CN106094794A - The functional test equipment of distribution type control system, control server and method - Google Patents

The functional test equipment of distribution type control system, control server and method Download PDF

Info

Publication number
CN106094794A
CN106094794A CN201610479985.XA CN201610479985A CN106094794A CN 106094794 A CN106094794 A CN 106094794A CN 201610479985 A CN201610479985 A CN 201610479985A CN 106094794 A CN106094794 A CN 106094794A
Authority
CN
China
Prior art keywords
test
execution
instruction
result
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610479985.XA
Other languages
Chinese (zh)
Other versions
CN106094794B (en
Inventor
王立刚
江国进
白涛
赵潮涌
朱郁
毛新民
肖红国
孟庆军
潘海波
李俊卿
蔡亚伟
林宗艺
张登超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Techenergy Co Ltd
Original Assignee
China General Nuclear Power Corp
China Techenergy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Techenergy Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201610479985.XA priority Critical patent/CN106094794B/en
Publication of CN106094794A publication Critical patent/CN106094794A/en
Application granted granted Critical
Publication of CN106094794B publication Critical patent/CN106094794B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring

Abstract

The embodiment of the present invention provides the functional test equipment of a kind of distribution type control system, controls server and method.Functional test equipment is connected with one or more control server communications by the management level network of distribution type control system, including: test case acquiring unit, for obtaining the test case including multiple test step data;Perform instruction signal generating unit, for for each test step data, operate according to the execution in test step data and input data genaration performs instruction;Perform instruction execution unit, for the execution instruction performing to instruct signal generating unit generation is sent to control server, and from controlling the execution result of server reception execution instruction;Test result determines unit, with execution instruction, the execution result that the execution for receiving according to execution instruction execution unit instructs expects that exporting result determines the test result performing to instruct.Use the embodiment of the present invention, the wiring performed in prior art between equipment and test device can be saved.

Description

The functional test equipment of distribution type control system, control server and method
Technical field
The present invention relates to distributing control technology, particularly relate to the functional test equipment of a kind of distribution type control system, control Control server and method.
Background technology
In the control field of nuclear power station, it is distribution type control system (i.e. DCS that process system controls logic realization (Distributed Control System) control system) automatic safe operating a key job, for nuclear power station control For system processed, at the correctness of the test phase access control logic of distribution type control system, particularly important.
At present, as it is shown in figure 1, in carrying out functional test, field control station or execution equipment connect and have test device, It is connected by cable between this test device and the control server in distribution type control system.Test unit simulation performs equipment (such as sensor) sends signal, and this signal is sent to control server through cable.Test device receives and controls what server sent Performing instruction, and simulate execution equipment and provide feedback signal, this feedback signal is transferred into control server through cable and (feeds back defeated Enter), thus complete this functional test.
Above-mentioned utilization test device carries out the functional test of distribution type control system and has the disadvantage that on the one hand, dispersion Formula control system includes up to ten thousand execution equipment, execution equipment or field control station are connected to test device time will necessarily Causing work heavy, and multiple stage may be needed to test device, therefore, testing cost is higher.On the other hand, the mistake of functional test Cheng Zhong, this test device cannot complete such as management level network in the operation controlled on server and check state etc., and can only Complete by controlling server.Tester needs to carry out the assignment of the input data of execution equipment on test device, and And also need on control server, carry out command operating and check state, so that testing efficiency is relatively low.
Summary of the invention
It is an object of the invention to, it is provided that the functional test equipment of a kind of distribution type control system and control server, with And by functional test equipment with control server distribution type control system is carried out functional test method, be possible not only to save Wiring between execution equipment and test device, but also so that the functional test of distribution type control system is more convenient, and Effective must improve testing efficiency.
According to an aspect of the present invention, it is provided that the functional test equipment of a kind of distribution type control system, described functional test Equipment is connected with one or more control server communications by the management level network of described distribution type control system, including: survey Example acquiring unit on probation, for obtaining the test case including multiple test step data, described test step data include walking sequence number, Perform operation, perform equipment, input data and the data of expection output result;Perform instruction signal generating unit, for for often Individual described test step data, operate according to the execution in described test step data and input data genaration performs instruction;Execution refers to Make performance element, for the described execution instruction performing instruction signal generating unit generation is sent to described control server, and The described execution result performing instruction is received from described control server;Test result determines unit, for according to described execution The execution result of the described execution instruction that instruction execution unit receives determines described with the described expection output result performing instruction Perform the test result of instruction.
Alternatively, described functional test equipment also includes: delay type acquiring unit, for obtaining and described expection output The data corresponding delay type information of result;Described test result determines unit, for according to described delay type information, institute State and control the execution result of server return and expect that output result determines the test result of described execution instruction accordingly.
According to a further aspect in the invention, it is provided that the control server of a kind of distribution type control system, including: first instruction Interactive unit, for receive carry perform operation and input data perform instruction, and send described perform to instruct hold Row result;Second instruction interaction unit, is sent to described point for the execution instruction received by described first instruction interaction unit Dissipate the field control station of formula control system, and obtain described execution result from described field control station.
According to another aspect of the invention, it is provided that the function test method of a kind of distribution type control system.Described method bag Include, obtain include the test case of multiple test step data, described test step data include walking sequence number, performs operation, execution sets Standby, input data and expection output result data;Perform successively to perform accordingly to refer to according to the plurality of test step data Order, wherein, for each described test step data, operates according to the execution in described test step data and input data genaration is held Row instruction, is sent to described execution equipment by described execution instruction, and the execution result returned according to described execution equipment with Corresponding expection output result determines the described test result performing instruction.
Preferably, the described execution result returned according to described execution equipment determines described with corresponding expection output result The process of test result performing instruction includes: according to the data of the expection output result in each described test step data and defeated Enter data, determine the test array of predetermined number;Obtain and the described corresponding feedback data of input data from described execution equipment, And described feedback data is stored in described test array;Obtain the execution result of described execution equipment, and hold according to described Row result determines the described test result performing instruction with the expection output result in described test array.
Preferably, the described process performing successively to perform to instruct accordingly according to the plurality of test step data includes: obtain Take the current status data performing equipment described in described distribution type control system;If described current status data is defeated with described Enter data different, then the corresponding execution described input data being assigned in the described distribution type control system that described step sequence number is corresponding Equipment.
Preferably, described method also includes: defeated different from described current status data of labelling in described test array Enter data, to determine different pieces of information present in described current status data and described input data.
Preferably, described method also includes: obtain and the data corresponding delay type information of described expection output result; The described execution result performing instruction is determined according to described delay type information.
According to a further aspect in the invention, it is provided that the device for testing functions of a kind of distribution type control system.Described device bag Including: test case acquisition module, for obtaining the test case including multiple test step data, described test step data include step Sequence number, perform operation, perform equipment, input data and expection output result data;Test result determines module, for root Perform successively to perform instruction accordingly according to the plurality of test step data, wherein, for each described test step data, according to institute State the operation of the execution in test step data and input data genaration performs instruction, described execution instruction is sent to described execution and sets Standby, and determine the described survey performing instruction according to the execution result of described execution equipment return with corresponding expection output result Test result.
Preferably, described test result determines that module includes: test array determines unit, for according to each described test The data of the expection output result in step data and input data, determine the test array of predetermined number;Feedback data storage is single Unit, for obtaining and the described corresponding feedback data of input data from described execution equipment, and is stored in described feedback data In described test array;Test result determines unit, for obtaining the execution result of described execution equipment, and according to described execution Result determines the described test result performing instruction with the expection output result in described test array.
Preferably, described test result determines that module also includes: state data acquisition unit, is used for obtaining described distributing The current status data of equipment is performed described in control system;Assignment unit, if for described current status data with described Input data are different, then described input data are assigned to holding accordingly in the described distribution type control system that described step sequence number is corresponding Row equipment.
Preferably, described device also includes: input data markers module, for labelling in described test array with described The input data that current status data is different, to determine different numbers present in described current status data and described input data According to.
Preferably, described device also includes: delay type acquisition module, for obtaining and the number of described expection output result According to corresponding delay type information;Described test result determines module, holds described in determining according to described delay type information The test result of row instruction.
According to another aspect of the invention, it is provided that the function test method of a kind of distribution type control system.Described method bag Include, receive carry perform operation and input data perform instruction;Described execution instruction is sent to described distributing control The field control station of system, and obtain described execution result from described field control station;Send the described execution performing instruction Result.
The function test method of the distribution type control system provided according to embodiments of the present invention, equipment and control server, Included that by acquisition the multiple test step data in the test case of multiple test step data perform to perform instruction accordingly successively, And determine the test result that this execution instructs, i.e. originally according to the execution result of execution equipment return with corresponding expection output result Inventive embodiments is by arranging functional test equipment in distribution type control system, and the form simulated by application program is realized The functional test of distribution type control system, eliminates the wiring between execution equipment and test device, and inputs data, performs knot The judgement of fruit is all by operating the write and read performing equipment association attributes item in distribution type control system, and is compared to Complete, so that the functional test of distribution type control system is more convenient, and effective must improve testing efficiency.
Accompanying drawing explanation
Fig. 1 is to illustrate the structural representation of the function test system of distribution type control system in prior art;
Fig. 2 is the structural representation of the function test system of the distribution type control system illustrating according to embodiments of the present invention Figure;
Fig. 3 is the logic diagram of the functional test equipment of the distribution type control system illustrating according to embodiments of the present invention;
Fig. 4 is showing of the control logical design input figure of the execution equipment XXX201PO illustrating according to embodiments of the present invention Example schematic diagram;
Fig. 5 be illustrate according to embodiments of the present invention one based on perform equipment XXX201PO control logical design input figure Test case schematic diagram;
Fig. 6 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention two;
Fig. 7 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention three;
Fig. 8 is the structure of arrays schematic diagram of four the test arrays illustrating according to embodiments of the present invention three;
Fig. 9 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention four;
Figure 10 is the logic diagram controlling server of the distribution type control system illustrating according to embodiments of the present invention five.
Detailed description of the invention
The inventive concept of this programme is, controls system by arranging distributing in the management level network of distribution type control system The functional test equipment of system, holds successively for obtaining the multiple test step data in the test case including multiple test step data Row performs instruction accordingly, and with corresponding expection output result, the execution result returned according to execution equipment determines that this execution refers to The test result of order, the i.e. embodiment of the present invention are by arranging functional test equipment in distribution type control system, and pass through application The form of program simulation realizes the functional test of distribution type control system, eliminates the wiring between execution equipment and test device, And input data, perform result judgement be all by distribution type control system perform equipment association attributes item write and Read operation, and being compared to, so that the functional test of distribution type control system is more convenient, and effective must improve Testing efficiency.
Describe the exemplary embodiment of the present invention below in conjunction with the accompanying drawings in detail.
Embodiment one
Fig. 2 is the structural representation of the function test system of the distribution type control system illustrating according to embodiments of the present invention Figure.
With reference to Fig. 2, the function test system of distribution type control system can include distribution type control system and distributing control The functional test equipment of system processed, described distribution type control system includes one or more control server and one or more existing Control station, and multiple execution equipment (not shown in Fig. 2) etc., execution equipment can be as switchgear, communication apparatus and Sensor etc..Described functional test equipment controls clothes by the management level network of described distribution type control system with one or more Business device communication connection, the one or more controls server by system level network and one or more field control station communications Connecting, each field control station controls one or more execution equipment.Distribution type control system in the embodiment of the present invention with It is described in detail as a example by DCS (Distributed Control System) control system, other distribution type control system Process can be same or similar with this, does not repeats them here.
Can be completed merit corresponding in distribution type control system by the function test system of above-mentioned distribution type control system The automatic test of energy.Described functional test equipment can be the terminal units such as computer.In order to complete above-mentioned functions test, permissible Described functional test equipment is divided into multiple functional unit, is completed distribution type control system by different functional units Functional test.Specifically, as it is shown on figure 3, described functional test equipment can include test case acquiring unit 310, perform to refer to Signal generating unit 320, execution instruction execution unit 330 and test result is made to determine unit 340, wherein, test case acquiring unit 310 are connected with performing instruction signal generating unit 320, perform instruction signal generating unit 320 and are connected with performing instruction execution unit 330 Connect, perform instruction execution unit 330 and determine that with test result unit 340 is connected.
Test case acquiring unit 310, for obtaining the test case including multiple test step data, described test step number According to including step sequence number, performing operation, execution equipment, input data and the data of expection output result.
Wherein, the data that test step data comprise in being some testing procedure.Test case can be for some Specify target and work out one group test input, execution condition and the data of output result, in order to test certain Program path Or examine whether meet the demand etc. specified.In the embodiment of the present invention, test case refers to as test distribution type control system The test truth table controlling logic function and write according to input design file.Wherein, described test truth table comprise input and Output, input comprises man machine interface action-item, physical points, the input of communication point, and output comprises physical points output, human interface devices State-output or display, it is contemplated that the different operating modes that input design file is to be stated, can obtain the operation of input, physical points Numerical value, the various combination of numerical value of communication point, and then obtain expection output result, form two dimension truth table and (i.e. test use Example).Step sequence number can be the sequence number of test step.Execution equipment can be described physical points or the equipment of communication point, as switch sets Standby etc..
Above-mentioned functions test can be carried out during distribution type control system normally works, distribution type control system Control logic to realize according to corresponding input design file.As shown in Figure 4, to perform the control logic of equipment XXX201PO Illustrate as a example by design input figure.Wherein, the signal of input area, from sensor, can be used for equipment control.Operational order district Include controlling the operational order that server sends.Output area, for sending output signal to performing equipment accordingly, is used for On-the-spot display or driving execution equipment perform corresponding action etc..
In above-mentioned Fig. 4, after performing equipment XXX201PO startup, feedback signal FF can be sent, show for state and control. And after execution equipment XXX201PO stops, feedback signal GG can be sent, show for state and control.
Figure can be inputted, by using test case to currently according to the control logical design of the XXX201PO in above-mentioned Fig. 4 The distribution type control system being currently running carries out functional test, and corresponding test case can be as it is shown in figure 5, concrete process can be wrapped Include herein below:
Before distribution type control system is carried out functional test, need to obtain physical points and/or communication from test case Point ranks, physical points and/or communication vertex type row, test step initiate row, test step end column, test walking, input data Initial row and end line, the initial row of output data and end line, the initial row of status data and the letter such as end line and judgement row Breath, can be input to above-mentioned information in corresponding input item.In addition, it is contemplated that test case includes multiple test step, The data of the input data corresponding to different test steps and expection output result can be different.In order to make above-mentioned functions Test can either automatically or manually perform, and can arrange corresponding item of information and/or button, control holding of test case according to this OK, specifically, it is also possible to be provided for display and work as preamble sequence number and the display device of next test step sequence number, automatically perform Button, single step perform button and exit test button etc..Wherein, automatically perform button can be used for controlling distribution type control system by Corresponding test step is performed successively, until test terminates according to next the test step sequence number set.Single step performs button and can be used for controlling The test step sequence number that distribution type control system processed inputs according to user carries out above-mentioned functions test.
Perform instruction signal generating unit 320, for for each described test step data, according in described test step data Perform operation and input data genaration performs instruction.
Perform instruction execution unit 330, for the described execution instruction performing instruction signal generating unit generation is sent to institute State control server, and receive the described execution result performing instruction from described control server.
In force, corresponding control mechanism can be pre-set so that performing instruction execution unit 330 can will perform In the control server that instruction is sent in distribution type control system, one controls server, or, it is also possible to instruction will be performed Being sent respectively to each and control server, then, distribution type control system can be specified some to control server and will be performed Instruction is sent to field control station, and wherein, execution instruction is sent to the process of field control station by control server can be with upper State processing mode identical, a field control station i.e. can be selected to receive and send to perform instruction.
Controlling server can periodically or non-periodically obtains corresponding execution equipment execution from corresponding field control station Described perform the execution result that obtains after instruction, perform instruction execution unit again may be by periodically or non-periodically mode to Described control server sends for obtaining the described request of execution result performing instruction, described control server can by To described execution instruction execution result be sent to perform instruction execution unit 330.
Test result determines unit 340, and the described execution for receiving according to described execution instruction execution unit instructs Perform result and determine the described test result performing instruction with the described expection output result performing instruction.
