CN106093507A - A kind of monitoring method and system - Google Patents

A kind of monitoring method and system Download PDF

Info

Publication number
CN106093507A
CN106093507A CN201610383841.4A CN201610383841A CN106093507A CN 106093507 A CN106093507 A CN 106093507A CN 201610383841 A CN201610383841 A CN 201610383841A CN 106093507 A CN106093507 A CN 106093507A
Authority
CN
China
Prior art keywords
checked object
power consumption
electricity
default
currently available
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610383841.4A
Other languages
Chinese (zh)
Inventor
张春梅
李宾
张新花
李文彬
黄静婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201610383841.4A priority Critical patent/CN106093507A/en
Publication of CN106093507A publication Critical patent/CN106093507A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/56Special tariff meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application provides a kind of monitoring method and system, by detecting the current power amount of checked object, and utilize the default power consumption of this checked object, calculate its currently available electricity, when determining this current available power less than the default power threshold obtained, the application will send the first prompting message to the default terminal of user in time, so that user learns the electricity consumption situation of checked object in time, and then timely electricity payment, increase the currently available electricity of checked object, avoid checked object to quit work because of power-off, the inconvenience brought for user's life, simultaneously, improve checked object power supply reliability, and then ensure that the work efficiency under the application scenarios such as workshop.

Description

A kind of monitoring method and system
Technical field
Present application relates generally to electronic technology field, monitor method and system more particularly to one.
Background technology
Nowadays, along with the fast development of electronic technology, electronics categories on the market gets more and more, in order to live or work The facility made etc., either in user family, the place such as workshop or enterprise Office Area, the most all can have a lot of electronics to produce Product.Based on this, in actual applications, it usually needs big volume and electricity is pre-purchase, power for each electronic product, thus ensure to use Family quality of the life, the normal of workshop produce and the normal work etc. of employee.
But, in actual applications, owing to the working condition of each electronic product every day is different, so, each electronic product Every daily power consumption not immobilizes, and this is just easy to occur that electronic product quits work because having a power failure suddenly during using Situation, this will give user daily life cause a lot of inconvenience, also can largely effect on the work efficiency of workshop.
Summary of the invention
In view of this, this application provides a kind of monitoring method and system, it is achieved that the prison to checked object electricity consumption situation Control, it is possible to when its available power deficiency, it is possible in time send prompting message to the default terminal of user, to remind the user can Timely electricity payment, it is to avoid checked object quits work because of power-off, makes troubles its life, and improves checked object The reliability of power supply, and then improve the work efficiency of workshop.
In order to realize foregoing invention purpose, this application provides techniques below scheme:
A kind of monitoring method, described method includes:
The current power amount of detection checked object;
Utilize the default power consumption of described checked object, calculate the currently available electricity of described checked object;
When described currently available electricity is less than the default power threshold obtained, send the first prompting letter to default terminal Breath.
Preferably, described method also includes:
According to the job information of the described checked object of storage, obtain described checked object within the different operating time period Estimate power consumption;
The current power amount of the most described detection checked object, including:
The detection checked object actual power consumption within the different operating time period.
Preferably, described method also includes:
Whether the described checked object that checking detects described actual power consumption within the work at present time period is more than phase The first preset multiple estimating power consumption answered;
When the described checked object described actual power consumption within the work at present time period is more than estimating power consumption accordingly The first preset multiple, send the second prompting message to described default terminal.
Preferably, when current power amount includes current daily power consumption, the current power amount of described detection checked object, also Including:
The first power consumption and preset termination time that the default initial time of detection checked object every day is corresponding are corresponding Second power consumption;
Calculate the difference of described second power consumption and described first power consumption, and using described difference as described checked object Current daily power consumption.
Preferably, described method also includes:
By the described current daily power consumption detected and the association storage of corresponding current detection date;
The process then obtaining described default power threshold includes:
Transfer the daily power consumption of at least two days before the current detection date of the described checked object of storage;
Calculate the described checked object average daily power consumption in described at least two days, and by described average daily power consumption Second preset multiple is as described default power threshold.
Preferably, before sending the first prompting message to default terminal, described method also includes:
Utilize described currently available electricity and described average daily power consumption, calculate described checked object and currently may be used to described The pot life of power consumption;
Accordingly, described send the first prompting message to default terminal particularly as follows:
Send to default terminal and carry described pot life and the first prompting message of described currently available electricity.
Preferably, when described currently available electricity is less than the default power threshold obtained, described method also includes:
Send control instruction to described default terminal, control described default terminal according to preset rules to described checked object Electricity payment.
A kind of monitoring system, described system includes:
Detection equipment, for detecting the current power amount of checked object;
Controller, for utilizing the default power consumption of described checked object, calculates the currently available electricity of described checked object;
Communication equipment, for when described currently available electricity is less than the default power threshold obtained, sending out to default terminal Send the first prompting message.
Preferably, described system also includes:
Memorizer, for storing the job information of described checked object;
The most described controller, specifically for the job information according to described checked object, obtains described checked object in difference Estimate power consumption in working time section, and detect the described checked object actual power consumption within the different operating time period, when Verify the described checked object described actual power consumption within the work at present time period more than estimating the first of power consumption accordingly Preset multiple, sends the second prompting message by described communication equipment to described default terminal.
Preferably, described memorizer is additionally operable to work as the current daily power consumption of the described checked object detected with corresponding The front detection date is associated storage;
Accordingly, described controller is additionally operable to transfer at least two days before the current detection date of described checked object Daily power consumption, calculates the described checked object average daily power consumption in described at least two days, and by described average daily power consumption The second preset multiple as described default power threshold;Utilize described currently available electricity and described average daily power consumption, Calculate the described checked object pot life to described currently available electricity, and pre-less than obtain at described currently available electricity If during power threshold, send the first prompting letter carrying described pot life and described currently available electricity to default terminal Breath.
As can be seen here, compared with prior art, this application provides a kind of monitoring method and system, tested right by detection The current power amount of elephant, and utilize the default power consumption of this checked object, calculate its currently available electricity, determining that this currently may be used When power consumption is less than the default power threshold obtained, the application will send the first prompting message to the default terminal of user in time, So that user learns the electricity consumption situation of checked object, and then electricity payment in time in time, increase the currently available of checked object Electricity, it is to avoid checked object quits work because of power-off, lives the inconvenience brought for user, meanwhile, improves checked object Power supply reliability, and then ensure that the work efficiency under the application scenarios such as workshop.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this The embodiment of application, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
A kind of flow chart monitoring embodiment of the method that Fig. 1 provides for the application;
The partial process view of the another kind of monitoring embodiment of the method that Fig. 2 provides for the application;
The flow chart of another monitoring embodiment of the method that Fig. 3 provides for the application;
The flow chart of another monitoring embodiment of the method that Fig. 4 provides for the application;
The structural representation of a kind of monitoring system embodiment that Fig. 5 provides for the application;
The structural representation of the another kind of monitoring system embodiment that Fig. 6 provides for the application.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is carried out clear, complete Describe, it is clear that described embodiment is only some embodiments of the present application rather than whole embodiments wholely.Based on Embodiment in the application, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of the application protection.
This application provides a kind of monitoring method and system, by detecting the current power amount of checked object, and utilization should The default power consumption of checked object, calculates its currently available electricity, is determining that this current available power is less than the default electricity obtained During amount threshold value, the application will send the first prompting message to the default terminal of user, so that user learns tested in time in time The electricity consumption situation of object, and then in time electricity payment, increase the currently available electricity of checked object, it is to avoid checked object is because breaking Electricity and quit work, live the inconvenience that brings for user, meanwhile, improve checked object power supply reliability, and then ensure that life Produce the work efficiency under the application scenarios such as workshop.
Understandable in order to enable the above-mentioned purpose of the application, feature and advantage to become apparent from, below in conjunction with the accompanying drawings and specifically The application is described in further detail by embodiment.
As it is shown in figure 1, a kind of flow chart monitoring embodiment of the method provided for the application, the method can include following Step:
Step S11: the current power amount of detection checked object.
Wherein, checked object can be one or more electronic equipment, it is of course also possible to be the institute in a certain application scenarios There is the system that electronic equipment is constituted, such as the system of each electronic equipment composition, each electronic equipment of some Factory Building in one family System constituted etc., the content that checked object is comprised by the application is not construed as limiting, and specifically can determine according to actual needs, this Application will not enumerate at this.
In this embodiment, in order to grasp the electricity consumption situation of checked object, in order to when its available power deficiency, user Can pay the fees in time, increase its available power, thus ensure checked object functional reliability, the application can detect tested in real time The current power amount of object.
In conjunction with foregoing description, when checked object includes multiple electronic equipment, in actual applications, the present embodiment can be real Time detect the current power amount of each electronic equipment, it is also possible to detect the current of the whole system that these multiple electronic equipments constitute Power consumption etc., the particular content that above-mentioned steps S11 is comprised by the application is not construed as limiting.
Optionally, when the application needs the electricity consumption situation obtaining the entirety of checked object, it will usually with every day as list Position, the day electricity consumption situation of detection checked object, but be not limited thereto, the week of checked object can also be detected according to actual needs Electricity consumption situation, moon electricity consumption situation etc., the application only illustrates at this as a example by the day electricity consumption situation of detection checked object, base In this, as in figure 2 it is shown, above-mentioned steps S11 may include that
Step S111: when the first power consumption that the default initial time of detection checked object every day is corresponding and preset termination Between corresponding the second power consumption.
In actual applications, checked object is the most all the interior work of section at a fixed time, therefore, in order to reduce monitoring system The power consumption of system, the application can detect the first power consumption corresponding to the default initial time of this checked object and preset termination The second power consumption that time is corresponding.Wherein, preset initial time and the preset termination time can be according to the work feelings of checked object Condition determines, this is not construed as limiting by the application.
It should be noted that for the checked object needing successive work, the application can detect its startup time The first corresponding power consumption and the second power consumption corresponding to off-air time.Pre-clearly for different checked objects If initial time and preset termination time are the most all different, the rated power being additionally, since different checked object is not Consistent, so, even if the electricity consumption situation of the different checked objects detected at identical time point is likely to difference, the application couple This is not especially limited.
It addition, above-mentioned first power consumption and the above-mentioned second power consumption electricity that can be checked object currently used, with The increase of the working time of tested time, corresponding power consumption also can be gradually increased.
Step S112: calculate the second power consumption and the difference of the first power consumption, and using this difference working as checked object Front daily power consumption.
Understanding based on the above-mentioned description to the first power consumption and the second power consumption, this second power consumption is typically larger than the first use Electricity, so, the present embodiment can be using the difference of the second power consumption and the first power consumption as the current day electricity consumption of checked object Amount, now, the current daily power consumption of calculated checked object can also be associated by the application with the current detection date It is uploaded to data base, in order to transfer from now on after storage, the current daily power consumption that will obtain and the binding of current detection date.
As can be seen here, the application can be by detection the most corresponding for the daily power consumption of the checked object every day detected Date association stores to server, and the association storage mode of each daily power consumption and each detection date is not construed as limiting by the application, Can be forms mode, it is also possible to be curve chart mode etc..
Step S12: utilize the default power consumption of checked object, calculates the currently available electricity of checked object.
Wherein, the default power consumption of checked object can be the available power after subscriber payment, specifically can be depending on user Payment situation;Certainly, it can be the power consumption allowing checked object to use that user sets according to actual needs, the application couple Its concrete numerical value is not construed as limiting.
As can be seen here, the currently available electricity of checked object can be the difference presetting power consumption with current power amount, but It is not limited thereto.
Step S13: verify that this current available power, whether less than the default power threshold obtained, if so, performs step S14;If it is not, return step S11.
In the present embodiment, default power threshold can be the second preset multiple of the average daily power consumption of checked object, and This second preset multiple can be more than 1;It is of course also possible to set the electricity consumption allowing checked object to use according to actual needs Amount, its concrete numerical value is not construed as limiting by the application.
Optionally, in actual applications, due to can be by the daily power consumption of every day of checked object detected and its phase The detection time answered is associated storage, and therefore, the present embodiment obtains the current day electricity consumption of checked object at current sensing time After amount, can with called data library storage about the day electricity consumption of at least two days before the current detection date of this checked object Amount, and after calculating the checked object average daily power consumption in these at least two days accordingly, can be by this average daily power consumption Second preset multiple is as default power threshold.
Concrete, after the checked object current daily power consumption of n-th day being detected, can be from transferring the n-th-5 days to n-th-3 The daily power consumption of it this checked object, and calculate average at this daily power consumption of the n-th-5 days to the n-th-3 days of checked object Value, obtains the average daily power consumption of checked object, at this point it is possible to using this average daily power consumption of 2 times as default power threshold, But it is not limited thereto.
In addition, it is necessary to explanation, the daily power consumption number transferred during for calculating the average daily power consumption of checked object Be not construed as limiting, can be the daily power consumption of above-mentioned 2 days, it is also possible to be 3 days, 4 days ..., the daily power consumption etc. of m days, specifically may be used To determine according to actual needs.
Step S14: send the first prompting message to default terminal.
In conjunction with above-mentioned analysis, when determining that the currently available electricity obtaining checked object, less than presetting power threshold, illustrates this Time checked object power consumption not enough, it will affect the reliability of its work, to this, in time this situation can be informed use Family, in order to user pays the fees for this checked object in time, thus increase its available power.
Concrete, the application can send the first prompting message to the default terminal of user, and this first prompting message is permissible Including checked object currently available electricity, preset power threshold and can also be used with the information such as how long, in order to user is accordingly Reasonable arrangement electricity payment matters, thus avoid the normal use affecting user to checked object.
Optionally, above-mentioned default terminal can be user mobile phone, ipad or other electronic equipments of carrying with etc., also Can be the industrial computer etc. at user place, the concrete structure of this default terminal be not construed as limiting by the application.
As can be seen here, the application, after obtaining above-mentioned first prompting message, can pass through wireless network or cable network, with The modes such as short message, voice or mail send to default terminal, thus play the prompting currently available electricity of user's checked object not The effect of foot, concrete transmission means and the form of expression of above-mentioned first prompting message are not construed as limiting by the application.
In sum, the application is by detecting the current power amount of checked object, and utilizes the default use of this checked object Electricity, calculates its currently available electricity, and when determining this current available power less than the default power threshold obtained, the application will Send the first prompting message to the default terminal of user in time, so that user learns the electricity consumption situation of checked object in time, enter And timely electricity payment, increase the currently available electricity of checked object, it is to avoid checked object quits work because of power-off, for The inconvenience that family life brings, meanwhile, improves checked object power supply reliability, and then ensure that under the application scenarios such as workshop Work efficiency.
As the another embodiment of the application, after the average daily power consumption obtaining checked object, the application can also utilize This average daily power consumption and currently available electricity, calculate the time that can also use currently available electricity of checked object, this time Between equal to currently available electricity divided by average daily power consumption, then, user just can be current according to calculated tested correspondence The time that can also use, the more reasonable arrangement electricity charge are paid matters, cannot be paid the most in time especially for user Receive the situation of the electricity charge, preset the data of power threshold by Reasonable adjustment, it becomes possible to reserve abundance for user's electricity payment Time, very convenient, and avoid because of user cannot in time electricity payment and affect the work efficiency of checked object.
Concrete, as it is shown on figure 3, the flow chart of another the monitoring embodiment of the method provided for the application, the method can To include:
Step S31: when the first power consumption that the default initial time of detection checked object every day is corresponding and preset termination Between corresponding the second power consumption.
Step S32: calculate the second power consumption and the difference of the first power consumption, and using current as checked object of this difference Daily power consumption.
Step S33: transfer the daily power consumption of at least two days before the current detection date of this checked object of storage.
Understanding in conjunction with foregoing description, the daily power consumption of checked object and detection date can be associated depositing by the application Storage, when needed, can transfer the daily power consumption corresponding with this detection date directly according to the detection date determined.
Step S34: calculate this checked object average daily power consumption in these at least two days.
Step S35: utilize currently available electricity and average daily power consumption, calculate checked object to currently available electricity Pot life.
Understanding in conjunction with foregoing description, calculated checked object can be multiple to the pot life of currently available electricity Hour, one day or two days, the most for a long time, be specifically dependent upon the average daily power consumption of above-mentioned calculated checked object, More specifically, it depends on the rated power of checked object, but is not limited thereto.
Step S36: when checked object is less than Preset Time to the pot life of currently available electricity, send to default terminal Carry the first prompting message of this pot life and currently available electricity.
In the present embodiment, it is also possible to when the currently available electricity judging checked object is less than and presets power threshold, Perform step S36, thus reduce the power consumption of monitoring system, it is not limited to the above-mentioned judgement to pot life.
Certainly, if user needs to grasp in real time the electricity consumption situation of checked object, it is also possible to by each calculated tested The currently available electricity of object and pot life send in real time to default terminal and export, in order to user adjusts each tested right accordingly The working condition of elephant, its method of adjustment is not construed as limiting by the application.
As can be seen here, the electricity consumption situation that the present embodiment can grasp checked object every day by the way in real time, thus Adjust the working condition of each checked object accordingly in real time, in order to reduce the whole power consumption of system, can not only send out in time meanwhile Situation that existing electricity consumption is not enough and allow users to timely electricity payment, find abnormal tested of power consumption in time it can also enough Object, thus save power consumption.
As shown in Figure 4, for the application provide another monitoring embodiment of the method flow chart, unlike the embodiments above , the present embodiment can also more accurately monitor the checked object electricity consumption situation in each time period of every day, improve further The reliability of checked object work, concrete, the method may include that
Step S41: according to the job information of the checked object of storage, obtains checked object within the different operating time period Estimate power consumption.
In actual applications, rated power and the working time of different checked objects is typically different, with user family As a example by front yard, user's TV from the point of view of 18 o'clock to 22 at night, used the domestic such as electromagnetic oven, microwave oven and electric cooker at 18 o'clock to 20 o'clock Electrical equipment cooks supper, uses 6 thirty to 7 thirty microwave oven to cook breakfast in the morning, only has ice during working in morning 7 at 18 in evening Case energising work etc., it can be seen that, in subscriber household, the working time of different household electrical appliance is different, say, that tested Object power consumption within the different operating time period is different.
Based on this, the application, can in order to more precisely grasp the checked object electricity consumption situation in the different operating time period The requirements such as the job placement with the living habit according to user or workshop, determine the job information of checked object, namely Say, determine in checked object is when have which electronic product work, and the rated power of these electronic products is how many Etc., the particular content of the job information of checked object is not construed as limiting by the application, can determine according to actual needs, the application Will not enumerate at this.
Continue foregoing description, after determining the job information of checked object, it is possible to use this quilt within the different operating time period Inspection object participates in rated power and the concrete time of this working time section of each electronic equipment of work, is calculated this work That makees checked object in the time period estimates power consumption.Wherein, working time section can be true according to the specific works situation of checked object Fixed, its concrete time is not construed as limiting by the application.
Still as a example by above-mentioned subscriber household, 18 o'clock to 20 o'clock periods at night, participate in work has TV, electromagnetic oven, micro- Ripple stove, electric cooker and refrigerator, so, within this time period, checked object (i.e. the whole electricity system of this subscriber household) is pre- Estimating power consumption can be that these participate in the sum of products of rated power and working time of electronic product of work, but is not limited to This.
Step S42: the detection checked object actual power consumption within the different operating time period.
Still as a example by above-mentioned subscriber household, the change of data can be exported by detecting the ammeter of this user, thus obtain The checked object actual power consumption within the different operating time period, but it is not limited to this kind of monitoring actual electricity consumption of checked object The mode of amount, specifically can adjust according to the change of actual application scenarios.
Optionally, after determining each working time section of checked object, for each working time section, With by detecting the 3rd power consumption corresponding to the initial time of this working time section and the 4th power consumption corresponding to termination time, Afterwards, calculate the 4th power consumption and the difference of the 3rd power consumption, obtain the checked object actual electricity consumption in this working time section Amount.It should be noted that the detection mode for the actual power consumption of checked object is not limited to this kind of mode.
Step S43: whether the checked object that checking detects actual power consumption within the work at present time period is more than phase The first preset multiple estimating power consumption answered, if so, performs step S44;If it is not, return step S42.
In actual applications, for the time to the reserved sufficient electricity payment of user, above-mentioned first preset multiple can be fitted When choosing bigger numerical, but can not be excessive, thus guarantee when checked object power consumption within certain time period is excessive, Find in time and process, it is to avoid electricity is wasted and caused any property loss.
Based on this, the present embodiment can first obtain the work at present time period corresponding estimate power consumption, afterwards, then checking should The actual power consumption of work at present time period whether this more than 1.5 times estimates power consumption, thus realizes to checked object more Monitor accurately.
Step S44: send the second prompting message to default terminal
Such as the description of above-described embodiment corresponding part, the application to the structure of this default terminal and with this default terminal Connected mode, the transmission means etc. i.e. sending the second prompting message is not construed as limiting.
Wherein, the second prompting message can include that actual power consumption is more than the first preset multiple estimating power consumption accordingly Checked object and actual power consumption thereof, estimate power consumption etc. accordingly, it is also possible to include that this checked object is beyond power consumption Etc., content and the way of output thereof that the second prompting message is comprised by the application are not construed as limiting, can pass through short message, mail or The modes such as voice export, and the application will not enumerate at this.
As can be seen here, in the present embodiment, by the electricity consumption situation of checked object in each working time section of monitoring, thus and Its actual power consumption within the work at present time period of Shi Faxian is more than the situation of the first preset multiple estimating power consumption accordingly, And this situation is notified user in time, so that user specifically adjusts the working condition of checked object, investigation is now currently running Power consumption be the most greatly the bigger electronic product of power and close, it is to avoid the generation of waste of energy phenomenon.
Optionally, on the basis of the various embodiments described above, when determining that the currently available electricity of checked object is less than presetting electricity During amount threshold value, it is also possible to send control instruction to default terminal, control this default terminal according to preset rules to checked object Electricity payment, thus increase its currently available electricity, very convenient, and avoid affecting the normal of checked object because of unexpected power-off Work, life and work to user cause a lot of inconvenience.
Concrete, the application can preset when some or multiple checked object available power deficiency, it is allowed to from The dynamic payment application program triggered, can also set simultaneously can the number of electricity payment automatically, specifically can be according to actual need It was determined that the application to its concrete number and can the checked object of electricity payment automatically all be not construed as limiting.
As can be seen here, the present embodiment can trigger the pre-of this default terminal by sending control instruction to default terminal If payment application program launching, according to default amount electricity payment;It is of course also possible to checked object is paid electricity by instruction user Taking, this is not construed as limiting by the application.
As it is shown in figure 5, the structural representation of a kind of monitoring system embodiment provided for the application, this system can be wrapped Include:
Detection equipment 51, for detecting the current power amount of checked object.
In the actual application of this enforcement, the current power of checked object can be determined by the output data of detection ammeter Amount, but it is not limited to this kind of mode.
And, in order to grasp the electricity consumption situation of checked object, a checked object can be detected with separated in time Current power amount, it is also possible to detect in real time the current power amount of checked object, the application current power amount to checked object Detection mode be not construed as limiting.
Optionally, in actual applications, after the working time determining checked object, detection equipment 51 can be by detection The first power consumption that initial working time of this checked object is corresponding and terminate the second power consumption corresponding to working time, determines Checked object during this work in power consumption, i.e. the daily power consumption of checked object, or the use of each working time section Electricity etc..
Controller 52, for utilizing the default power consumption of checked object, calculates the currently available electricity of checked object.
The present embodiment can determine according to actual needs or according to user's situation to the electricity payment of this checked object Most power consumptions that the default power consumption of each checked object, i.e. this checked object can use, pre-to checked object of the application If the concrete numerical value of power consumption is not construed as limiting.
Based on this, the currently available electricity of checked object can be default power consumption and the current power amount of this checked object Difference.
Communication equipment 53, during for being less than, at the currently available electricity determining checked object, the default power threshold obtained, The first prompting message is sent to default terminal.
The present embodiment, can be according to actual needs in order to find the situation of the available power deficiency of checked object in time Set the available power of this checked object to reach how many times and carry out early warning, say, that determine that this checked object of raising can electricity consumption The critical electricity that amount is not enough, i.e. presets power threshold, and the concrete numerical value of this default power threshold is not construed as limiting by the application.
Based on this, after the currently available electricity obtaining checked object, it can be determined that whether this current available power is less than Preset power threshold, if it is not, continue the current power amount of detection checked object in the manner described above;If so, illustrate that this is tested right The available power of elephant is not enough, can send the first prompting message to the default terminal of user, remind this user to pay electricity in time Take, thus increase the available power of this checked object, it is to avoid checked object quits work because of power-off, for life or the work of user Cause a lot of inconvenience.
Optionally, when determining the available power deficiency of checked object, the application can also be by communication equipment 53 in advance If terminal send control instruction, control preset terminal according to preset rules to checked object electricity payment, thus increase it can Power consumption, detailed process can refer to the description of said method embodiment corresponding part, and this enforcement does not repeats them here.
In sum, the present embodiment is by detecting the current power amount of checked object, and utilizes presetting of this checked object Power consumption, calculates its currently available electricity, when determining this current available power less than the default power threshold obtained, and the application By sending the first prompting message to the default terminal of user in time, so that user learns the electricity consumption situation of checked object in time, And then timely electricity payment, increase the currently available electricity of checked object, it is to avoid checked object quits work because of power-off, for The inconvenience that user's life brings, meanwhile, improves checked object power supply reliability, and then ensure that the application scenarios such as workshop Under work efficiency.
As another embodiment of the application, as shown in Figure 6, on the basis of above-described embodiment, monitoring system can also be wrapped Include:
Memorizer 54, for storing the job information of checked object, such as the volume of each electronic product in this checked object Determining power and working time section etc., the content that this job information is comprised by the application is not especially limited.
Based on this, controller 52 can obtain checked object in the different operating time according to the job information of checked object Estimating power consumption in Duan, concrete this process estimating power consumption that obtains is referred to retouching of said method embodiment corresponding part Stating, this enforcement does not repeats them here.
Afterwards, detect the checked object actual power consumption within the different operating time period by detection equipment 51, and verify Whether the actual power consumption detected in the work at present time period is more than the first preset multiple estimating power consumption accordingly, if It is, it is believed that have high-power electronic product to work within the work at present time period, in order to save energy consumption, can be set by communication Standby 53 send the second prompting message to the default terminal of user, inform this situation of user, in order to user adjusts currently accordingly Participate in the duty of the electronic product of work in working time section, or directly close the electronic product that power consumption is bigger, the application This is not construed as limiting.
Wherein, above-mentioned default terminal can be mobile phone, ipad or industrial computer etc., it is common that is responsible for the user of electricity payment The electronic equipment that can check in time, the concrete structure of this default terminal is not construed as limiting by the application.
It addition, controller 52 can detect the date by being calculated the daily power consumption of checked object with it, to associate storage supreme State memorizer 54, so, according to actual needs, after obtaining current daily power consumption, can transfer about this from memorizer 54 The daily power consumption of at least two days before the current detection date of checked object, thus it is calculated the average day of this checked object Power consumption, afterwards, can be using the second preset multiple of this average daily power consumption as the currently available electricity judging checked object Enough marginal values, i.e. preset power threshold, when determining that the currently available electricity of checked object is less than this default electricity threshold During value, directly send the first prompting message to default terminal.
Certainly, controller 52 can also utilize the average daily power consumption of the checked object obtained and currently available electricity, Calculate the checked object pot life to this current available power, and when judging this pot life less than Preset Time, in advance If terminal sends the first prompting message, now, this first prompting message can include checked object currently available electricity and Pot life etc., its particular content comprised is not construed as limiting by the application.
As can be seen here, the application the most accurately controls available power and the pot life thereof of checked object, side Just user's reasonable arrangement electricity payment time accordingly, it is to avoid the checked object out-of-work situation because of arrearage during operation, Ensure that the reliability that checked object works.
Finally, it should be noted that about in the various embodiments described above, the relational terms of such as first, second or the like is only Only it is used for separating an operation or unit with another operation or cellular zone, and not necessarily requires or imply these unit Or between operation, there is relation or the order of any this reality.Term " includes ", " comprising " or its any other variant It is intended to comprising of nonexcludability, so that include that the process of a series of key element, method or system not only include those Key element, but also include other key elements being not expressly set out, or also include being consolidated by this process, method or system Some key elements.In the case of there is no more restriction, statement " including ... " key element limited, it is not excluded that including The process of described key element, method or system there is also other identical element.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is and other The difference of embodiment, between each embodiment, identical similar portion sees mutually.For system disclosed in embodiment For, due to its with embodiment disclosed in method corresponding, so describe is fairly simple, relevant part sees method part explanation ?.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the application. Multiple amendment to these embodiments will be apparent from for those skilled in the art, as defined herein General Principle can realize in the case of without departing from spirit herein or scope in other embodiments.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein and features of novelty phase one The widest scope caused.

Claims (10)

1. a monitoring method, it is characterised in that described method includes:
The current power amount of detection checked object;
Utilize the default power consumption of described checked object, calculate the currently available electricity of described checked object;
When described currently available electricity is less than the default power threshold obtained, send the first prompting message to default terminal.
Method the most according to claim 1, it is characterised in that described method also includes:
According to the job information of the described checked object of storage, obtain described checked object estimating within the different operating time period Power consumption;
The current power amount of the most described detection checked object, including:
The detection checked object actual power consumption within the different operating time period.
Method the most according to claim 2, it is characterised in that described method also includes:
Whether the described checked object that checking detects described actual power consumption within the work at present time period is more than corresponding Estimate the first preset multiple of power consumption;
When the described checked object described actual power consumption within the work at present time period is more than estimating the of power consumption accordingly One preset multiple, sends the second prompting message to described default terminal.
4. according to the method described in claim 1-3 any one, it is characterised in that include current day electricity consumption in current power amount During amount, the current power amount of described detection checked object, also include:
The first power consumption that the default initial time of detection checked object every day is corresponding and the preset termination time corresponding second Power consumption;
Calculate the difference of described second power consumption and described first power consumption, and using described difference working as described checked object Front daily power consumption.
Method the most according to claim 4, it is characterised in that described method also includes:
By the described current daily power consumption detected and the association storage of corresponding current detection date;
The process then obtaining described default power threshold includes:
Transfer the daily power consumption of at least two days before the current detection date of the described checked object of storage;
Calculate the described checked object average daily power consumption in described at least two days, and by the second of described average daily power consumption Preset multiple is as described default power threshold.
Method the most according to claim 4, it is characterised in that before sending the first prompting message to default terminal, institute Method of stating also includes:
Utilize described currently available electricity and described average daily power consumption, calculate described checked object to described currently available electricity The pot life of amount;
Accordingly, described send the first prompting message to default terminal particularly as follows:
Send to default terminal and carry described pot life and the first prompting message of described currently available electricity.
Method the most according to claim 1, it is characterised in that at described currently available electricity less than the default electricity obtained During threshold value, described method also includes:
Send control instruction to described default terminal, control described default terminal and according to preset rules, described checked object is paid The electricity charge.
8. a monitoring system, it is characterised in that described system includes:
Detection equipment, for detecting the current power amount of checked object;
Controller, for utilizing the default power consumption of described checked object, calculates the currently available electricity of described checked object;
Communication equipment, for when described currently available electricity is less than the default power threshold obtained, sending the to default terminal One prompting message.
System the most according to claim 8, it is characterised in that described system also includes:
Memorizer, for storing the job information of described checked object;
The most described controller, specifically for the job information according to described checked object, obtains described checked object at different operating Estimate power consumption in time period, and detect the described checked object actual power consumption within the different operating time period, work as checking The described checked object described actual power consumption within the work at present time period is preset more than estimate power consumption accordingly first Multiple, sends the second prompting message by described communication equipment to described default terminal.
System the most according to claim 8 or claim 9, it is characterised in that described memorizer is additionally operable to the described quilt that will detect The current daily power consumption of inspection object is associated storage with the corresponding current detection date;
Accordingly, described controller is additionally operable to transfer the daily of at least two days before the current detection date of described checked object Electricity, calculates the described checked object average daily power consumption in described at least two days, and by the of described average daily power consumption Two preset multiple are as described default power threshold;Utilize described currently available electricity and described average daily power consumption, calculate The described checked object pot life to described currently available electricity, and at described currently available electricity less than the default electricity obtained During amount threshold value, send to default terminal and carry described pot life and the first prompting message of described currently available electricity.
CN201610383841.4A 2016-05-31 2016-05-31 A kind of monitoring method and system Pending CN106093507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610383841.4A CN106093507A (en) 2016-05-31 2016-05-31 A kind of monitoring method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610383841.4A CN106093507A (en) 2016-05-31 2016-05-31 A kind of monitoring method and system

Publications (1)

Publication Number Publication Date
CN106093507A true CN106093507A (en) 2016-11-09

Family

ID=57447465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610383841.4A Pending CN106093507A (en) 2016-05-31 2016-05-31 A kind of monitoring method and system

Country Status (1)

Country Link
CN (1) CN106093507A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107015038A (en) * 2017-04-21 2017-08-04 武汉理工大学 A kind of power consumption reminding method, device and ammeter based on intelligent electric meter
CN108596384A (en) * 2018-04-19 2018-09-28 国网山东省电力公司济宁供电公司 The method and apparatus of pre- electricity payment
CN108628201A (en) * 2017-03-22 2018-10-09 鸿富锦精密工业(深圳)有限公司 Item Management device and method
CN109822449A (en) * 2019-01-24 2019-05-31 深圳市新杰斯锐电子科技有限公司 A kind of grinder system
CN110766927A (en) * 2019-10-16 2020-02-07 国网山东省电力公司汶上县供电公司 User side-based power consumption autonomous monitoring system and method
CN111929583A (en) * 2020-09-16 2020-11-13 湖南新云网科技有限公司 Electric quantity monitoring method, device and system of intelligent terminal
CN113743755A (en) * 2021-08-24 2021-12-03 安特仪表集团有限公司 Data supervision method, ammeter, system and storage medium of multifunctional ammeter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103455006A (en) * 2013-09-09 2013-12-18 国家电网公司 Household electricity intelligent management system
CN104503276A (en) * 2014-11-24 2015-04-08 东莞宇龙通信科技有限公司 Intelligent power utilization method, device and terminal
CN104535830A (en) * 2014-10-30 2015-04-22 国家电网公司 Power consumption monitoring method and device
CN104869241A (en) * 2015-05-04 2015-08-26 惠州Tcl移动通信有限公司 Intelligent terminal and electric quantity prompting method thereof
CN105429300A (en) * 2015-12-16 2016-03-23 徐承柬 Electricity utilization monitoring method and system
CN105547331A (en) * 2016-01-14 2016-05-04 重庆蓝岸通讯技术有限公司 Intelligent electric meter electric quantity reminding method based on wireless communication

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103455006A (en) * 2013-09-09 2013-12-18 国家电网公司 Household electricity intelligent management system
CN104535830A (en) * 2014-10-30 2015-04-22 国家电网公司 Power consumption monitoring method and device
CN104503276A (en) * 2014-11-24 2015-04-08 东莞宇龙通信科技有限公司 Intelligent power utilization method, device and terminal
CN104869241A (en) * 2015-05-04 2015-08-26 惠州Tcl移动通信有限公司 Intelligent terminal and electric quantity prompting method thereof
CN105429300A (en) * 2015-12-16 2016-03-23 徐承柬 Electricity utilization monitoring method and system
CN105547331A (en) * 2016-01-14 2016-05-04 重庆蓝岸通讯技术有限公司 Intelligent electric meter electric quantity reminding method based on wireless communication

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108628201A (en) * 2017-03-22 2018-10-09 鸿富锦精密工业(深圳)有限公司 Item Management device and method
CN108628201B (en) * 2017-03-22 2020-11-24 鸿富锦精密工业(深圳)有限公司 Article management apparatus and method
CN107015038A (en) * 2017-04-21 2017-08-04 武汉理工大学 A kind of power consumption reminding method, device and ammeter based on intelligent electric meter
CN108596384A (en) * 2018-04-19 2018-09-28 国网山东省电力公司济宁供电公司 The method and apparatus of pre- electricity payment
CN109822449A (en) * 2019-01-24 2019-05-31 深圳市新杰斯锐电子科技有限公司 A kind of grinder system
CN110766927A (en) * 2019-10-16 2020-02-07 国网山东省电力公司汶上县供电公司 User side-based power consumption autonomous monitoring system and method
CN111929583A (en) * 2020-09-16 2020-11-13 湖南新云网科技有限公司 Electric quantity monitoring method, device and system of intelligent terminal
CN113743755A (en) * 2021-08-24 2021-12-03 安特仪表集团有限公司 Data supervision method, ammeter, system and storage medium of multifunctional ammeter

Similar Documents

Publication Publication Date Title
CN106093507A (en) A kind of monitoring method and system
KR101484482B1 (en) Energy consumption measurement
CA2752987C (en) Low cost and flexible energy management system with a scheduling capability
US20110119515A1 (en) Power Monitoring and Control System
CN107478882A (en) Intelligent electric meter long-distance monitorng device
EP2418462A1 (en) Sub-metering hardware for measuring energy data of an energy consuming device
JP2015029418A (en) Power monitoring device, identification method, and generation method
CN105979103A (en) Cell power guarantee method of portable electronic product, equipment and mobile terminal
CN106556738A (en) Electricity consumption monitoring system
US20150303693A1 (en) Power control system and method thereof
US20140052304A1 (en) Dynamic enforcement of power management policy and methods thereof
KR20110117469A (en) A smart server and smart device
CN109361266A (en) A kind of intelligent house management system, control method, electronic equipment and storage medium
USRE45602E1 (en) Method and arrangement for registering and evaluating energy consumption
JP6971313B2 (en) Information processing equipment and control system
CN101296439A (en) System and method for displaying residual power-on time of mobile phone battery and saving power
CN103543309B (en) Method and apparatus to user reminding power consumption
CN114778914B (en) Smart electric meter acquisition system
CA2747468A1 (en) Diagnostics using sub-metering device
CN103680106B (en) Intelligent air switch system
CN201707569U (en) Intelligent residence control terminal
JP2010117879A (en) Energy consumption management system using network household appliance
CN205158005U (en) Smart home systems's intelligence switch
KR20120114708A (en) Method of electric power control using smart meter and apparatus thereof
Paul et al. Centralized power monitoring & management system of an institution based on Android app

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication