CN106089046A - A kind of from mobile roadway floor armature boring chassis - Google Patents
A kind of from mobile roadway floor armature boring chassis Download PDFInfo
- Publication number
- CN106089046A CN106089046A CN201610544683.6A CN201610544683A CN106089046A CN 106089046 A CN106089046 A CN 106089046A CN 201610544683 A CN201610544683 A CN 201610544683A CN 106089046 A CN106089046 A CN 106089046A
- Authority
- CN
- China
- Prior art keywords
- underframe
- supporting cylinder
- location
- guiding mechanism
- rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 63
- 238000005086 pumping Methods 0.000 claims abstract description 16
- 239000003351 stiffener Substances 0.000 claims description 3
- 239000012530 fluid Substances 0.000 claims description 2
- 230000004807 localization Effects 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 12
- 238000009434 installation Methods 0.000 abstract description 8
- 238000005553 drilling Methods 0.000 description 15
- 239000011435 rock Substances 0.000 description 10
- 239000003245 coal Substances 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 238000005728 strengthening Methods 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/024—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting having means for adapting to inclined terrain; having means for stabilizing the vehicle while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a kind of from mobile roadway floor armature boring chassis, including underframe (1), workpiece (2), added (3) and device positioning element (4);Added it is fixedly mounted on underframe;Workpiece is arranged on underframe, including body (21), front and back guiding mechanism (22), front and back detent mechanism (23), left and right guiding mechanism (24), left and right detent mechanism (25), rig installing rack (26) and rig (27);Device positioning element includes location supporting cylinder, top (41), location supporting cylinder, bottom (42) and control valve group and pumping plant (43), and control valve group and pumping plant are connected with top location supporting cylinder and location, bottom supporting cylinder respectively.This base plate armature boring trolley structure is simple, it is possible to realize quickly holing roadway floor on the premise of providing reverse holding power in boring procedure, and then overall raising rockbolt installation speed, is adapted to the requirement of Quick Road-Made.
Description
Technical field
The present invention relates to a kind of drilling jumbo, specifically one be applicable to underground coal mine roadway floor carries out anchor pole of holing
The most mobile roadway floor armature boring chassis of supporting, belongs to down-hole support equipment technical field.
Background technology
Due to the self-characteristic of different depth rock mass and the difference of residing ambient stress around tunnel, transported by geologic rhythm
The factor impacts such as dynamic, ground water pressure, country rock easily produces Incoordinate deformation, exploits especially for underground coal mine, top, tunnel, the end
Plate and two helps country rock to be deformed and move in tunnel, and the phenomenon that wherein roadway floor or gob floor upwards swell is i.e.
Referred to as pucking, pucking is a kind of dynamic phenomenon often occurred in roadway, it and the character of country rock, mining influence, mining depth
And geological structure etc. is directly related, some Floor Heave in Roadway amount of domestic mine even account for top, tunnel, the base plate amount of shifting near 70% with
On, bigger particular for mining depth, have that stress is high, temperature is high, subsoil water hydraulic pressure is high, strength of turbulence is high, danger of burst
The deep-seated setting of feature, high stress and soft rock mine roadway and the chambers such as height, creep is obvious, deformation is big, pucking makes roadway deformation, section become
Little, drastically influence the links such as mine ventilation, transport and personnel's walking, restriction mine safety and high-yield and high-efficiency and produce.
Underground coal mine prevents the generation of pucking phenomenon from not only wanting reinforcement roadway support, reinforced design method, and will be according to specifically
Wall rock geology condition take measures pucking amount is reduced to allowed band, generally use method for strengthening, destressing method, combination method and add
Gu the methods such as tunnel side, angle reduce pucking phenomenon, wherein method for strengthening is to be enclosed base plate by raising floor rocks intensity or raising
The supporting power of rock reaches the purpose of floor lift control, is a kind of the most frequently used pucking control method.
Improve the intensity of floor rocks, mainly have floor grouting, floor bolting etc., base plate is being used suspension roof support
Needing during operation first to hole base plate, traditional method need to be with pin or reversely air leg support above drilling rod in boring procedure
On back, to provide reverse holding power, but due in order to ensure that roadway floor does not destroys before installing anchor pole, it is necessary to
Installing anchor pole in driving face certain distance, the size of this distance is relevant with the character of floor rock, typically should be little
In 10 meters, the most unaffected in order to ensure tunnelling speed, the speed of usual rockbolt installation wants fast, and this traditional brill
Hole method operation not only complicated, manpower and materials consume big, and hole and install the speed of anchor pole compared with slow, efficiency is low, inadaptable
Requirement in Quick Road-Made.
Summary of the invention
For the problems referred to above, the present invention provides a kind of from mobile roadway floor armature boring chassis, simple in construction, it is possible to
Realize on the premise of boring procedure provides reverse holding power roadway floor quickly carries out drilling operation, and then overall raising anchor
Bar installation rate, is adapted to the requirement of Quick Road-Made.
For achieving the above object, this includes underframe, workpiece, added and dress from mobile roadway floor armature boring chassis
Put positioning element;
Described added being fixedly mounted on underframe, underframe bottom is provided with at least one deflecting roller and at least includes one group of coaxially side
To the drivewheel arranged, drivewheel is connected with driving hydraulic motor, and deflecting roller is connected with steering hydraulic motor, and underframe is additionally provided with
Working pedal and guidance panel;
Described workpiece is arranged on underframe, including body, front and back guiding mechanism, front and back detent mechanism, left and right Guiding machine
Structure, left and right detent mechanism, rig installing rack and rig;Before and after body is arranged by fore-and-aft direction, guiding mechanism is erected at underframe
On;Front and back detent mechanism is equipped with on front and back's guiding mechanism;The left and right that rig installing rack is arranged by left and right directions guides
Mechanism rack is located on body;Left and right detent mechanism is equipped with on the guiding mechanism of left and right;Rig is vertically arranged and is arranged on rig
On installing rack;
Described device positioning element includes location, top supporting cylinder, bottom location supporting cylinder and control valve group and pump
Stand;Location, top supporting cylinder is set to two pieces, and location, two pieces top supporting cylinder piston end sets up, about cylinder body
Symmetry is vertically fixedly mounted on the centre position of added fore-and-aft direction, and its piston end end is provided with support footstock;Location, bottom
Supporting cylinder is set to two pieces, and bottom two pieces, location supporting cylinder piston end is down-set, cylinder body is symmetrical the most solid
Dingan County is contained on the centre position of underframe fore-and-aft direction, and its piston end end is provided with support base;Control valve group and pumping plant are installed
Underframe or added on, the outfan of control valve group and pumping plant positions supporting cylinder, the end by fluid pressure line and top respectively
Location, portion supporting cylinder, driving hydraulic motor and steering hydraulic motor connect.
Scheme as a further improvement on the present invention, described body is by angle regulation positioning device and Guiding machine front and back
Structure connects.
Scheme as a further improvement on the present invention, described rig installing rack passes through angle regulation positioning device and left and right
Guiding mechanism connects.
Scheme as a further improvement on the present invention, described underframe and added be all frame structure.
Scheme as a further improvement on the present invention, described underframe and/or added frame structure two sides are provided with
Supporting rib stiffener arranged in a crossed manner.
Scheme as a further improvement on the present invention, described Working pedal is provided with seat.
Compared with prior art, this from movement roadway floor armature boring chassis owing to being provided be arranged on underframe upper
Frame, top location supporting cylinder and control valve group and pumping plant are arranged on added, and location, bottom supporting cylinder is arranged on
On underframe, therefore it is manipulated by valve group and pumping plant makes top location supporting cylinder and location, bottom supporting cylinder respectively
Stretching out, the support footstock of location, top supporting cylinder acts against on top board, the support base top of location, bottom supporting cylinder
Leaning against and make underframe form stable rigid support between back and base plate on base plate, during boring, the drilling rod of rig pierces
The counteracting force that base plate produces acts on underframe by rig installing rack, body, and active force is supported by underframe by location, top
Hydraulic cylinder and location, bottom supporting cylinder directly act on back and base plate, therefore need not above the drilling rod of rig
It is supported on back to provide reverse holding power with pin or reverse air leg;Owing to workpiece is provided with before and after's Guiding machine
Structure, front and back detent mechanism, left and right guiding mechanism, left and right detent mechanism, therefore will this most mobile roadway floor armature boring chassis
Can realize pinpointing a position after having good positioning and can complete the multiple rows of or operation in multiple row hole, i.e. can realize rig and lead front and back
All full lines and the bore position of permutation in mechanism and left and right guiding mechanism stroke range carry out location boring;This is from mobile
Roadway floor armature boring trolley structure is simple, easily operated to be controlled from mobile, can carry out rockbolt installation, bore after completing boring
Hole and the installation speed of anchor pole, installation effectiveness height, be adapted to the requirement of Quick Road-Made, be particularly well-suited to control Floor Heave in Roadway
The Quick mounting anchor rod of floor bolting is used during reason.
Accompanying drawing explanation
Fig. 1 is the three dimensional structure schematic diagram of the present invention.
In figure: 1, underframe, 11, drivewheel, 12, drive hydraulic motor, 13, deflecting roller, 14, Working pedal, 2, work portion
Part, 21, body, 22, front and back guiding mechanism, 23, front and back detent mechanism, 24, left and right guiding mechanism, 25, left and right detent mechanism,
26, rig installing rack, 27, rig, 3, added, 4, device positioning element, 41, location, top supporting cylinder, 42, location, bottom
Supporting cylinder, 43, control valve group and pumping plant.
Detailed description of the invention
The present invention will be further described below in conjunction with the accompanying drawings.
As it is shown in figure 1, this includes underframe 1, workpiece 2, added 3 and device from mobile roadway floor armature boring chassis
Positioning element 4.
Described added 3 are fixedly mounted on underframe 1, and underframe 1 bottom is provided with at least one deflecting roller 13 and at least includes
The drivewheel 11 that one group of coaxial direction is arranged, drivewheel 11 is connected with driving hydraulic motor 12, deflecting roller 13 and steering hydraulic horse
Reach connection, underframe 1 is additionally provided with Working pedal 14 and guidance panel.
Described workpiece 2 is arranged on underframe 1, including body 21, front and back guiding mechanism 22, front and back detent mechanism
23, left and right guiding mechanism 24, left and right detent mechanism 25, rig installing rack 26 and rig 27;Body 21 is arranged by fore-and-aft direction
Before and after guiding mechanism 22 be erected on underframe 1;Front and back detent mechanism 23 is equipped with on front and back's guiding mechanism 22, body 21
Can by front and back's guiding mechanism 22 and front and back detent mechanism 23 fore-and-aft direction on underframe 1 move and position;Rig installing rack
The 26 left and right guiding mechanisms 24 arranged by left and right directions are erected on body 21;Left and right detent mechanism 25 is equipped with in left and right
On guiding mechanism 24, rig installing rack 26 can pass through left and right guiding mechanism 24 and left and right detent mechanism 25 left and right on body 21
Direction is moved and is positioned;Rig 27 is vertically arranged and is arranged on rig installing rack 26.
Described device positioning element 4 includes location, top supporting cylinder 41, bottom location supporting cylinder 42 and control
Valve group processed and pumping plant 43;Location, top supporting cylinder 41 is set to two pieces, location, two pieces top supporting cylinder 41 piston end
Set up, on the symmetrical centre position being vertically fixedly mounted on added 3 fore-and-aft directions of cylinder body, its piston end end is provided with
Support footstock;Location, bottom supporting cylinder 42 is set to two pieces, positions supporting cylinder 42 piston end to dividing into bottom two pieces
Put, on the symmetrical centre position being vertically fixedly mounted on underframe 1 fore-and-aft direction of cylinder body, its piston end end is provided with the support end
Seat;Control valve group and pumping plant 43 are arranged on underframe 1 or added 3, and the outfan of control valve group and pumping plant 43 passes through hydraulic pressure respectively
Pipeline and location, top supporting cylinder 41, location, bottom supporting cylinder 42, driving hydraulic motor 12 and steering hydraulic motor
Connect.
Operator are manipulated by valve group on Working pedal 14 guidance panel and pumping plant 43 controls to drive hydraulic pressure horse
Reach 12 actions and need to carry out operation after on the roadway floor of base plate boring by originally staying in from mobile roadway floor armature boring chassis
Control valve group and pumping plant 43 make top location supporting cylinder 41 and location, bottom supporting cylinder 42 stretch out respectively, and top positions
The support footstock of supporting cylinder 41 acts against on top board, the support base of location, bottom supporting cylinder 42 acts against on base plate
Make underframe 1 form rigid support between back and base plate, then unclamp before and after's detent mechanism 23 and left and right detent mechanism
25, detent mechanism 23, then mobile drill installing rack before and after locking after mobile body 21 to fore-and-aft direction needs the position of boring
Locking left and right detent mechanism 25 after needing the position of boring on 26 to left and right directions, rig 27, the most just to bore position, starts rig
27 carry out holing, and during boring, the drilling rod of rig 27 pierces the counteracting force of base plate generation by rig installing rack 26, basis
Body 21 acts on underframe 1, and underframe 1 is straight by top location supporting cylinder 41 and location, bottom supporting cylinder 42 by active force
Connect and act on back and base plate;It is drilled first Kong Houke and directly unclamps before and after's detent mechanism 23 or left and right detent mechanism 25
Carry out the bore position on fore-and-aft direction or left and right directions and adjust the drilling operation realizing a row or string.
In order to realize this equipment can on fore-and-aft direction non-fully the roadway floor of level carry out vertical drilling, Jin Erzeng
The suitability of university degree equipment, as a further improvement on the present invention scheme, described body 21 passes through angle regulation positioning device
It is connected with front and back guiding mechanism 22, makes the drilling rod of rig 27 be perpendicular in the longitudinal direction by regulation angle regulation positioning device
The roadway floor of non-fully level and lock, vertical drilling can be realized.
In order to realize this equipment can on left and right directions non-fully the roadway floor of level carry out vertical drilling, Jin Erzeng
The suitability of university degree equipment, as a further improvement on the present invention scheme, described rig installing rack 26 is fixed by angular adjustment
Position mechanism is connected with left and right guiding mechanism 24, makes the drilling rod of rig 27 be perpendicular in left and right by regulation angle regulation positioning device
The roadway floor of the non-fully level on direction also locks, and can realize vertical drilling.
In order to alleviate the overall weight of whole device so that moving, scheme as a further improvement on the present invention, described
Underframe 1 and added 3 be all frame structure.
In order to increase the integrated support intensity of this equipment, scheme as a further improvement on the present invention, described underframe 1
And/or the frame structure two sides of added 3 are provided with supporting rib stiffener arranged in a crossed manner.
In order to alleviate labor intensity of operating staff, scheme as a further improvement on the present invention, described Working pedal 14
It is provided with seat.
This is from mobile roadway floor armature boring chassis owing to being provided with added 3 be arranged on underframe 1, and location, top supports
Hydraulic cylinder 41 and control valve group and pumping plant 43 are arranged on added 3, and location, bottom supporting cylinder 42 is arranged on underframe 1,
Therefore it is manipulated by valve group and pumping plant 43 makes top location supporting cylinder 41 and location, bottom supporting cylinder 42 respectively
Stretch out, top location supporting cylinder 41 support footstock act against on top board, bottom location supporting cylinder 42 support at the bottom of
Seat acts against and makes underframe 1 form stable rigid support between back and base plate on base plate, rig 27 during boring
Drilling rod pierces the counteracting force of base plate generation and acts on underframe 1 by rig installing rack 26, body 21, and active force is led to by underframe 1
Cross top location supporting cylinder 41 and location, bottom supporting cylinder 42 directly acts on back and base plate, be therefore not required to
To be supported on back to provide reverse holding power with pin or reverse air leg above the drilling rod of rig 27;Due to work
Parts 2 are provided with before and after's guiding mechanism 22, front and back detent mechanism 23, left and right guiding mechanism 24, left and right detent mechanism 25, therefore incite somebody to action this
Can realize pinpointing a position after mobile roadway floor armature boring chassis is had good positioning and can complete multiple rows of or multiple row hole
Operation, i.e. can realize the rig 27 all full lines in front and back's guiding mechanism 22 and left and right guiding mechanism 24 stroke range and whole
The bore position of row carries out location boring;This is simple, easily operated from mobile from mobile roadway floor armature boring trolley structure
Control, after completing boring, rockbolt installation can be carried out, hole and the speed of anchor pole, installation effectiveness height are installed, being adapted to fast
The requirement in rapid-result lane, uses the Quick mounting anchor rod of floor bolting when being particularly well-suited to administer Floor Heave in Roadway.
Claims (6)
1. from a mobile roadway floor armature boring chassis, including rig (27), it is characterised in that also include underframe (1), work
Make parts (2), added (3) and device positioning element (4);
Described added (3) are fixedly mounted on underframe (1), and underframe (1) bottom is provided with at least one deflecting roller (13) and at least
The drivewheel (11) arranged including one group of coaxial direction, drivewheel (11) is connected with driving hydraulic motor (12), deflecting roller (13)
It is connected with steering hydraulic motor, underframe (1) is additionally provided with Working pedal (14) and guidance panel;
Described workpiece (2) is arranged on underframe (1), including body (21), front and back guiding mechanism (22), front and back localization machine
Structure (23), left and right guiding mechanism (24), left and right detent mechanism (25), rig installing rack (26) and rig (27);Body (21) leads to
Cross guiding mechanism (22) before and after fore-and-aft direction is arranged to be erected on underframe (1);Front and back detent mechanism (23) is equipped with front
On rear guiding mechanism (22);The left and right guiding mechanism (24) that rig installing rack (26) is arranged by left and right directions is erected at body
(21) on;Left and right detent mechanism (25) is equipped with on left and right guiding mechanism (24);Described rig (27) is vertically arranged peace
It is contained on rig installing rack (26);
Described device positioning element (4) include top location supporting cylinder (41), bottom location supporting cylinder (42) and
Control valve group and pumping plant (43);Location supporting cylinder, top (41) is set to two pieces, location, two pieces top supporting cylinder
(41) piston end set up, on the symmetrical centre position being vertically fixedly mounted on added (3) fore-and-aft direction of cylinder body, it is lived
Plug end end is provided with support footstock;Location supporting cylinder, bottom (42) is set to two pieces, positions supporting cylinder bottom two pieces
(42) piston end is down-set, on the symmetrical centre position being vertically fixedly mounted on underframe (1) fore-and-aft direction of cylinder body, it is lived
Plug end end is provided with support base;Control valve group and pumping plant (43) are arranged on underframe (1) or added (3), control valve group and pump
Stand the outfan of (43) respectively by fluid pressure line and top location supporting cylinder (41), location, bottom supporting cylinder
(42) hydraulic motor (12) and steering hydraulic motor, is driven to connect.
The most according to claim 1 from mobile roadway floor armature boring chassis, it is characterised in that described body (21)
It is connected with front and back's guiding mechanism (22) by angle regulation positioning device.
The most according to claim 1 and 2 from mobile roadway floor armature boring chassis, it is characterised in that described rig
Installing rack (26) is connected with left and right guiding mechanism (24) by angle regulation positioning device.
The most according to claim 3 from mobile roadway floor armature boring chassis, it is characterised in that described underframe (1)
It is all frame structure with added (3).
The most according to claim 4 from mobile roadway floor armature boring chassis, it is characterised in that described underframe (1)
And/or the frame structure two sides of added (3) are provided with supporting rib stiffener arranged in a crossed manner.
The most according to claim 1 from mobile roadway floor armature boring chassis, it is characterised in that described Working pedal
(14) it is provided with seat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610544683.6A CN106089046A (en) | 2016-07-12 | 2016-07-12 | A kind of from mobile roadway floor armature boring chassis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610544683.6A CN106089046A (en) | 2016-07-12 | 2016-07-12 | A kind of from mobile roadway floor armature boring chassis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106089046A true CN106089046A (en) | 2016-11-09 |
Family
ID=57219875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610544683.6A Pending CN106089046A (en) | 2016-07-12 | 2016-07-12 | A kind of from mobile roadway floor armature boring chassis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106089046A (en) |
-
2016
- 2016-07-12 CN CN201610544683.6A patent/CN106089046A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106089044A (en) | A kind of from mobile four stud location base plate armature boring chassis | |
CN106089041A (en) | A kind of from the steady platform flatcar of movable base plate armature boring | |
CN106089042A (en) | A kind of from mobile diagonal orientation base plate armature boring chassis | |
CN106089072A (en) | A kind of coal mine self-moving moves four stud location base plate anchor rod drilling devices | |
CN106089055A (en) | A kind of from mobile four stud location base plate anchor rod drilling devices | |
CN106089073A (en) | A kind of coal mine self-moving moves the steady platform flatcar of roadway floor anchor pole | |
CN106089076A (en) | A kind of coal mine self-moving moves the steady platform flatcar of base plate armature boring | |
CN106089074A (en) | A kind of coal mine self-moving moves four stud location base plate armature boring chassis | |
CN106089033A (en) | A kind of roadway floor anchor rod drilling device | |
CN106089065A (en) | A kind of coal mine self-moving moves roadway floor anchor rod drilling device | |
CN106089034A (en) | A kind of steady boring device of roadway floor armature boring | |
CN106089100A (en) | A kind of coal mine self-moving moves the steady boring device of roadway floor armature boring | |
CN106089095A (en) | A kind of steady boring device of base plate armature boring | |
CN106089046A (en) | A kind of from mobile roadway floor armature boring chassis | |
CN106089049A (en) | A kind of from the mobile steady platform flatcar of roadway floor anchor pole | |
CN106089043A (en) | A kind of from movable base plate armature boring chassis | |
CN106089067A (en) | A kind of coal mine self-moving moves roadway floor armature boring chassis | |
CN106089045A (en) | A kind of from mobile diagonal angle cross bearing roadway floor armature boring chassis | |
CN106089069A (en) | A kind of coal mine self-moving moves the steady platform flatcar of roadway floor armature boring | |
CN106089070A (en) | A kind of coal mine self-moving moves base plate armature boring chassis | |
CN106089047A (en) | A kind of from mobile diagonal orientation roadway floor armature boring chassis | |
CN106089068A (en) | A kind of coal mine self-moving moves diagonal orientation roadway floor armature boring chassis | |
CN106089050A (en) | A kind of from the mobile steady platform flatcar of roadway floor armature boring | |
CN106089098A (en) | A kind of from the mobile steady boring device of roadway floor anchor pole | |
CN106089097A (en) | A kind of from mobile roadway floor anchor rod drilling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161109 |
|
WD01 | Invention patent application deemed withdrawn after publication |