CN106096690A - Equipment information management method and apparatus - Google Patents
Equipment information management method and apparatus Download PDFInfo
- Publication number
- CN106096690A CN106096690A CN201610418326.5A CN201610418326A CN106096690A CN 106096690 A CN106096690 A CN 106096690A CN 201610418326 A CN201610418326 A CN 201610418326A CN 106096690 A CN106096690 A CN 106096690A
- Authority
- CN
- China
- Prior art keywords
- equipment
- information
- quick response
- response code
- facility information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K19/00—Record carriers for use with machines and with at least a part designed to carry digital markings
- G06K19/06—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
- G06K19/06009—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking
- G06K19/06037—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking multi-dimensional coding
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of equipment information management method and apparatus, belongs to engineering construction technical field.The facility information of acquisition equipment;The equipment information management page is generated according to described facility information;Generating the Quick Response Code mark that the described equipment information management page is corresponding, described Quick Response Code mark is arranged on the surface of described equipment.The equipment information management method and apparatus that the present invention provides, improves the efficiency of management of facility information.
Description
Technical field
The present invention relates to engineering construction technical field, particularly relate to a kind of equipment information management method and apparatus.
Background technology
For most of engineering units, as a example by clean coal gasification projects project construction, execute in engineering project
During work, it usually needs plurality of devices completes this clean coal gasification projects project construction work jointly.
In order to plurality of devices information in work progress is managed, in prior art, it is common that in multiple equipment
Place identification label on each equipment, this identification label records the essential information (example of equipment corresponding to this identification label
Such as date of marching into the arena, machinery model, serviceability etc.), the essential information of this equipment can be inquired about by this identification label, if this sets
Standby essential information changes, then need to remodify the information on this identification label, or again make a new mark
Know label, record this facility information after change, but, owing to the specification size of identification label is limited, can only record a small amount of
Information, for the specifying information (such as equipment source, examination situation, rule of operation, operator etc.) of this equipment, be the most all
Dependence is manually recorded on paper document or desktop computer;Management personnel it should be understood that or during the specifying information of more new equipment,
Indoor have to be returned to carry out inquiring about and record, and then realize the management of the specifying information of this equipment.
But, in prior art, the efficiency of management of facility information is the highest.
Summary of the invention
The embodiment of the present invention provides a kind of equipment information management method and apparatus, to improve the efficiency of management of facility information.
The embodiment of the present invention provides a kind of equipment information management method, including:
The facility information of acquisition equipment;
The equipment information management page is generated according to described facility information;
Generating the Quick Response Code mark that the described equipment information management page is corresponding, described Quick Response Code mark is arranged on described equipment
Surface.
In an embodiment of the present invention, this equipment information management method also includes:
Receiving the access request that client sends by scanning described Quick Response Code to identify, described access request is used for asking to visit
Ask the equipment information management page that described Quick Response Code mark is corresponding;
Sending access response to described client, described access response is used for showing the described equipment information management page.
In an embodiment of the present invention, described facility information includes: engineering entity information, engineering process parameter information,
Device parameter information, engineering valve information, meter information, pipe fitting information, engineering archive information and/or personal information.
In an embodiment of the present invention, this equipment information management method also includes:
Receive the amendment information of the facility information of described equipment;
Facility information described in amendment information updating according to described facility information.
In an embodiment of the present invention, described Quick Response Code is code of living.
The embodiment of the present invention also provides for a kind of equipment, described equipment is provided with the facility information of described equipment is corresponding two
Dimension code mark.
In an embodiment of the present invention, described Quick Response Code mark is sprayed on the surface of described equipment.
In an embodiment of the present invention, described Quick Response Code mark label is located at the surface of described equipment.
In an embodiment of the present invention, described Quick Response Code mark uses anti-corrosion and waterproof paint spraying.
In an embodiment of the present invention, described Quick Response Code mark is arranged at least one component surface of described equipment.
