CN106089245A - A kind of delay grouting method after single shield TBM wall - Google Patents

A kind of delay grouting method after single shield TBM wall Download PDF

Info

Publication number
CN106089245A
CN106089245A CN201610475430.8A CN201610475430A CN106089245A CN 106089245 A CN106089245 A CN 106089245A CN 201610475430 A CN201610475430 A CN 201610475430A CN 106089245 A CN106089245 A CN 106089245A
Authority
CN
China
Prior art keywords
ring
slip casting
point
grouting
serosity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610475430.8A
Other languages
Chinese (zh)
Other versions
CN106089245B (en
Inventor
孙鹤明
刘拴锭
张志伟
张波
彭朝阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201610475430.8A priority Critical patent/CN106089245B/en
Publication of CN106089245A publication Critical patent/CN106089245A/en
Application granted granted Critical
Publication of CN106089245B publication Critical patent/CN106089245B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of delay grouting method after single shield TBM wall, it is characterized in that step is as follows: starting before slip casting, check grouting equipment whether normal operation, check that Grouting Pipe is the most unobstructed, and whether hole for hoist port lid exists and does not screws on or do not tighten, it is to avoid during slip casting, cement mortar flows out from hole for hoist;Slip casting point is selected at distance face 90m;The method replacing, complementing one another about slip casting employing, grouting pressure controls 0.2~0.3MPa;Pouring quality timely cleaning equipment pipeline is checked after having irrigated.The present invention utilizes the feature that the setting time of serosity is short, is grouped slip casting, and grouting behind shaft or drift lining triangle basin is overlapped mutually, reach the effect that grouting behind shaft or drift lining is closely knit, finally make bean gravel, serosity form an entirety with section of jurisdiction, reduce molding section of jurisdiction faulting of slab ends, decrease water seepage of tunnel rate.

Description

A kind of delay grouting method after single shield TBM wall
Technical field
Along with complete-section tunnel boring machine (TBM) driving speed and the raising of pipe-plate lining effect, it is widely used in tunnel In road construction, driving, prefabricated pipe section lining cutting, grouting be-hind segment are the major control links in construction, the structure of prefabricated pipe section Size, the concrete strength of prefabricated pipe section, the quality of grouting be-hind segment are to ensure that the basic of lining quality.
Background technology
Along with constantly bringing forth new ideas of single shield TBM technology, single shield TBM is increasingly widely used in domestic subway field. The important procedure that bean gravel hydraulic reclamation slurry injection technique is constructed as rock matter bottom list shield TBM plays an important role.But due to Single shield TBM not pressurize in tunneling process, carries out synchronous grouting after conventional hydraulic reclamation bean gravel in time, and one ensures with this Filling to bean gravel gap.But problems are present in synchronous grouting, owing to synchronous grouting position is positioned at outside shield tail, warp Often result in shield tail spillage and serosity and flow into cutterhead, contaminated equipment, be difficult to clear up, waste serosity while, cause grouting behind shaft or drift lining Uneven, after forming wall, cavity causes Tunnel Water Leakage;Additionally serosity inflow cutterhead causes cutterhead to be shut, and has a strong impact on equipment fortune OK.Meanwhile, serosity can flow into the gap of shield body and rock stratum by the space of peripheral rock, ultimately results in card shield, it is impossible to continue to execute Work.By to the research of original grouting behind shaft or drift lining method and improvement, existing invention one postpones slip casting side after single shield TBM wall Method, improves grouting behind shaft or drift lining condition of construction with this, it is to avoid shield tail spillage, return corresponding problem such as slurry card shield etc., improves grouting behind shaft or drift lining quality, Promote work efficiency.
Summary of the invention
A kind of delay grouting method after single shield TBM wall, it is characterised in that one is prolonged after single shield TBM wall Late grouting method, it is characterised in that by postponing slip casting after the wall of section of jurisdiction and left and right replaces, the side of the slip casting that complements one another, is grouped Method, reaches to fill bean gravel space, closes the purpose of section of jurisdiction.After the section of jurisdiction abjection tail shield once installed, implement hydraulic reclamation the most immediately Bean gravel, after bean gravel hydraulic reclamation is full, it still suffers from substantial amounts of space, but owing to the existence of bean gravel is as skeleton, a stay tube Sheet, grouting behind shaft or drift lining can postpone to carry out.By postponing slip casting, slip casting position is arranged at distance face 90m, prevents serosity Flow into shield tail, flow into cutterhead and return the problems such as slurry card shield.Slip casting is replaced, it is achieved serosity is complementary, and slip casting is uniform by left and right.Profit By the short feature of the setting time of serosity, being grouped slip casting, grouting behind shaft or drift lining triangle basin is overlapped mutually, and reaches grouting behind shaft or drift lining closely knit Effect, finally make bean gravel, serosity and section of jurisdiction form an entirety.
A kind of delay grouting method after single shield TBM wall, it is characterised in that step is as follows:
(1), starting before slip casting, check grouting equipment whether normal operation, check that Grouting Pipe is the most unobstructed, and lifting Whether hole port lid exists is not screwed on or does not tightens, it is to avoid during slip casting, cement mortar flows out from hole for hoist;
(2), serosity is transported to chassis by electromobile from well head blending station, then is carried by chassis and take out stock pump by serosity suction platform Car mortar jar;
(3), slip casting point is selected at distance face 90m;
(4), slip casting use about alternately, the method that complements one another, every 6 endless tube sheets are a circulation, and slip casting position all exists Top, section of jurisdiction, every ring selects a position slip casting in 1 point, 11 directions, and left and right is the most afterwards;Grouting sequence is first Ring 1 point, the second ring 11 point, every 2 ring note five rings 1 points, the 6th ring 11 point, the most again note the 3rd ring 1 point, Fourth Ring 11 point;Or Person is followed successively by the first ring 11 point, the second ring 1 point, every 2 ring note five rings 11 points, the 6th ring 1 point, the most again note the 3rd ring 11 point, Fourth Ring 1 point;Above-mentioned 1 or 11 all referring to according to clock scale segmentation place position;Grouting pressure controls 0.2 ~0.3MPa;
(5) pouring quality timely cleaning equipment pipeline are checked after, having irrigated.
Further, every ring needs slip casting 4m3, serosity per car carries 4m3
By disturbance or by the kata-rocks of failure by shear around development machine (TBM) Stratum Loss that causes of construction and TBM tunnel Secondary consolidation and the infiltration of subsoil water, all can cause the stresses re-distribution of country rock again.Simultaneously in order to prevent the deformation of Wall Rock of Tunnel, The load-carrying ring making section of jurisdiction and formed entirety by excavation country rock, reduces section of jurisdiction deformation under deadweight and interior load and between section of jurisdiction Changing of the relative positions unstability, need to carry out bean gravel hydraulic reclamation and section of jurisdiction in time to the annular space between the tunnel and the section of jurisdiction external diameter that excavated Grouting behind shaft or drift lining.The method adheres to the principle of " left and right replaces, complements one another, is grouped slip casting ", accomplishes ring ring slip casting so that section of jurisdiction with The cavity that country rock is formed is the most closely knit completely.
Postponing grouting method after this wall used, relative TBM construction is with the obvious advantage, simple to operate, can reach carrying The intensity of pressure from surrounding rock, after pipe sheet assembling completes, carries out section of jurisdiction loopful bean gravel and uniformly backfills, and enter the section of jurisdiction backfilled Row grouting behind shaft or drift lining, reduces molding section of jurisdiction faulting of slab ends, decreases water seepage of tunnel rate, achieve Expected Results.Slip casting is postponed after application wall, Condensing bean gravel, make section of jurisdiction be stablized, transmission rock pressure or internal water pressure, make section of jurisdiction, the bean gravel of condensation and enclose simultaneously Rock forms closely knit entirety, here it is postpone grouting method after wall.
Accompanying drawing explanation
Fig. 1--slip casting position view
Fig. 2--grouting sequence floor map,
Fig. 3--grouting sequence elevational schematic view,
Fig. 4--grouting sequence schematic perspective view.
Detailed description of the invention
This detailed description of the invention employing technical scheme: its operating process:
1, starting before slip casting, check grouting equipment whether normal operation, it is to avoid construction period because of downtime, affect into Degree.Check that Grouting Pipe is the most unobstructed, and whether hole for hoist port lid exist and do not screw on or do not tighten, it is to avoid during slip casting cement mortar from Hole for hoist flows out.Admittedly effect is coagulated, avoidance breakout of should trying one's best in construction, or the event that the waiting time is long due to serosity.Respectively Smoothness is wanted in the linking of inter process, prevents grout cures damage equipment.
2, according to calculating, every ring needs slip casting 4m3, serosity per car carries 4m3Cement paste, by electromobile from well head blending station It is transported at 1# chassis, then is carried by chassis and take out stock pump by serosity suction chassis mortar jar.
3, using open type boring mode because of single shield TBM, cutterhead front portion does not has pressure, for preventing from returning showing of slurry card shield As, slip casting point is selected at 90m at face 90m.Be illustrated in figure 1 slip casting position view, sequence number be 1. face, Sequence number is 2. for slip casting position.
4, the method replacing, complementing one another about slip casting employing, the every ring of the method is reserved an injected hole and is facilitated secondary to mend Slurry, also ensure that slip casting maximizes simultaneously.Every 6 endless tube sheets are a circulation, slip casting position all on top, section of jurisdiction, every ring select 1, A position slip casting in 11 directions, left and right is the most afterwards.Grouting sequence is the first ring 1 point (or 11 points), the second ring 11 points (or 1 point), every two ring note five rings 1 point (or 11 points), the 6th ring 11 point (1 point), note the 3rd ring 1 point (or 11 the most again Point), Fourth Ring 11 point (or 1 point).It is illustrated in figure 2 floor map, is illustrated in figure 3 elevational schematic view, be illustrated in figure 4 Schematic perspective view, in figure, sequence number represents grouting sequence.
5, slip casting to be followed up in time, prevents section of jurisdiction from forming big faulting of slab ends because rubble hydraulic reclamation is the fullest, affects construction quality.
Wanting close observation to alter slurry situation during slip casting, as found, hole for hoist, section of jurisdiction circumferential weld and longitudinal joint, bolt hole have water When slurry liquid spills phenomenon, take measures in time to block.To the flushing of serosity Polluted area water, (electrical equipment is smeared with dry Cloth is cleared up), prevent serosity from polluting chassis, grouting pressure is normally controlled in 0.2~0.3MPa.
6, check pouring quality timely cleaning equipment pipeline after having irrigated, prevent grout cures damage equipment, plugging, Prepare next ring slip casting.
Technical advantage
Grouting method advantage is postponed after wall
(1) the method adheres to the principle of " tunnel a ring and be necessary for hydraulic reclamation slip casting one ring ", greatly reduces section of jurisdiction depression Faulting of slab ends is made to reduce.Return slurry, card shield common fault is well solved.After pipe sheet assembling, first section of jurisdiction is held by backfill bean gravel, After carry out grout pouring.Now space, behind, section of jurisdiction is by bean gravel pack, and required serosity is little;Colleague's shield tail stops pulpboard also Play only slurry effect, serosity can be stoped to flow to outside shield, reduce the generation returning slurry solidification card shield phenomenon.
(2) duct piece float upward is overcome.The buoyancy produced in bottom range is conducted oneself with dignity much smaller than section of jurisdiction, not enough so that on section of jurisdiction Floating.
(3) postpone slip casting shrinkage factor after wall to be obviously reduced.Owing to bean gravel does aggregate, cement grout is filling bean gravel Gap, consolidation bean gravel, form shrink space, beneficially sealing the most hardly behind in section of jurisdiction.
(4) postpone after wall after slip casting makes section of jurisdiction wall because the bean the fullest problem of gravel hydraulic reclamation is addressed, make section of jurisdiction and country rock Between cavity form uniform closed chamber, after grouting formed bean gravel concrete, beneficially tunnel total quality promote.
(5) compared with synchronizing loopful cementing mortar technique, postpone slip casting after wall and greatly reduce plugging rate, and technique letter Single.
(6) stablizing of the full beneficially section of jurisdiction of slip casting is postponed after wall.Section of jurisdiction is held by bean gravel, forms rigid support, no Section of jurisdiction can be caused to sink, decrease section of jurisdiction faulting of slab ends, and then prevent drainage.
(7) accelerate driving speed, improve construction safety.Postpone slip casting ratio after hydraulic reclamation bean gravel and wall and synchronize loopful note Cement mortar is simple to operate, and cementing mortar must control injection speed, in order to avoid section of jurisdiction pressurized sinks, needs to control driving Speed.And postpone slip casting after bean gravel hydraulic reclamation and wall and need not control operating speed, decrease circulation time, accelerate driving speed Degree.
Chongqing region uses in tunneling boring hard rock mole (single shield TBM) work progress, and summary and induction draws this kind of list Shield TBM wall thickness postpones grouting method, uses detections of radar actual hydraulic reclamation effect, and testing result shows all slip casting of more than 95% ring Full, effectively control ring plate floating, the sinkage often occurred in TBM construction, without faulting of slab ends after pipe sheet assembling, outward appearance smoothes out Greatly improve cavitation quality, there is good economy, the suitability.After bean gravel hydraulic reclamation and wall postpone slip casting through coring, Mud jacking checks, normal hole section is the most qualified has reached design requirement.

Claims (2)

1. one kind postpones grouting method after single shield TBM wall, it is characterised in that step is as follows:
(1), starting before slip casting, check grouting equipment whether normal operation, check that Grouting Pipe is the most unobstructed, and hole for hoist hole Whether lid exists is not screwed on or does not tightens, it is to avoid during slip casting, cement mortar flows out from hole for hoist;
(2), serosity is transported to chassis by electromobile from well head blending station, then is carried by chassis and take out stock pump by serosity suction chassis sand Slurry tank;
(3), slip casting point is selected at distance face 90m;
(4), slip casting use about alternately, the method that complements one another, every 6 endless tube sheets are a circulation, and slip casting position is all in section of jurisdiction Top, every ring selects a position slip casting in 1 point, 11 directions, and left and right is the most afterwards;Grouting sequence is the first ring 1 Point, the second ring 11 point, every 2 ring note five rings 1 points, the 6th ring 11 point, the most again note the 3rd ring 1 point, Fourth Ring 11 point;Or Be followed successively by the first ring 11 point, the second ring 1 point, every 2 ring note five rings 11 points, the 6th ring 1 point, the most again note the 3rd ring 11 point, Fourth Ring 1 point;Above-mentioned 1 or 11 all referring to according to clock scale segmentation place position;Grouting pressure control 0.2~ 0.3MPa;
(5) pouring quality timely cleaning equipment pipeline are checked after, having irrigated.
Method the most according to claim 1, it is characterised in that: every ring needs slip casting 4m3, serosity per car carries 4m3
CN201610475430.8A 2016-06-25 2016-06-25 One kind postpones grouting method after being used for single shield TBM walls Expired - Fee Related CN106089245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610475430.8A CN106089245B (en) 2016-06-25 2016-06-25 One kind postpones grouting method after being used for single shield TBM walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610475430.8A CN106089245B (en) 2016-06-25 2016-06-25 One kind postpones grouting method after being used for single shield TBM walls

Publications (2)

Publication Number Publication Date
CN106089245A true CN106089245A (en) 2016-11-09
CN106089245B CN106089245B (en) 2018-02-23

Family

ID=57252890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610475430.8A Expired - Fee Related CN106089245B (en) 2016-06-25 2016-06-25 One kind postpones grouting method after being used for single shield TBM walls

Country Status (1)

Country Link
CN (1) CN106089245B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939420A (en) * 2017-08-21 2018-04-20 中铁六局集团有限公司 The construction method filled after two backing of bored tunnel assembled
CN110454194A (en) * 2019-08-06 2019-11-15 中广核工程有限公司 Shield-tunneling construction secondary grouting method
CN113217037A (en) * 2021-06-25 2021-08-06 中铁二局集团有限公司 Backfill system and backfill method for single shield TBM or behind shield segment wall
CN115012998A (en) * 2022-06-24 2022-09-06 吉林大学 Post-grouting method capable of realizing real-time grout supplement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1362573A (en) * 2002-01-26 2002-08-07 刘丽萍 Construction mode with full cross-section tunneller
JP3753729B1 (en) * 2005-01-07 2006-03-08 株式会社ケー・エフ・シー Tunnel waterproof structure
CN101614124A (en) * 2008-06-27 2009-12-30 中铁隧道集团有限公司 Open type hard rock mole driving and secondary lining method for synchronously constructing
CN102562146A (en) * 2012-03-07 2012-07-11 深圳市市政工程总公司 Construction gap filling method and device for shield through air pushing section
CN103510964A (en) * 2013-07-31 2014-01-15 中铁隧道集团有限公司 Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1362573A (en) * 2002-01-26 2002-08-07 刘丽萍 Construction mode with full cross-section tunneller
JP3753729B1 (en) * 2005-01-07 2006-03-08 株式会社ケー・エフ・シー Tunnel waterproof structure
CN101614124A (en) * 2008-06-27 2009-12-30 中铁隧道集团有限公司 Open type hard rock mole driving and secondary lining method for synchronously constructing
CN102562146A (en) * 2012-03-07 2012-07-11 深圳市市政工程总公司 Construction gap filling method and device for shield through air pushing section
CN103510964A (en) * 2013-07-31 2014-01-15 中铁隧道集团有限公司 Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939420A (en) * 2017-08-21 2018-04-20 中铁六局集团有限公司 The construction method filled after two backing of bored tunnel assembled
CN110454194A (en) * 2019-08-06 2019-11-15 中广核工程有限公司 Shield-tunneling construction secondary grouting method
CN113217037A (en) * 2021-06-25 2021-08-06 中铁二局集团有限公司 Backfill system and backfill method for single shield TBM or behind shield segment wall
CN115012998A (en) * 2022-06-24 2022-09-06 吉林大学 Post-grouting method capable of realizing real-time grout supplement

Also Published As

Publication number Publication date
CN106089245B (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN204984441U (en) It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN106089245B (en) One kind postpones grouting method after being used for single shield TBM walls
CN105626096A (en) Pea gravel hydraulic filling construction process for TBM
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN110864162B (en) Construction process of argillaceous sandstone geological pipe jacking
CN204080789U (en) The preparing structure of underground continuous wall width breach
CN103437348A (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
CN103696416B (en) A kind of method for processing foundation
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN114150749A (en) Construction method for non-stop connection of new and old sewage wells
CN106284365A (en) A kind of WATER-WASHING METHOD of building foundation pit excavation
CN110158630A (en) A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN110344448A (en) A kind of blocking method of the deep hole perfusion grouting material of basement bottom board large-scale water leakage
CN103133004A (en) Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft
CN203160254U (en) Pit support structure
CN214614083U (en) Grouting assembly for repairing quality defects of karst geological cast-in-place pile
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN102535518A (en) Plugging method of large seam of underground diaphragm wall
CN206457835U (en) A kind of open caisson

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20180625