CN106095856A - A kind of analysis method and device of client's outage information - Google Patents
A kind of analysis method and device of client's outage information Download PDFInfo
- Publication number
- CN106095856A CN106095856A CN201610390150.7A CN201610390150A CN106095856A CN 106095856 A CN106095856 A CN 106095856A CN 201610390150 A CN201610390150 A CN 201610390150A CN 106095856 A CN106095856 A CN 106095856A
- Authority
- CN
- China
- Prior art keywords
- power
- event
- outage information
- time
- actual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 42
- 230000008878 coupling Effects 0.000 claims abstract description 25
- 238000010168 coupling process Methods 0.000 claims abstract description 25
- 238000005859 coupling reaction Methods 0.000 claims abstract description 25
- 230000005611 electricity Effects 0.000 claims description 9
- 238000007726 management method Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 238000009826 distribution Methods 0.000 description 3
- 235000013399 edible fruits Nutrition 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/242—Query formulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Public Health (AREA)
- Mathematical Physics (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of analysis method of client's outage information, comprising: obtain whole power-off event obtaining overall power-off event pond, and the actual outage information that metering automation terminal gathers;Judge whether the power-off event in described power-off event pond and described actual outage information mate according to matched rule, if it is, generate final power off time according to corresponding coupling object;If it is not, then corresponding non-matching object is carried out error analysis to generate final power off time.As can be seen here, during the course, carry out the coupling between object according to matched rule, decrease manual entry, and improve accuracy, provide more easily management control service for power supply enterprise.Additionally, invention additionally discloses the analytical equipment of a kind of client's outage information.
Description
Technical field
The present invention relates to technical field of electric power, particularly relate to the analysis method and device of a kind of client's outage information.
Background technology
In terms of the grid company management of power use, outage management is an important field, to the satisfaction of client relatively
Greatly.Relate to multiple business scopes such as planning construction, production run, customer service due to client's outage management, need comprehensive coordination
All departments work, and are generally converged power failure scheduled transfer to Sales Department, Sales Department by each business department in day-to-day operations
Total all departments have a power failure and plan and manual typing marketing management system, generate power-off event, and send outage information to client.
In addition, the collection for client's power off time is mainly carried out after equipment has a power failure, by related staff
Initiate the work order of power off time in distribution network system, and joined information integrated platform deliver among each marketing system by battalion,
Time and the event of power failure are all carried out typing with manual form and generate corresponding power-failure counting form with this,.
As can be seen here, during above-mentioned two, the inconsistent problem of outage information easily occurs, it is impossible to accurately determine visitor
The power off time at family, and during two, all of data message is all artificial treatment, adds cost of labor, reduces
Operating efficiency.
Therefore, how accurately to determine the power off time of client, improving operating efficiency is that those skilled in the art are urgently to be resolved hurrily
Problem.
Content of the invention
It is an object of the invention to provide the analysis method and device of a kind of client's outage information, determine client's for accurate
Power off time, improves operating efficiency.
For solving above-mentioned technical problem, the present invention provides a kind of analysis method of client's outage information, comprising:
Obtain whole power-off event obtaining overall power-off event pond, and the actual power failure that metering automation terminal gathers
Information;
Judge whether the power-off event in described power-off event pond and described actual outage information mate according to matched rule,
If it is, generate final power off time according to corresponding coupling object;
If it is not, then corresponding non-matching object is carried out error analysis to generate final power off time.
Preferably, described matched rule is:
Transformer numbering in described power-off event meets the requirements with the customer number in described actual outage information, and institute
The power off time stated in power-off event then determines within a predetermined range with the error of the power off time in described actual outage information
Described power-off event mates with described actual outage information, otherwise determines described power-off event and non-of described actual outage information
Join;
Wherein, transformer numbering is as the match flag of described power-off event, and customer number is as the described actual letter that has a power failure
The match flag of breath.
Preferably, described error range is ± 5 minutes.
Preferably, described whole power-off event specifically includes: pre-arranged power-off event, limit power-off event and fault outage thing
Part.