The equipment information management method and apparatus that the present invention provides, obtains the facility information of equipment, raw according to facility information
The forming apparatus information management page, generates the Quick Response Code mark that the equipment information management page is corresponding, and Quick Response Code mark is arranged on equipment
Surface.So, server, after the facility information getting equipment, generates equipment information management by facility information
The page, and generate, according to the equipment information management page, the Quick Response Code mark that this equipment information management page is corresponding further, change sentence
Talk about, namely establish the corresponding relation between the facility information of equipment and Quick Response Code mark, again because of Quick Response Code mark by
It is arranged on the surface of equipment, then management personnel are when being managed equipment, it is possible to directly scanned by scanning means and set
Put the Quick Response Code in equipment surface and identify acquisition facility information, thus the facility information of this equipment is managed, improve and set
The efficiency of management of standby information.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing used required in having technology to describe does one and introduces simply, it should be apparent that, the accompanying drawing in describing below is this
Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to
Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of present device approaches to IM embodiment one;
Fig. 2 is the schematic flow sheet of present device approaches to IM embodiment two;
Fig. 3 is the schematic flow sheet of present device approaches to IM embodiment three;
Fig. 4 is the structural representation of present device embodiment one.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
Term " first " in description and claims of this specification and above-mentioned accompanying drawing, " second ", " the 3rd " "
Four " etc. (if present) is for distinguishing similar object, without being used for describing specific order or precedence.Should manage
Solve the data so used can exchange in the appropriate case, in order to embodiments of the invention described herein such as can be to remove
Order beyond those that here illustrate or describe is implemented.Additionally, term " includes " and " having " and theirs is any
Deformation, it is intended that cover non-exclusive comprising, such as, contain series of steps or the process of unit, method, system, product
Product or equipment are not necessarily limited to those steps or the unit clearly listed, but can include the most clearly listing or for this
Other step that a little processes, method, product or equipment are intrinsic or unit.
In Engineering Project Construction field, for most of engineering units, it usually needs plurality of devices completes work jointly
Journey building-up work.During Construction of Engineering Projects, the relevant information of these equipment often (such as to be marched into the arena by management personnel
Date, machinery model, equipment source, examination situation etc.) inquire about and manage, thus ensure to complete this engineering safe and orderlyly
Project construction works.
Fig. 1 is the schematic flow sheet of present device approaches to IM embodiment one, and the method is performed by server, please
Shown in Figure 1, in the present embodiment, this equipment information management method includes:
S101, the facility information of acquisition equipment.
Wherein, this facility information not only includes the essential information of equipment self, such as, machinery model, serviceability, technique
The information such as parameter, may further include in the Construction Process of Engineering Project using this equipment, believe with this device-dependent equipment
Breath, such as, the information such as date of marching into the arena, place to use, operator.
Example, server can obtain the facility information of equipment by input equipment.Specifically can include two kinds of realizations
Mode, the first, management personnel's inputting interface input equipment information at input equipment can be passed through, and will by input equipment
This facility information uploads onto the server, thus obtains the facility information of equipment;The second, this sets can to pass through input equipment collection
Standby facility information, and this facility information is uploaded onto the server, thus obtain the facility information of equipment.Optionally, input sets
Standby can be notebook computer, it is also possible to be mobile phone, it is of course also possible to be other electronic equipments such as panel computer, here, for
Input equipment specifically what, the present invention does not do further restriction.
S102, according to facility information generate the equipment information management page.
In the present embodiment, after server gets the facility information of this equipment, can generate according to facility information should
The equipment information management page that facility information is corresponding, this administration page stores the facility information of this equipment, say, that pass through
Inquiry apparatus information administration page just can get the facility information of this equipment.
The Quick Response Code mark that S103, the generation equipment information management page are corresponding, Quick Response Code mark is arranged on the surface of equipment.
In the present embodiment, after server generates the Quick Response Code that the equipment information management page is corresponding, because this Quick Response Code
Mark is to be arranged on equipment surface, so management personnel are when inquiry apparatus information, directly can be scanned by scanning means
The Quick Response Code mark of equipment surface obtains facility information, and then is managed facility information.Optionally, scanning means can be
Mobile phone, it is also possible to be that panel computer etc. has scanning and the electronic equipment of display function, here, for the type of scanning means,
The present invention is the most further limited.
