kind of fine early warning system of power grid GIS based on environmental risk
CN109446289B (en) * 2018-10-18 2020-07-10 国网山东省电力公司应急管理中心 Electric wire netting GIS meticulous early warning system based on environmental risk
CN112330061A (en) * 2020-11-25 2021-02-05 广东省气象公共安全技术支持中心 Service object-oriented differential meteorological disaster risk early warning system
CN115223336A (en) * 2022-06-23 2022-10-21 中核核信信息技术(北京)有限公司 Disaster early warning analysis system and method based on location service

Also Published As

Publication number Publication date
CN106097661B (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN106097661A (en) A kind of meter and the power equipment method for prewarning risk of meteorological disaster and system
Gehring et al. Communication towers, lights, and birds: successful methods of reducing the frequency of avian collisions
JP4511560B2 (en) Method and system for automated location-dependent recognition of flood risk
Lindell et al. A hurricane evacuation management decision support system (EMDSS)
Nielsen et al. Double impact: When both tornadoes and flash floods threaten the same place at the same time
Bahraminejad et al. Proposing an early-warning system for optimal management of protected areas (Case study: Darmiyan protected area, Eastern Iran)
CN107391697A (en) Customizable synoptic analysis system, method and computer-readable medium
CN105069558A (en) Warning and analyzing method for power facility damage based on meteorological data
Rogers et al. Implementing hazard early warning systems
Jacobson et al. Assessing the Wind Energy Potential in Bangladesh: Enabling Wind Energy Development with Data Products
CN112380301A (en) Weather modification service information platform
Walker et al. Wind energy essentials: Societal, economic, and environmental Impacts
CN110111539A (en) A kind of Internet of Things cloud method for early warning, apparatus and system merging multiple information
Jacob et al. Indicators and monitoring
Sun et al. Early warning system for spatiotemporal prediction of fault events in a power transmission system
Bonelli et al. Thunderstorm nowcasting by means of lightning and radar data: algorithms and applications in northern Italy
Tang et al. The Shanghai multi-hazard early warning system: addressing the challenge of disaster risk reduction in an urban megalopolis
CN205941952U (en) Weather information early warning system
Bucchignani et al. Analysis of expected climate extreme variability with regional climate simulations over Napoli Capodichino Airport: A contribution to a climate risk assessment framework
Solecki et al. New York City Panel on Climate Change 2019 Report Chapter 9: Perspectives on a City in a Changing Climate 2008-2018
Sambo et al. Framework for multirisk climate scenarios across system receptors with application to the Metropolitan City of Venice
Al-Zaabi et al. Qualitative analysis of early warning: A case study from Oman
KR102143039B1 (en) Remote monitoring and control apparatus for the type of multi-path
Guan The impact of onshore wind farms on ecological corridors in Ningbo, China
Obermeier Verification and analysis of impact-based tornado warnings in the central region of the National Weather Service

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant