CN106089218A - Precast assembly underground gallery bimodulus development machine - Google Patents

Precast assembly underground gallery bimodulus development machine Download PDF

Info

Publication number
CN106089218A
CN106089218A CN201610638233.3A CN201610638233A CN106089218A CN 106089218 A CN106089218 A CN 106089218A CN 201610638233 A CN201610638233 A CN 201610638233A CN 106089218 A CN106089218 A CN 106089218A
Authority
CN
China
Prior art keywords
cabin
supporting
plate
assembled
bimodulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610638233.3A
Other languages
Chinese (zh)
Other versions
CN106089218B (en
Inventor
翟世鸿
杨秀礼
程茂林
孟奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201610638233.3A priority Critical patent/CN106089218B/en
Publication of CN106089218A publication Critical patent/CN106089218A/en
Application granted granted Critical
Publication of CN106089218B publication Critical patent/CN106089218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of precast assembly underground gallery bimodulus development machine, including closed pipe sheet assembling cabin, top be articulated with that pipe sheet assembling cabin is anterior, can close relative to pipe sheet assembling cabin left-right rotation, top and form the excavation supporting cabin of an airtight nacelle;The section of jurisdiction posting connected with pipe sheet assembling cabin it is fixed with on the downside of the rear portion in pipe sheet assembling cabin;Being fixed with the straight line thrustor corresponding with gallery in pipe sheet assembling cabin, connecting between pipe sheet assembling cabin and excavation supporting cabin has hinged power set;The internal circumferential of section of jurisdiction posting is provided with the grout outlet whitewashed backward.Development machine foundation ditch length designed by the present invention is short, and risk of caving in is little;Having open cut and two kinds of Construction Modes of tunneling, be suitable for the construction of varying environment, efficiency of construction is greatly improved;Development machine complete machine may move, it is achieved that continuous-flow type, uninterrupted construction operation.

Description

Precast assembly underground gallery bimodulus development machine
Technical field
The present invention relates to underground pipe gallery technical field of construction, in particular to the bimodulus pick of a kind of precast assembly underground gallery Enter machine.
Background technology
Modern city, the planning construction scale of construction of underground pipe gallery grows with each passing day, but new is combined by old underground utilities Closing piping lane construction serious interference, road traffic pressure is the heaviest can not occupy road for a long time, adds many to piping lane construction Limit, its construction technology is had higher requirement.Existing pipe gallery construction technology, general procedure is: building enclosure is executed Monolithic reinforced concrete structure, backfill, building enclosure dismounting etc. in work, Support of Foundation Pit Excavation, foundation ditch, device therefor is common, work Sequence complexity, risk height, engineering time length, need a large amount of human assistances, efficiency is low, be formed without set of mechanized continuous productive process; Although shield method have employed advanced efficient Suporting structure, but is unsuitable for shallow buried covered excavation, construction section is poor for applicability, is generally used for Circular cross section is constructed, and equipment purchase cost and construction cost are high;Push bench process is used for soft soil layer, and general employing circle is disconnected Face, basal area is typically small and limited, and one time jacking length is short, poor for applicability.
Summary of the invention
Present invention aim to solve the deficiency of above-mentioned background technology, it is provided that a kind of short construction period, low cost, energy The precast assembly underground gallery bimodulus development machine of streamlined operation.
For realizing this purpose, the precast assembly underground gallery bimodulus development machine designed by the present invention, it includes that top can be sealed The pipe sheet assembling cabin closed and be articulated with pipe sheet assembling cabin anterior, can relative to pipe sheet assembling cabin left-right rotation, top can enclosed shape Become the excavation supporting cabin of an airtight nacelle;It is fixed with, on the downside of the rear portion in described pipe sheet assembling cabin, the section of jurisdiction connected with pipe sheet assembling cabin Posting;The straight line thrustor for pushing tow section of jurisdiction, described pipe sheet assembling cabin and excavation it is fixed with in described pipe sheet assembling cabin Connect between supporting cabin and have hinged power set;The internal circumferential of described section of jurisdiction posting is provided with the grout outlet to post jacking.
Preferably, it is hingedly connected with backfill supporting on the upside of the rear portion in described pipe sheet assembling cabin.
Concrete, described pipe sheet assembling cabin include assembled Ceiling and two pieces be vertically fixed on the assembled Ceiling left and right sides Assembled cabin side plate, be fixedly connected with, bottom surface vertical with assembly cabin side plate between the leading inside surface of described assembled cabin side plate It is fixed on the assembled cabin front end-plate on assembled Ceiling.
Concrete, described section of jurisdiction posting includes the location of two pieces of left and right sides, rear end being perpendicularly fixed at assembled Ceiling Frame side plate, the front end face of two blocks of posting side plates is respectively fixedly connected with on the rear end face of assembled cabin side plate, described two pieces of location The posting top board vertical with posting side plate it is fixedly connected with between the top of frame side plate.
Further, the top of described two blocks of assembled cabin side plates has been hingedly connected one piece of assembled cabin and has folded breast boards, Two pieces of assembled cabins fold breast boards and can cooperate fixing formation by the top board of pipe sheet assembling cabin top seal.
Preferably, described two pieces of assembled cabins fold and have the breach cooperated, and two pieces of assembled cabins on breast boards Fold and on breast boards, have the most corresponding multiple bolt connecting holes.
Concrete, described excavation supporting cabin include supporting Ceiling and two pieces be vertically fixed on the supporting Ceiling left and right sides Supporting cabin side plate, the front end face of described supporting cabin side plate and horizontal plane angle are obtuse angle, in the rear portion of described supporting cabin side plate Being fixedly connected with the supporting cabin end plate vertical with supporting cabin side plate between side surface, end plate bottom surface, described supporting cabin is fixed on On supporting Ceiling.
Further, the top of two blocks of supporting cabin side plates in described excavation supporting cabin has been hingedly connected one piece of supporting cabin Breast boards, described two pieces of supporting cabin breast boards can cooperate fixing formation by the top board of excavation supporting cabin top seal.
Preferably, described two pieces of supporting cabin breast boards have the breach cooperated, and two blocks of supporting cabin gear soil The most corresponding multiple bolt connecting holes are had on plate.
Further, described precast assembly underground gallery bimodulus development machine also include being arranged at two pieces of supporting cabin breast boards it Between vertical breast boards, the rear inside of described supporting cabin breast boards is interval with multiple bolt fixed plate, institute along short transverse Stating and have bolt connecting hole on bolt fixed plate, the both sides of described vertical breast boards are respectively by bolt with bolt fixed plate even Connect, the bottom surface of described vertical breast boards and the either flush of supporting cabin end plate.
Concrete, described straight line thrustor is to be fixed on four corners of assembled cabin front console, backward pushing tow Pipe bending cylinder.
Concrete, the both sides up and down of the front end face in described pipe sheet assembling cabin are respectively fixedly connected with one piece horizontally disposed the One sealing plate, the rear end face top in described excavation supporting cabin is fixedly connected with one piece of second horizontally disposed sealing plate, and described Two sealing plates are positioned at above the first sealing plate on the upside of pipe sheet assembling cabin, and the base plate in described excavation supporting cabin is positioned at pipe sheet assembling cabin Below first sealing plate of downside, described second sealing plate the plate top surface in bottom surface and excavation supporting cabin be respectively and fixedly provided with and first The watertight rubber circle of sealing plate laminating.
Concrete, described hinged power set include being fixed on the of four corners of the rear end panel in excavation supporting cabin One fixed support and be fixed on four corners of front console in pipe sheet assembling cabin and the first fixed support just to second solid Fixed rack, is respectively and fixedly provided with vertical cylinder, described first fixed support and in described first fixed support and the second fixed support Connecting between two fixed supports and have double head oil cylinder, the end sleeve of two oil cylinder axles of described double head oil cylinder is located on vertical cylinder.
Preferably, the top of described assembled cabin side plate is fixed with dismountable straddle truck.
Preferably, the described assembled rear end upper surface of Ceiling and the inner circumferential of section of jurisdiction posting are respectively and fixedly provided with sealing steel Wire brush, and the described assembled rear end upper surface of Ceiling and the bottom surface of posting top board be equipped with seal grease jet.
Further, the middle part of described supporting cabin end plate has conveying worm installing hole, described supporting cabin end plate Be fixedly arranged in the middle of closure temporarily the sealing up a door of conveying worm installing hole.
Concrete, described backfill supporting includes being perpendicularly fixed at returning of the left and right sides, top of the rear end face in pipe sheet assembling cabin Fill out retaining-plate and many stulls of the fixing inner surface connecting two pieces of backfill retaining-plates, the bottom surface of described backfill retaining-plate and pipe Gap is there is between the end face of sheet posting.
Preferably, the top of the top in described excavation supporting cabin and backfill supporting is respectively fixed with the first belt conveyor and props up Seat and the second belt conveyor bearing, described first belt conveyor bearing and the second belt conveyor bearing are fixed with for The belt conveyor of the backfill earthwork.
The invention has the beneficial effects as follows: 1. excavation of foundation pit, Sloping, gallery assembly molding, the whole process of foundation ditch backfill Synchronization is carried out;2. foundation ditch length is short, and risk of caving in is little;3. there are open cut and two kinds of Construction Modes of tunneling.Utilize the tunneling pattern can Evade special short-range subterranean pipe line, urban operating mechanism and moving of greening and change problem;During open cut pattern, anti-bucket excavator can be direct From ground earth excavation, section of jurisdiction directly can hang in pipe sheet assembling jacking cabin and carry out assembly from ground, and efficiency of construction is greatly improved;4. Development machine complete machine may move, it is achieved that continuous-flow type, uninterrupted construction operation.
Accompanying drawing explanation
Fig. 1 is the structural front view of the development machine designed by the present invention;
Fig. 2 is the schematic enlarged-scale view in Fig. 1 at A;
Fig. 3 is the schematic enlarged-scale view in Fig. 1 at B;
Fig. 4 is the structure top view of the development machine designed by the present invention;
Fig. 5 is the structural representation that in the present invention, excavation supporting cabin turns to relative to pipe sheet assembling cabin;
Fig. 6 is the front view in excavation supporting cabin in the present invention;
Fig. 7 is the front view in pipe sheet assembling cabin in the present invention;
Fig. 8 is the structural representation of the development machine in the present invention under tunneling pattern;
Fig. 9 is the development machine operating diagram in the present invention under open cut pattern;
Figure 10 is the development machine operating diagram in the present invention under tunneling pattern;
Wherein, 1 pipe sheet assembling cabin (1.1 assembled Ceilings, 1.2 assembled cabin side plates, 1.3 assembled cabin front end-plates, 1.4 assembled cabins fold breast boards), and 2 excavation supporting cabins (2.1 supporting Ceilings, 2.2 supporting cabin side plates, 2.3 Protect cabin end plate, 2.4 supporting cabin breast boards), 3 section of jurisdiction postings (3.1 posting side plates, 3.2 posting top boards), 4 gallerys, 5 backfill supportings (5.1 backfill retaining-plates, 5.2 stulls), 6 vertical breast boards, 7 bolt fixed plate, 8 bolts, 9 pipe bending cylinders, 10 first sealing plates, 11 second sealing plates, 12 watertight rubber circles, 13 first fix Support, 14 second fixed supports, 15 vertical cylinders, 16 double head oil cylinders, 17 straddle trucks, 18 seal wire brush, 19 conveying worm installing holes, 20 seal up a door temporarily, 21 first belt conveyor bearings, and 22 second belt conveyors prop up Seat, 23 belt conveyors, the 24 anti-excavators that struggle against, 25 sections of jurisdiction, 26 seal greases, 27 conveying worms, 28 pipes Sheet assembling machine, 29 supporting legs.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Precast assembly underground gallery bimodulus development machine as shown in Figure 1, including pipe sheet assembling cabin 1, as shown in Figure 1 and Figure 4, Pipe sheet assembling cabin 1 include assembled Ceiling 1.1 and two pieces just to and be perpendicularly fixed at the assembly of assembled Ceiling 1.1 left and right sides Cabin side plate 1.2, be fixedly connected with between the leading inside surface of assembled cabin side plate 1.2 vertical with assembly cabin side plate 1.2, bottom surface is solid Assembled cabin front end-plate 1.3 on assembled Ceiling 1.1;It is fixed with on the downside of the rear portion in pipe sheet assembling cabin 1 and pipe sheet assembling cabin 1 The section of jurisdiction posting 3 of connection;Section of jurisdiction posting 3 includes two pieces of left and right sides, rear end being perpendicularly fixed at assembled Ceiling 1.1 Posting side plate 3.1, the front end face of two blocks of posting side plates 3.1 is respectively fixedly connected with on the rear end face of assembled cabin side plate 1.2, The posting top board 3.2 vertical with posting side plate 3.1 it is fixedly connected with between the top of two blocks of posting side plates 3.1.Two pieces The top of assembled cabin side plate 1.2 has been hingedly connected one piece of assembled cabin and has folded breast boards 1.4.As shown in Figure 7: two pieces of assembled cabins Fold and on breast boards 1.4, have the breach cooperated, and two pieces of assembled cabins fold and have mutually on breast boards 1.4 Corresponding multiple bolt connecting holes, two pieces of assembled cabins fold breast boards 1.4 and can fix formation by pipe sheet assembling cabin 1 by bolt 8 The top board of top seal.
As shown in Fig. 1 and Fig. 45, front portion, pipe sheet assembling cabin 1 is hinged with excavation supporting cabin 2, and excavation supporting cabin 2 can be relative Formation one airtight nacelle can be closed in pipe sheet assembling cabin 1 left-right rotation, top;Excavation supporting cabin 2 includes supporting Ceiling 2.1 He Two pieces just to and be perpendicularly fixed at the supporting cabin side plate 2.2 of supporting Ceiling 2.1 left and right sides, the front end of supporting cabin side plate 2.2 Face and horizontal plane angle are obtuse angle, are fixedly connected with and supporting cabin side plate 2.2 between the posterior medial surface of supporting cabin side plate 2.2 Vertical supporting cabin end plate 2.3, end plate 2.3 bottom surface, supporting cabin is fixed on supporting Ceiling 2.1.As shown in Figure 6: excavation The top of two blocks of supporting cabin side plates 2.2 in supporting cabin 2 has been hingedly connected one piece of supporting cabin breast boards 2.4, two pieces of supporting cabins Have on breast boards 2.4 on the breach cooperated, and two pieces of supporting cabin breast boards 2.4 have mutually corresponding many Individual bolt connecting hole.Two pieces of supporting cabin breast boards 2.4 can be bolted and be formed the top of excavation supporting cabin 2 top seal Plate.As it is shown in figure 1, be provided with vertical breast boards 6, as shown in Figure 6, supporting cabin breast boards between two pieces of supporting cabin breast boards 2.4 The rear inside of 2.4 is interval with multiple bolt fixed plate 7 along short transverse, and bolt fixed plate 7 has bolt connecting hole, perpendicular The both sides of straight breast boards 6 are connected with bolt fixed plate 7 by bolt 8 respectively, and the bottom surface of vertical breast boards 6 is not higher than side, supporting cabin The end face of plate 2.2.
As shown in Fig. 12, Fig. 4 and Fig. 9, four corners connecing cabin front end-plate 1.3 are respectively fixed with two and gallery 4 The pipe bending cylinder 9 (after pipe sheet assembling completes, promoting development machine to travel forward by pipe bending cylinder 9) of corresponding pushing tow backward.
As shown in Fig. 1 and Fig. 45, the both sides up and down of the front end face in pipe sheet assembling cabin 1 have been respectively fixedly connected with one piece of level The first sealing plate 10 arranged, the rear end face top in excavation supporting cabin 2 is fixedly connected with one piece of second horizontally disposed sealing plate 11, the second sealing plate 11 is positioned at above the first sealing plate 10 on the upside of pipe sheet assembling cabin 1, and the base plate in excavation supporting cabin 2 is positioned at pipe Below the first sealing plate 10 on the downside of sheet assembly cabin 1, the bottom surface of the second sealing plate 11 and the plate top surface in excavation supporting cabin 2 are the most solid Surely have the watertight rubber circle 12 with the first sealing plate 10 laminating (between avoiding the earthwork in the external world or foreign material to enter two pieces of sealing plates, Affect it to relatively rotate);Four corners of the rear end face in excavation supporting cabin 2 are respectively fixed with the first fixed support 13, and section of jurisdiction is spelled Four corners of front end face of stowage 1 be respectively fixed with the first fixed support 13 just to the second fixed support 14, first is solid Be respectively and fixedly provided with in fixed rack 13 and the second fixed support 14 vertical cylinder 15, the first fixed support 13 and the second fixed support 14 it Between connect have double head oil cylinder 16, the end sleeve of two oil cylinder axles of double head oil cylinder 16 is located on vertical cylinder 15.By oil cylinder axle The relative position in collapsing length scalable pipe sheet assembling cabin 1 and excavation supporting cabin 2, simple to operate.
As shown in figures 1 and 3, the top of assembled cabin side plate 1.2 is fixed with dismountable straddle truck 17 (at assembled cabin side plate The top of 1.2 sets up supporting leg 29, is fixed on supporting leg 29 by the support of straddle truck 17), as shown in figures 1 and 3, assembled Ceiling The rear end upper surface of 1.1 and the bottom surface of posting top board 3.2 are respectively and fixedly provided with and seal wire brush 18 (in the inner side sealing wire brush 18 Fill seal grease 26 seal inside periphery, section of jurisdiction and posting between gap, prevent subsoil water enter pipe sheet assembling cabin 1.), And the assembly rear end upper surface of Ceiling 1.1 and the inner circumferential of section of jurisdiction posting 3 are equipped with seal grease jet (by oil Fat mouth outwards sprays seal grease 26 to guarantee the sealing of section of jurisdiction 25 surrounding).The internal circumferential of section of jurisdiction posting 3 and the assembled bilge The tail end of plate 1.1 is equipped with the grout outlet whitewashed backward, and (development machine limit moves forward, and pulp tube edge pulp is to complete gallery 4 Assembly, is arranged at pulp structure in section of jurisdiction posting 3, is not take up space, further increases the operability of development machine).
As shown in Figure 1 and Figure 4, backfill supporting 5 it is hingedly connected with on the upside of the rear portion in pipe sheet assembling cabin 1.Backfill supporting 5 includes It is perpendicularly fixed at backfill retaining-plate 5.1 and two pieces of backfills of fixing connection of the left and right sides, top of the rear end face in pipe sheet assembling cabin 1 Many stulls 5.2 of the inner surface of retaining-plate 5.1, the bottom surface of backfill retaining-plate 5.1 is positioned at above section of jurisdiction posting 3.
As shown in Figure 1 and Figure 4, the middle part of supporting cabin end plate 2.3 has conveying worm installing hole 19, rear end, supporting cabin Plate 2.3 be fixedly arranged in the middle of closure conveying worm installing hole 19 seal up a door 20 temporarily.
The top in excavation supporting cabin 2 shown in as shown in Fig. 1, Fig. 4 and Fig. 9 and the top of backfill supporting 5 are respectively fixed with the One belt conveyor bearing 21 and the second belt conveyor bearing 22, the first belt conveyor bearing 21 and the second belt conveyor The belt conveyor 23 for backfilling the earthwork it is fixed with on bearing 22.
The work process of the present invention is:
Open cut pattern (as shown in Figure 9), comprises the following steps:
(1), in originating foundation ditch, development machine is assembled by the structure of Fig. 1;(2), save gallery with the first of assembled molding and originate Reaction frame supports as counter-force, utilizes the pipe bending cylinder 9 in pipe sheet assembling cabin 1 development machine entirety to be pushed ahead;(3), development machine The excavation supporting cabin 2 of front end heads into the soil body, under the gib in supporting cabin, in the anti-bucket excavator 24 excavation supporting cabin on ground The soil body;(4), after the inner excavation of excavation supporting cabin 2, pipe bending cylinder 9 jacking in pipe sheet assembling cabin 1, the gallery 4 of assembled molding by Step abjection pipe sheet assembling cabin 1, synchronous grouting also fills the gap formed between gallery and the soil body;(5), when the advancing distance of development machine In time meeting next ring gallery assembly space, stop advancing, and next ring gallery assembled in pipe sheet assembling cabin 1;(6), in pick While entering machine jacking forward, it is connected to the backfill supporting 5 of pipe sheet assembling cabin 1 afterbody to both sides, the most mounted gallery 4 top The soil body carries out gib, and carries out backfilling, tamping in gib inter-sync by belt conveyor 23, recovers road surface.
When running into special road section, it is impossible to when using open cut pattern, development machine is converted into tunneling pattern (such as Fig. 8 and Figure 10 Shown in) comprise the following steps:
(1), open and seal up a door 20 temporarily, conveying worm 27, and installation duct piece assembling machine pipe sheet assembling cabin 1 in are installed 28;(2), the collapsible breast boards in excavation supporting cabin 2, both sides, pipe sheet assembling cabin 1 is folded mutually overlap joint to inner side flat turn 90 degree And fix, make excavation supporting cabin 2, pipe sheet assembling cabin 1 are changed into closed state by top opening-wide state, and remove backfill supporting 5 With vertical breast boards 6;(3), it is unearthed forward by conveying worm 27, utilizes pipe bending cylinder 9 to make development machine advance, and utilize pipe Sheet assembling machine 28 installs section of jurisdiction 25;(4), gallery assembly by after special sector, stop driving, excavate under gib and expose Development machine top;(5), by excavation supporting cabin 2 and both sides, pipe sheet assembling cabin 1 it is the outside vertical transfer of folding breast boards 90 of closed state Degree, removes conveying worm 27, duct piece assembling machine 28, and again installs vertical breast boards 6 and backfill supporting 5;(6), again turn Change open cut pattern into and continue driving.
Present invention achieves foundation trench excavation, Sloping, gallery assembly molding, the whole process synchronization mechanism of foundation trench backfill Operation, and reached short foundation ditch, continuous-flow type moves the purpose of construction, takies that link length is short, the time is short, by open cut and tunneling The mutual conversion of pattern, has effectively evaded moving of subterranean pipe line, urban operating mechanism and greening and has changed problem, substantially increases work effect Rate, reduces cost.
The above, be only presently preferred embodiments of the present invention, and not the structure to the present invention is done any pro forma Limit.Every any simple modification, equivalent variations and modification above example made according to the technical spirit of the present invention, all Still fall within the range of technical scheme.

Claims (18)

1. a precast assembly underground gallery bimodulus development machine, it is characterised in that: it includes closed pipe sheet assembling cabin, top (1) and be articulated with pipe sheet assembling cabin (1) anterior, can relative to pipe sheet assembling cabin (1) left-right rotation, that formation one can be closed in top is close Close the excavation supporting cabin (2) of nacelle;It is fixed with on the downside of the rear portion of described pipe sheet assembling cabin (1) and to connect with pipe sheet assembling cabin (1) Section of jurisdiction posting (3);It is fixed with the straight line thrustor for pushing tow section of jurisdiction (25), described pipe in described pipe sheet assembling cabin (1) Connect between sheet assembly cabin (1) and excavation supporting cabin (2) and have hinged power set;The internal circumferential of described section of jurisdiction posting (3) It is provided with the grout outlet to post jacking.
2. precast assembly underground gallery as claimed in claim 1 bimodulus development machine, it is characterised in that: described pipe sheet assembling cabin (1) backfill supporting (5) it is hingedly connected with on the upside of rear portion.
3. precast assembly underground gallery as claimed in claim 1 bimodulus development machine, it is characterised in that: described pipe sheet assembling cabin (1) assembled Ceiling (1.1) is included and two blocks of assembled cabin side plates being vertically fixed on assembly Ceiling (1.1) left and right sides (1.2), it is fixedly connected with, the end vertical with assembled cabin side plate (1.2) between the leading inside surface of described assembled cabin side plate (1.2) Assembled cabin front end-plate (1.3) on assembled Ceiling (1.1) is fixed in face.
4. precast assembly underground gallery as claimed in claim 3 bimodulus development machine, it is characterised in that: described section of jurisdiction posting (3) the posting side plate (3.1) of two pieces of left and right sides, rear end being vertically fixed on assembled Ceiling (1.1), two pieces of location are included The front end face of frame side plate (3.1) is respectively fixedly connected with on the rear end face of assembled cabin side plate (1.2), described two blocks of posting side plates (3.1) the posting top board (3.2) vertical with posting side plate (3.1) it is fixedly connected with between top.
5. precast assembly underground gallery as claimed in claim 3 bimodulus development machine, it is characterised in that: side, described two pieces of assembled cabins The top of plate (1.2) has been hingedly connected one piece of assembled cabin and has folded breast boards (1.4), and two pieces of assembled cabins fold breast boards (1.4) can cooperate fixing formation the top board of pipe sheet assembling cabin (1) top seal.
6. precast assembly underground gallery as claimed in claim 5 bimodulus development machine, it is characterised in that: described two pieces of assembled cabins folding Have the breach cooperated on folded breast boards (1.4), and two pieces of assembled cabins fold and have phase on breast boards (1.4) The most corresponding multiple bolt connecting holes.
7. precast assembly underground gallery as claimed in claim 1 bimodulus development machine, it is characterised in that: described excavation supporting cabin (2) supporting Ceiling (2.1) is included and two blocks of supporting cabin side plates being vertically fixed on supporting Ceiling (2.1) left and right sides (2.2), the front end face of described supporting cabin side plate (2.2) and horizontal plane angle are obtuse angle, the rear portion of described supporting cabin side plate (2.2) Supporting cabin end plate (2.3) vertical with supporting cabin side plate (2.2), rear end, described supporting cabin it is fixedly connected with between inner surface Plate (2.3) bottom surface is fixed on supporting Ceiling (2.1).
8. precast assembly underground gallery as claimed in claim 7 bimodulus development machine, it is characterised in that: described excavation supporting cabin (2) top of two pieces of supporting cabins side plate (2.2) has been hingedly connected one piece of supporting cabin breast boards (2.4), and described two pieces are propped up Protect cabin breast boards (2.4) and fixing formation can be cooperated by the top board of excavation supporting cabin (2) top seal.
9. precast assembly underground gallery as claimed in claim 8 bimodulus development machine, it is characterised in that: described two pieces of supporting cabins gear Have on the breach cooperated, and two pieces of supporting cabins breast boards (2.4) on soil plate (2.4) and have mutual correspondence Multiple bolt connecting holes.
10. precast assembly underground gallery as claimed in claim 9 bimodulus development machine, it is characterised in that: it also includes being arranged at Vertical breast boards (6) between two pieces of supporting cabins breast boards (2.4), the rear inside of described supporting cabin breast boards (2.4) is along high Degree direction is interval with multiple bolt fixed plate (7), and described bolt fixed plate (7) has bolt connecting hole, described vertical gear The both sides of soil plate (6) are connected with bolt fixed plate (7) by bolt (8) respectively, the bottom surface of described vertical breast boards (6) and supporting The either flush of cabin end plate (2.3).
11. precast assembly underground gallery as claimed in claim 1 bimodulus development machines, it is characterised in that: described straight line pushing tow fills It is set to be fixed on the pipe bending cylinder (9) of four corners of pipe sheet assembling cabin (1) front console, backward pushing tow.
The 12. precast assembly underground gallery bimodulus development machines as described in claim 1 or 3 or 7, it is characterised in that: described section of jurisdiction The both sides up and down of the front end face of assembled cabin (1) are respectively fixedly connected with one piece of horizontally disposed first sealing plate (10), described in open The rear end face top digging supporting cabin (2) is fixedly connected with one piece of horizontally disposed second sealing plate (11), described second sealing plate (11) being positioned at the first sealing plate (10) top of upside, pipe sheet assembling cabin (1), the base plate of described excavation supporting cabin (2) is positioned at section of jurisdiction First sealing plate (10) lower section of assembled cabin (1) downside, the bottom surface of described second sealing plate (11) and the end of excavation supporting cabin (2) Plate top surface is respectively and fixedly provided with the watertight rubber circle (12) fitted with the first sealing plate (10).
13. precast assembly underground gallery as claimed in claim 1 bimodulus development machines, it is characterised in that: described hinged power fills Put and include being fixed on first fixed support (13) of four corners of the rear end panel in excavation supporting cabin (2) and be fixed on section of jurisdiction Four corners of the front console of assembled cabin (1) and the first fixed support (13) just to the second fixed support (14), described Vertical cylinder (15), described first fixed support (13) it is respectively and fixedly provided with in first fixed support (13) and the second fixed support (14) With second connect between fixed support (14) and have double head oil cylinder (16), the end sleeve of two oil cylinder axles of described double head oil cylinder (16) It is located on vertical cylinder (15).
14. precast assembly underground gallery as claimed in claim 3 bimodulus development machines, it is characterised in that: described assembled cabin side plate (1.2) top is fixed with dismountable straddle truck (17).
15. precast assembly underground gallery as claimed in claim 3 bimodulus development machines, it is characterised in that: described assembled Ceiling (1.1) rear end upper surface and the bottom surface of posting top board (3.2) are respectively and fixedly provided with sealing wire brush (18), and the described assembled bilge The rear end upper surface of plate (1.1) and the inner circumferential of section of jurisdiction posting (3) are equipped with seal grease jet.
16. precast assembly underground gallery as claimed in claim 7 bimodulus development machines, it is characterised in that: rear end, described supporting cabin The middle part of plate (2.3) has conveying worm installing hole (19), described supporting cabin end plate (2.3) be fixedly arranged in the middle of closure spiral shell Temporarily seal up a door (20) of rotation conveyer installing hole (19).
17. precast assembly underground gallery as claimed in claim 2 bimodulus development machines, it is characterised in that: described backfill supporting (5) Including the backfill retaining-plate (5.1) of the left and right sides, top of the rear end face being perpendicularly fixed at pipe sheet assembling cabin (1) with fixing connect Many stulls (5.2) of the inner surface of two pieces of backfills retaining-plate (5.1), the bottom surface of described backfill retaining-plate (5.1) and section of jurisdiction Gap is there is between the end face of posting (3).
The 18. precast assembly underground gallery bimodulus development machines as described in claim 2 or 17, it is characterised in that: described excavation props up The top at the top and backfill supporting (5) of protecting cabin (2) is respectively fixed with the first belt conveyor bearing (21) and the second belt is defeated Send machine bearing (22), described first belt conveyor bearing (21) and the second belt conveyor bearing (22) are fixed with for returning The belt conveyor (23) of earth fill.
CN201610638233.3A 2016-08-05 2016-08-05 Precast assembly underground gallery bimodulus development machine Active CN106089218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610638233.3A CN106089218B (en) 2016-08-05 2016-08-05 Precast assembly underground gallery bimodulus development machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610638233.3A CN106089218B (en) 2016-08-05 2016-08-05 Precast assembly underground gallery bimodulus development machine

Publications (2)

Publication Number Publication Date
CN106089218A true CN106089218A (en) 2016-11-09
CN106089218B CN106089218B (en) 2017-08-15

Family

ID=57454559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610638233.3A Active CN106089218B (en) 2016-08-05 2016-08-05 Precast assembly underground gallery bimodulus development machine

Country Status (1)

Country Link
CN (1) CN106089218B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979019A (en) * 2017-05-25 2017-07-25 中交第二航务工程局有限公司 A kind of pipe sheet assembling cabin structure for burst prefabrication and assembly construction underground pipe gallery
CN108425367A (en) * 2018-04-09 2018-08-21 成都利拓重工机械有限公司 A kind of mobile supporting shield and its mounting base for the construction of city pipe capsule
CN108560582A (en) * 2018-04-09 2018-09-21 成都利拓重工机械有限公司 A kind of mobile supporting shield and its limit hinge for the construction of city pipe capsule
CN109098206A (en) * 2018-09-12 2018-12-28 中交第二航务工程局有限公司 City tunnel prefabrication and assembly construction construction method and precast assembly development machine
CN110409497A (en) * 2019-06-21 2019-11-05 中交第二航务工程局有限公司 Construction method suitable for water-bed shallow embedding prefabrication and assembly construction tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150701A (en) * 1994-12-21 1997-05-28 东芝照相技术株式会社 Incandescent lamp bulb and lighting installation
JP2001098883A (en) * 1999-09-29 2001-04-10 Taisei Corp Tunnel construction method and shield machine for use therein
CN103352710A (en) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN104453927A (en) * 2013-09-23 2015-03-25 中铁隧道装备制造有限公司 Double-hinged-joint double-mode anti-explosion type inclined shaft full face rock tunnel boring machine
CN204941556U (en) * 2015-07-29 2016-01-06 中铁工程装备集团有限公司 A kind of special-shaped development machine for single line soft rock tunnel
CN205876324U (en) * 2016-08-05 2017-01-11 中交第二航务工程局有限公司 Prefabricated underground gallery bimodulus entry driving machine of assembling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150701A (en) * 1994-12-21 1997-05-28 东芝照相技术株式会社 Incandescent lamp bulb and lighting installation
JP2001098883A (en) * 1999-09-29 2001-04-10 Taisei Corp Tunnel construction method and shield machine for use therein
CN103352710A (en) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN104453927A (en) * 2013-09-23 2015-03-25 中铁隧道装备制造有限公司 Double-hinged-joint double-mode anti-explosion type inclined shaft full face rock tunnel boring machine
CN204941556U (en) * 2015-07-29 2016-01-06 中铁工程装备集团有限公司 A kind of special-shaped development machine for single line soft rock tunnel
CN205876324U (en) * 2016-08-05 2017-01-11 中交第二航务工程局有限公司 Prefabricated underground gallery bimodulus entry driving machine of assembling

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979019A (en) * 2017-05-25 2017-07-25 中交第二航务工程局有限公司 A kind of pipe sheet assembling cabin structure for burst prefabrication and assembly construction underground pipe gallery
CN106979019B (en) * 2017-05-25 2023-09-12 中交第二航务工程局有限公司 Segment assembly cabin structure for segment prefabricated underground pipe gallery
CN108425367A (en) * 2018-04-09 2018-08-21 成都利拓重工机械有限公司 A kind of mobile supporting shield and its mounting base for the construction of city pipe capsule
CN108560582A (en) * 2018-04-09 2018-09-21 成都利拓重工机械有限公司 A kind of mobile supporting shield and its limit hinge for the construction of city pipe capsule
CN108425367B (en) * 2018-04-09 2023-08-29 成都利拓重工机械有限公司 Movable support shield for urban pipe bag construction and mounting seat thereof
CN108560582B (en) * 2018-04-09 2023-08-29 成都利拓重工机械有限公司 Movable support shield for urban pipe bag construction and limiting hinge thereof
CN109098206A (en) * 2018-09-12 2018-12-28 中交第二航务工程局有限公司 City tunnel prefabrication and assembly construction construction method and precast assembly development machine
CN110409497A (en) * 2019-06-21 2019-11-05 中交第二航务工程局有限公司 Construction method suitable for water-bed shallow embedding prefabrication and assembly construction tunnel

Also Published As

Publication number Publication date
CN106089218B (en) 2017-08-15

Similar Documents

Publication Publication Date Title
CN106089218A (en) Precast assembly underground gallery bimodulus development machine
CN106088149B (en) A kind of mechanization rapid constructing method of precast splice type underground gallery
CN104088647B (en) Shield tube push bench with super-large rectangular cross section
US6869147B2 (en) Method and system for mining hydrocarbon-containing materials
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN104196538A (en) Combined type double-shield tunneling machine
CN203905954U (en) Super-large shield pipe push bench with rectangular cross section
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN105888677A (en) Underground pipe gallery construction device, combination and construction method
CN104131821B (en) A kind of shield tunnel plug-in conduit grooving structure and fixing means thereof
CN103410523A (en) Double-layer water-stopping steel ring for shield starting tunnel portal and mounting method of double-layer water-stopping steel ring
CN110748349A (en) Double-molecular originating method for small-clear-distance double-line tunnel shield
CN109406759B (en) Assembled multifunctional geotechnical engineering test model box
CN212985227U (en) Underground shared cavern structure for dismounting TBM
JP5781574B2 (en) Starting reaction device for open shield machine
CN103670446A (en) Method for constructing circular diversion tunnel 2/3 circular concrete lining
CN205876324U (en) Prefabricated underground gallery bimodulus entry driving machine of assembling
CN105926642A (en) Urban underground comprehensive pipe gallery foundation pit support and underground structure external mold integrated structure and construction method
CN112855181B (en) Pipe jacking and shield tunneling up-down parallel overlapping tunnel structure and construction method thereof
CN110820803B (en) Open excavation construction method for transverse connection channel of shield tunnel
CN205743914U (en) Underground pipe gallery constructing device and assembly
CN104895100B (en) Building close quarters builds underground space Caisson method
CN208669310U (en) A kind of compound shield of assembling combination section of jurisdiction
CN205742215U (en) A kind of reusable pipe gallery pattern foundation pit supporting structure and structure external mold combinative structure
CN110513118B (en) Shield non-negative ring originating structure and originating process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Hong

Inventor after: Zhu Mingqing

Inventor after: Zhai Shihong

Inventor after: Yang Xiuli

Inventor after: Cheng Maolin

Inventor after: Meng Kui

Inventor after: Xu Jie

Inventor after: Hua Xiaotao

Inventor after: Xia Hao

Inventor after: Liu Xiucheng

Inventor before: Zhai Shihong

Inventor before: Yang Xiuli

Inventor before: Cheng Maolin

Inventor before: Meng Kui

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20161109

Assignee: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Assignor: CCCC WUHAN CHI HENG INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.|CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Contract record no.: X2022980017115

Denomination of invention: Double mold roadheader for prefabricated and assembled underground gallery

Granted publication date: 20170815

License type: Common License

Record date: 20220929

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20161109

Assignee: CHENGDU CHENGTOU CITY CONSTRUCTION TECHNOLOGY CO.,LTD.

Assignor: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.|CCCC WUHAN CHI HENG INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.

Contract record no.: X2022980017310

Denomination of invention: Double mold roadheader for prefabricated and assembled underground gallery

Granted publication date: 20170815

License type: Common License

Record date: 20220930