In the present embodiment, server, after the facility information getting equipment, generates equipment by facility information and believes
Breath administration page, and generate, according to the equipment information management page, the Quick Response Code mark that this equipment information management page is corresponding further
Know, in other words, namely establish the corresponding relation between the facility information of equipment and Quick Response Code mark, again because of Quick Response Code mark
Knowledge is the surface being arranged on equipment, then management personnel are when being managed equipment, it is possible to direct by scanning means
Scan setting identifies acquisition facility information at the Quick Response Code of equipment surface, thus is managed the facility information of this equipment, carries
The high efficiency of management of facility information.
Based on the embodiment that Fig. 1 is corresponding, further, the embodiment of the present invention provides another kind of equipment information management method,
Shown in Figure 2, Fig. 2 is the schematic flow sheet of present device approaches to IM embodiment two.This equipment information management
Method may include that
S201, the facility information of acquisition equipment.
The S101 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
S202, according to facility information generate the equipment information management page.
The S102 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
The Quick Response Code mark that S203, the generation equipment information management page are corresponding, Quick Response Code mark is arranged on the surface of equipment.
The S103 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
The access request that S204, reception client are sent by scanning Quick Response Code mark, access request is used for asking to access
The equipment information management page that Quick Response Code mark is corresponding.
Wherein, client can be to have scanning any one scanning means of Quick Response Code identification function, here, for client
Type, the present invention does not do and limits further.
Optionally, after facility information is stored in server, if management personnel need to obtain this facility information, Ke Yitong
Cross client scan Quick Response Code mark and send access request, in order to after server receives this access request, according to this access
Ask to send access response to client.
S205, to client send access response, access response be used for the display device information management page.
Optionally, server is after receiving the access request that client sends, it is possible to according to access request to visitor
Family end returns an access response, in order to the client display device information management page, because this equipment information management page
Storing the facility information of this equipment, therefore, the facility information of this equipment just can be looked into by management personnel by client
Ask and management.
Optionally, facility information includes: engineering entity information, engineering process parameter information, device parameter information, engineering
Valve information, meter information, pipe fitting information, engineering archive information and/or personal information.
Wherein, engineering entity information spinner to include using the title of on-the-spot structure of the engineering of this equipment, size, class
Type, construction time started, the construction information such as end time, concrete square amount;Engineering process parameter information mainly includes using being somebody's turn to do
Technological parameter information in the engineering of equipment;Device parameter information spinner to include the photo of this equipment self, equipment march into the arena the date,
The information such as unit type, serviceability, place to use, equipment source, examination situation, rule of operation, operator;Engineering valve
Information spinner to include using the information of each engineering valve in the engineering of this equipment;Meter information mainly includes using this equipment
The information of each instrument in engineering;Pipe fitting information spinner to include using the letter of each pipe fitting in the engineering of this equipment
Breath;Engineering archive information spinner to include construction project management file, the inspection lot data etc. using this equipment;Personal information
Mainly include using the name of each workmen in the engineering of this equipment, sex, age, native place, photo, academic title, work post (specially
Industry), personnel's tell somebody what one's real intentions are situation, potential job safety risk and emergency disposal of time, safety education and Check, safe practice of marching into the arena do
Method informs that situation ordered by situation, safety responsibility bookmark, professional technique obtains situation, rewards and punishments situation etc..
In the present embodiment, after facility information is stored in server, if management personnel need to obtain this facility information,
The Quick Response Code mark of equipment surface will be arranged on by client scan, thus send access request, server to server
After receiving this access request, return an access response according to this access request to client, in order to show to client
Show the equipment information management page, because this equipment information management page stores the facility information of this equipment, therefore, management personnel
Just by client, the facility information of this equipment can be inquired about and managed, thus be effectively improved the pipe of facility information
Reason inquiry and the efficiency of management.
Based on the embodiment that Fig. 1 or Fig. 2 is corresponding, further, the embodiment of the present invention provides another kind of equipment information management
Method, shown in Figure 3, Fig. 3 is the schematic flow sheet of present device approaches to IM embodiment two.
S301, the facility information of acquisition equipment.
The S101 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
S302, according to facility information generate the equipment information management page.
The S102 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
The Quick Response Code mark that S303, the generation equipment information management page are corresponding, Quick Response Code mark is arranged on the surface of equipment.
The S103 describing embodiment shown in Figure 1 in detail of this step, here is omitted.
S304, receive the amendment information of facility information of equipment.
Optionally, after facility information is stored in server, if this facility information changes, then need server
The facility information of storage is modified, and then realizes the renewal to facility information.In the present embodiment, management personnel can pass through
Input equipment to server send facility information amendment information, in order to server receive facility information amendment information it
After, according to the amendment information of this facility information, the facility information prestored is updated.
S305, amendment information updating device information according to facility information.
In the present embodiment, server is after receiving the amendment information of facility information, according to the amendment of this facility information
The facility information prestored is updated by information, it should be noted that simply enter the facility information prestored herein
Gone renewal, the facility information after renewal still corresponding update before the equipment information management page corresponding to facility information, and because of
The equipment information management page corresponding for facility information does not change, so the two dimension that this equipment information management page is corresponding
Code mark also will not change, the facility information after i.e. updating still corresponding update before Quick Response Code mark corresponding to facility information
Know, it is not necessary to server goes to generate new Quick Response Code mark again, and therefore, management personnel still can be according to the equipment letter before updating
Facility information after updating is inquired about and is managed by the Quick Response Code mark that breath is corresponding, further increases the management of facility information
Efficiency.
In any of the above-described embodiment, optionally, Quick Response Code is code of living.
Wherein, code of living is a kind of higher state of Quick Response Code, uses this work code, can be by amendment equipment information management
Facility information in the page, thus change the facility information that Quick Response Code mark is corresponding.
In the present embodiment, by Quick Response Code being set to code of living, accordingly even when facility information changes, it is only necessary to right
The facility information that server prestores is updated, and need not regenerate new further according to the facility information after updating
The new Quick Response Code mark of the equipment information management page and its correspondence, management personnel by the facility information before updating corresponding two
Dimension code mark just can inquire the facility information after renewal, thus is managed the facility information after updating, and improves and sets
The efficiency of management of standby information.
Fig. 4 is the structural representation of present device 40 embodiment one, the equipment 40 shown in Fig. 4, for above-mentioned Fig. 1, Fig. 2 and
The equipment 40 that in embodiment shown in Fig. 3, equipment 40 information is corresponding, shown in Figure 4, in the present embodiment, equipment 40 sets
It is equipped with the Quick Response Code mark 401 that equipment 40 information of described equipment 40 is corresponding.
In the present embodiment, by Quick Response Code mark 401 is arranged on equipment 40, because Quick Response Code mark 401 is corresponding
Having equipment 40 information of this equipment 40, therefore, management personnel just can directly scan this Quick Response Code mark 401 by scanning means
Equipment 40 information of this equipment 40 correspondence can be got, improve the acquisition efficiency of equipment 40 information, meanwhile, also allow for management
Equipment 40 information is managed by personnel, further increases the efficiency of management of equipment 40 information.
Optionally, above-mentioned by Quick Response Code mark 401 be arranged on equipment 40 time, specifically can include that following two can realize
Mode:
The first, can be sprayed on the surface of equipment 40 by Quick Response Code mark 401;The second, can identify Quick Response Code
401 are sticked on the surface of equipment 40.
For above-mentioned the first can implementation, Quick Response Code mark 401 is sprayed on equipment 40 surface, optionally, two dimension
Code mark 401 employing anti-corrosion and waterproof paint sprayings, by which, can be effectively prevented from Quick Response Code damaged or rushed
Brush, thus improve integrity and the persistency of Quick Response Code mark 401.
For above-mentioned the second can implementation, Quick Response Code mark 401 is sticked on equipment 40 surface, specifically can wrap
Include: after server generates the Quick Response Code mark 401 that equipment 40 information is corresponding, can be by printing device 40 by this Quick Response Code
Mark 401 prints, and the most again the Quick Response Code of printing is identified 401 and is sticked on equipment 40 surface, in order to management personnel according to
Equipment 40 information is managed by this Quick Response Code mark 401.
Further, when Quick Response Code mark 401 being arranged on equipment 40 surface by above two mode, this Quick Response Code
The surface of any parts that mark 401 can be arranged in equipment 40.Optionally, in the present embodiment, Quick Response Code mark 401
It is arranged at least one component surface of equipment 40.
Wherein, in valve during at least one parts can be this equipment 40, instrument, pipeline, pipe fitting one or
Multiple, here, for these at least one parts specifically what, the present invention does not do and limits further.
