A kind of abridged edition type hoisting test method of heavy lift carrier
Technical field
The invention belongs to technical field of ships, in particular to the abridged edition type hoisting test method of a kind of heavy lift carrier.
Background technique
With the needs that marine cause develops, operation on the sea is increasingly enlarged, this requires to get over to marine large lifting equipment
Come higher.Rising on heavy lift carrier enables the manufacture requirement hung high, and difficulty is big, wherein acting enable the hoisting test hung be mostly important one
Ring, the purpose of test are to examine the installation integrity of crane, correctness, functional reliability, and verify whether performance indicator accords with
Close design and test program requirement.Therefore rising and enabling the hoisting test hung is a comprehensive complicated engineering.Existing heavy lift carrier
Hoisting test method, be usually transported on ship from harbour by huge heavy weight, order then used to hang and match with huge heavy weight
Conjunction is tested, but the test method have the defects that it is certain: in the test method, need to by huge heavy transporting heavy things to ship,
Hoisting test is carried out again, process is more complicated, meanwhile, extraneous weight need to be used, will increase cost, and transports weight to enhance labor
Fatigue resistance.
Therefore, a kind of abridged edition type hoisting test that can reduce cost, labor intensity and easily operated heavy lift carrier is researched and developed
Method is necessary.
Summary of the invention
It can reduce cost, labor intensity the technical problem to be solved in the present invention is to provide a kind of and easily operated hang again
The abridged edition type hoisting test method of ship.
In order to solve the above technical problems, the technical solution of the present invention is as follows: a kind of abridged edition type hoisting test method of heavy lift carrier,
Method includes the following steps:
(1) experiment of weighing hoist: weighing examines the test hoist approved by shipowner's ship, hangs/self-propelled hatchway cover
P25 hangs/self-propelled hatchway cover P26, and two deck D5, two deck D 12, two deck D 7, two deck D6 and several weight are not
One 1x hanging block;
(2) overload test:
A.1# crane main hook load raising test: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled cabin
Cover board P26, two deck D 5, two deck D 6 and two deck D 12;To be hung using 1# crane/self-propelled hatchway cover P26 hangs
To FR106, that is, hatchcover stop place is moved ,/self-propelled hatchway cover P25 block hoist superposition then will be hung by 1# crane
On hatch coaming, and lock, then successively D6, D5 and D12 are added to by wharf crane and hung/self-propelled hatchway cover P25 on, make
Loading Center is located at FR106, and 1# crane raising radius is 18m at this time;Suspender is hung, main hook, which slowly rises, rises to 5 meters of height, and by 5
The high position of rice is defined as position A;
B.1# crane main hook load luffing test: after step a, from position, A does luffing movement, reaches luffing movement
To maximum functional angle, it is then back to position A;
C.1# crane main hook loads turning test: after step b, first rotating clockwise 360 ° from position A, then again
Slowly 360 ° of revolution returns to position A counterclockwise, then slowly falls and removes hoist;
D.1# crane main hook load raising test: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled cabin
Cover board P26, the 1x hanging block of two deck D 5 and 13.5t;To be hung using 1# crane/self-propelled hatchway cover P25 is hung to FR106
Place, then successively two deck D6 and 1x hanging blocks are added to by wharf crane hang/self-propelled hatchway cover P25 on, make in prestowage
The heart is located at FR106, hang at this time/self-propelled hatchway cover P25 raising radius be 18m;Suspender is hung, main hook is slow after rising to 5 meters
Outboard is screwed out to boom and beam upright position, then slow luffing to minimum operating angle, and by the minimum operating angle of main hook
The location of degree is defined as position B, then slow 5 meters of slow raising again after 5 meters of weight of decline, and the radius of gyration is 33 at this time
Rice;
E.1# crane main hook load luffing test: after step d, from position B slowly do luffing move to touch less than
9 meters of the least radius of loop wheel machine ontology, then luffing returns to initial position B to 33 meters of maximum working radius again;
F.1# crane main hook loads turning test: after step e, first slowly rotating about 70 ° clockwise from position B simultaneously
Stop, then counterclockwise slowly 140 ° of stoppings of rotation, then rotate clockwise 70 ° of stoppings, after rotating, boom is slow
Luffing slowly returns back to initial position FR106 stopping to 18 meters of the radius of gyration, slowly falls and removes weight;
G.1# crane auxiliary hook raising is tested: by boom rotation direction harbour, with the 1x hanging block of auxiliary hook lifting 50t, auxiliary hook work
36.5 meters of radius, first auxiliary hook is slowly risen and rises to 5 meters of height, then slowly falls and removes hoist;Again with wharf crane by the 1x of 50t
Hanging block is hung to 3.5 meters of the position away from FR127 on ship, and 1# crane lifts by crane the 1x hanging block of 50t, auxiliary hook working radius with auxiliary hook
5.1 meters, then auxiliary hook is slowly increased to 5 meters of height, it then slowly falls and removes hoist;
H. it uses 1# crane instead 2# crane, overload test is carried out using 2# crane, the test procedure repeats step (a)
~(g);
(3) load test:
A.1# crane is once tested: hoist includes hanging/self-propelled hatchway cover P25 and two deck D 5;Utilize 1# grams
Order, which is hung, to be hung/and self-propelled hatchway cover P25 is hung at FR106, and then two deck D5 are added to and hang/self-propelled hatchway cover
On P25, Loading Center is made to be located at FR106,1# crane raising radius is 18m at this time;
Hoist is hung, after boom rotates outboard to boom and beam upright position, boom position is defined as position C, with normal
Speed does three raising, revolution, luffing movement joint operations, and lifting altitude peaks, and angle of revolution is controlled in position
C70 °, luffing requires to accomplish 9 meters and 33 meters of maximum working radius of minimum working radius, continues 15 minutes, finally in initial position
FR106 removes hoist;
B.1# crane second trial: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26,
Two deck D 5 and two deck D12;To be hung using 1# crane/self-propelled hatchway cover P26 is hung at FR106, then it will hang
From/self-propelled hatchway cover P25, two deck D5 and two deck D12 be added to hang/self-propelled hatchway cover P26 on, make Loading Center
Positioned at FR106,1# crane raising radius is 18m at this time;Hoist is hung, raising, revolution, luffing three movements are done with normal speed
Joint operation, lifting altitude peak, 360 ° of angle of revolution, and luffing requires to accomplish 9 meters of minimum working radius and maximum work
Make 33 meters of radius, continues 15 minutes, finally remove hoist in FR106;
C.1# crane auxiliary hook raising is tested: by boom rotation direction harbour, boom is vertical with captain direction, and by boom position
It is defined as position D, hoist is lifted by crane with auxiliary hook, three raising, revolution, luffing movement joint operations is done with normal speed, rise and increase
Degree peaks, and D70 ° of position, luffing requires to accomplish 9 meters of minimum working radius and maximum working radius for angle of revolution control
36.5 meters, continue 15 minutes, finally removes hoist in initial position FR106;
D. it uses 1# crane instead 2# crane, load test is carried out using 2# crane, the test procedure repeats step (a)
~(c);
(4) wheels-locked testing:
A. main hook loads a wheels-locked testing: in a in step (3), respectively maximum working radius, maximum raising and
Brake when maximum falling speed, raising does 1 brake, and 3 brakes are done in decline, meanwhile, when maximum rotational speed, maximum luffing into
Row stops test;
B. main hook load secondary braking test: in the b in step (3), respectively maximum working radius, maximum raising and
It brakes when decrease speed, raising does 1 brake, and 3 brakes are done in decline, meanwhile, when maximum rotational speed, maximum luffing, is stopped
Only test;
C. it uses 1# crane instead 2# crane, wheels-locked testing is carried out using 2# crane, the test procedure repeats step (a)
~(b);
(5) safety feature test:
A. emergency stop test: starting pumping plant, respectively at crane driver's cabin, main junction box, power unit, channel into
The cutting test of row emergency button, guarantees pumping plant can be made to stop working immediately in these position emergency switching-ofves;
B. emergency manual operation test: cutting off the power, raising of being decided respectively with manual pump, secondary raising, luffing and rotation;
C. emergency load discharges test: first main hook is tested, starts pumping plant, is stopped after hoist is lifted by crane 0.5 meter, and
Button release hoist is discharged by pressing emergency;Auxiliary hook is tested again, starts pumping plant, is stopped after hoist is lifted by crane 0.5 meter, and
Button release hoist is discharged by pressing emergency;The hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchcover
Plate P26, two deck D5, two deck D6 and two deck D12.
(6) post-test-inspection: check that whether there is or not obvious deformation or damages for crane structure;The crane includes 1# grams of order
It hangs and 2# crane.
The present invention has the advantages that the abridged edition type hoisting test method of heavy lift carrier of the present invention, compared with conventional test methods,
It does not need using extraneous weight, directly using hanging on heavy lift carrier/two deck of self-propelled hatchway cover and 1x hanging block, both reduced
Cost, has been greatly reduced labor intensity, and make easy to operate.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 to Fig. 8 is the process schematic of the abridged edition type hoisting test method of heavy lift carrier of the present invention.
Specific embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this
It is bright to be limited among the embodiment described range.
Embodiment
The abridged edition type hoisting test method of the heavy lift carrier of the present embodiment, method includes the following steps:
(1) experiment of weighing hoist: weighing examines the test hoist approved by shipowner's ship, and 90t's hangs/self-propelled hatchcover
The hanging of plate P25,90t/self-propelled hatchway cover P26,34t two deck D5, the two deck D 7 of the two deck D 12 of 34t, 30t,
The two deck D6 of 30t, the 1x hanging block of 13.5t, the 1x hanging block of 45t and the 1x hanging block of 50t.
(2) overload test:
A.1# crane main hook load raising test: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled cabin
Cover board P26, two deck D 5, two deck D 6 and two deck D 12;As shown in Figure 1 ,/self-propelled will be hung using 1# crane
Hatchway cover P26 is hung at FR106, that is, moves hatchcover stop place, and P25 block hoist is then superimposed upon hatch by 1# crane
It places, and locks, then successively two deck D6, two deck D5 and D12 are added to and hang/self-propelled hatchway cover by wharf crane
On P25, Loading Center is made to be located at FR106,1# crane raising radius is 18m at this time;Suspender is hung, main hook, which slowly rises, rises to 5 meters
Height, and this 5 meters of high positions are defined as position A;And log is in table 1;
B.1# crane main hook load luffing test: after step a, from position, A does luffing movement, reaches luffing movement
To maximum functional angle, it is then back to position A;And log is in table 1;
C.1# crane main hook loads turning test: after step b, first rotating clockwise 360 ° from position A, then again
Slowly 360 ° of revolution returns to position A counterclockwise, then slowly falls and removes hoist;And log is in table 1;
D.1# crane main hook load raising test: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled cabin
Cover board P26, the 1x hanging block of two deck D 5 and 13.5t;As shown in Fig. 2,/self-propelled hatchway cover will be hung using 1# crane
P25 is hung at FR106, and then successively two deck D6 and hanging block are added to by wharf crane and hang/self-propelled hatchway cover P25
On, so that Loading Center is located at FR106, crane raising radius is 18m at this time;Suspender is hung, main hook slowly screws out after rising to 5 meters
Outboard is to boom and beam upright position, then slow luffing to minimum operating angle, and by the minimum operating angle institute of main hook
The position at place is defined as position B, then slow 5 meters of slow raising again after 5 meters of weight of decline, and the radius of gyration is 33 meters at this time;And
Log is in table 1;
E.1# crane main hook load luffing test: after step d, from position B slowly do luffing move to touch less than
9 meters of the least radius of loop wheel machine ontology, then luffing returns to position B to 33 meters of maximum working radius again;And log in
Table 1;
F.1# crane main hook loads turning test: after step e, first slowly rotating about 70 ° clockwise from position B simultaneously
Stop, then counterclockwise slowly 140 ° of stoppings of rotation, then rotate clockwise 70 ° of stoppings, after rotating, boom is slow
Luffing slowly returns back to initial position FR106 stopping to 18 meters of the radius of gyration, slowly falls and removes weight;And record examination
Result is tested in table 1;
G.1# crane auxiliary hook raising is tested: by boom rotation direction harbour, with the 1x hanging block of auxiliary hook lifting 50t, auxiliary hook work
36.5 meters of radius, first auxiliary hook is slowly risen and rises to 5 meters of height, then slowly falls and removes hoist;Again with wharf crane by the 1x of 50t
Hanging block is hung to 3.5 meters of the position away from FR127 on ship, and 1# crane lifts by crane the 1x hanging block of 50t, auxiliary hook working radius with auxiliary hook
5.1 meters, then auxiliary hook is slowly increased to 5 meters of height, it then slowly falls and removes hoist;And log is in table 1;
H. it uses 1# crane instead 2# crane, overload test is carried out using 2# crane, is as shown in Figure 3 superimposed hoist
To such as figure position, the test procedure repeats step (a)~(c), and log is in table 1;Hoist is superimposed as shown in Figure 4
To such as figure position, the test procedure repeats step (d)~(f), and log is in table 1;The examination of 2# crane auxiliary hook raising
It tests process and repeats step g.
(3) load test:
A.1# crane is once tested: hoist includes hanging/self-propelled hatchway cover P25 and two deck D 5;Such as Fig. 5 institute
Show, will be hung using 1# crane/self-propelled hatchway cover P25 is hung at FR106, then two deck D5 are added to hang/from
On line hatchway cover P25, Loading Center is made to be located at FR106, crane raising radius is 18m at this time;Hoist is hung, boom rotates the side of a ship
Outside to behind boom and beam upright position, boom position is defined as position C, with normal speed do raising, revolution, luffing three it is dynamic
Make joint operation, lifting altitude peaks, and C70 ° of position, luffing requires to accomplish minimum working radius for angle of revolution control
9 meters and 33 meters of maximum working radius, continue 15 minutes, finally remove hoist in initial position FR106, and records raising, returns
Turn, derricking speed and hydraulic oil temperature are in table 2;
B.1# crane second trial: hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26,
Two deck D 5 and two deck D12;As shown in fig. 6, will be hung using 1# crane/self-propelled hatchway cover P26 is hung at FR106,
Then will hang/self-propelled hatchway cover P25, two deck D5 and two deck D12 be added to hang/self-propelled hatchway cover P26 on, make
Loading Center is located at FR106, and crane raising radius is 18m at this time;Hoist is hung, raising, revolution, luffing three are done with normal speed
A movement joint operation, lifting altitude peak, 360 ° of angle of revolution, luffing require to accomplish 9 meters of minimum working radius and
33 meters of maximum working radius, continue 15 minutes, finally removes hoist in initial position FR106, and record raising, revolution, change
Amplitude velocity degree and hydraulic oil temperature are in table 2;
C.1# crane auxiliary hook raising is tested: by boom rotation direction harbour, boom is vertical with captain direction, and by boom position
It is defined as position D, hoist is lifted by crane with auxiliary hook, three raising, revolution, luffing movement joint operations is done with normal speed, rise and increase
Degree peaks, and D70 ° of position, luffing requires to accomplish 9 meters of minimum working radius and maximum working radius for angle of revolution control
36.5 meters, continue 15 minutes, finally remove hoist in initial position FR106, and record raising, revolution, derricking speed and
Hydraulic oil temperature is in table 2;
D. it uses 1# crane instead 2# crane, load test is carried out using 2# crane, as shown in fig. 7, hoist is folded
It is added to such as figure position, the test procedure repeats step (a), and records raising, revolution, derricking speed and hydraulic oil temperature in table 2;
As shown in figure 8, being added to hoist such as figure position, the test procedure repeats step (b), and record raising, revolution, derricking speed with
And hydraulic oil temperature is in table 2;2# crane auxiliary hook raising the test procedure repeats step (c), and records raising, revolution, luffing speed
Degree and hydraulic oil temperature are in table 2.
(4) wheels-locked testing:
A. main hook loads a wheels-locked testing: in a in step (3), respectively maximum working radius, maximum raising and
Brake when maximum falling speed, raising does 1 brake, and 3 brakes are done in decline, meanwhile, when maximum rotational speed, maximum luffing into
Row stops test;
B. main hook load secondary braking test: in the b in step (3), respectively maximum working radius, maximum raising and
It brakes when decrease speed, raising does 1 brake, and 3 brakes are done in decline, meanwhile, when maximum rotational speed, maximum luffing, is stopped
Only test;
C. it uses 1# crane instead 2# crane, wheels-locked testing is carried out using 2# crane, the test procedure repeats step (a)
~(b).
(5) safety feature test:
A. emergency stop test: starting pumping plant, respectively at crane driver's cabin, main junction box, power unit, channel into
The cutting test of row emergency button, guarantees pumping plant can be made to stop working immediately in these position emergency switching-ofves;
B. emergency manual operation test: cutting off the power, raising of being decided respectively with manual pump, secondary raising, luffing and rotation;
C. emergency load discharges test: first main hook is tested, starts pumping plant, is stopped after hoist is lifted by crane 0.5 meter, and
Button release hoist is discharged by pressing emergency;Auxiliary hook is tested again, starts pumping plant, is stopped after hoist is lifted by crane 0.5 meter, and
Button release hoist is discharged by pressing emergency;The hoist includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchcover
Plate P26, two deck D5, two deck D6 and two deck D12.
(6) post-test-inspection: check that whether there is or not obvious deformation or damages for crane structure.The crane includes 1# grams of order
It hangs and 2# crane.
1 overload test result of table
2 load test result of table
Basic principles and main features and advantages of the present invention of the invention have been shown and described above.The skill of the industry
Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the above embodiments and description only describe
The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these
Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and
Its equivalent thereof.