Preferably, described corresponding non-matching object carried out error analysis specifically include to generate final power off time:
Man Machine Interface is provided, and receives the check data of user's input;
Final power off time according to described check data genaration.
A kind of analytical equipment of client's outage information, comprising:
Acquiring unit, is used for obtaining whole power-off event obtaining overall power-off event pond, and metering automation terminal
The actual outage information gathering;
Judging unit, for judging the power-off event in described power-off event pond and described actual power failure according to matched rule
Whether information mates, if it is, trigger the first signal generating unit, if it is not, then trigger error analytic unit;
Described first signal generating unit, for generating final power off time according to corresponding coupling object;
Described error analysis unit, during for carrying out error analysis to generate final power failure by corresponding non-matching object
Between.
Preferably, described matched rule is:
Transformer numbering in described power-off event meets the requirements with the customer number in described actual outage information, and institute
The power off time stated in power-off event then determines within a predetermined range with the error of the power off time in described actual outage information
Described power-off event mates with described actual outage information, otherwise determines described power-off event and non-of described actual outage information
Join;
Wherein, transformer numbering is as the match flag of described power-off event, and customer number is as the described actual letter that has a power failure
The match flag of breath.
Preferably, described error range is ± 5 minutes.
Preferably, described whole power-off event specifically includes: pre-arranged power-off event, limit power-off event and fault outage thing
Part.
Preferably, described error analysis unit includes:
Receiving unit, is used for providing Man Machine Interface, and receives the check data of user's input;
Second signal generating unit, for final power off time according to described check data genaration.
The analysis method of client's outage information provided by the present invention, by being summarised in unified for whole power-off events together
Obtain overall power-off event pond, then judge whether whether each power-off event mate with corresponding actual outage information, as
Fruit coupling, then generate final power off time according to corresponding coupling object, if it does not match, enter corresponding non-matching object
Row error analysis is to generate final power off time.As can be seen here, during the course, according to matched rule carry out between object
Join, decrease manual entry, and improve accuracy, provide more easily management control service for power supply enterprise.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention, the accompanying drawing of use required in embodiment will be done simply below
Introduce, it should be apparent that, the accompanying drawing in describing below is only some embodiments of the present invention, for ordinary skill people
From the point of view of Yuan, on the premise of not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The flow chart of the analysis method of a kind of client's outage information that Fig. 1 provides for the present invention;
The structure chart of the analytical equipment of a kind of client's outage information that Fig. 2 provides for the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention wholely, rather than whole embodiment.Based on this
Embodiment in invention, those of ordinary skill in the art are not under the premise of making creative work, and obtained is every other
Embodiment, broadly falls into scope.
The core of the present invention is to provide the analysis method and device of a kind of client's outage information.
In order to make those skilled in the art be more fully understood that the present invention program, below in conjunction with the accompanying drawings and detailed description of the invention
The present invention is described in further detail.
The flow chart of the analysis method of a kind of client's outage information that Fig. 1 provides for the present invention.As it is shown in figure 1, client stops
The analysis method of power information includes:
S10: obtain whole power-off event obtaining overall power-off event pond, and the reality that metering automation terminal gathers
Outage information.
S11: judge whether the power-off event in power-off event pond and actual outage information mate according to matched rule, if
It is to enter step S12, if it does not, enter step S13.
S12: generate final power off time according to corresponding coupling object.
S13: corresponding non-matching object is carried out error analysis to generate final power off time.
In being embodied as, generate system and dispatching patcher etc. by marketing system, distribution and obtain whole power-off event,
Each power-off event has the mark of self.Metering automation terminal can gather the power failure data of each electricity consumer, i.e. originally
Actual outage information in Wen, each outage information has the mark of self.Whole power-off events constitutes power-off event
Pond, can leave power-off event pond in marketing system in, also leaves the actual outage information obtaining in marketing system in,
Marketing system completes analyze work.