Processing further, it is also possible to arrange data delay, corresponding processing mode can be varied, and one presented below can The processing mode of choosing, accordingly, described functional test equipment also includes delay type acquiring unit, for obtaining and described expection The data corresponding delay type information of output result;Test result determines unit 340, for believing according to described delay type Execution result and corresponding expection output result that breath, described control server return determine the described test knot performing instruction Really.
After the processing procedure of above-mentioned delay type acquiring unit and test result determine that the process of unit 340 may refer to In continuous embodiment, the related content of the function test method of distribution type control system, does not repeats them here.
In the embodiment of the present invention, by arranging distribution type control system in the management level network of distribution type control system Functional test equipment, performs phase successively for obtaining the multiple test step data in the test case including multiple test step data That answers performs instruction, and the execution result returned according to execution equipment determines what this execution instructed with corresponding expection output result Test result, the i.e. embodiment of the present invention are by arranging functional test equipment in distribution type control system, and pass through application program The form of simulation realizes the functional test of distribution type control system, eliminates and performs in prior art between equipment and test device Wiring, and input data, perform result judgement be all by distribution type control system perform equipment association attributes item Write and read operation, and be compared to, so that the functional test of distribution type control system is more convenient, and effectively Testing efficiency must be improve.
Embodiment two
Fig. 6 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention two.Logical Cross the functional test equipment included as shown in Figure 3 and perform described method.Wherein, functional test equipment is at distribution type control system Position may refer to Fig. 2, and function test system based on Fig. 2 distribution type control system illustrates the dispersion of the embodiment of the present invention two The function test method of formula control system.Distribution type control system in the embodiment of the present invention is with DCS (Distributed Control System) be described in detail as a example by control system, the process of other distribution type control system can identical with this or Similar, do not repeat them here.
With reference to Fig. 6, in step S610, obtain the test case including multiple test step data, described test step packet Include step sequence number, perform operation, execution equipment, input data and the data of expection output result.
In actual applications, can first by tabulating for the relevant informations such as the ON/OFF performing equipment that to carry out testing, Can be as shown in table 1, this form includes switchgear (i.e. performing equipment) title, open instruction call the roll, open feedback call the roll, close anti- Feed point name and device type etc..Wherein it is possible to switchgear can be divided into different types according to the difference of ON/OFF instruction, bag Include double instruction type, singly open instruction type and single close instruction type etc..
Table 1
When starting the correlation function testing in distribution type control system, corresponding switch can be extracted from above table The information such as device name, territory number and device type, it is then possible to according to device type, from current distribution type control system Each execution switch order of equipment of middle reading, aperture output point value, can be according to the above-mentioned numerical value read to the equipment of execution Value of feedback and process variable value of feedback initialize, the execution equipment value of feedback after being initialized accordingly and process variable feedback Value etc..
In order to perform the variable condition of equipment in observing different time sections, the status scan cycle can be set, such as 5 seconds or 20 seconds etc..After completing the initialization to execution equipment value of feedback and process feedback amount, a status scan cycle can be postponed, Afterwards, the switch order data of execution equipment can be read from distribution type control system, the switch order number that can will obtain Contrast according to the switch order data performing equipment corresponding with the laststate scan period, it is judged that currently available switch Whether director data exists data content change.If it does not exist, then aperture letter can be read from distribution type control system Number director data.If it is present can be anti-according to the device type of described execution equipment and corresponding instruction triggers state Feed point assignment, can read opening amount signal director data from distribution type control system simultaneously.It is then possible to based on above-mentioned relevant Numerical value, can obtain 4 break values, thus can obtain process feedback amount, it is possible to further pass through inertia rings by calculating Joint is calculated process variable feedback.At this point it is possible to call interface function (such as, the DBCOM (DataBase pre-set Communication, database communication interface) readings function) perform write operation.
Such as, for dipulse switchtype equipment (its device type numbering can be 1-3), instruction can be read open, close DI (Digital input, digital quantity inputs) the some entry value of instruction.If the DI point entry value opening instruction read is 0, closes instruction DI point entry value be 1 or 0, then for singly opening feedback (its device type numbering can be 1), can give and open feedback point and compose initial value 0;And Close feedback (its device type numbering can be 2) for single, initial value 1 can be composed to closing feedback point;For double feedbacks (its device type Numbering can be 3), can give and open feedback point tax initial value 0, give simultaneously and close feedback point tax initial value 1.If opening the DI point entry value of instruction Be 1, the DI point entry value of closing instruction be 0, then for singly opening feedback (its device type numbering can be 1), can be to opening at the beginning of feedback point tax Initial value 1;Close feedback (its device type numbering can be 2) for single, initial value 0 can be composed to closing feedback point;And for double feedback (its Device type numbering can be 3), can give and open feedback point tax initial value 1, compose initial value 0 to pass feedback point.
For singly opening type equipment (its device type numbering can be 4-6), readable taking away instructs DI point entry value.If opening finger Order is 0, for singly opening feedback (its device type numbering can be 4), can give and open feedback point tax initial value 0;Feedback (its is closed for single Device type numbering can be 5), can give and close feedback point tax initial value 1;For double feedbacks (its device type numbering can be 6), can give Open feedback point and compose initial value 0, give simultaneously and close feedback point tax initial value 1.If opening instruction is 1, then for singly opening feedback (its equipment Type number can be 4), can give and open feedback point tax initial value 1;Close feedback (its device type numbering can be 5) for single, can give and close Feedback point composes initial value 0;For double feedbacks (its device type numbering can be 6), can give and open feedback point tax initial value 1, give simultaneously Close feedback point and compose initial value 0.
Closing type equipment (its device type numbering can be 7-9) for single, readable taking away instructs DI point entry value.Refer to if closed Order is 0, then for singly opening feedback (its device type numbering can be 7), can give and open feedback point tax initial value 1;Feedback is closed for single (its device type numbering can be 8), can give and close feedback point tax initial value 0;For double feedbacks (its device type numbering can be 9), Can give and open feedback point tax initial value 1, give simultaneously and close feedback point tax initial value 0.If closing instruction is 1, then for singly opening feedback (its Device type numbering can be 7), can give and open feedback point tax initial value 0;Feedback (its device type numbering can be 8) is closed for single, can Give and close feedback point tax initial value 1;For double feedbacks (its device type numbering can be 9), can give and open feedback point tax initial value 0, with Time give close feedback point compose initial value 1.
For analog quantity equipment, AI (Analog Input, the analog quantity number inputs) value of aperture output can be read, according to The functional relationship of process variable feedback Y and the aperture output X that break can calculate, thus calculate Y ' value, and write distributing control In system processed.
Additionally, process for the said equipment feedback of status, specifically can be found in the example below:
For dipulse command switch equipment, if opening instruction rising edge, then for singly opening feedback, can give and opening feedback point tax Value 1;Close feedback for single, can give and close feedback point assignment 0;For double feedbacks, can give and open feedback point assignment 1, give simultaneously and close feedback Point assignment 0.If closing instruction rising edge, then for singly opening feedback, feedback point assignment 0 can be opened;Close feedback for single, can give and close Feedback point assignment 1;For double feedbacks, can give and open feedback point assignment 0, give simultaneously and close feedback point assignment 1.
For singly opening type equipment, if opening instruction rising edge, then for singly opening feedback, feedback point assignment 1 can be opened;Right Yu Danguan feeds back, and can give and close feedback point assignment 0;For double feedbacks, can give and open feedback point assignment 1, give simultaneously and close feedback point assignment 0.If opening instruction trailing edge, then for singly opening feedback, feedback point assignment 0 can be opened;Close feedback for single, can give and close feedback point Assignment 1;For double feedbacks, can give and open feedback point assignment 0, give simultaneously and close feedback point assignment 1.
Closing type equipment for single, if closing instruction rising edge, then for singly opening feedback, feedback point assignment 0 can be opened;Right Yu Danguan feeds back, and can give and close feedback point assignment 1;For double feedbacks, can give and open feedback point assignment 0, give simultaneously and close feedback point assignment 1.If closing instruction trailing edge, then for singly opening feedback, feedback point assignment 1 can be opened;Close feedback for single, can give and close feedback point Assignment 0;For double feedbacks, can give and open feedback point assignment 1, give simultaneously and close feedback point assignment 0.
For analog quantity equipment, the AI value of aperture output can be read, process variable feedback Y can be calculated according to break and open The functional relationship of degree output X, and then calculate Y ' value, and Y ' value is obtained Y value through the process computing of inertial element.
With the process using test case, test case in above-described embodiment one be may refer to for acquisition test case obtain Take the corresponding contents of unit, do not repeat them here.
In step S620, perform successively to perform instruction accordingly according to the plurality of test step data, wherein, for each Described test step data, operate according to the execution in described test step data and input data genaration performs instruction, hold described Row instruction is sent to described execution equipment, and the execution result and the corresponding expection output that return according to described execution equipment are tied Fruit determines the described test result performing instruction.
In force, when getting from described test case when after the input data that preamble is corresponding, can generate Carry described input data and corresponding perform operation perform instruction, and can be sent to perform accordingly by described execution instruction Equipment (such as above-mentioned switchgear).By the above-mentioned status scan cycle, can the periodically invoked interface letter for reading data Number reads the numerical value of predetermined attribute items, so by the numerical value of this attribute item judge execution operation corresponding to this attribute item whether by Triggering, if be triggered, then can change its mode of operation.When mode of operation corresponding to described predetermined attribute item is all in " complete Become " and/or " without operation " after, described interface function can be called, read the correlation values in respective attributes item, it is possible to foundation Correlation values determines the execution result when preamble.
If described execution result is identical with corresponding expection output result, then may determine that the described test performing instruction Result is correct, if described execution result is different with corresponding expection output result, then may determine that described execution instruction Test result is mistake, at this point it is possible to judge when whether preamble is last test step, if it is, terminate this merit Can test, if it is not, then the process of above-mentioned steps S610 and step S620 can be repeated, directly by add 1 when preamble sequence number To being last test step when preamble.
The function test method of the distribution type control system that the embodiment of the present invention provides, includes multiple test step by acquisition Multiple test step data in the test case of data perform to perform instruction accordingly successively, and according to holding that execution equipment returns With corresponding expection output result, row result determines that the test result that this execution instructs, the i.e. embodiment of the present invention are by distributing Functional test equipment is set in control system, and the form simulated by application program realizes the function survey of distribution type control system Examination, eliminate in prior art perform equipment and test device between wiring, and input data, perform result judgement be all By the write and read performing equipment association attributes item in distribution type control system is operated, and it is compared to, so that The functional test of distribution type control system is more convenient, and effective must improve testing efficiency.
Embodiment three
Fig. 7 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention three, institute State embodiment and can be considered another concrete implementation scheme of Fig. 6.
With reference to Fig. 7, in step S710, obtain the test case including multiple test step data, described test step packet Include step sequence number, perform operation, execution equipment, input data and the data of expection output result.
Wherein, the step content of above-mentioned steps S710 is identical with the step content of step S610 in above-described embodiment one, Do not repeat them here.
In step S720, according to data and the input data of the expection output result in each described test step data, really Determine the test array of predetermined number.
Wherein, the test array of predetermined number can set one or more test arrays according to practical situation.
In force, for convenience data check the management with data, all test step data can be carried out data Dividing, determine multiple test array, in the embodiment of the present invention, can arrange 4 test arrays, respectively OPERATE tests number Group, INPUT test array, OUTPUT test array and STATE test array.Each test array has corresponding function, As INPUT test array is used for recording input data, OUTPUT test array is used for recording output data, and STATE tests array For recording the state of execution equipment, OPERATE test array is used for recording the data such as execution operation.
The attribute item comprised in different test arrays can be different, as shown in Figure 8, wherein, put in entitled test case Physical points or the roll-call of communication point;Vertex type is the physical points in test case or the vertex type of communication point;Current data is When row and this physical points or the data of the row infall at communication point place at preamble place in test case;Retaking of a year or grade value be from The current value read in distribution type control system;Retaking of a year or grade attribute item can be used for recording this physical points or communication point in current test Step needs the attribute item of retaking of a year or grade value, specifically can analyze according to above-mentioned " current data " and " vertex type " and obtain;It is expert at available In the actual line number represented in the test case at this physical points or communication point place, in order to the letter produced in described functional test Breath record is in test case;Mode of operation can be used for recording this physical points or communication point is presently in mode of operation (for OPERATE tests array);Value to be written can be when preamble will write the numerical value of corresponding attribute item (for INPUT test Array), specifically can analyze according to above-mentioned " current data " and " vertex type " and obtain;Whether Q position can be used for indicating whether is to this Quality of data position carries out operating (testing array for INPUT), specifically can analyze according to above-mentioned " current data " and " vertex type " Obtain;Whether displacement can be used for this physical points of labelling or communication point when whether there being displacement (to test for INPUT in preamble Array);Desired value, this physical points or communication point (test array for OUTPUT when the desired value of preamble retaking of a year or grade attribute item Array is tested with STATE), specifically can analyze according to above-mentioned " current data " and " vertex type " and obtain;Delay type can be divided into A, B, nothing postpone three types, and B type is to complete in input data, and arrives time delay, is output as expection and exports result, A class Type is to be output as expection output result after input data complete, and postpones scheduled duration, it is contemplated that output result returns to initial value, nothing After postponing i.e. input data completing, it is output as expection output result, specifically can analyze according to above-mentioned " current data " and obtain;Postpone Time can be analyzed according to above-mentioned " current data " and obtain;Judge position can be judge when the execution result of preamble whether correct and The judgement intermediate marker added.
Input data in test case can be input in above-mentioned 4 test arrays, calculate each test array Value, thus obtain 4 test arrays magnitude relationship.4 test numbers can be defined according to the magnitude relationship of 4 test data Group, i.e. determines which test array is that OPERATE tests array, which test array is INPUT test array etc..
In step S730, obtain and the described corresponding feedback data of input data from described control server, and by described Feedback data is stored in described test array.
In force, can obtain from test case when the input data of preamble are as current data, and to upper State 4 test arrays and above-mentioned input data are analyzed, to complete the tax to the association attributes item in above-mentioned 4 test arrays Value is (including the title of the retaking of a year or grade attribute item in each test array, the value to be written in INPUT test array, OUTPUT Delay in expection output result in test array and STATE test array, OUTPUT test array and STATE test array Time delay etc. in type, OUTPUT test array and STATE test array).Such as, if OPERATE in test case Some point in test array, the title of retaking of a year or grade attribute item can be according to vertex type KG and current state ON, and selection use ONL is The title of the attribute item of this physical points or communication point, if current state is OFF, optional use OFL is this physical points or communication The title of the attribute item of point.
Can continue to run with distribution type control system, and can call for reading connecing of related data in distribution type control system Mouth function, reads from distribution type control system and performs data, and records (i.e. 4 test arrays in above-mentioned 4 test arrays In retaking of a year or grade attribute item in).
In step S740, obtain the current of execution equipment corresponding to test step data described in described distribution type control system Status data.
In step S750, if described current status data is different from described input data with described feedback data, then will Described input data are assigned to when the corresponding execution equipment in the described distribution type control system that the step sequence number of preamble is corresponding.
In force, when determining that retaking of a year or grade value is inconsistent with value to be written, then can call for writing distribution type control system The interface function of middle related data, writes input data into correspondence and performs equipment, thus complete the input simulation of data.
Meanwhile, for the ease of investigate problem time can it can be apparent that this test step occurs data variation attribute item or Equipment, can labelling is different from described current status data in described test array input data, with determine described currently Different pieces of information present in status data and described input data.
Wherein, labelling input data can have various ways, such as, highlight this input data with different colors, Or these input data are proposed, and it is medium to be stored in the marked region pre-set.
In force, this test step can will occur the attribute item of data variation, this test step in test case The respective attributes item mark color that previous test step is corresponding, in order to can it can be apparent that in this test step when the problem of investigation and send out The attribute item of raw data variation, in order to its process logic is analyzed, the relevant issues such as location.
In step S760, obtain the execution result of described execution equipment, and according to described execution result and described test number Expection output result in group determines the described test result performing instruction.
In force, can periodically call corresponding interface function, the retaking of a year or grade read in OPERATE test array belongs to Property item numerical value, and then judge that whether execution operation corresponding to this attribute item is triggered, if be triggered, then can change current Mode of operation, when in OPERATE test array mode of operation corresponding to all properties item all in " completing " and " without operating " Time, then show when the execution of preamble has operated.At this point it is possible to call corresponding interface function, read OUTPUT test Numerical value (i.e. AV (Analog Value, the mould in OUTPUT test array of association attributes item in array and STATE test array Analog quantity numerical value) or the numerical value of DV (digital value, digital quantity numerical value) attribute item, the DRN (Data in STATE test array Run, running status word) numerical value of attribute item), thus obtain judging bit value.When the judgement position that all of execution equipment is corresponding It is 1 (the most correct), then judges that the test result of this test step is correct, judging that row beats " √ ", continuing executing with next step.Otherwise Beat "×" and exit this functional test.
Processing further, it is also possible to arrange data delay, corresponding processing mode can be varied, and one presented below can The processing mode of choosing, specifically can include herein below:
Step one, obtains and the data corresponding delay type information of described expection output result.
In force, delay type can be divided into A, B, nothing to postpone three types, and B type is to complete in input data, and arrives Reaching time delay, be output as expection output result, type-A is to be output as expection output result after input data complete, and postpones Scheduled duration, it is contemplated that output result returns to initial value, without postponing after i.e. input data complete, is output as expection output result, tool Body can be analyzed according to above-mentioned " current data " and obtain;Can analyze according to above-mentioned " current data " time delay and obtain;Judge that position can For judging judgement intermediate marker that is the most correct when the execution result of preamble and that add.
Step 2, according to described delay type information, the execution result of described control server return and expects accordingly Output result determines the described test result performing instruction.
In force, for containing the test step postponed, needing retaking of a year or grade correlation values.Retaking of a year or grade for the first time can be input behaviour After completing, for the execution equipment without delay type, if retaking of a year or grade value (i.e. performing result) is identical, then with expection output result This point judges that position is 1 (the most correct), is otherwise 2 (i.e. mistakes);For delay type B, if retaking of a year or grade value and expection output result Identical, then the misjudgment of this execution equipment.If retaking of a year or grade value is inconsistent with expection output result, then the judgement position of this attribute item It is 3 (i.e. waiting);For delay type A, retaking of a year or grade value is different from expection output result, then attribute item for 2.Retaking of a year or grade value and expection Output result is consistent, then this attribute item judges that position is 3.
After arriving predetermined time delay, carry out second time retaking of a year or grade.Wherein, for the execution equipment without delay type, If it judges that position is 2, no matter retaking of a year or grade value is the most correct, it is judged that invariant position, if judging, position is 1, retaking of a year or grade value and expection output knot The most identical, then the judgement position in this execution equipment is 1, is otherwise 2.For delay type B, if it judges that position is 3, and retaking of a year or grade Be worth inconsistent with expection output result, then the judgement position of this execution equipment is that 2 retaking of a year or grade values are consistent with expection output result, then this genus Judgement position in property item is 1, otherwise judges that position is 2.
By above-mentioned related content, corresponding first the holding of current step sequence number can be obtained from described control server First execution result of row instruction, and the first expection output knot that result is corresponding with described current step sequence number is performed by described first Fruit is compared, if described first execution result is identical with described first expection output result, then obtains the next one and walks sequence number.
It is then possible to the second corresponding for described next step sequence number execution instruction is sent to described control server, and From described control server, obtain the described second the second execution result performing instruction, and perform result by described second respectively With corresponding second expection output results contrast, determine the described second test result performing instruction.As above circulation performs corresponding Processing procedure, until test case in all test steps complete
The function test method of the distribution type control system that the embodiment of the present invention provides, on the one hand, included many by acquisition Multiple test step data in the test case of individual test step data perform to perform instruction accordingly successively, and according to the equipment of execution With corresponding expection output result, the execution result returned determines that the test result that this execution instructs, the i.e. embodiment of the present invention are passed through Functional test equipment is set in distribution type control system, and the form simulated by application program realizes distribution type control system Functional test, eliminate in prior art perform equipment and test device between wiring;On the other hand, by arranging many numbers Group, so that the judgement of input data, execution result is all by performing equipment association attributes in distribution type control system Write and read operation, and be compared to, and then made the functional test of distribution type control system more convenient, and had Imitate to improve testing efficiency.
Embodiment four
Fig. 9 is the flow chart of the function test method of the distribution type control system illustrating according to embodiments of the present invention four.Logical Cross the control server in distribution type control system and perform described method.Distribution type control system in the embodiment of the present invention with It is described in detail as a example by DCS (Distributed Control System) control system, other distribution type control system Process can be same or similar with this, does not repeats them here.
With reference to Fig. 9, in step S910, receive carry perform operation and input data perform instruction.
In step S920, perform instruction be sent to the field control station of described distribution type control system by described, and from Described field control station obtains described execution result.
In step S930, send the described execution result performing instruction.
The process of above-mentioned steps S910~step S930 may refer to inside the Pass the phase in above-described embodiment one~embodiment three Hold, do not repeat them here.
The function test method of the distribution type control system that the embodiment of the present invention provides, on the one hand, included many by acquisition Multiple test step data in the test case of individual test step data perform to perform instruction accordingly successively, and according to the equipment of execution With corresponding expection output result, the execution result returned determines that the test result that this execution instructs, the i.e. embodiment of the present invention are passed through Functional test equipment is set in distribution type control system, and the form simulated by application program realizes distribution type control system Functional test, eliminate in prior art perform equipment and test device between wiring;On the other hand, by arranging many numbers Group, so that the judgement of input data, execution result is all by performing equipment association attributes in distribution type control system Write and read operation, and be compared to, and then made the functional test of distribution type control system more convenient, and had Imitate to improve testing efficiency.
Embodiment five
Based on identical technology design, Figure 10 is the control of the distribution type control system illustrating according to embodiments of the present invention five The logic diagram of server.With reference to Figure 10, described control server includes that the first instruction interaction unit 1010 and the second instruction are handed over Unit 1020 mutually.
First instruction interaction unit 1010, performs operation for receiving to carry and inputs the instruction that performs of data, and Send the described execution result performing instruction.
Second instruction interaction unit 1020, is sent to institute for the execution instruction received by described first instruction interaction unit State the field control station of distribution type control system, and obtain described execution result from described field control station.
The control server of the distribution type control system that the embodiment of the present invention provides, includes multiple test step number by acquisition According to test case in multiple test step data perform successively to perform instruction accordingly, and according to perform equipment return execution With corresponding expection output result, result determines that the test result that this execution instructs, the i.e. embodiment of the present invention are by distributing control Functional test equipment is set in system processed, and the form simulated by application program realizes the function survey of distribution type control system Examination, eliminates the wiring between execution equipment and test device, and by arranging multiple array, so that input data, execution The judgement of result is all by operating the write and read performing equipment association attributes item in distribution type control system, and compares Complete, and then make the functional test of distribution type control system more convenient, and effective must improve testing efficiency.
It may be noted that according to the needs implemented, each step/parts described in this application can be split as more multistep Suddenly/parts, it is possible to the part operation of two or more step/parts or step/parts is combined into new step/parts, To realize the purpose of the present invention.
Above-mentioned the method according to the invention can realize in hardware, firmware, or is implemented as being storable in recording medium Software in (such as CD ROM, RAM, floppy disk, hard disk or magneto-optic disk) or computer code, or it is implemented through network download Original storage and the meter in local recording medium will be stored in remotely record medium or nonvolatile machine readable media Calculation machine code, thus method described here can be stored in use general purpose computer, application specific processor or able to programme or special By the such software processes on the record medium of hardware (such as ASIC or FPGA).It is appreciated that computer, processor, micro- Processor controller or programmable hardware include can storing or receive software or computer code storage assembly (such as, RAM, ROM, flash memory etc.), when described software or computer code are by computer, processor or hardware access and execution, it is achieved at this The processing method described.Additionally, when general purpose computer accesses for the code of the process that realization is shown in which, the execution of code General purpose computer is converted to the special-purpose computer of the process being shown in which for execution.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those familiar with the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (10)

1. the functional test equipment of a distribution type control system, it is characterised in that described functional test equipment passes through described point The management level network dissipating formula control system is connected with one or more control server communications, including:
Test case acquiring unit, for obtaining the test case including multiple test step data, described test step data include Walk sequence number, perform operation, execution equipment, input data and the data of expection output result;
Perform instruction signal generating unit, for for each described test step data, according to described test step data perform behaviour Make and input data genaration performs instruction;
Perform instruction execution unit, take for the execution instruction that described execution instruction signal generating unit generates is sent to described control Business device, and receive the described execution result performing instruction from described control server;
Test result determines unit, the execution result of the described execution instruction for receiving according to described execution instruction execution unit The described test result performing instruction is determined with the described expection output result performing instruction.
Functional test equipment the most according to claim 1, it is characterised in that described functional test equipment also includes:
Delay type acquiring unit, for obtaining and the data corresponding delay type information of described expection output result;
Described test result determines unit, performs knot for return according to described delay type information, described control server Fruit and corresponding expection output result determine the described test result performing instruction.
3. the control server of a distribution type control system, it is characterised in that including:
First instruction interaction unit, performs operation for receiving to carry and inputs the instruction that performs of data, and sending described Perform the execution result of instruction;
Second instruction interaction unit, is sent to described distributing for the execution instruction received by described first instruction interaction unit The field control station of control system, and obtain described execution result from described field control station.
4. the function test method of a distribution type control system, it is characterised in that described method includes:
Obtain include the test case of multiple test step data, described test step data include walking sequence number, performs operation, execution sets Standby, input data and expection output result data;
Perform successively to perform instruction accordingly according to the plurality of test step data, wherein, for each described test step data, Operate according to the execution in described test step data and input data genaration performs instruction, described execution instruction is sent to described The control server of distribution type control system, and the execution result returned according to described control server is defeated with corresponding expection Go out result and determine the described test result performing instruction.
Method the most according to claim 4, it is characterised in that described method also includes:
Data according to the expection output result in each described test step data and input data, determine the test of predetermined number Array;
Receive and the described corresponding feedback data of input data from described control server, and described feedback data is stored in institute State in test array;
With corresponding, the described execution result returned according to described control server expects that exporting result determines and described perform instruction The process of test result include:
Institute is determined according to execution result expection corresponding with the described test array output result that described control server returns State the test result performing instruction.
Method the most according to claim 5, it is characterised in that described method also includes:
For each described test step data, obtain the execution that described in described distribution type control system, test step data are corresponding and set Standby current status data;
If described current status data is different from described input data with described feedback data, then by described test step data pair The input data answered are assigned to the corresponding execution equipment in the described distribution type control system that described step sequence number is corresponding.
Method the most according to claim 6, it is characterised in that described method also includes:
The input data that labelling is different from described current status data in described test array, to determine described current state number According to described input data present in different pieces of information.
Method the most according to claim 7, it is characterised in that described method also includes:
Obtain and the data corresponding delay type information of described expection output result;
With corresponding, the described execution result returned according to described control server expects that exporting result determines and described perform instruction The process of test result include:
The execution result and the corresponding expection output result that return according to described delay type information, described control server determine The described test result performing instruction.
Method the most according to claim 4, it is characterised in that described perform phase successively according to the plurality of test step data The process performing instruction answered includes:
The first execution result of the first execution instruction corresponding to current step sequence number is obtained from described control server, and by described First perform result corresponding with described current step sequence number first expection output results contrast, if described first perform result and Described first expection output result is identical, then obtain next one step sequence number;
The second corresponding for described next step sequence number execution instruction is sent to described control server, and controls service from described Device obtains the described second the second execution result performing instruction, and respectively by second pre-with corresponding for described second execution result Phase output results contrast, determines the described second test result performing instruction.
10. the function test method of a distribution type control system, it is characterised in that described method includes:
Receive carry perform operation and input data perform instruction;
Described execution instruction is sent to the field control station of described distribution type control system, and obtains from described field control station Take described execution result;
Send the described execution result performing instruction.
CN201610479985.XA 2016-06-27 2016-06-27 Functional test equipment, control server and the method for distribution type control system Active CN106094794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610479985.XA CN106094794B (en) 2016-06-27 2016-06-27 Functional test equipment, control server and the method for distribution type control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610479985.XA CN106094794B (en) 2016-06-27 2016-06-27 Functional test equipment, control server and the method for distribution type control system

Publications (2)

Publication Number Publication Date
CN106094794A true CN106094794A (en) 2016-11-09
CN106094794B CN106094794B (en) 2019-07-19

Family

ID=57253106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610479985.XA Active CN106094794B (en) 2016-06-27 2016-06-27 Functional test equipment, control server and the method for distribution type control system

Country Status (1)

Country Link
CN (1) CN106094794B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110120896A (en) * 2019-04-15 2019-08-13 北京达佳互联信息技术有限公司 Network delay control method, device, electronic equipment and storage medium
CN113485290A (en) * 2021-06-28 2021-10-08 中车青岛四方机车车辆股份有限公司 Detection method, device, equipment and medium for rail vehicle traction control logic
CN115333987A (en) * 2022-08-11 2022-11-11 北京广利核系统工程有限公司 Interface test system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050033457A1 (en) * 2003-07-25 2005-02-10 Hitoshi Yamane Simulation aid tools and ladder program verification systems
CN102412003A (en) * 2011-09-20 2012-04-11 中广核工程有限公司 Nuclear power station DCS debugging system and method thereof
CN102541045A (en) * 2010-12-31 2012-07-04 镇江灵芯软件实验室有限公司 Method for automatically testing programmable logic controller program
CN103345442A (en) * 2013-06-06 2013-10-09 莱诺斯科技(北京)有限公司 Equipment automated testing service integration system
CN103869801A (en) * 2012-12-13 2014-06-18 中广核工程有限公司 Test method of nuclear power plant instrumentation control logic function block and system
CN104932479A (en) * 2015-04-27 2015-09-23 深圳市中电电力技术股份有限公司 Automatic test method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050033457A1 (en) * 2003-07-25 2005-02-10 Hitoshi Yamane Simulation aid tools and ladder program verification systems
CN102541045A (en) * 2010-12-31 2012-07-04 镇江灵芯软件实验室有限公司 Method for automatically testing programmable logic controller program
CN102412003A (en) * 2011-09-20 2012-04-11 中广核工程有限公司 Nuclear power station DCS debugging system and method thereof
CN103869801A (en) * 2012-12-13 2014-06-18 中广核工程有限公司 Test method of nuclear power plant instrumentation control logic function block and system
CN103345442A (en) * 2013-06-06 2013-10-09 莱诺斯科技(北京)有限公司 Equipment automated testing service integration system
CN104932479A (en) * 2015-04-27 2015-09-23 深圳市中电电力技术股份有限公司 Automatic test method and system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110120896A (en) * 2019-04-15 2019-08-13 北京达佳互联信息技术有限公司 Network delay control method, device, electronic equipment and storage medium
US11496380B2 (en) 2019-04-15 2022-11-08 Beijing Dajia Internet Information Technology Co., Ltd. Network delay control method and apparatus, electronic device, and storage medium
CN113485290A (en) * 2021-06-28 2021-10-08 中车青岛四方机车车辆股份有限公司 Detection method, device, equipment and medium for rail vehicle traction control logic
CN115333987A (en) * 2022-08-11 2022-11-11 北京广利核系统工程有限公司 Interface test system and method
CN115333987B (en) * 2022-08-11 2023-12-29 北京广利核系统工程有限公司 Interface test system and method

Also Published As

Publication number Publication date
CN106094794B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN104407980B (en) Mobile solution automatic test device and method
CN104484273B (en) The method of testing of application program, equipment and system
US5778004A (en) Vector translator
Thimbleby et al. Usability analysis with Markov models
CN101763443B (en) Avionics system digitalized design verification system and method
CN102023861A (en) Method and system for generating test script and test suite
CN106094794A (en) The functional test equipment of distribution type control system, control server and method
CN106598834A (en) UI (User Interface) testing method and device
CN107122295A (en) The generation method and device of test case script
CN112148580A (en) Test method and device and electronic equipment
EP0460114A1 (en) System for evaluating the performance of a large scale programmable machine capable of having a plurality of terminals attached thereto
CN110069376A (en) Several method, apparatus, storage medium and computer equipment are made in a kind of association
CN114662427A (en) Debugging method and device for logic system design
CN116049014A (en) AMBA bus verification platform generation method and device
US8180610B2 (en) Model-based diagnostic interface for a vehicle health management system having a system model with a system nomeclature
CN105632270A (en) Data processing method and data processing device based on exam
CN109189688A (en) A kind of generation method, generating means and the electronic equipment of test case script
CN110221955A (en) Test report generating means
CN109871551A (en) A kind of intelligent subscriber handbook generation method, device, terminal and storage medium
CN109636692A (en) A kind of generation method and electronic equipment of user's portrait
CN110537171A (en) Test equipment and method for being tested device driver software
CN106066822A (en) A kind of emulator supporting coverage rate statistical function and method
CN107085553B (en) Input box testing method and device
CN111078576A (en) Independent Web service test equipment based on USB network card technology
CN109902029A (en) A kind of test method and test device for POS terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant