CN106087777A - High pier long cantilever Cast-in-place Bent Cap combined type formwork system and construction method - Google Patents

High pier long cantilever Cast-in-place Bent Cap combined type formwork system and construction method Download PDF

Info

Publication number
CN106087777A
CN106087777A CN201610628993.6A CN201610628993A CN106087777A CN 106087777 A CN106087777 A CN 106087777A CN 201610628993 A CN201610628993 A CN 201610628993A CN 106087777 A CN106087777 A CN 106087777A
Authority
CN
China
Prior art keywords
support post
bent cap
suspension column
limit
locking screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610628993.6A
Other languages
Chinese (zh)
Other versions
CN106087777B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang sea Construction Co., Ltd.
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610628993.6A priority Critical patent/CN106087777B/en
Publication of CN106087777A publication Critical patent/CN106087777A/en
Application granted granted Critical
Publication of CN106087777B publication Critical patent/CN106087777B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Height pier long cantilever Cast-in-place Bent Cap combined type formwork system of the present invention and construction method, structure specifically includes that cushion cap, the steel plate of falling grooved, shock insulation sheet, rubber stopper, bridge pier, bent cap, limiting plate, crab-bolt, middle support post suspension column locking screw, middle support post, transverse connecting rod, column braces, hinge, middle hound, protection network, Bailey beam, backing plate, jack, short stanchion, adjustable jacking, bent cap end template, limit support post, prefabricated strip footing, pre-buried screw shell, limit support post suspension column locking screw, support beam.Main construction procedure includes: 1) cushion cap construction of prevention work;2) in, support post is set up;3) support beam is set up;4) Bailey beam is installed;5) limit support post is set up;6) bent cap end template is installed;7) gutter is laid;8) bent cap pours.The construction method formwork system rigidity that the present invention relates to is big, little to road traffic influence on system operation, and in construction, drainage effect is notable, has preferable economic technology benefit.

Description

High pier long cantilever Cast-in-place Bent Cap combined type formwork system and construction method
Technical field
The present invention relates to the construction of bridge pier upper cantilever arm bent cap.
Background technology
In bridge coping construction at present, its stress system type is a lot, such as girder steel method, Support Method, pre-embedded steel slab welding three Dihedral bracing members method, Hold Hoop method etc..When the cantilever of bent cap is long, first-selected Support Method, conventional support force body in construction System has two kinds: land full hall steel tubular scaffold with couplers, gate type steel pipe scaffold (support).
When construction area is positioned at the big location of people's vehicle flowrate, urban district, work progress must assure that the operation that is normally open to traffic, and tradition is full Hall rack construction can not meet requirement.
In consideration of it, conventional support system uses gate type steel pipe scaffold and anchor ear suspension scaffold, gate type steel pipe scaffold is subject to Power is clear and definite, technology maturation, but speed of application is slow, and the construction period is long, needs the most, there is quality, potential safety hazard big;Anchor ear hangs Builder's jack, using existing pier footing as stress basis, saves the time again pouring basis;Stress column is put down with overhead bridge pier Row is arranged, reduces and takies vehicles and pedestrians road, alleviates the traffic pressure that construction brings, but cantilever design system exists The risk of stability is had in the case of high buttress.
Summary of the invention
It is an object of the invention to provide high pier long cantilever Cast-in-place Bent Cap combined type formwork system and construction method, for realizing Above-mentioned purpose, present invention employs techniques below scheme:
High pier long cantilever Cast-in-place Bent Cap combined type formwork system, including: cushion cap, the steel plate of falling grooved, shock insulation sheet, rubber stopper, Bridge pier, bent cap, limiting plate, crab-bolt, middle support post suspension column locking screw, middle support post, transverse connecting rod, column braces, Hinge, middle hound, protection network, Bailey beam, backing plate, jack, short stanchion, adjustable jacking, bent cap end template, limit support vertical Post, prefabricated strip footing, pre-buried screw shell, limit support post suspension column locking screw, vertical rod, fastening bolt, Prefabricated Concrete draining Ditch, lanyard, rubble, roadbed, support beam.By middle support post suspension column locking screw and limiting plate phase bottom middle support post Even, limiting plate is fixed on the steel plate of falling grooved by crab-bolt, and shock insulation sheet is attached to cushion cap both sides by tack adhesive, and middle hound leads to Cross the stud connection being arranged in middle support post and Bailey beam, wedge is installed between bent cap end template and vertical rod and adjustable jacking Shape sheeting caps.
The construction method of high pier long cantilever Cast-in-place Bent Cap, including following construction procedure:
1) cushion cap construction of prevention work: before cushion cap concrete is unhardened, buries underground down with bridge pier interstitial site at cushion cap top Preset clearance bottom grooved steel plate, the steel plate of falling grooved and bridge pier, gap rubber stopper is filled;
2) in, support post is set up: first limiting plate is fixed on the steel plate of falling grooved by crab-bolt, logical bottom middle support post In crossing, support post suspension column locking screw is connected with limiting plate, after middle support post suspension column is fixing, sets up temporary support to prevent Column is toppled over, and finally installs transverse connecting rod and column braces;
3) support beam is set up: after middle support post fixing formation integral structural post, formed at middle support post Lattice capital installs support beam;
4) Bailey beam is installed: Bailey beam rides upon support beam top, and middle hound is by being arranged on middle support post and shellfish Stud connection on Lei Liang;
5) limit support post is set up: first carries out slot grooving in precalculated position, buries prefabricated strip footing, limit support post underground Be inserted into respectively in prefabricated strip footing by preset pitch, limit support post suspension column by limit support post suspension column locking screw with Prefabricated strip footing is fixed, and backfill rubble in the most backward preform strip shape foundation trench, support post top, limit is connected with Bailey beam;
6) bent cap end template is installed: install bent cap end template, provides temporary supports by jack, by adjustable top Torr carrys out adjusting template height, after treating that position is fixing, then installs vertical rod in jack both sides, vertical rod is fixing remove afterwards very heavy Top;
7) gutter is laid: use Prefabricated Concrete gutter, backfills rubble, put into Prefabricated Concrete gutter, prefabricated in groove Lanyard is installed in gutter near cushion cap side;
8) bent cap pours: use primary concreting principle to pour;
As preferably: step 5) described in prefabricated strip footing arranges pre-buried screw shell, limit support post suspension column is locked Gu screw rod two ends are fixed with pre-buried screw shell, limit support post suspension column locking screw passes limit support post, by fastening spiral shell Bolt is fixed.
Beneficial effect:
(1) use combined type to encorbelment supports, make the runway can be properly functioning, accomplish that top construction is driven a vehicle Tong Bu with bottom.
(2) limit support post is set in outside, stablizes cantilever supporting frame, ensure that on the premise of not affecting track operation and prop up The safety of die body system.
(3) prefabricated bar shaped gutter is set, the draining of construction site can be carried out fast and flexible.
Accompanying drawing explanation
Fig. 1 is high pier long cantilever Cast-in-place Bent Cap combined type formwork system structural representation;
Fig. 2 is middle support post suspension column organigram;
Fig. 3 is limit support post suspension column organigram;
Description of reference numerals: 1. cushion cap;2. the steel plate of falling grooved;3. shock insulation sheet;4. rubber stopper;5. bridge pier;6. bent cap;7. limit Position plate;8. crab-bolt;9. support post suspension column locking screw in;10. support post in;11. transverse connecting rods;12. column braces; 13. hinges;Hound in 14.;15. protection networks;16. Bailey beams;17. backing plates;18. jack;19. short stanchions;20. is adjustable Jacking;21. bent cap end templates;22. limit support posts;23. prefabricated strip footings;24. pre-buried screw shells;25. limits support vertical Post suspension column locking screw;26. vertical rods;27. fastening bolts;28. Prefabricated Concrete gutters;29. lanyards;30. backfill rubbles;31. Roadbed;32. support beams.
Detailed description of the invention
In these enforcements such as present embodiment welding for steel structure technique, bolt connection construction technique, template-setup technique the most not Stating tired, emphasis illustrates the embodiment that the present invention relates to structure.
High pier long cantilever Cast-in-place Bent Cap combined type formwork system, including: cushion cap 1, the steel plate of falling grooved 2, shock insulation sheet 3, rubber Plug 4, bridge pier 5, bent cap 6, limiting plate 7, crab-bolt 8, middle support post suspension column locking screw 9, middle support post 10, transverse connecting rod 11, column braces 12, hinge 13, middle hound 14, protection network 15, Bailey beam 16, backing plate 17, jack 18, short stanchion 19, can Mode jacking 20, bent cap end template 21, limit support post 22, prefabricated strip footing 23, pre-buried screw shell 24, limit support post Suspension column locking screw 25, vertical rod 26, fastening bolt 27, Prefabricated Concrete gutter 28, lanyard 29, rubble 30, roadbed 31, support beam 32.Being connected with limiting plate 7 by middle support post suspension column locking screw 9 bottom middle support post 10, limiting plate 7 is by crab-bolt 8 Being fixed on the steel plate of falling grooved 2, shock insulation sheet 3 is attached to cushion cap 1 both sides by tack adhesive, and middle hound 14 is by being arranged on Hinge 13 on support column 10 and Bailey beam 16 connects, and installs wedge between bent cap end template 21 and vertical rod 26 and adjustable jacking 20 Shape sheeting caps.
The construction method of high pier long cantilever Cast-in-place Bent Cap, including following construction procedure:
1) cushion cap 1 construction of prevention work: before cushion cap 1 concrete is unhardened, buries with bridge pier 5 interstitial site at cushion cap 1 top If the steel plate of falling grooved 2, preset clearance bottom the steel plate of falling grooved 2 and bridge pier 5, gap rubber stopper 4 is filled;
2) in, support post 10 is set up: first limiting plate 7 is fixed on the steel plate of falling grooved 2 by crab-bolt 8, middle support post 10 Bottom is connected with limiting plate 7 by middle support post suspension column locking screw 9, after middle support post 10 suspension column is fixing, sets up and faces Time support and prevent column from toppling over, transverse connecting rod 11 and column braces 12 are finally installed,
3) support beam 30 is set up: after middle support post 10 fixing formation integral structural post, at middle support post 10 The lattice capital formed installs support beam 30;
4) Bailey beam 16 is installed: Bailey beam 16 rides upon support beam 26 top, and middle hound 14 is by being arranged on middle support Hinge 13 on column 10 and Bailey beam 16 connects;
5) limit support post 22 is set up: first carry out slot grooving in precalculated position, buries prefabricated strip footing 23 underground, and limit supports Column 22 is inserted in prefabricated strip footing 23 respectively by preset pitch, and limit support post 22 suspension column passes through limit support post suspension column Locking screw 25 is fixed with prefabricated strip footing 23, backfill rubble 30 in 23 grooves of the most backward preform strip shape basis, limit support post 22 tops are connected with Bailey beam 16;
6) bent cap end template 21 is installed: installs bent cap end template 21, provides temporary supports by jack 18, by can Mode jacking 20 carrys out adjusting template height, after treating that position is fixing, then installs vertical rod 2 in jack 18 both sides, and vertical rod 26 is fixed Remove jack 18 afterwards;
7) gutter is laid: use Prefabricated Concrete gutter 28, backfills rubble 30, put into Prefabricated Concrete gutter 28 in groove, Lanyard 29 is installed near cushion cap 1 side in prefabricated gutter 28;
8) bent cap 6 pours: use primary concreting principle to pour;
Step 5) described in prefabricated strip footing 23 arranges pre-buried screw shell 24, limit support post suspension column locking screw 25 two ends are fixed with pre-buried screw shell 24, and limit support post suspension column locking screw 25 is through limit support post 22, by fastening Bolt 27 is fixed.
Shown in reference Fig. 1, in figure: prefabricated strip footing 23 and Prefabricated Concrete gutter 28 flush with road surface, and road surface arranges 3% Drainage grade, middle support post 10 for being arranged symmetrically with totally 8, the vertical spacing of transverse connecting rod 11 according in support post 10 Stability Calculation determines.
With reference to shown in Fig. 2, in figure, shock insulation sheet 3 is taken from end face and is played the length that 2/3 cushion cap 1 bassets.

Claims (3)

1. one kind high pier long cantilever Cast-in-place Bent Cap combined type formwork system, it is characterised in that including: cushion cap (1), the steel plate of falling grooved (2), shock insulation sheet (3), rubber stopper (4), bridge pier (5), bent cap (6), limiting plate (7), crab-bolt (8), the locking of middle support post suspension column Screw rod (9), middle support post (10), transverse connecting rod (11), column braces (12), hinge (13), middle hound (14), protection Net (15), Bailey beam (16), backing plate (17), jack (18), short stanchion (19), adjustable jacking (20), bent cap end template (21), limit support post (22), prefabricated strip footing (23), pre-buried screw shell (24), limit support post suspension column locking screw (25), vertical rod (26), fastening bolt (27), Prefabricated Concrete gutter (28), lanyard (29), rubble (30), roadbed (31) and Support beam (32);Middle support post (10) bottom is connected with limiting plate (7) by middle support post suspension column locking screw (9), spacing Plate (7) is fixed on the steel plate of falling grooved (2) by crab-bolt (8), and shock insulation sheet (3) is attached to cushion cap (1) both sides by tack adhesive, in Hound (14) is connected by the hinge (13) being arranged in middle support post (10) and Bailey beam (16), bent cap end template (21) And chock plate is installed between vertical rod (26) and adjustable jacking (20).
2. the construction method of a high pier long cantilever Cast-in-place Bent Cap combined type formwork system as claimed in claim 1, it is characterised in that Including following construction procedure:
1) cushion cap (1) construction of prevention work: before cushion cap (1) concrete is unhardened, in cushion cap (1) top and bridge pier (5) gap digit Putting and bury the steel plate of falling grooved (2) underground, the steel plate of falling grooved (2) is filled with bridge pier (5) bottom preset clearance, gap rubber stopper (4);
2) in, support post (10) is set up: first limiting plate (7) is fixed on the steel plate of falling grooved (2) by crab-bolt (8), and middle support is stood Post (10) bottom is connected with limiting plate (7) by middle support post suspension column locking screw (9), and middle support post (10) suspension column is fixed Afterwards, set up temporary support to prevent column from toppling over, transverse connecting rod (11) and column braces (12) are finally installed;
3) support beam (32) is set up: after middle support post (10) fixing formation integral structural post, at middle support post (10) the lattice capital formed installs support beam (32);
4) Bailey beam (16) is installed: Bailey beam (16) rides upon support beam (32) top, during middle hound (14) is by being arranged on Hinge (13) on support post (10) and Bailey beam (16) connects;
5) limit support post (22) is set up: first carry out slot grooving in precalculated position, buries prefabricated strip footing (23) underground, and limit supports Column (22) is inserted into respectively by preset pitch in prefabricated strip footing (23), and limit support post (22) suspension column supports vertical by limit Post suspension column locking screw (25) is fixed with prefabricated strip footing (23), backfill rubble in (23) groove of the most backward preform strip shape basis (30), limit support post (22) top is connected with Bailey beam (16);
6) bent cap end template (21) is installed: install bent cap end template (21), provides temporary supports by jack (18), passes through Adjustable jacking (20) carrys out adjusting template height, after treating that position is fixing, then installs vertical rod (2) in jack (18) both sides, vertical Bar (26) is fixing removes jack (18) afterwards;
7) gutter is laid: use Prefabricated Concrete gutter (28), backfills rubble (30), put into Prefabricated Concrete gutter in groove (28), in Prefabricated Concrete gutter (28) near cushion cap (1) side installation lanyard (29);
8) bent cap (6) pours: use primary concreting principle to pour.
The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system the most according to claim 2, its feature exists In step 5) described in prefabricated strip footing (23) arranges pre-buried screw shell (24), limit support post suspension column locking screw (25) two ends are fixed with pre-buried screw shell (24), and limit support post suspension column locking screw (25) passes limit support post (22), Fixed by fastening bolt (27).
CN201610628993.6A 2016-08-03 2016-08-03 The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system Active CN106087777B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610628993.6A CN106087777B (en) 2016-08-03 2016-08-03 The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610628993.6A CN106087777B (en) 2016-08-03 2016-08-03 The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system

Publications (2)

Publication Number Publication Date
CN106087777A true CN106087777A (en) 2016-11-09
CN106087777B CN106087777B (en) 2017-10-31

Family

ID=57453618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610628993.6A Active CN106087777B (en) 2016-08-03 2016-08-03 The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system

Country Status (1)

Country Link
CN (1) CN106087777B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755439A (en) * 2018-07-23 2018-11-06 中铁四局集团有限公司 Universal telescopic support frame suitable for V-shaped bridge pier and mounting method
CN110080116A (en) * 2019-05-30 2019-08-02 甘肃路桥建设集团有限公司 A kind of large-span prestressed bent cap supporting apparatus and its construction method
CN111042006A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof
CN111472305A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method
CN112853929A (en) * 2021-01-15 2021-05-28 浙江交工集团股份有限公司 Anti-tilting structure of high-altitude lower cross beam and construction method thereof
CN115323920A (en) * 2022-07-12 2022-11-11 中建八局第二建设有限公司 Construction supporting device for middle pier stud viaduct capping beam and using method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2412301C1 (en) * 2009-10-30 2011-02-20 Закрытое акционерное общество "Шнейдер Электрик" Collapsible combined trestlework
CN202347446U (en) * 2011-12-06 2012-07-25 中铁四局集团第一工程有限公司 Supporting structure for construction of zero block of reinforced concrete continuous beam
CN102605717A (en) * 2012-04-09 2012-07-25 中铁七局集团郑州工程有限公司 Pier-top longitudinal support scaffolding method
CN202626846U (en) * 2012-06-03 2012-12-26 中交第四公路工程局有限公司 Ultrahigh combined support for bridge side span cast-in-situ section
CN103194982A (en) * 2013-03-25 2013-07-10 中交路桥建设有限公司 Construction method for short cantilever support at bridge side span cast-in-situ segment
CN103410102A (en) * 2013-08-29 2013-11-27 浙江省宏途交通建设有限公司 H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN104963290A (en) * 2015-07-08 2015-10-07 杭州江润科技有限公司 Mold supporting structure for variable cross-section cast-in-place box girder at section combining horizontal and longitudinal curves, and construction method of the mold supporting structure
CN205975387U (en) * 2016-08-03 2017-02-22 杭州江润科技有限公司 Cast -in -place bent cap combined type formwork system of long cantilever of high mound

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2412301C1 (en) * 2009-10-30 2011-02-20 Закрытое акционерное общество "Шнейдер Электрик" Collapsible combined trestlework
CN202347446U (en) * 2011-12-06 2012-07-25 中铁四局集团第一工程有限公司 Supporting structure for construction of zero block of reinforced concrete continuous beam
CN102605717A (en) * 2012-04-09 2012-07-25 中铁七局集团郑州工程有限公司 Pier-top longitudinal support scaffolding method
CN202626846U (en) * 2012-06-03 2012-12-26 中交第四公路工程局有限公司 Ultrahigh combined support for bridge side span cast-in-situ section
CN103194982A (en) * 2013-03-25 2013-07-10 中交路桥建设有限公司 Construction method for short cantilever support at bridge side span cast-in-situ segment
CN103410102A (en) * 2013-08-29 2013-11-27 浙江省宏途交通建设有限公司 H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN104963290A (en) * 2015-07-08 2015-10-07 杭州江润科技有限公司 Mold supporting structure for variable cross-section cast-in-place box girder at section combining horizontal and longitudinal curves, and construction method of the mold supporting structure
CN205975387U (en) * 2016-08-03 2017-02-22 杭州江润科技有限公司 Cast -in -place bent cap combined type formwork system of long cantilever of high mound

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755439A (en) * 2018-07-23 2018-11-06 中铁四局集团有限公司 Universal telescopic support frame suitable for V-shaped bridge pier and mounting method
CN108755439B (en) * 2018-07-23 2023-08-01 中铁四局集团有限公司 Universal telescopic support frame suitable for V-shaped bridge pier and installation method
CN111472305A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method
CN110080116A (en) * 2019-05-30 2019-08-02 甘肃路桥建设集团有限公司 A kind of large-span prestressed bent cap supporting apparatus and its construction method
CN111042006A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof
CN111042006B (en) * 2020-01-16 2022-04-15 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof
CN112853929A (en) * 2021-01-15 2021-05-28 浙江交工集团股份有限公司 Anti-tilting structure of high-altitude lower cross beam and construction method thereof
CN115323920A (en) * 2022-07-12 2022-11-11 中建八局第二建设有限公司 Construction supporting device for middle pier stud viaduct capping beam and using method

Also Published As

Publication number Publication date
CN106087777B (en) 2017-10-31

Similar Documents

Publication Publication Date Title
CN106087777B (en) The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system
CN205975387U (en) Cast -in -place bent cap combined type formwork system of long cantilever of high mound
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN104727223B (en) A kind of hoop platform for bridge pier column construction and construction method
CN105113434B (en) On remove supporting construction and construction method across operation highway spandrelless arch bridge framing
CN110387822B (en) Cast-in-situ bent cap assembly type steel pipe support and construction method thereof
KR100949601B1 (en) Method for broadening width of existing bridge without Temporary road
CN112323627A (en) Frame type construction system and construction method in existing railway temporary bridge construction
CN107059592B (en) Beam-first pier-second pier construction method for pier top segment of auxiliary pier of cable-stayed bridge
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN105200925B (en) Construction method of ultra-wide main arch ring of large span open-spandrel type arch bridge in extremely-cold regions
CN111622124B (en) Construction method and support system for large cantilever bent cap of soft foundation
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN216379170U (en) Construction safety device strides on cast-in-place concrete beam support
CN208328660U (en) The U-shaped girder construction of the Two bors d's oeuveres of combined bridge
CN109706842A (en) A kind of urban viaduct Single column pier capping beam construction device
CN210482000U (en) Limiting device for jacking construction of large-span steel pipe concrete tied arch bridge
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN210086061U (en) City viaduct single-column pier bent cap construction equipment
CN211689932U (en) Cast-in-place beam suspends support in midair
CN211772868U (en) Pier temporary consolidation device in large-span continuous beam
CN210621475U (en) Cast-in-situ bent cap assembled steel pipe support
CN207295774U (en) A kind of Underground Station structure
CN211006299U (en) Steel structure bridge that full-bridge integration top pushed away
CN212612617U (en) Open-hole type cast-in-place concrete template supporting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180522

Address after: No. 3388, Yinzhou District Cang Hai Road, Yinzhou District, Ningbo, Zhejiang

Patentee after: Zhejiang sea Construction Co., Ltd.

Address before: 310015 room 3, unit 3, Wanda Commercial Center, Hangzhou, Zhejiang, 1901.

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.