Example, in the present embodiment, if these at least one parts are conveyed to maintenance, because being arranged on its surface
Quick Response Code mark 401 stores the relevant information (such as, working service information, mount message etc.) of this equipment 40, overhauls people
These at least one parts are overhauled by the working service information etc. that member is just referred in equipment 40 information;Additionally, when being somebody's turn to do
After at least one parts has been overhauled, equally according to the mount message etc. in equipment 40 information find this at least one
Equipment 40 belonging to individual parts, and according to mount message, these at least one parts are arranged on its affiliated equipment 40,
Thus complete the maintenance process of these at least one parts, improve the overhaul efficiency of at least one parts.
One of ordinary skill in the art will appreciate that: all or part of step realizing above-mentioned each method embodiment can be led to
The hardware crossing programmed instruction relevant completes.Aforesaid program can be stored in a computer read/write memory medium.This journey
Sequence upon execution, performs to include the step of above-mentioned each method embodiment;And aforesaid storage medium includes: ROM, RAM, magnetic disc or
The various media that can store program code such as person's CD.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent
The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on
So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered
Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology
The scope of scheme.
Claims (10)
1. an equipment information management method, it is characterised in that including:
The facility information of acquisition equipment;
The equipment information management page is generated according to described facility information;
Generating the Quick Response Code mark that the described equipment information management page is corresponding, described Quick Response Code mark is arranged on the table of described equipment
Face.
Method the most according to claim 1, it is characterised in that also include:
Receiving the access request that client sends by scanning described Quick Response Code to identify, described access request is used for asking to access institute
State the equipment information management page that Quick Response Code mark is corresponding;
Sending access response to described client, described access response is used for showing the described equipment information management page.
Method the most according to claim 2, it is characterised in that described facility information includes: engineering entity information, engineering
Technological parameter information, device parameter information, engineering valve information, meter information, pipe fitting information, engineering archive information and/
Or personal information.
4. according to the method described in any one of claims 1 to 3, it is characterised in that also include:
Receive the amendment information of the facility information of described equipment;
Facility information described in amendment information updating according to described facility information.
5. according to the method described in any one of claims 1 to 3, it is characterised in that described Quick Response Code is code of living.
6. an equipment, it is characterised in that be provided with the Quick Response Code mark that the facility information of described equipment is corresponding on described equipment.
Equipment the most according to claim 6, it is characterised in that described Quick Response Code mark is sprayed on the surface of described equipment.
Equipment the most according to claim 6, it is characterised in that described Quick Response Code mark label is located at the surface of described equipment.
Equipment the most according to claim 7, it is characterised in that described Quick Response Code mark uses anti-corrosion and waterproof paint spraying.
10. according to the equipment described in any one of claim 6~9, it is characterised in that described Quick Response Code mark be arranged on described in set
At least one standby component surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610418326.5A CN106096690A (en) | 2016-06-12 | 2016-06-12 | Equipment information management method and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610418326.5A CN106096690A (en) | 2016-06-12 | 2016-06-12 | Equipment information management method and apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106096690A true CN106096690A (en) | 2016-11-09 |
Family
ID=57846756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610418326.5A Pending CN106096690A (en) | 2016-06-12 | 2016-06-12 | Equipment information management method and apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106096690A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107730146A (en) * | 2017-11-09 | 2018-02-23 | 北京恒华伟业科技股份有限公司 | A kind of material information management and material information recognition methods and device |
CN107845326A (en) * | 2017-12-19 | 2018-03-27 | 中铁第四勘察设计院集团有限公司 | Rail in high speed railway expansion and cotraction regulator displacement identification Sign Board and measuring method |
CN109753725A (en) * | 2019-01-03 | 2019-05-14 | 江南造船(集团)有限责任公司 | Pipeline section approaches to IM and its device, equipment and storage medium |
CN109766620A (en) * | 2019-01-03 | 2019-05-17 | 江南造船(集团)有限责任公司 | Digitize pipeline installation method and its device, equipment and storage medium |
CN109857704A (en) * | 2018-12-29 | 2019-06-07 | 北京起重运输机械设计研究院有限公司 | Equipment maintenance system and maintaining method |
CN111046990A (en) * | 2019-12-04 | 2020-04-21 | 中铁大桥局第七工程有限公司 | Method for managing test detection instrument based on two-dimensional code |
CN112687026A (en) * | 2020-12-24 | 2021-04-20 | 深圳市兴海物联科技有限公司 | Equipment management method, equipment management system and computer readable storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103390258A (en) * | 2013-06-28 | 2013-11-13 | 环境保护部华南环境科学研究所 | Updating and inquiring method and management system of laboratory object information and based on information code |
CN105260816A (en) * | 2015-09-17 | 2016-01-20 | 中国运载火箭技术研究院 | Aircraft full-life-cycle configuration management system |
-
2016
- 2016-06-12 CN CN201610418326.5A patent/CN106096690A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103390258A (en) * | 2013-06-28 | 2013-11-13 | 环境保护部华南环境科学研究所 | Updating and inquiring method and management system of laboratory object information and based on information code |
CN105260816A (en) * | 2015-09-17 | 2016-01-20 | 中国运载火箭技术研究院 | Aircraft full-life-cycle configuration management system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107730146A (en) * | 2017-11-09 | 2018-02-23 | 北京恒华伟业科技股份有限公司 | A kind of material information management and material information recognition methods and device |
CN107845326A (en) * | 2017-12-19 | 2018-03-27 | 中铁第四勘察设计院集团有限公司 | Rail in high speed railway expansion and cotraction regulator displacement identification Sign Board and measuring method |
CN109857704A (en) * | 2018-12-29 | 2019-06-07 | 北京起重运输机械设计研究院有限公司 | Equipment maintenance system and maintaining method |
CN109753725A (en) * | 2019-01-03 | 2019-05-14 | 江南造船(集团)有限责任公司 | Pipeline section approaches to IM and its device, equipment and storage medium |
CN109766620A (en) * | 2019-01-03 | 2019-05-17 | 江南造船(集团)有限责任公司 | Digitize pipeline installation method and its device, equipment and storage medium |
CN111046990A (en) * | 2019-12-04 | 2020-04-21 | 中铁大桥局第七工程有限公司 | Method for managing test detection instrument based on two-dimensional code |
CN112687026A (en) * | 2020-12-24 | 2021-04-20 | 深圳市兴海物联科技有限公司 | Equipment management method, equipment management system and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106096690A (en) | Equipment information management method and apparatus | |
Legner et al. | RFID-based maintenance at Frankfurt airport | |
US6810406B2 (en) | Method and system for servicing a selected piece of equipment having unique system configurations and servicing requirements | |
WO2019062254A1 (en) | Device management system and method | |
CN106056268A (en) | Engineering project management cloud platform system based on material tracking | |
CA3003827A1 (en) | Methods, systems, mobile devices and software products for automatic data processing in the maintenance of engine or vehicle systems | |
CN105302098A (en) | Subway vehicle interoperation maintenance and support platform based on IETM and building method thereof | |
JP2006260344A (en) | Failure history management device | |
AU2011286387A1 (en) | Methods and systems for optical asset recognition and location tracking | |
CN109902942A (en) | Change management method, device and storage medium on a kind of cell house decoration inspection line | |
CN203299881U (en) | Warehouse management system based on RFID technology | |
CN105574647A (en) | Active intelligent in-place equipment management system | |
CN102005075A (en) | Method, device and system for returning lottery ticket | |
CN110852578A (en) | Mobile operation system for maintenance management | |
CN104537504A (en) | University experiment equipment locating and managing system based on RFID perceiving technology of Internet of things | |
JP2016115027A (en) | Centralized monitoring system for work site | |
CN117077976A (en) | Workshop production management method, device and storage medium | |
US20220405672A1 (en) | System for management of facility construction and maintenance | |
JP4800997B2 (en) | Work process management system | |
JP2008305374A (en) | Information processor management system, information processor management program and information processor management method | |
JP2008261803A (en) | Valve inspection support system | |
JP2018205899A (en) | Notification omission prevention method, notification omission prevention program and notification omission prevention device | |
Betz | The secret life of machines–boundary objects in maintenance, repair and overhaul | |
Edwards et al. | Identifying and communicating project stakeholder risks | |
JP2005128760A (en) | Rail vehicle system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |