CN106090963A - A kind of cooling section of electric furnace gasification cooling flue - Google Patents

A kind of cooling section of electric furnace gasification cooling flue Download PDF

Info

Publication number
CN106090963A
CN106090963A CN201610606812.XA CN201610606812A CN106090963A CN 106090963 A CN106090963 A CN 106090963A CN 201610606812 A CN201610606812 A CN 201610606812A CN 106090963 A CN106090963 A CN 106090963A
Authority
CN
China
Prior art keywords
flue
water inlet
water
electric furnace
leading portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610606812.XA
Other languages
Chinese (zh)
Inventor
王中建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengang Steel Plates Co Ltd
Original Assignee
Bengang Steel Plates Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengang Steel Plates Co Ltd filed Critical Bengang Steel Plates Co Ltd
Priority to CN201610606812.XA priority Critical patent/CN106090963A/en
Publication of CN106090963A publication Critical patent/CN106090963A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J13/00Fittings for chimneys or flues 
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/06Arrangements of devices for treating smoke or fumes of coolers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2213/00Chimneys or flues

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The present invention relates to the auxiliary equipment of a kind of electric furnace, be specifically related to the cooling section of a kind of electric furnace gasification cooling flue.Including leading portion, back segment and flange, described leading portion passes through with back segment, together with described Flange joint, to be arranged parallel to the water screen tube one that flue axis carries out extending, be arranged parallel to the water screen tube two that flue axis carries out extending inside described back segment inside described leading portion;Described leading portion is connected with the water inlet manifold of water circulating pump by water inlet pipe one, is connected with the flue backwater rising main of drum by return pipe one;Described back segment is connected with the water inlet manifold of water circulating pump by water inlet pipe two, is connected with the flue backwater rising main of drum by return pipe two;Water circulating pump is connected with drum by return main.The high-temperature area that the invention enables flue is relatively independent, can process at short notice after it breaks down, and can change damageable zone in time, reduces maintenance load and maintenance cost.

Description

A kind of cooling section of electric furnace gasification cooling flue
Technical field
The present invention relates to the auxiliary equipment of a kind of electric furnace, be specifically related to the cooling section of a kind of electric furnace gasification cooling flue.
Background technology
The gasification cooling flue of electric furnace is to realize one of energy recovery and the green necessaries produced, and it is for by electricity The flue gas produced in stove steelmaking process cools down and reclaims.The most domestic gasification cooling flue is from the first paragraph of electric furnace side (i.e. cooling section) is an entirety, and such design have ignored the Temperature Distribution in flue, and flue extends to inner side from import The position on arc top is high-temperature area, and maximum temperature can reach 1300 DEG C, and following position is middle gentle low-temperature region, and temperature exists Between 800 DEG C-1000 DEG C.The service life of normal gasification cooling flue was up to 4 years, and the life-span of high-temperature area can be only sustained at 2 years, do not carry out independently considering to damageable zone, relatively reduce the service life of flue.
Summary of the invention
The present invention provides the cooling section of a kind of electric furnace gasification cooling flue so that the high-temperature area of flue is relatively independent, when It can process after breaking down at short notice, and can change damageable zone in time, reduces maintenance load and maintenance Cost.
Technical scheme is as follows:
The cooling section of a kind of electric furnace gasification cooling flue, including leading portion, back segment and flange, described leading portion and back segment pass through institute State Flange joint together, inside described leading portion, be arranged parallel to the water screen tube one that flue axis carries out extending, described back segment Inside is arranged parallel to the water screen tube two that flue axis carries out extending;Described leading portion is entered by water inlet pipe one and water circulating pump Supply mains connects, and is connected with the flue backwater rising main of drum by return pipe one;Described back segment passes through water inlet pipe two and follows The water inlet manifold of ring water pump connects, and is connected with the flue backwater rising main of drum by return pipe two;Water circulating pump passes through back Supply mains is connected with drum;Flow control valve one is set on water inlet pipe one, water inlet pipe two arranges flow control valve two.
The cooling section of described electric furnace gasification cooling flue, its preferred version is, described flange is by asbestos seal.
The cooling section of described electric furnace gasification cooling flue, its preferred version is, water inlet pipe one and the caliber of water inlet pipe two At least 150mm.
The cooling section of described electric furnace gasification cooling flue, its preferred version is, return pipe one and the caliber of return pipe two At least 200mm.
The cooling section of described electric furnace gasification cooling flue, its preferred version is, the caliber of return main is at least 300mm。
The cooling section of described electric furnace gasification cooling flue, its preferred version is, water screen tube one and water screen tube two Quantity is at least 108.
The invention have the benefit that
1, the present invention carries out subsection setup by the cooling section of electric furnace gasification cooling flue so that flue from import to inner side The position (i.e. high-temperature area) extending to arc top is relatively independent, can process at short notice after it breaks down, and can be to easily Damage position to change in time, reduce maintenance load and maintenance cost.
2, the cooling water pipeline in the present invention is optimised, and the leading portion of cooling section, back segment carry out independent water distribution circulation, by growing Distance many groups loop optimization becomes short distance list group to circulate so that its cooling effect is ensured, extends the service life of flue.
3, on the water inlet pipe one in the present invention, flow control valve one is set, water inlet pipe two arranges flow control valve two, side Just the distribution being circulated the water yield adjusts, it is possible to ensureing that the output of leading portion is suitably above the output of back segment, cooling effectiveness obtains To improve.
Accompanying drawing explanation
Fig. 1 is the cooling section structural representation of electric furnace gasification cooling flue;
Fig. 2 is Section A-A schematic diagram in Fig. 1;
Fig. 3 is the circulation waterway schematic diagram of electric furnace gasification cooling flue.
Detailed description of the invention
As shown in Figures 1 to 3, the cooling section of a kind of electric furnace gasification cooling flue, including leading portion 1, back segment 3 and flange 2, described Leading portion 1 and back segment 3 is linked together by described flange 2, and described flange 2 is by asbestos seal;Described leading portion 1 inside arranges parallel Carry out the water screen tube one extended in flue axis, described back segment 3 is internal is arranged parallel to the water-cooled that flue axis carries out extending Wall pipe 24;Described leading portion 1 is connected with the water inlet manifold 13 of water circulating pump 5, by return pipe 1 and vapour by water inlet pipe 1 The flue backwater rising main 14 of bag 6 connects;Described back segment 3 is connected by the water inlet manifold 13 of water inlet pipe 2 10 with water circulating pump 5 Connect, be connected with the flue backwater rising main 14 of drum 6 by return pipe 2 12;Water inlet pipe 1 and the caliber of water inlet pipe 2 10 For 150mm, the caliber of return pipe 11 and return pipe 2 12 is 200mm;Water circulating pump 5 is connected with drum 6 by return main 15, The caliber of return main is 300mm;Flow control valve 1 is set on water inlet pipe 1, water inlet pipe 2 10 arranges flow control valve 28, during use, flow control valve 1 controls the inflow of water inlet pipe one is 270m3/ h, flow control valve 28 controls water inlet pipe The inflow of two is 200m3/ h, to ensure to strengthen the cooling effect of described leading portion 1;Water screen tube one and the number of water screen tube 24 Amount is all 108;The overall length of water screen tube one is 8 meters, it is achieved short distance list group circulates, and its cooling effect is ensured.

Claims (6)

1. the cooling section of an electric furnace gasification cooling flue, it is characterised in that include leading portion, back segment and flange, described leading portion with Back segment by described Flange joint together, is arranged parallel to the water screen tube that flue axis carries out extending inside described leading portion One, it is arranged parallel to the water screen tube two that flue axis carries out extending inside described back segment;Described leading portion by water inlet pipe one with The water inlet manifold of water circulating pump connects, and is connected with the flue backwater rising main of drum by return pipe one;Described back segment passes through Water inlet pipe two is connected with the water inlet manifold of water circulating pump, is connected with the flue backwater rising main of drum by return pipe two;Follow Ring water pump is connected with drum by return main;Flow control valve one is set on water inlet pipe one, water inlet pipe two arranges flow and adjusts Joint valve two.
The cooling section of electric furnace gasification cooling flue the most according to claim 1, it is characterised in that described flange is close by asbestos Envelope.
The cooling section of electric furnace gasification cooling flue the most according to claim 1, it is characterised in that water inlet pipe one and water inlet pipe The caliber of two is at least 150mm.
The cooling section of electric furnace gasification cooling flue the most according to claim 1, it is characterised in that return pipe one and return pipe The caliber of two is at least 200mm.
The cooling section of electric furnace gasification cooling flue the most according to claim 1, it is characterised in that the caliber of return main is extremely It is 300mm less.
The cooling section of electric furnace gasification cooling flue the most according to claim 1, it is characterised in that water screen tube one and water-cooled The quantity of wall pipe two is at least 108.
CN201610606812.XA 2016-07-29 2016-07-29 A kind of cooling section of electric furnace gasification cooling flue Pending CN106090963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610606812.XA CN106090963A (en) 2016-07-29 2016-07-29 A kind of cooling section of electric furnace gasification cooling flue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610606812.XA CN106090963A (en) 2016-07-29 2016-07-29 A kind of cooling section of electric furnace gasification cooling flue

Publications (1)

Publication Number Publication Date
CN106090963A true CN106090963A (en) 2016-11-09

Family

ID=57478481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610606812.XA Pending CN106090963A (en) 2016-07-29 2016-07-29 A kind of cooling section of electric furnace gasification cooling flue

Country Status (1)

Country Link
CN (1) CN106090963A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413779A (en) * 2018-05-15 2018-08-17 江苏联峰能源装备有限公司 A kind of split type, curved flue of mixed type electric furnace entrance
CN108800960A (en) * 2018-06-29 2018-11-13 北京京诚科林环保科技有限公司 Flue for cooling flue gas

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5762390A (en) * 1980-10-01 1982-04-15 Mitsubishi Heavy Ind Ltd Emergency gas cooling device
CN2637922Y (en) * 2003-02-21 2004-09-01 龚辉勤 Segment cold slag heat excahnge transfer device
CN201121905Y (en) * 2007-11-06 2008-09-24 金川集团有限公司 Device for cooling high temperature flue gas
CN105043120A (en) * 2015-08-24 2015-11-11 江苏联峰能源装备有限公司 Cooling component of evaporation cooling flue of electric furnace
CN204786466U (en) * 2015-05-30 2015-11-18 四川省凯明机械制造有限公司 High -efficient cold sediment machine of sectional type
CN204854421U (en) * 2015-08-26 2015-12-09 天津泰通金属结构制造有限公司 Tubular vapour - water heat exchanger
CN206094126U (en) * 2016-07-29 2017-04-12 本钢板材股份有限公司 Electric stove evaporative cooling flue's cooling zone

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5762390A (en) * 1980-10-01 1982-04-15 Mitsubishi Heavy Ind Ltd Emergency gas cooling device
CN2637922Y (en) * 2003-02-21 2004-09-01 龚辉勤 Segment cold slag heat excahnge transfer device
CN201121905Y (en) * 2007-11-06 2008-09-24 金川集团有限公司 Device for cooling high temperature flue gas
CN204786466U (en) * 2015-05-30 2015-11-18 四川省凯明机械制造有限公司 High -efficient cold sediment machine of sectional type
CN105043120A (en) * 2015-08-24 2015-11-11 江苏联峰能源装备有限公司 Cooling component of evaporation cooling flue of electric furnace
CN204854421U (en) * 2015-08-26 2015-12-09 天津泰通金属结构制造有限公司 Tubular vapour - water heat exchanger
CN206094126U (en) * 2016-07-29 2017-04-12 本钢板材股份有限公司 Electric stove evaporative cooling flue's cooling zone

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413779A (en) * 2018-05-15 2018-08-17 江苏联峰能源装备有限公司 A kind of split type, curved flue of mixed type electric furnace entrance
CN108800960A (en) * 2018-06-29 2018-11-13 北京京诚科林环保科技有限公司 Flue for cooling flue gas
CN108800960B (en) * 2018-06-29 2024-02-02 北京京诚科林环保科技有限公司 Flue for cooling flue gas

Similar Documents

Publication Publication Date Title
CN106090963A (en) A kind of cooling section of electric furnace gasification cooling flue
CN211233352U (en) Heating furnace
KR20140024335A (en) Exhaust heat recovery boiler, and power generation plant
CN209540854U (en) A kind of power generation station-service boiler overheating cooling device
CN106122952A (en) A kind of CFB boiler nested type blast cap air-distribution device and remodeling method thereof
CN204987895U (en) Take sintering waste heat power generation facility of external overheated after burning
CN204730670U (en) A kind of residual heat and energy comprehensive utilization TRT
CN206094126U (en) Electric stove evaporative cooling flue's cooling zone
CN104833218A (en) Sintering waste heat power generation device with external overheating afterburner and waste heat utilization method
CN103697451B (en) A kind of high-temperature atmospheric steam generator
CN204026622U (en) Steam boiler
CN105509083A (en) Flue gas waste heat recovery system for gas thermal equipment
CN109605231A (en) A kind of collection method of chicken manure boiler sandblasting fugitive dust
CN102878818A (en) Heat supply system using waste heat in self-absorption type negative-pressure adjustable heat carrier furnace
CN108413779A (en) A kind of split type, curved flue of mixed type electric furnace entrance
CN204511993U (en) A kind of boiler room feed water pump cooling water circulation utilization apparatus of energy-conserving and environment-protective
CN209027307U (en) A kind of split type, curved flue of mixed type electric furnace entrance
CN206771303U (en) A kind of natural gas steam generator
CN104807338A (en) Coal gas, converter steam and sintering waste heat combined power generation device and waste heat utilization method
CN206958585U (en) A kind of blast furnace blower Lubricating oil heating device
CN206369480U (en) Copper refining flue gas system and its flue gas cooling device
CN110160030A (en) Air-heater heats boiled water steam engine
CN109442369A (en) A kind of energy conservation and environmental protection steam boiler for dual purpose
CN205119846U (en) Ceramic factory kiln waste heat utilization equipment
CN108239691A (en) A kind of natural gas annealing furnace roller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109