CN106088132A - Armored concrete M shape tower crane and construction method thereof - Google Patents

Armored concrete M shape tower crane and construction method thereof Download PDF

Info

Publication number
CN106088132A
CN106088132A CN201610421768.5A CN201610421768A CN106088132A CN 106088132 A CN106088132 A CN 106088132A CN 201610421768 A CN201610421768 A CN 201610421768A CN 106088132 A CN106088132 A CN 106088132A
Authority
CN
China
Prior art keywords
tower crane
vierendeel girder
shape
cushion cap
dark
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610421768.5A
Other languages
Chinese (zh)
Inventor
李晓栋
金国栋
董政
杜晶
李僚
邱勇
徐凌晓
任思澔
赵辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610421768.5A priority Critical patent/CN106088132A/en
Publication of CN106088132A publication Critical patent/CN106088132A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of armored concrete M shape tower crane and construction method, wherein tower crane includes: construct the tower crane cushion cap of surface in existing structure center trestle;Being arranged in described tower crane cushion cap and extend the dark beam of M shape of described tower crane cushion cap, Vierendeel girder and the secondary beam drawknot of the dark beam of described M shape and side of described frame column week are fixed;And it is embedded in the tower crane suspension column in described tower crane cushion cap.Construction method includes: frame column and Vierendeel girder location, cover to reinforcement cut, the implantation of tension rib on frame column and secondary beam, tower crane cushion cap and rice word intersect dark beam binding reinforcing bars and template is set up and concreting.So, utilize frame column to replace the stake of tradition tower crane, then strengthened bearing capacity and resist collapse, the ability of resistant to tipping of whole tower crane structure by the dark beam of M shape fixing with the Vierendeel girder of frame column week side and secondary beam drawknot.

Description

Armored concrete M shape tower crane and construction method thereof
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of armored concrete M shape tower crane and construction party thereof Method.
Background technology
Along with the fast development of society, the force structures such as construction projects gets more and more, traditional pile foundation can not be suitable for, And the tower crane requisite vertical transport crane gear that is project construction.Therefore, whether the design being seated tower crane closes Reason is reliable, has both been related to the safety of existing structure self, and can be related to again production work be smoothed out safely.
Nowadays above-mentioned construction projects is common in the City Rail Transit System that cities in China is built.In due to State has become as the Construction of Urban Rail Traffic market of maximum-norm in the world, it is contemplated that built 96 lines before and after 2015, builds If circuit overall length is more than 2500km, gross investment is more than 1 trillion yuan.Therefore, upper cover exploitation in track traffic parking lot has become inevitable Trend, the comprehensive development and utilization of Subway Stop field upper cover, while carrying out urban land saving utilization, improves the most dull Workshop image, meet the thinking of development building amphitypy society, be the only way of track parking field, future city exploitation.
Subway upper cover adds the construction of building, if using the tower crane of traditional stake and cushion cap, engineering cost will be big Big raising, the pile foundation construction of next-door neighbour's subway will have influence on the safety of Subway Facilities and metro operation.
Summary of the invention
A technical problem to be solved by this invention is that instead of the structure of traditional stake and cushion cap, uses and directly constructs Tower crane cushion cap directly over existing structure center trestle and with the M shape of Vierendeel girder and secondary beam drawknot dark beam as tower crane Basis.
Another technical problem to be solved by this invention is to provide a kind of structure replacing traditional stake and cushion cap, uses Directly construct the tower crane cushion cap directly over existing structure center trestle and dark with the M shape of Vierendeel girder and secondary beam drawknot Beam is as the construction method of tower crane.
Wherein armored concrete M shape tower crane, including:
The dark beam of tower crane cushion cap, M shape and tower crane suspension column;
Described tower crane cushion cap is constructed in the surface of existing structure center trestle;
The dark beam of described M shape be arranged in described tower crane cushion cap and extend described tower crane cushion cap with institute Vierendeel girder and the secondary beam drawknot of stating the side of frame column week described in existing structure are fixed, and described Vierendeel girder is positioned at described frame column top week Side, described secondary beam connects with described Vierendeel girder cross;
Described tower crane suspension column is embedded in described tower crane cushion cap.
Further, eight beam section of the dark beam of described M shape are symmetrically arranged in all sides of described frame column.
Further, the dark beam of described M shape includes the beam section that four decussations are arranged, and described four beam section are along described Frame column week, four described Vierendeel girders of side extended.
Further, the dark beam of described M shape is connected with between described Vierendeel girder and described secondary beam the described framework of pre-implantation Tension rib in beam and described secondary beam.
Further, described tower crane cushion cap uses double-layer double-direction reinforcing bar, is provided with quincunx cloth between gluten and end muscle The single hoop put;Be laid with extremity hoop between top muscle and the bottom muscle of the dark beam of described M shape, described tower crane cushion cap and The dark beam of described M shape waters and builds up an entirety.
Further, side of described frame column week has the first Vierendeel girder being oppositely arranged and the 3rd Vierendeel girder, is oppositely arranged The second Vierendeel girder and the 4th Vierendeel girder and described secondary beam, described first Vierendeel girder and described 3rd Vierendeel girder higher than described the Two Vierendeel girders, described 4th Vierendeel girder and described secondary beam;The dark beam of described M shape includes the beam section that four decussations are arranged, its In two beam section being oppositely arranged construct in described first Vierendeel girder and the end face of the second Vierendeel girder, other two are oppositely arranged Being provided for the connection post that drawknot is fixing between beam section and described second Vierendeel girder and described 4th Vierendeel girder, described M shape is dark Four beam section of remaining of beam be distributed between the corner of the beam section that described four decussations are arranged and and described secondary beam between set Put the connection post fixed for drawknot.
The wherein construction method of armored concrete M shape tower crane, comprises the following steps:
The frame column constructing armored concrete M shape tower crane in existing structure in advance is positioned, and to described frame The bearing capacity of trestle and the Vierendeel girder of side of described frame column week and secondary beam is verified;
Cut tower crane cushion cap and rice word with described armored concrete M shape tower crane on described existing structure The dark beam of shape is connected the cover to reinforcement in region;
Bar planting work is carried out on the described Vierendeel girder having cut cover to reinforcement and described secondary beam;
Carry out described tower crane cushion cap and the binding reinforcing bars of the dark beam of described M shape and template erection construction, by described tower The steel bar framework hanging foundation platform is arranged on the surface of described frame column;
Pour described tower crane cushion cap and the dark beam of described M shape, and tower crane suspension column is watered with described tower crane cushion cap Build together.
Further, the steel bar framework of eight beam section of dark for described M shape beam is symmetrically arranged in the week of described frame column Side, and the steel bar framework of four beam section arranged by decussation in described eight beam section is along four institutes of side of described frame column week State Vierendeel girder to arrange.
Further, described bar planting work includes: prior to beam dark with described M shape on described Vierendeel girder and described secondary beam Drawknot position boring, reinject anchoring adhesive, finally implant tension rib.
Further, side of described frame column week has the first Vierendeel girder being oppositely arranged and the 3rd Vierendeel girder, is oppositely arranged The second Vierendeel girder and the 4th Vierendeel girder and described secondary beam, described first Vierendeel girder and described 3rd Vierendeel girder higher than described the Two Vierendeel girders, described 4th Vierendeel girder and described secondary beam;The dark beam of described M shape includes the beam section that four decussations are arranged, will Wherein two beam section being oppositely arranged are constructed in described first Vierendeel girder and the end face of the second Vierendeel girder, relatively set at other two The connection post fixed for drawknot, described rice word is constructed between beam section and described second Vierendeel girder and described 4th Vierendeel girder put Four beam section of remaining of the dark beam of shape be distributed between the corner of the beam section that described four decussations are arranged and with described secondary beam it Between construct for the fixing connection post of drawknot.
Use the method have the advantages that of technique scheme
Tower crane cushion cap is directly constructed directly over the frame column in existing structure, utilizes frame column to replace tradition tower crane The stake on basis, it is to avoid destroy original structure owing to arranging the specific stub of tower crane in existing structure, to cause unnecessary Potential safety hazard;And the dark beam of M shape coordinating the Vierendeel girder with frame column week side and secondary beam drawknot to fix strengthens total Bearing capacity, make tower crane load jointly be shared by the Vierendeel girder of frame column He its surrounding, make the reliability of this tower crane enter one Step improves.
Accompanying drawing explanation
Fig. 1 is the structural representation of first embodiment of armored concrete M shape tower crane of the present invention.
Fig. 2 is that first embodiment of armored concrete M shape tower crane of the present invention is along the existing structure center side of setting a roof beam in place To sectional view.
Fig. 3 be armored concrete M shape tower crane of the present invention first embodiment in the view of bar planting.
Fig. 4 is the structural representation of second embodiment of armored concrete M shape tower crane of the present invention.
Fig. 5 is that second embodiment of armored concrete M shape tower crane of the present invention is along the existing structure center side of setting a roof beam in place To sectional view.
Fig. 6 be armored concrete M shape tower crane of the present invention second embodiment in the view of bar planting.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that technical scheme, and make technical solution of the present invention Above-mentioned purpose, feature and advantage can become apparent from understandable, and the present invention is further detailed explanation below in conjunction with the accompanying drawings.
First embodiment of armored concrete M shape tower crane of the present invention is illustrated referring to figs. 1 to Fig. 3, Fig. 1 Structural representation, Fig. 2 illustrates first embodiment of armored concrete M shape tower crane of the present invention along existing structure The sectional view in Vierendeel girder direction, Fig. 3 illustrates in first embodiment of armored concrete M shape tower crane of the present invention and plants The view of muscle.From upper figure, armored concrete rice font tower crane of the present invention mainly by tower crane cushion cap 20, The dark beam of M shape 10 and tower crane suspension column 60 are constituted;Tower crane suspension column 60 is for connecting the tower crane body 40 of top;Xoncrete structure Tower crane cushion cap 20 and the dark beam of M shape 10 as the brace foundation of tower crane body 40, to prevent from whole tower crane from occurring subsiding, The accident such as tumble.
Firstly, it is necessary to explanation is that the existing structure 30 in the present invention includes frame column 31, Vierendeel girder 32 and secondary beam 33, its Center is set a roof beam in place the 32 all sides being positioned at frame column 31 top, and secondary beam 33 connects with Vierendeel girder 32 cross.Specifically, xoncrete structure Tower crane cushion cap 20 and the dark beam of M shape 10 be built into an entirety;Wherein tower crane cushion cap 20 is constructed in existing structure 30 end faces and be positioned at the surface of existing structure 30 center trestle 31, the dark beam of M shape 10 be arranged in tower crane cushion cap 20 and Extending tower crane cushion cap 20, also construct in existing structure 30 end face simultaneously, especially, the dark beam of M shape 10 is gone back and frame column Vierendeel girder 32 and secondary beam 33 drawknot of 31 weeks sides are fixed.And tower crane suspension column 30 is embedded in tower crane cushion cap 20, and have Protrude from the canned paragraph for connecting tower crane body 40 of tower crane cushion cap 20 end face.So, with the frame in existing structure 30 Trestle 31 replaces the stake in traditional stake and suspended deck structure, it is to avoid cause existing structure 30 because constructing extra support stake Unnecessary potential safety hazard;Vierendeel girder 32 and secondary beam 33 drawknot of 31 weeks sides of the dark beam of M shape 10 and frame column are fixed, and improve The bearing capacity of this armored concrete rice font tower crane and stability, and avoid whole tower crane to occur subsiding, tumbling further Fortuitous event.
As one preferred embodiment, eight beam section of the dark beam of M shape 10 are symmetrically arranged in the week of frame column 31 Side;It is positioned at tower owing to tower crane cushion cap 20 is positioned at the cross point of each beam section of the dark beam in the surface of frame column 31, i.e. M shape 10 Hang the center of foundation platform 20.Technique scheme is used to make present embodiment armored concrete rice font tower crane have There is more preferable stability, it is to avoid the weak spot of structure occurs in a direction of the dark beam of M shape 10.
As one preferred embodiment, referring again to Fig. 2 and Fig. 3, the dark beam of M shape 10 has in figs. 2 and 3 Eight beam section, four beam section that wherein decussation is arranged extend along four Vierendeel girders 32 of 31 weeks sides of frame column respectively, make this Four beam section are all constructed in the surface of Vierendeel girder 32, and be connected the drawknot having in pre-implantation Vierendeel girder 32 between Vierendeel girder 32 Muscle 50;Other four beam section are distributed between the corner of the beam section that above-mentioned four decussations are arranged and ride upon on secondary beam 33, It is connected, between this four beam section and secondary beam 33, the tension rib 50 having in pre-implantation secondary beam 33.Tension rib 50 strengthens present embodiment Connectivity robustness between armored concrete rice font tower crane and existing structure 30 and globality so that it is have the most anti- Roll-over action.
In first embodiment, refer again to Fig. 1 to Fig. 3, construct the present embodiment armored concrete rice font tower crane in advance The end face of existing structure 30 on basis is smooth, in figure 3 31 weeks sides of frame column Vierendeel girder 32 specially the first Vierendeel girder 321, Second Vierendeel girder the 322, the 3rd Vierendeel girder 323 and the 4th Vierendeel girder 324.Now, in the dark beam of M shape 10, four decussations set Put beam section and be the most directly cast in the first Vierendeel girder the 321, second Vierendeel girder the 322, the 3rd Vierendeel girder 323 and the 4th Vierendeel girder 324 End face, and fixed by multiple rows of tension rib 50 drawknot being implanted on Vierendeel girder 32 in advance with Vierendeel girder 32;And other four beam section Be cast on existing structure 30 and and secondary beam 33 between fixed by multiple rows of tension rib drawknot of being implanted on secondary beam 33 in advance.Additionally, In present embodiment, tower crane cushion cap 20 uses double-layer double-direction reinforcing bar, is provided with single limb of quincuncial arrangement between gluten and end muscle Hoop, is laid with extremity hoop, tower crane cushion cap 20 and the dark beam of M shape 10 between top muscle and the bottom muscle of the dark beam of M shape 10 Water and build up an overall structure.
In the second embodiment, armored concrete M shape tower crane of the present invention is illustrated with reference to Fig. 4 to Fig. 6, Fig. 4 The structural representation of second embodiment, Fig. 5 illustrates second reality of armored concrete M shape tower crane of the present invention Executing example to set a roof beam in place along existing structure center the sectional view in direction, Fig. 6 illustrates armored concrete M shape tower crane of the present invention The view of bar planting in second embodiment.First, it will be appreciated from fig. 6 that 31 weeks sides of frame column have first be oppositely arranged Vierendeel girder 321 and the 3rd Vierendeel girder 323, the second Vierendeel girder 322 being oppositely arranged and the 4th Vierendeel girder 324 and secondary beam 33, One Vierendeel girder 321 and the 3rd Vierendeel girder 323 are higher than the second Vierendeel girder the 322, the 4th Vierendeel girder 324 and secondary beam 33.Again by Fig. 5 and Tu 6 understand, and have the beam section that four decussations are arranged in the dark beam of M shape 10, and wherein two beam section being oppositely arranged directly pour At the first Vierendeel girder 321 and the 3rd Vierendeel girder 323 end face, other two beam section being oppositely arranged and the second Vierendeel girder 322 and the Fixed by connection post 11 drawknot between four Vierendeel girders 324;In the dark beam of M shape 10, other four beam section are cast in existing structure Top and fixing also by being connected post 11 drawknot with between secondary beam 33;Connect post 11 for be furnished with pre-implantation the second Vierendeel girder 322 or The concrete post of the tension rib 50 in the 4th Vierendeel girder 324 or secondary beam.In present embodiment, tower crane cushion cap 20 is also adopted by double-deck double To being provided with the single hoop of quincuncial arrangement between reinforcing bar, gluten and end muscle, cloth between top muscle and the bottom muscle of the dark beam of M shape It is provided with extremity hoop, tower crane cushion cap 20 and the dark beam of M shape 10 to water and build up an overall structure.
The construction method of armored concrete rice font tower crane of the present invention comprises the following steps:
Step 1: the frame column 31 constructing armored concrete M shape tower crane in existing structure 30 in advance is positioned, And the bearing capacity of frame column 31 and the Vierendeel girder 32 of 31 weeks sides of frame column and secondary beam 33 is verified;
Step 2: cut tower crane cushion cap 20 and rice with armored concrete M shape tower crane on existing structure 30 The dark beam of font 10 is connected the cover to reinforcement in region;
Step 3: carry out bar planting work on the Vierendeel girder 32 having cut cover to reinforcement and secondary beam 33;
Step 4: carry out tower crane cushion cap 20 and the binding reinforcing bars of the dark beam of M shape 10 and template erection construction, by tower crane The steel bar framework of foundation platform 20 is arranged on the surface of frame column 31;
Step 5: pour tower crane cushion cap 20 and the dark beam of M shape 10, and by tower crane suspension column 60 and tower crane cushion cap 20 It is cast in together.
Specifically, after having poured due to existing structure, it is difficult to go out the accurate position of frame beam column 31 with naked eyes Direct Recognition Put, therefore reserve the relative position relation of structures to constructing armored concrete in advance by total powerstation the scene that combines in step 1 The frame column 31 of rice font tower crane positions.To be positioned complete after, need frame column 31, Vierendeel girder 32 and secondary beam 33 Stress check, with determine construction this armored concrete rice font tower crane feasibility.
In step 2, by the frame column 31 oriented through total powerstation, Vierendeel girder 32 and secondary beam 33 with armored concrete rice The cover to reinforcement of font tower crane overlapping region cuts, the step on the one hand for guaranteeing step 1 center trestle 31 Position absolutely accurate, be on the other hand that the bar planting facilitating next step operation works.
In step 3, the bar planting work of Vierendeel girder 32 and secondary beam 33 is carried out, prior to step 2 has cut cover to reinforcement Vierendeel girder 32 and secondary beam 33 on get out appropriate number of bar planting hole, the position of boring according to design requirement determine, for clearance complete Injecting anchoring adhesive behind bar planting hole, be inserted into tension rib, after anchoring adhesive solidifies, tension rib is bonding with Vierendeel girder 32 and secondary beam 33 It is integrated.
In step 4, tower crane cushion cap 20 and the binding reinforcing bars of the dark beam of M shape 10 and template erection construction are carried out;Will The steel bar framework of described tower crane cushion cap 20 is arranged on the surface of described frame column 31.More specifically, tower crane holds Platform 20 uses double-layer double-direction reinforcing bar, is provided with the single hoop of quincuncial arrangement between gluten and end muscle;The top of the dark beam of M shape 10 Extremity hoop it is laid with between muscle and bottom muscle.
In steps of 5, tower crane cushion cap 20 and the concrete of the dark beam of M shape 10 are poured, by the drawknot of tension rib 50 Act on the cohesive force of concrete armored concrete rice font tower crane is firmly attached into existing structure 30 one whole Body.
In sum, armored concrete rice font tower crane of the present invention is just directly constructing the frame column in existing structure Top, utilizes frame column to replace the stake of tradition tower crane, it is to avoid owing to arranging the special of tower crane in existing structure Stake and cause unnecessary potential safety hazard;And the dark beam of M shape that combination is fixing with the Vierendeel girder of frame column week side and secondary beam drawknot Improve the bearing capacity of total further, make tower crane load jointly be shared by the Vierendeel girder of frame column He its surrounding, and increase The resist collapse of strong total and resistant to tipping ability, make the reliability of this tower crane improve further.
Being described in detail the present invention above in association with drawings and the embodiments, those skilled in the art can root According to described above, the present invention made many variations example.Thus, some details in embodiment should not be constituted the present invention's Limit, the present invention by the scope that defines using appended claims as protection scope of the present invention.

Claims (10)

1. an armored concrete M shape tower crane, it is characterised in that including: the dark beam of tower crane cushion cap, M shape and Tower crane suspension column;
Described tower crane cushion cap is constructed in the surface of existing structure center trestle;
The dark beam of described M shape be arranged in described tower crane cushion cap and extend described tower crane cushion cap with described both The Vierendeel girder and the secondary beam drawknot that have the side of frame column week described in structure are fixed, and described Vierendeel girder is positioned at described frame column top week Side, described secondary beam connects with described Vierendeel girder cross;
Described tower crane suspension column is embedded in described tower crane cushion cap.
Armored concrete M shape tower crane the most according to claim 1, it is characterised in that the dark beam of described M shape Eight beam section are symmetrically arranged in all sides of described frame column.
Armored concrete M shape tower crane the most according to claim 1, it is characterised in that the dark Liang Bao of described M shape Including the beam section that four decussations are arranged, described four beam section extend along four described Vierendeel girders of side of described frame column week.
Armored concrete M shape tower crane the most according to claim 3, it is characterised in that the dark beam of described M shape with Connect between described Vierendeel girder and described secondary beam and have the tension rib in the described Vierendeel girder of pre-implantation and described secondary beam.
Armored concrete M shape tower crane the most according to claim 1, it is characterised in that described tower crane cushion cap Use double-layer double-direction reinforcing bar, between gluten and end muscle, be provided with the single hoop of quincuncial arrangement;The top muscle of the dark beam of described M shape And be laid with extremity hoop, described tower crane cushion cap and the dark beam of described M shape between the muscle of bottom and water and build up an entirety.
Armored concrete M shape tower crane the most according to claim 1, it is characterised in that described frame column week side tool There are the first Vierendeel girder being oppositely arranged and the 3rd Vierendeel girder, the second Vierendeel girder being oppositely arranged and the 4th Vierendeel girder and described time Beam, described first Vierendeel girder and described 3rd Vierendeel girder are higher than described second Vierendeel girder, described 4th Vierendeel girder and described secondary beam; The dark beam of described M shape includes the beam section that four decussations are arranged, and wherein two beam section being oppositely arranged are constructed in described first Vierendeel girder and the end face of the second Vierendeel girder, other two beam section being oppositely arranged and described second Vierendeel girder and described 4th framework Being provided for the connection post that drawknot is fixing between beam, four beam section of remaining of the dark beam of described M shape are distributed in described four crosses Between the corner of beam section arranged in a crossed manner and and described secondary beam between be provided for the connection post that drawknot is fixing.
7. a construction method for armored concrete M shape tower crane according to any one of claim 1 to 6, its feature exists In, comprise the following steps:
The frame column constructing armored concrete M shape tower crane in existing structure in advance is positioned, and to described frame column And the bearing capacity of the Vierendeel girder of side of described frame column week and secondary beam verifies;
Cut on described existing structure dark with the tower crane cushion cap of described armored concrete M shape tower crane and M shape Beam is connected the cover to reinforcement in region;
Bar planting work is carried out on the described Vierendeel girder having cut cover to reinforcement and described secondary beam;
Carry out described tower crane cushion cap and the binding reinforcing bars of the dark beam of described M shape and template erection construction, by described tower crane base The steel bar framework of plinth cushion cap is arranged on the surface of described frame column;
Pour described tower crane cushion cap and the dark beam of described M shape, and tower crane suspension column is cast in described tower crane cushion cap Together.
Construction method the most according to claim 7, it is characterised in that by the reinforcing bar of eight beam section of dark for described M shape beam Framework is symmetrically arranged in all sides of described frame column, and the reinforcing bar of four beam section arranged by decussation in described eight beam section Framework is arranged along four described Vierendeel girders of side of described frame column week.
Construction method the most according to claim 7, it is characterised in that described bar planting work includes: prior to described Vierendeel girder The drawknot position boring of beam dark with described M shape, reinjects anchoring adhesive, finally implants tension rib with on described secondary beam.
Construction method the most according to claim 7, it is characterised in that described frame column week side there is be oppositely arranged One Vierendeel girder and the 3rd Vierendeel girder, the second Vierendeel girder being oppositely arranged and the 4th Vierendeel girder and described secondary beam, described first frame Set a roof beam in place and described 3rd Vierendeel girder is higher than described second Vierendeel girder, described 4th Vierendeel girder and described secondary beam;Described M shape is dark Beam includes the beam section that four decussations are arranged, and wherein two beam section being oppositely arranged is constructed in described first Vierendeel girder and the The end face of two Vierendeel girders, structure between other two beam section being oppositely arranged and described second Vierendeel girder and described 4th Vierendeel girder Building the connection post fixed for drawknot, four beam section of remaining of the dark beam of described M shape are distributed in described four decussations and arrange Beam section corner between and and described secondary beam between construct for the fixing connection post of drawknot.
CN201610421768.5A 2016-06-15 2016-06-15 Armored concrete M shape tower crane and construction method thereof Pending CN106088132A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610421768.5A CN106088132A (en) 2016-06-15 2016-06-15 Armored concrete M shape tower crane and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610421768.5A CN106088132A (en) 2016-06-15 2016-06-15 Armored concrete M shape tower crane and construction method thereof

Publications (1)

Publication Number Publication Date
CN106088132A true CN106088132A (en) 2016-11-09

Family

ID=57845793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610421768.5A Pending CN106088132A (en) 2016-06-15 2016-06-15 Armored concrete M shape tower crane and construction method thereof

Country Status (1)

Country Link
CN (1) CN106088132A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759434A (en) * 2016-12-05 2017-05-31 中国航空规划设计研究总院有限公司 A kind of groined type precast concrete king-post basis and its construction method
CN109577359A (en) * 2018-11-24 2019-04-05 武汉建工集团股份有限公司 A kind of stepped tower crane and construction method
CN112900473A (en) * 2021-01-26 2021-06-04 东莞职业技术学院 Tower crane foundation reinforcing method, electronic equipment and computer readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008045342A (en) * 2006-08-17 2008-02-28 Koyama Kosakusho:Kk Pile foundation structure and pile head treatment method
CN201991013U (en) * 2011-02-28 2011-09-28 温州建设集团有限公司 High-piled tower footing structure of tower crane concrete-filled steel tube
CN203256761U (en) * 2013-05-17 2013-10-30 中建八局第三建设有限公司 Tower crane foundation arranged on top plate of basement
AU2014203401A1 (en) * 2013-06-21 2015-01-22 Ip Reserve Pty Ltd Post and Beam Support Block

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008045342A (en) * 2006-08-17 2008-02-28 Koyama Kosakusho:Kk Pile foundation structure and pile head treatment method
CN201991013U (en) * 2011-02-28 2011-09-28 温州建设集团有限公司 High-piled tower footing structure of tower crane concrete-filled steel tube
CN203256761U (en) * 2013-05-17 2013-10-30 中建八局第三建设有限公司 Tower crane foundation arranged on top plate of basement
AU2014203401A1 (en) * 2013-06-21 2015-01-22 Ip Reserve Pty Ltd Post and Beam Support Block

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任思澔等: "既有地铁停车场上盖物业的塔吊基础施工技术", 《建筑施工》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759434A (en) * 2016-12-05 2017-05-31 中国航空规划设计研究总院有限公司 A kind of groined type precast concrete king-post basis and its construction method
CN109577359A (en) * 2018-11-24 2019-04-05 武汉建工集团股份有限公司 A kind of stepped tower crane and construction method
CN109577359B (en) * 2018-11-24 2024-03-19 武汉建工集团股份有限公司 Stepped tower crane foundation and construction method
CN112900473A (en) * 2021-01-26 2021-06-04 东莞职业技术学院 Tower crane foundation reinforcing method, electronic equipment and computer readable storage medium
CN112900473B (en) * 2021-01-26 2022-05-10 东莞职业技术学院 Tower crane foundation reinforcing method, electronic equipment and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN106088131A (en) Armored concrete cross tower crane and construction method thereof
CN203247506U (en) Bridge high-pier construction creeping formwork internal formwork lifting frame
CN105484285A (en) Spliced steel pipe concrete column type high bearing platform tower crane foundation structure and construction method
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN106088132A (en) Armored concrete M shape tower crane and construction method thereof
CN102966016A (en) Internal double-layer prefabricated traffic lane structure of shield tunnel
CN109403654A (en) A kind of underpinning method of existing building structure
CN204825914U (en) A reinforced concrete roof beam and fish belly sill combined supporting structure for complicated plane foundation ditch
CN103967018B (en) Deep big foundation pit angle support level shear structure
CN103726613B (en) A kind of novel fabricated concrete column
CN106930557A (en) Conjoined structure is built
CN109854276A (en) A kind of small spacing multiple track tunnel hole support construction
CN212452263U (en) Pier stud reinforcing bar construction tower cage and construction structure
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN106906896A (en) The construction method of conjoined structure building
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN207032663U (en) A kind of assembled reinforcing bar concrete composite beam
CN101525918A (en) Method for making winged steel tube-concrete composite beam
CN111424676B (en) Main frame beam support changing structure and construction method
CN205917718U (en) Rood beam folding type tower crane foundation
CN104652446A (en) Temporary steel lattice column core filling device and method thereof
CN203684528U (en) Novel assembled concrete column
CN210104781U (en) Tower crane foundation and structure of supporting sharing stand pile that links to each other
CN106759089A (en) A kind of simple harbour of beach based on junked tire and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109