After having obtained power-off event pond and actual outage information, judge each power-off event and every according to matched rule
Article one, whether outage information mates, if a certain bar power-off event and a certain bar outage information coupling, then this power-off event and should
Outage information is just for coupling object, then generate final power off time according to coupling object.It is understood that due to this power failure
Event and this outage information are mated, then can be according to the power-off event of power-off event as final power-off event, it is also possible to press
According to the power-off event of outage information as final power-off event.If a certain bar power-off event and a certain bar outage information are not
Join, then this power-off event and this outage information be not just for coupling object, then needs corresponding non-matching object is carried out error
Analyze.It is understood that owing to this power-off event and this outage information are not mated, then need by after error analysis really
Surely it is as final power-off event according to the power-off event of power-off event, also according to the power-off event of outage information as finally
Power-off event.
The analysis method of client's outage information that the present embodiment provides, by being summarised in unified for whole power-off events together
Obtain overall power-off event pond, then judge whether whether each power-off event mate with corresponding actual outage information, as
Fruit coupling, then generate final power off time according to corresponding coupling object, if it does not match, enter corresponding non-matching object
Row error analysis is to generate final power off time.As can be seen here, during the course, according to matched rule carry out between object
Join, decrease manual entry, and improve accuracy, provide more easily management control service for power supply enterprise.
It is understood which type of matching way matched rule specifically uses can determine according to actual conditions, its
In, the method for match flag can be used.Detailed description below.
On the basis of above-described embodiment, matched rule is:
Transformer numbering in power-off event meets the requirements with the customer number in actual outage information, and in power-off event
Power off time and the error of the power off time in actual outage information then determine that power-off event stops with actual within a predetermined range
Power information is mated, and otherwise determines that power-off event is non-matching with actual outage information;
Wherein, transformer numbering is as the match flag of power-off event, and customer number is as the coupling of actual outage information
Mark.
It in the present embodiment, is that power-off event is respectively provided with a match flag, wherein, power-off event with actual power off time
Match flag is transformer numbering;The match flag of actual power off time is customer number.In order to judge that one of them stops
Whether electricity event mates with an actual power off time, it is only necessary to judge whether the match flag of the two meets the requirements and have a power failure
Within a predetermined range whether the error of time.Specifically, the transformer in power-off event is numbered and in actual outage information
Customer number meet the requirements, the transformer that meeting the requirements here refers to customer number place is the change in power-off event
Power off time in depressor, and power-off event then determines within a predetermined range with the error of the power off time in actual outage information
Power-off event mates with actual outage information, otherwise determines that power-off event is non-matching with actual outage information.
As one preferred embodiment, error range is ± 5 minutes.It is understood that error range can root
Setting according to actual conditions, the present embodiment is a kind of concrete form of expression.
As one preferred embodiment, on the basis of above-described embodiment, whole power-off events specifically include: pacify in advance
Row's power-off event, limit power-off event and fault outage event.
As one preferred embodiment, on the basis of above-described embodiment, step S13 specifically includes:
Man Machine Interface is provided, and receives the check data of user's input;
According to the check final power off time of data genaration.
In being embodied as, when occurring in that non-matching object by match flag, need to carry out non-matching object by mistake
Difference is analysed, and now, provides Man Machine Interface, and receives the check data of user's input.Here Man Machine Interface is permissible
It is to arrange in the way of display interface.Generate final power off time after user inputs check data.As can be seen here, only occur
During non-matching object, just need manually to carry out error analysis.
The structure chart of the analytical equipment of a kind of client's outage information that Fig. 2 provides for the present invention.Dividing of client's outage information
Analysis apparatus includes:
Acquiring unit 10, is used for obtaining whole power-off event obtaining overall power-off event pond, and metering automation is eventually
The actual outage information that end gathers;
Judging unit 11, for judging that according to matched rule the power-off event in power-off event pond with actual outage information is
No coupling, if it is, trigger the first signal generating unit 12, if it is not, then trigger error analytic unit 13;
First signal generating unit 12, for generating final power off time according to corresponding coupling object;
Error analysis unit 13, for carrying out error analysis to generate final power off time by corresponding non-matching object.
In being embodied as, acquiring unit 10 generates system and dispatching patcher etc. by marketing system, distribution and obtains complete
Portion's power-off event, each power-off event has the mark of self.Metering automation terminal can gather stopping of each electricity consumer
Electricity data, actual outage information i.e. herein, each outage information has the mark of self.Whole power-off events is constituted
Power-off event pond, can leave power-off event pond in marketing system in, also leaves the actual outage information obtaining in battalion
In pin system, complete to analyze work in marketing system.
After having obtained power-off event pond and actual outage information, it is judged that according to matched rule, unit 11 judges that each is stopped
Whether electricity event and each outage information mate, if a certain bar power-off event and a certain bar outage information coupling, then this stops
Electricity event and this outage information are just for coupling object, then when the first signal generating unit 12 generates final power failure according to coupling object
Between.It is understood that owing to this power-off event and this outage information are mated, then can be according to the power-off event of power-off event
As final power-off event, it is also possible to according to the power-off event of outage information as final power-off event.If a certain bar has a power failure
Event and a certain bar outage information are not mated, then this power-off event and this outage information be not just for coupling object, then needs by mistake
Corresponding non-matching object is carried out error analysis by difference analytic unit 13.It is understood that owing to this power-off event stops with this
Power information is not mated, then need by determining it is to have a power failure as final according to the power-off event of power-off event after error analysis
Event, also according to the power-off event of outage information as final power-off event.
The analytical equipment of client's outage information that the present embodiment provides, by being summarised in unified for whole power-off events together
Obtain overall power-off event pond, then judge whether whether each power-off event mate with corresponding actual outage information, as
Fruit coupling, then generate final power off time according to corresponding coupling object, if it does not match, enter corresponding non-matching object
Row error analysis is to generate final power off time.As can be seen here, during the course, according to matched rule carry out between object
Join, decrease manual entry, and improve accuracy, provide more easily management control service for power supply enterprise.
It is understood which type of matching way matched rule specifically uses can determine according to actual conditions, its
In, the method for match flag can be used.Detailed description below.
On the basis of above-described embodiment, matched rule is:
Transformer numbering in power-off event meets the requirements with the customer number in actual outage information, and in power-off event
Power off time and the error of the power off time in actual outage information then determine that power-off event stops with actual within a predetermined range
Power information is mated, and otherwise determines that power-off event is non-matching with actual outage information;
Wherein, transformer numbering is as the match flag of power-off event, and customer number is as the coupling of actual outage information
Mark.
It in the present embodiment, is that power-off event is respectively provided with a match flag, wherein, power-off event with actual power off time
Match flag is transformer numbering;The match flag of actual power off time is customer number.In order to judge that one of them stops
Whether electricity event mates with an actual power off time, it is only necessary to judge whether the match flag of the two meets the requirements and have a power failure
Within a predetermined range whether the error of time.Specifically, the transformer in power-off event is numbered and in actual outage information
Customer number meet the requirements, the transformer that meeting the requirements here refers to customer number place is the change in power-off event
Power off time in depressor, and power-off event then determines within a predetermined range with the error of the power off time in actual outage information
Power-off event mates with actual outage information, otherwise determines that power-off event is non-matching with actual outage information.
As one preferred embodiment, error range is ± 5 minutes.It is understood that error range can root
Setting according to actual conditions, the present embodiment is a kind of concrete form of expression.
As one preferred embodiment, on the basis of above-described embodiment, whole power-off events specifically include: pacify in advance
Row's power-off event, limit power-off event and fault outage event.
As one preferred embodiment, on the basis of above-described embodiment, error analysis unit 13 includes:
Receiving unit, is used for providing Man Machine Interface, and receives the check data of user's input;
Second signal generating unit, for according to the check final power off time of data genaration.
In being embodied as, when occurring in that non-matching object by match flag, need to carry out non-matching object by mistake
Difference is analysed, and now, provides Man Machine Interface, and receives the check data of user's input.Here Man Machine Interface is permissible
It is to arrange in the way of display interface.Generate final power off time after user inputs check data.As can be seen here, only occur
During non-matching object, just need manually to carry out error analysis.
Above the analysis method and device of client's outage information provided by the present invention is described in detail.Specification
In each embodiment use the mode gone forward one by one to describe, what each embodiment stressed is different from other embodiments it
Place, between each embodiment, identical similar portion sees mutually.For device disclosed in embodiment, due to itself and reality
Executing method disclosed in example corresponding, so describe is fairly simple, related part sees method part and illustrates.Should refer to
Go out, for those skilled in the art, under the premise without departing from the principles of the invention, can also be to the present invention
Carrying out some improvement and modification, these improve and modify in the protection domain also falling into the claims in the present invention.
Professional further appreciates that, in conjunction with the unit of each example that the embodiments described herein describes
And algorithm steps, can with electronic hardware, computer software or the two be implemented in combination in, in order to clearly demonstrate hardware and
The interchangeability of software, generally describes composition and the step of each example in the above description according to function.These
Function performs with hardware or software mode actually, depends on application-specific and the design constraint of technical scheme.Specialty
Technical staff specifically should can be used for using different methods to realize described function to each, but this realization should not
Think beyond the scope of this invention.
The method describing in conjunction with the embodiments described herein or the step of algorithm can directly be held by hardware, processor
The software module of row, or the combination of the two implements.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium known in field.
Claims (10)
1. the analysis method of client's outage information, it is characterised in that include:
Obtain whole power-off event obtaining overall power-off event pond, and the actual power failure letter that metering automation terminal gathers
Breath;
Judge whether the power-off event in described power-off event pond and described actual outage information mate according to matched rule, if
It is then to generate final power off time according to corresponding coupling object;
If it is not, then corresponding non-matching object is carried out error analysis to generate final power off time.
2. analysis method according to claim 1, it is characterised in that described matched rule is:
Transformer numbering in described power-off event meets the requirements with the customer number in described actual outage information, and described stops
Power off time in electricity event then determines described within a predetermined range with the error of the power off time in described actual outage information
Power-off event mates with described actual outage information, otherwise determines that described power-off event is non-matching with described actual outage information;
Wherein, transformer numbering is as the match flag of described power-off event, and customer number is as described actual outage information
Match flag.
3. analysis method according to claim 2, it is characterised in that described error range is ± 5 minutes.
4. the analysis method according to claims 1 to 3 any one, it is characterised in that described whole power-off events are concrete
Including: pre-arranged power-off event, limit power-off event and fault outage event.
5. analysis method according to claim 1, it is characterised in that described corresponding non-matching object is carried out error divide
Analysis specifically includes to generate final power off time: provides Man Machine Interface, and receives the check data of user's input;
Final power off time according to described check data genaration.
6. the analytical equipment of client's outage information, it is characterised in that include:
Acquiring unit, is used for obtaining whole power-off event obtaining overall power-off event pond, and metering automation terminal gathers
Actual outage information;
Judging unit, for judging the power-off event in described power-off event pond and described actual outage information according to matched rule
Whether mate, if it is, trigger the first signal generating unit, if it is not, then trigger error analytic unit;
Described first signal generating unit, for generating final power off time according to corresponding coupling object;
Described error analysis unit, for carrying out error analysis to generate final power off time by corresponding non-matching object.
7. analytical equipment according to claim 1, it is characterised in that described matched rule is:
Transformer numbering in described power-off event meets the requirements with the customer number in described actual outage information, and described stops
Power off time in electricity event then determines described within a predetermined range with the error of the power off time in described actual outage information
Power-off event mates with described actual outage information, otherwise determines that described power-off event is non-matching with described actual outage information;
Wherein, transformer numbering is as the match flag of described power-off event, and customer number is as described actual outage information
Match flag.
8. analytical equipment according to claim 7, it is characterised in that described error range is ± 5 minutes.
9. the analytical equipment according to claim 6 to 8 any one, it is characterised in that described whole power-off events are concrete
Including: pre-arranged power-off event, limit power-off event and fault outage event.
10. analytical equipment according to claim 6, it is characterised in that described error analysis unit includes:
Receiving unit, is used for providing Man Machine Interface, and receives the check data of user's input;
Second signal generating unit, for final power off time according to described check data genaration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610390150.7A CN106095856A (en) | 2016-06-01 | 2016-06-01 | A kind of analysis method and device of client's outage information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610390150.7A CN106095856A (en) | 2016-06-01 | 2016-06-01 | A kind of analysis method and device of client's outage information |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106095856A true CN106095856A (en) | 2016-11-09 |
Family
ID=57447706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610390150.7A Pending CN106095856A (en) | 2016-06-01 | 2016-06-01 | A kind of analysis method and device of client's outage information |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106095856A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845782A (en) * | 2016-12-23 | 2017-06-13 | 国网浙江省电力公司台州供电公司 | Distribution big data intelligent analysis method |
CN108539736A (en) * | 2018-04-26 | 2018-09-14 | 广州供电局有限公司 | Power-off event analysis method, system and computer equipment based on multi-source data |
CN109857765A (en) * | 2018-12-18 | 2019-06-07 | 广东电网有限责任公司 | Client's power failure data analysing method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104881729A (en) * | 2015-04-23 | 2015-09-02 | 中国南方电网有限责任公司 | Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system |
CN105260843A (en) * | 2015-10-16 | 2016-01-20 | 国网甘肃省电力公司天水供电公司 | Power supply stoppage information analyzing system |
-
2016
- 2016-06-01 CN CN201610390150.7A patent/CN106095856A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104881729A (en) * | 2015-04-23 | 2015-09-02 | 中国南方电网有限责任公司 | Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system |
CN105260843A (en) * | 2015-10-16 | 2016-01-20 | 国网甘肃省电力公司天水供电公司 | Power supply stoppage information analyzing system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845782A (en) * | 2016-12-23 | 2017-06-13 | 国网浙江省电力公司台州供电公司 | Distribution big data intelligent analysis method |
CN108539736A (en) * | 2018-04-26 | 2018-09-14 | 广州供电局有限公司 | Power-off event analysis method, system and computer equipment based on multi-source data |
CN109857765A (en) * | 2018-12-18 | 2019-06-07 | 广东电网有限责任公司 | Client's power failure data analysing method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yuan et al. | Developing key performance indicators for public-private partnership projects: questionnaire survey and analysis | |
Cater-Steel et al. | Challenge of adopting multiple process improvement frameworks | |
CN109800250B (en) | System architecture for no longer configuring enterprise central server | |
CN106846176B (en) | Electricity charge accounting system | |
CN107451738A (en) | A kind of construction-engineering project appraisal procedure and its assessment system | |
CN106095856A (en) | A kind of analysis method and device of client's outage information | |
CN104992279A (en) | Performance assessment method and device | |
CN109472550A (en) | The anti-human-equation error method, apparatus in million kilowatt nuclear power station and terminal device | |
CN108829466A (en) | A kind of data processing method, device, electronic equipment and storage medium | |
CN106408319A (en) | Distribution data management system and method | |
US20160267250A1 (en) | Method and System for Managing and Tracking Medical and Legalized Marijuana | |
CN109086446A (en) | NPS customer experience management method, device and computer readable storage medium | |
CN113052417A (en) | Resource allocation method and device | |
CN116796950A (en) | Online review system and method for power distribution network project capable of being researched | |
CN110599245A (en) | Engineering project cost data management system | |
CN110097424A (en) | A kind of one-stop service online trade platform | |
CN114860790A (en) | Marketing meter reading abnormity analysis system | |
CN107067137A (en) | A kind of power marketing metering class's routine work management control method and system | |
CN106066860A (en) | A kind of method of electric power meter management | |
CN111652744A (en) | Health risk product configuration method, device, medium and equipment | |
CN101976421A (en) | Financing analysis system in operation of commercial tenants | |
CN103903193A (en) | Power supporting system and method | |
CN110097247A (en) | A kind of cost data gathering system based on Internet technology | |
Nazmi et al. | Testing Phases for RFID Inventory Management System | |
CN114564474B (en) | Photovoltaic ledger data automatic verification method and related device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Faxuan Inventor after: Ye Ruijing Inventor after: Xiong Jianhong Inventor after: Hu Xiuzhen Inventor after: Qiao Jiageng Inventor after: Wang Guorui Inventor after: Chen Haiyan Inventor before: Ma Faxuan |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |