CN106088175B - Rectifying of leaned building device and method - Google Patents

Rectifying of leaned building device and method Download PDF

Info

Publication number
CN106088175B
CN106088175B CN201610409069.9A CN201610409069A CN106088175B CN 106088175 B CN106088175 B CN 106088175B CN 201610409069 A CN201610409069 A CN 201610409069A CN 106088175 B CN106088175 B CN 106088175B
Authority
CN
China
Prior art keywords
building
expansion tube
rectifying
pipe
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610409069.9A
Other languages
Chinese (zh)
Other versions
CN106088175A (en
Inventor
殷树芳
宋占诚
童景
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEOTECHNICAL TECHNOLOGY Co Ltd
Original Assignee
GEOTECHNICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEOTECHNICAL TECHNOLOGY Co Ltd filed Critical GEOTECHNICAL TECHNOLOGY Co Ltd
Priority to CN201610409069.9A priority Critical patent/CN106088175B/en
Publication of CN106088175A publication Critical patent/CN106088175A/en
Application granted granted Critical
Publication of CN106088175B publication Critical patent/CN106088175B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of rectifying of leaned building device and method, it is intended to which rectifying by jack up is ineffective during solving existing building jacking Deviation Correction Construction, and construction is cumbersome, in some instances it may even be possible to damages building, destroys the deficiency of building original structure.The invention includes being placed on the high-pressure grout injector outside structure foundation, the expansion tube below building grade beam and Grouting Pipe, expansion tube is arranged on the top of Grouting Pipe, the outer end of expansion tube and Grouting Pipe is connected by pipeline with high-pressure grout injector, expansion tube inner and outer wall is in bellows-like structure, the both ends of expansion tube are fixedly connected with structure foundation, expansion tube the inner is connected with blast pipe, blast pipe stretches out structure foundation, blast pipe external part connects closing cap, and some row's grout outlets are alongst provided with slip casting pipe outer wall.Rectifying by jack up effect is good during building jacking Deviation Correction Construction, and construction is simple is convenient, will not damage building, building is kept original structure.

Description

Rectifying of leaned building device and method
Technical field
The present invention relates to a kind of rectifying of leaned building technology, more specifically, it relates to a kind of building using expansion tube Deviation correcting device and method.
Background technology
After many building long-time uses, different degrees of sedimentation occurs in ground both sides, so as to cause building Tilt, national regulation has clear and definite regulation to the tilt quantity of buildings at different levels, will try to rectify a deviation more than defined building Or remove.The method of house deviation rectifying is broadly divided into two major classes, i.e. forced falling rectifying deviation method and rectifying by jack up method at present, in two methods In, rectifying by jack up cost is higher, and difficulty is larger, but for requiring to architecture indoor terrace absolute altitude, it is proposed that entangled using jacking Folk prescription method.Forced falling rectifying deviation is first to carry out consolidation process in house sinking side, then uses machine to the soil body under house high point ground Tool soil digging, the control of soil digging amount are mainly controlled with building settlement amount, typically cannot be greater than 5mm/ days.Forced falling rectifying deviation cost is relatively low, Quality is guaranteed, and weakness is that house terrace absolute altitude decreases after rectifying a deviation.Therefore many times still rectifying by jack up method pair is used Building is rectified a deviation, but rectifying by jack up is ineffective during now many building jacking Deviation Correction Constructions, and construction is numerous It is trivial, in some instances it may even be possible to damage building, destroy building original structure.
Chinese patent publication No. CN104763004A, a kind of soil base building method for correcting error is disclosed, including:1. The side drilling in opposite direction close to building inclination, drilling include vertical scour hole and oblique osculum, vertical scour hole with Oblique osculum intersects in bottom;2. semicircle pipeline retaining wall is inserted in vertical scour hole, circular pipe retaining wall is inserted oblique In osculum;3. will be connected with the puddler insertion vertical scour hole of high-pressure hydraulic pump, water under high pressure is first injected after insertion wash away and build The soil body under thing ground is built, makes its softening and part forms mud, then will be configured with the stirring-head of injector head laterally towards ground Base soil stretches out, and starts motor after stretching, rotates stirring-head, stirs the soil body, coordinates injector head to accelerate mud and is formed, and discharges oblique To osculum;4. hold building
Gradually after correction, drinking-water pipe is inserted into oblique osculum using water pumper, by the mud emptying in hole;5. to The soft soil curing agent of slurry condition is injected in drainpipe, solidifies ground scholar;6. last grout injection sealing of hole.This method can Correction processing is quickly carried out to structure foundation, and forms more firm soil body solidification.But house terrace mark after rectifying a deviation Height decreases, and does not apply to many times.
The content of the invention
Instant invention overcomes rectifying by jack up during existing building jacking Deviation Correction Construction is ineffective, construction is cumbersome, Building is possibly even damaged, destroys the deficiency of building original structure, there is provided a kind of rectifying of leaned building device and method, build It is good to build rectifying by jack up effect in thing rectifying by jack up work progress, construction is simple is convenient, will not damage building, keep building Original structure.
In order to solve the above-mentioned technical problem, the present invention uses following technical scheme:A kind of rectifying of leaned building device, including put The high-pressure grout injector outside structure foundation, the expansion tube below building grade beam and Grouting Pipe are put, expansion tube is set In the top of Grouting Pipe, the outer end of expansion tube and Grouting Pipe is connected by pipeline with high-pressure grout injector, expansion inside pipe wall and outer Wall is in bellows-like structure, and the both ends of expansion tube are fixedly connected with structure foundation, and expansion tube the inner is connected with blast pipe, Blast pipe stretches out structure foundation, and blast pipe external part connects closing cap, is alongst provided with slip casting pipe outer wall some Arrange grout outlet.
Cement mortar is injected into Grouting Pipe by high-pressure grout injector first during rectifying of leaned building, cement mortar passes through pulp Pipe spreads to surrounding, and cement mortar forms rigid body after condensing in structure foundation around Grouting Pipe, for supporting expansion tube. Then the closing cap opened on blast pipe is easy to be vented, and cement mortar is injected into expansion tube by high-pressure grout injector, waits to be vented Pipe external part covers closing cap after having cement mortar discharge, continues to cement mortar is injected into expansion tube, expansion tube is injecting Outside expanse while cement mortar, volume increase, and the rigid body formed around Grouting Pipe serves very well to expansion tube Rigid support effect, building is jacked up upwards using expansion tube outside expanse power.The expansion of bellows-like structure Pipe is advantageous to the outside expanse of expansion tube, and the both ends of expansion tube are fixedly connected with structure foundation avoids expansion tube from axially expanding Zhang Yanchang, expansion tube is radially outward expanded up and down, be easy to jack building.This rectifying of leaned building device is in building jacking Rectifying by jack up effect is good during Deviation Correction Construction, and construction is simple is convenient, will not damage building, building is kept original knot Structure.
Preferably, expansion tube includes elastic internal bladder layer, inner bag protective layer, inner bag protective layer is fitted tightly over elastic internal bladder Layer outer surface.Inner bag protective layer plays a very good protection to elastic internal bladder layer, prevents the bullet during expanse Property bladder layer is by foundation failure.
Preferably, expansion tube both ends are fastenedly connected with connecting seat, blast pipe is connected on connecting seat close to lower end edge Edge, exhaust bore are less than expansion bore.Expansion tube both ends are connected by connecting seat with other parts, connection is more convenient, Reliably.It is vented bore and is less than expansion bore, is advantageous to the expanse to expansion tube in cement mortar course of conveying.
Preferably, blast pipe is arranged between expansion tube and Grouting Pipe, blast pipe is provided with auxiliary tube, and auxiliary tube is in bullet Property bellows-like structure.Auxiliary tube is arranged between expansion tube and Grouting Pipe, during cement mortar is injected to expansion tube, Auxiliary tube also outside expanse, is connected to the support that expansion tube is improved between the rigid body around expansion tube and Grouting Pipe Effect, be advantageous to the rectifying by jack up to building.
Preferably, auxiliary tube includes elastic inner layer and protection outer layer, elastic inner layer and protection outer layer are close-coupled at one Rise.Protection outer layer plays a very good protection to elastic inner layer, prevents auxiliary tube outer surface during expanse Damaged by ground.
Preferably, grout outlet is obliquely installed outwardly along Grouting Pipe ecto-entad direction.Grout outlet is obliquely installed favorably Injected in cement mortar in ground.
A kind of method for correcting error of rectifying of leaned building device, comprises the following steps:
A, several jacking heatable adobe sleeping platforms are excavated on the larger side ground of building settlement to be rectified a deviation, then in jacking heatable adobe sleeping platform Two rounds are made a call to toward building direction in side wall, two rounds all extend to the following of building grade beam;
B, load the expansion tube for being connected to blast pipe in the round of top one, load Grouting Pipe in a following round, it is swollen Tube expansion and Grouting Pipe are all connected with high-pressure grout injector;
C, a certain amount of cement mortar is injected into Grouting Pipe using high-pressure grout injector, in building after cement mortar condensation Rigid body is formed in ground around Grouting Pipe;
D, the closing cap of blast pipe external part is opened, cement mortar is injected into expansion tube using high-pressure grout injector, the row for the treatment of After tracheae external part transfers out cement mortar, closing cap is covered tightly on blast pipe, continues to inject cement mortar into expansion tube, In the presence of high-pressure grout injector, expansion tube outside expanse while cement mortar is injected, volume increase, Grouting Pipe week Enclose the rigid body to be formed and good rigid support effect is served to expansion tube, will be built using the outside expanse power of expansion tube Thing is built to jack up upwards;
E, the correction reply volume of building is detected using detecting instrument, when rectifying a deviation, reply volume reaches requirement, after rectifying a deviation successfully, High-pressure grout injector is stopped, while the correction side to building carries out reinforcing support;
F, after the cement mortar in expansion tube condenses, the delivery pipe being connected on expansion tube and Grouting Pipe is pulled down, is removed High-pressure grout injector, jacking heatable adobe sleeping platform is filled up.
The rigid body formed around Grouting Pipe serves good supporting role to expansion tube, treats the cement bonded sand in expansion tube After slurry condenses, two layers of rigid body is formd below equivalent in building grade beam, and two layers of rigid body is supported to building, is protected Support strength has been demonstrate,proved, has avoided occurring settling again because support strength is inadequate.
Preferably, several support heatable adobe sleeping platforms are excavated in step a on the larger side ground of building settlement to be rectified a deviation, Excavated in support heatable adobe sleeping platform side wall toward building direction and reinforce hole, reinforcing hole, to extend to building grade beam following, reinforces hole top surface Cast support jacking block, supports jacking block face building grade beam, reinforces hole bottom surface cast supporting table, jack is installed in supporting table, The expansion link of jack is connected on support jacking block;The same of building is jacked up upwards toward expansion tube injection cement mortar in step d When, jack is adjusted, jack is closely connected to all the time between supporting table and support jacking block;Jack is removed in step f.
While jacking up building upwards toward expansion tube injection cement mortar, jack is adjusted, makes jack close all the time It is connected between supporting table and support jacking block, ensure that support strength of the building during jacking.
Preferably, cement mortar is expansive cement mortar.There is shrinkage phenomenon after preventing solidification in expansive cement mortar.
Compared with prior art, the beneficial effects of the invention are as follows:Rectifying by jack up is imitated during building jacking Deviation Correction Construction Fruit is good, and construction is simple is convenient, will not damage building, building is kept original structure.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention;
Fig. 2 is the close-up schematic view of the present invention;
Fig. 3 is the mounting structure schematic diagram of the jack of the present invention;
In figure:1st, high-pressure grout injector, 2, expansion tube, 3, Grouting Pipe, 4, blast pipe, 5, closing cap, 6, grout outlet, 7, elasticity Bladder layer, 8, inner bag protective layer, 9, connecting seat, 10, auxiliary tube, 11, elastic inner layer, 12, protection outer layer, 13, jacking heatable adobe sleeping platform, 14th, heatable adobe sleeping platform is supported, 15, reinforce hole, 16, support jacking block, 17, supporting table, 18, jack.
Embodiment
Below by specific embodiment, and with reference to accompanying drawing, technical scheme is further described specifically:
Embodiment:A kind of rectifying of leaned building device(Referring to accompanying drawing 1, accompanying drawing 2), including the height being placed on outside structure foundation Pressure injection pulp grinder 1, the expansion tube 2 below building grade beam and Grouting Pipe 3, expansion tube is arranged on the top of Grouting Pipe, swollen The outer end of tube expansion and Grouting Pipe is connected by pipeline with high-pressure grout injector, and expansion tube inner and outer wall is in corrugated tube shape knot Structure, the both ends of expansion tube are fixedly connected with structure foundation, and expansion tube the inner is connected with blast pipe 4, and blast pipe stretches out building Thing ground, blast pipe external part connect closing cap 5, and four row's grout outlets 6, four discharges are alongst provided with slip casting pipe outer wall Slurry pipe is uniformly arranged.Expansion tube includes elastic internal bladder layer 7, inner bag protective layer 8, and inner bag protective layer is fitted tightly over elastic internal bladder layer Outer surface.Expansion tube both ends are fastenedly connected with connecting seat 9, and blast pipe is connected on connecting seat close to lower edge, blast pipe Internal diameter is less than expansion bore.Blast pipe is arranged between expansion tube and Grouting Pipe, and blast pipe is provided with auxiliary tube 10, auxiliary tube It is resilient bellows-like structure.Auxiliary tube includes elastic inner layer 11 and protection outer layer 12, and elastic inner layer and protection outer layer closely connect It is connected together.Grout outlet is obliquely installed outwardly along Grouting Pipe ecto-entad direction.
Cement mortar is injected into Grouting Pipe by high-pressure grout injector first during rectifying of leaned building, cement mortar passes through pulp Pipe spreads to surrounding, and cement mortar forms rigid body after condensing in structure foundation around Grouting Pipe, for supporting expansion tube. Then the closing cap opened on blast pipe is easy to be vented, and cement mortar is injected into expansion tube by high-pressure grout injector, waits to be vented Pipe external part covers closing cap after having cement mortar discharge, continues to cement mortar is injected into expansion tube, expansion tube is injecting Outside expanse while cement mortar, volume increase, and the rigid body formed around Grouting Pipe serves very well to expansion tube Rigid support effect, building is jacked up upwards using expansion tube outside expanse power.The expansion of bellows-like structure Pipe is advantageous to the outside expanse of expansion tube, and the both ends of expansion tube are fixedly connected with structure foundation avoids expansion tube from axially expanding Zhang Yanchang, expansion tube is radially outward expanded up and down, be easy to jack building.This rectifying of leaned building device is in building jacking Rectifying by jack up effect is good during Deviation Correction Construction, and construction is simple is convenient, will not damage building, building is kept original knot Structure.
A kind of method for correcting error of rectifying of leaned building device, comprises the following steps:
A, several jacking heatable adobe sleeping platforms are excavated on the larger side ground of building settlement to be rectified a deviation, then in jacking heatable adobe sleeping platform Two rounds are made a call to toward building direction in side wall, two rounds all extend to the following of building grade beam;
B, load the expansion tube for being connected to blast pipe in the round of top one, load Grouting Pipe in a following round, it is swollen Tube expansion and Grouting Pipe are all connected with high-pressure grout injector;
C, a certain amount of cement mortar is injected into Grouting Pipe using high-pressure grout injector, in building after cement mortar condensation Rigid body is formed in ground around Grouting Pipe;
D, the closing cap of blast pipe external part is opened, cement mortar is injected into expansion tube using high-pressure grout injector, the row for the treatment of After tracheae external part transfers out cement mortar, closing cap is covered tightly on blast pipe, continues to inject cement mortar into expansion tube, In the presence of high-pressure grout injector, expansion tube outside expanse while cement mortar is injected, volume increase, Grouting Pipe week Enclose the rigid body to be formed and good rigid support effect is served to expansion tube, will be built using the outside expanse power of expansion tube Thing is built to jack up upwards;
E, the correction reply volume of building is detected using detecting instrument, when rectifying a deviation, reply volume reaches requirement, after rectifying a deviation successfully, High-pressure grout injector is stopped, while the correction side to building carries out reinforcing support;
F, after the cement mortar in expansion tube condenses, the delivery pipe being connected on expansion tube and Grouting Pipe is pulled down, is removed High-pressure grout injector, jacking heatable adobe sleeping platform is filled up.
The rigid body formed around Grouting Pipe serves good supporting role to expansion tube, treats the cement bonded sand in expansion tube After slurry condenses, two layers of rigid body is formd below equivalent in building grade beam, and two layers of rigid body is supported to building, is protected Support strength has been demonstrate,proved, has avoided occurring settling again because support strength is inadequate.It is larger in building settlement to be rectified a deviation in step a Several support heatable adobe sleeping platforms are excavated on the ground of side, is excavated in support heatable adobe sleeping platform side wall toward building direction and reinforces hole, hole is reinforced and prolongs It is following to reach building grade beam, reinforces hole top surface cast support jacking block, supports jacking block face building grade beam, reinforce hole bottom surface and pour Supporting table is noted, jack is installed in supporting table, the expansion link of jack is connected on support jacking block;Noted in step d toward expansion tube While entering cement mortar and jack up building upwards, jack is adjusted, jack is closely connected to supporting table and support all the time Between jacking block;Jack is removed in step f.While jacking up building upwards toward expansion tube injection cement mortar, regulation is very heavy Top, jack is closely connected to all the time between supporting table and support jacking block, ensure that support of the building during jacking Intensity.Cement mortar is expansive cement mortar.There is shrinkage phenomenon after preventing solidification in expansive cement mortar.To swollen in step d During tube expansion injection cement mortar, the auxiliary tube also outside expanse that is connected on blast pipe, be connected to expansion tube and Between rigid body around Grouting Pipe, the support effect of expansion tube is improved, is advantageous to the rectifying by jack up to building.
Embodiment described above is a kind of preferable scheme of the present invention, not the present invention is made any formal Limitation, there are other variants and remodeling on the premise of without departing from the technical scheme described in claim.

Claims (9)

1. a kind of rectifying of leaned building device, it is characterized in that, including be placed on outside structure foundation high-pressure grout injector, installed in building Build the expansion tube and Grouting Pipe below thing grade beam, expansion tube is arranged on the top of Grouting Pipe, and the outer end of expansion tube and Grouting Pipe is equal It is connected by pipeline with high-pressure grout injector, expansion tube inner and outer wall is in bellows-like structure, and the both ends of expansion tube are with building Build thing ground to be fixedly connected, expansion tube the inner is connected with blast pipe, and blast pipe stretches out structure foundation, the connection of blast pipe external part Closing cap, some row's grout outlets are alongst provided with slip casting pipe outer wall.
2. rectifying of leaned building device according to claim 1, it is characterized in that, expansion tube includes elastic internal bladder layer, inner bag is protected Sheath, inner bag protective layer are fitted tightly over elastic internal bladder layer outer surface.
3. rectifying of leaned building device according to claim 1, it is characterized in that, expansion tube both ends are fastenedly connected with connection Seat, blast pipe is connected on connecting seat is less than expansion bore close to lower edge, exhaust bore.
4. rectifying of leaned building device according to claim 1, it is characterized in that, blast pipe be arranged on expansion tube and Grouting Pipe it Between, blast pipe is provided with auxiliary tube, and auxiliary tube is resilient bellows-like structure.
5. rectifying of leaned building device according to claim 4, it is characterized in that, auxiliary tube includes elastic inner layer and protection is outer Layer, elastic inner layer and protection outer layer are closely joined together.
6. the rectifying of leaned building device according to claim 1 to 5 any one, it is characterized in that, grout outlet is along Grouting Pipe Ecto-entad direction is obliquely installed outwardly.
7. a kind of method for correcting error of rectifying of leaned building device according to claim 1 to 6 any one, it is characterized in that, bag Include following steps:
A, several jacking heatable adobe sleeping platforms are excavated on the larger side ground of building settlement to be rectified a deviation, then in jacking heatable adobe sleeping platform side wall Upper to make a call to two rounds toward building direction, two rounds all extend to the following of building grade beam;
B, load the expansion tube for being connected to blast pipe in the round of top one, load Grouting Pipe, expansion tube in a following round High-pressure grout injector is all connected with Grouting Pipe;
C, a certain amount of cement mortar is injected into Grouting Pipe using high-pressure grout injector, in structure foundation after cement mortar condensation Rigid body is formed around interior Grouting Pipe;
D, the closing cap of blast pipe external part is opened, cement mortar is injected into expansion tube using high-pressure grout injector, treats blast pipe After external part transfers out cement mortar, closing cap is covered tightly on blast pipe, continues to inject cement mortar into expansion tube, in height In the presence of pressure injection pulp grinder, expansion tube outside expanse while cement mortar is injected, volume increases, shape around Grouting Pipe Into rigid body the effect of good rigid support is served to expansion tube, using the outside expanse power of expansion tube by building Jack up upwards;
E, the correction reply volume of building is detected using detecting instrument, when rectifying a deviation, reply volume reaches requirement, after rectifying a deviation successfully, high pressure Slip casting machine is stopped, while the correction side to building carries out reinforcing support;
F, after the cement mortar in expansion tube condenses, the delivery pipe being connected on expansion tube and Grouting Pipe is pulled down, removes high pressure Slip casting machine, jacking heatable adobe sleeping platform is filled up.
8. rectifying of leaned building method according to claim 7, it is characterized in that, in step a building settlement to be rectified a deviation compared with Several support heatable adobe sleeping platforms are excavated on big side ground, is excavated in support heatable adobe sleeping platform side wall toward building direction and reinforces hole, reinforced It is following that hole extends to building grade beam, reinforces hole top surface cast support jacking block, supports jacking block face building grade beam, reinforce hole bottom Supporting table is poured into a mould in face, and jack is installed in supporting table, and the expansion link of jack is connected on support jacking block;In the past expansions of step d Pipe injection cement mortar adjusts jack while jack up building upwards, make jack be closely connected to all the time supporting table and Between support jacking block;Jack is removed in step f.
9. rectifying of leaned building method according to claim 7, it is characterized in that, cement mortar is expansive cement mortar.
CN201610409069.9A 2016-06-12 2016-06-12 Rectifying of leaned building device and method Active CN106088175B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610409069.9A CN106088175B (en) 2016-06-12 2016-06-12 Rectifying of leaned building device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610409069.9A CN106088175B (en) 2016-06-12 2016-06-12 Rectifying of leaned building device and method

Publications (2)

Publication Number Publication Date
CN106088175A CN106088175A (en) 2016-11-09
CN106088175B true CN106088175B (en) 2018-04-10

Family

ID=57228992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610409069.9A Active CN106088175B (en) 2016-06-12 2016-06-12 Rectifying of leaned building device and method

Country Status (1)

Country Link
CN (1) CN106088175B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502207A (en) * 2020-11-10 2021-03-16 广东华科大建筑技术开发有限公司 Portable sheet flexible jacking device applied to building jacking deviation correction
CN115710943A (en) * 2022-11-11 2023-02-24 南京东大鸿基结构设计事务所有限公司 Building deviation correcting device and method without damaging original building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1271045A (en) * 2000-03-03 2000-10-25 天津建岩岩土工程有限公司 Inclined building correcting method
CN102251543A (en) * 2011-05-06 2011-11-23 杭州岩土工程有限公司 Deviation rectification jacking-up method of building
JP5243669B1 (en) * 2013-02-21 2013-07-24 和明 中澤 Method of tilting structure and improving ground
CN104047305A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Fast repairing method of house sinking
CN104652415B (en) * 2015-02-09 2016-08-24 郑州安源工程技术有限公司 High-polymer membrane bag grouting method is repaired in underground piping sedimentation

Also Published As

Publication number Publication date
CN106088175A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN101936010B (en) Construction method of dewatering well in underground concrete structure
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN105155569A (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN105951826A (en) Suction ground anchor device in tubular pile and water pressure injection method thereof
JP2006265964A (en) Drainage treatment method
CN110453682B (en) Construction method of tubular pile reinforcement system
CN106088175B (en) Rectifying of leaned building device and method
CN105625420B (en) A kind of extension type support with manually dug piles construction and its construction method
CN109736340A (en) A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN108560580A (en) Earth-retaining wall construction method
CN102839691A (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN107956221A (en) Downcast well pipe proof protecting device and construction method
CN114232611B (en) Filling device and filling method for karst cave in pile hole
CN103276728A (en) Method for mending and reinforcing pile head
CN113668582B (en) Grouting type double-wall pressure-bearing water-reducing pipe well device and construction method thereof
CN110629775B (en) Construction method for quickly sealing foundation pit dewatering well
CN209040133U (en) Well-covering device for dewatering well suitable for rich groundwater region
CN204825955U (en) After drive piles construction equipment on marine fan basis
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
CN107816041A (en) Non-dumping pore-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
CN104975597B (en) Cast-in situ bored pile post-inserted steel reinforcement cage multi-point delivery device and use method
CN110258507B (en) Soft soil foundation reinforcing method
CN107419811A (en) The method and its structure of basement bottom board support pile and spilled water hole waterproofing and leakage-stopping
CN106351252A (en) Rapid construction method for earth-retaining wall
CN205742305U (en) A kind of rectifying of leaned building mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Building deviation correction device and method

Effective date of registration: 20220704

Granted publication date: 20180410

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180410

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Building correction device and method

Granted publication date: 20180410

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou