CN106089267A - 挖掘机辅助钢拱架安装工艺 - Google Patents
挖掘机辅助钢拱架安装工艺 Download PDFInfo
- Publication number
- CN106089267A CN106089267A CN201610514347.7A CN201610514347A CN106089267A CN 106089267 A CN106089267 A CN 106089267A CN 201610514347 A CN201610514347 A CN 201610514347A CN 106089267 A CN106089267 A CN 106089267A
- Authority
- CN
- China
- Prior art keywords
- shelf
- excavator
- steel arch
- groove
- draw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 47
- 239000010959 steel Substances 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000004873 anchoring Methods 0.000 claims abstract description 4
- 210000003205 muscle Anatomy 0.000 claims abstract description 4
- 238000011017 operating method Methods 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 238000012857 repacking Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了挖掘机辅助钢拱架安装工艺,操作步骤为:首先用钢板焊接成一段槽钢,形成一个卡槽,用螺栓把卡槽和挖掘机背斗栓接固定到一起,然后在隧道内地面上,把各节钢拱架拼装成整体,把拼装好的钢拱架的拱部放到背斗的卡槽里,把钢拱架整体竖立起来,通过挖掘机调整,把钢拱架放到事先确定的相应位置,最后把钢拱架用锁脚锚杆进行固定,同时用纵向连接筋与相邻钢拱架进行连接即可。本发明对挖掘机改装,在背斗上固定卡槽,再对拼装好的钢拱架进行整体吊装,合理利用了施工现场的资源,极大地提高了生产效率,保障了施工质量,把工人从繁重的体力劳动中解放出来,也确保了安全。
Description
技术领域
本发明涉及一种隧道施工技术领域,尤其涉及挖掘机辅助钢拱架安装工艺。
背景技术
目前国内复合式衬砌隧道的设计中,钢拱架比较经常采用,它适用于对软弱围岩的强支护。在正常施工中,一般是按照隧道轮廓,把钢拱架分成几个单位,运至现场人工进行分节拼装,组成一个整体的拱架。因为钢拱架较重,全靠人力施工劳动量很大,耗时费力,而且比较危险,若使用专业的拱架安装设备,造价比较昂贵,会增加工程的成本。
发明内容
本发明旨在解决现有技术的不足,而提供挖掘机辅助钢拱架安装工艺,利用改装的挖掘机进行钢拱架的整体吊装,提高生产效率,保证施工安全。
本发明为实现上述目的,采用以下技术方案:挖掘机辅助钢拱架安装工艺,其特征在于,包括以下操作步骤:
(1)、用钢板焊接成一段槽钢,形成一个卡槽;
(2)、卡槽加工完成后,在卡槽的腹板上钻孔,同时也在挖掘机的背斗上打孔,卡槽腹板上的孔和挖掘机背斗上的孔对应,然后用螺栓把卡槽和挖掘机背斗栓接固定到一起;
(3)、在隧道内地面上,人工把各节钢拱架拼装成整体;
(4)、把拼装好的钢拱架的拱部放到挖掘机的背斗上的卡槽里,然后启动挖掘机斗缓慢提升,把钢拱架整体竖立起来;
(5)、通过挖掘机进行上下左右调整,同时由人工配合,按照测量员用仪器测量的结果,把钢拱架放到事先确定的相应位置;
(6)、把钢拱架用锁脚锚杆进行固定,同时用纵向连接筋与相邻钢拱架进行连接,确保稳固,则钢拱架安装施工完毕。
作为优选,所述步骤(1)中的卡槽的尺寸为:长1.1m,宽0.2m,高0.25m。
作为优选,所述步骤(2)中卡槽腹板和挖掘机背斗上各有三个孔,通过三套螺栓进行紧固。
本发明的有益效果是:本发明对挖掘机改装,在背斗上固定卡槽,再对拼装好的钢拱架进行整体吊装,合理利用了施工现场的资源,极大地提高了生产效率,保障了施工质量,把工人从繁重的体力劳动中解放出来,也确保了安全。
具体实施方式
下面结合实施例对本发明作进一步说明:
实施例1
挖掘机辅助钢拱架安装工艺,其特征在于,包括以下操作步骤:
(1)、用厚度为16mm钢板焊接成一段槽钢,形成一个卡槽,卡槽的尺寸为:长1.1m,宽0.2m,高0.25m;
(2)、卡槽加工完成后,在卡槽的腹板上钻三个孔,同时也在挖掘机的背斗上面打三个孔,卡槽腹板上的孔和挖掘机背斗上的孔对应,然后用三套螺栓把卡槽和挖掘机背斗栓接固定到一起;
(3)、在隧道内地面上,人工把各节钢拱架拼装成整体;
(4)、把拼装好的钢拱架的拱部放到挖掘机的背斗的卡槽里,然后启动挖掘机斗缓慢提升,把钢拱架整体竖立起来;
(5)、通过挖掘机进行上下左右调整,同时由3~4名人工配合,按照测量员用仪器测量的结果,把钢拱架放到事先确定的相应位置;
(6)、把钢拱架用锁脚锚杆进行固定,同时用纵向连接筋与相邻钢拱架进行连接,确保稳固,则钢拱架安装施工完毕。
上面对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。
Claims (3)
1.挖掘机辅助钢拱架安装工艺,其特征在于,包括以下操作步骤:
(1)、用钢板焊接成一段槽钢,形成一个卡槽;
(2)、卡槽加工完成后,在卡槽的腹板上钻孔,同时也在挖掘机的背斗上打孔,卡槽腹板上的孔和挖掘机背斗上的孔对应,然后用螺栓把卡槽和挖掘机背斗栓接固定到一起;
(3)、在隧道内地面上,人工把各节钢拱架拼装成整体;
(4)、把拼装好的钢拱架的拱部放到挖掘机的背斗上的卡槽里,然后启动挖掘机斗缓慢提升,把钢拱架整体竖立起来;
(5)、通过挖掘机进行上下左右调整,同时由人工配合,按照测量员用仪器测量的结果,把钢拱架放到事先确定的相应位置;
(6)、把钢拱架用锁脚锚杆进行固定,同时用纵向连接筋与相邻钢拱架进行连接,确保稳固,则钢拱架安装施工完毕。
2.根据权利要求1所述的挖掘机辅助钢拱架安装工艺,其特征在于,所述步骤(1)中的卡槽的尺寸为:长1.1m,宽0.2m,高0.25m。
3.根据权利要求1所述的挖掘机辅助钢拱架安装工艺,其特征在于,所述步骤(2)中卡槽腹板和挖掘机背斗上各有三个孔,通过三套螺栓进行紧固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610514347.7A CN106089267A (zh) | 2016-06-30 | 2016-06-30 | 挖掘机辅助钢拱架安装工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610514347.7A CN106089267A (zh) | 2016-06-30 | 2016-06-30 | 挖掘机辅助钢拱架安装工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106089267A true CN106089267A (zh) | 2016-11-09 |
Family
ID=57213261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610514347.7A Pending CN106089267A (zh) | 2016-06-30 | 2016-06-30 | 挖掘机辅助钢拱架安装工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106089267A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761854A (zh) * | 2017-01-09 | 2017-05-31 | 北京新能正源环境科技有限公司 | 隧道拱架的安装方法 |
CN106894831A (zh) * | 2017-03-17 | 2017-06-27 | 北京新能正源环境科技有限公司 | 隧道拱架的安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01312196A (ja) * | 1988-06-13 | 1989-12-15 | Taisei Corp | 偏平トンネルの施工方法 |
JPH0227099A (ja) * | 1988-07-14 | 1990-01-29 | Hitachi Zosen Corp | シールド掘進機におけるセグメント組立装置 |
CN202079565U (zh) * | 2011-05-24 | 2011-12-21 | 中铁十二局集团第三工程有限公司 | 钢拱架安装辅助工具 |
CN202194664U (zh) * | 2011-08-25 | 2012-04-18 | 四川二滩国际工程咨询有限责任公司 | 隧道掘进机钢筋排架安装装置 |
CN203835417U (zh) * | 2014-01-14 | 2014-09-17 | 中国葛洲坝集团国际工程有限公司 | 隧洞支护钢拱架安装装置及夹具 |
-
2016
- 2016-06-30 CN CN201610514347.7A patent/CN106089267A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01312196A (ja) * | 1988-06-13 | 1989-12-15 | Taisei Corp | 偏平トンネルの施工方法 |
JPH0227099A (ja) * | 1988-07-14 | 1990-01-29 | Hitachi Zosen Corp | シールド掘進機におけるセグメント組立装置 |
CN202079565U (zh) * | 2011-05-24 | 2011-12-21 | 中铁十二局集团第三工程有限公司 | 钢拱架安装辅助工具 |
CN202194664U (zh) * | 2011-08-25 | 2012-04-18 | 四川二滩国际工程咨询有限责任公司 | 隧道掘进机钢筋排架安装装置 |
CN203835417U (zh) * | 2014-01-14 | 2014-09-17 | 中国葛洲坝集团国际工程有限公司 | 隧洞支护钢拱架安装装置及夹具 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761854A (zh) * | 2017-01-09 | 2017-05-31 | 北京新能正源环境科技有限公司 | 隧道拱架的安装方法 |
CN106761854B (zh) * | 2017-01-09 | 2019-06-28 | 北京新能正源智能装备有限公司 | 隧道拱架的安装方法 |
CN106894831A (zh) * | 2017-03-17 | 2017-06-27 | 北京新能正源环境科技有限公司 | 隧道拱架的安装方法 |
CN106894831B (zh) * | 2017-03-17 | 2019-06-28 | 北京新能正源智能装备有限公司 | 隧道拱架的安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205036392U (zh) | 一种隧道初期支护钢拱架锁脚锚杆用锚垫盒 | |
CN207004146U (zh) | 一种用于高压输电角钢塔主柱角钢的加固装置 | |
CN106089267A (zh) | 挖掘机辅助钢拱架安装工艺 | |
CN106499201A (zh) | 一种可拆卸的安全绳工具式固定卡具及其使用方法 | |
CN208023723U (zh) | 一种装配式半刚性双腹板木结构节点 | |
CN104863266A (zh) | 箱形柱-工形梁预制装配式高延性梁柱节点 | |
CN206768833U (zh) | 一种混凝土支撑与钢格柱连接结构 | |
CN205742554U (zh) | 一种钢柱与混凝土梁的混合结构体系 | |
CN205382632U (zh) | 一种钢结构梁 | |
CN102605945B (zh) | 木大模板的制作方法 | |
CN105800466B (zh) | 一种导电架 | |
CN214144125U (zh) | 一种钢构建筑的梁柱结构 | |
CN204959965U (zh) | 一种用于建筑框架中的钢结构 | |
CN204238443U (zh) | 一种可拆卸柱脚固定装置 | |
CN103486335A (zh) | 一种用于超高层施工混凝土泵输管的固定方法 | |
CN205348214U (zh) | 一种柱状式钢筋混凝土与型钢混合式龙门吊基础 | |
CN204781345U (zh) | 一种二次结构拉结筋预埋件施工结构 | |
CN207512585U (zh) | 用于高速铁路临时支座与桥墩连接结构及连接构件 | |
CN104358355A (zh) | 一种可拆卸柱脚固定装置及其施工方法 | |
CN205772901U (zh) | 一种导电架 | |
CN205444459U (zh) | 双对位钢结构 | |
CN106436899B (zh) | 一种轻钢桁架的连接节点及安装方法 | |
CN205153127U (zh) | 稳定钢结构 | |
CN205531401U (zh) | 一种预埋爬锥定位装置 | |
CN205578900U (zh) | 电缆托架支吊架的生根装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |
|
RJ01 | Rejection of invention patent application after publication |