CN108045527A - Process of jacking is played in a kind of large-scale crane span structure depressed place with hinge handoff functionality - Google Patents
Process of jacking is played in a kind of large-scale crane span structure depressed place with hinge handoff functionality Download PDFInfo
- Publication number
- CN108045527A CN108045527A CN201711036723.7A CN201711036723A CN108045527A CN 108045527 A CN108045527 A CN 108045527A CN 201711036723 A CN201711036723 A CN 201711036723A CN 108045527 A CN108045527 A CN 108045527A
- Authority
- CN
- China
- Prior art keywords
- span structure
- crane span
- raising
- place
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000008569 process Effects 0.000 title claims abstract description 18
- 230000000994 depressogenic effect Effects 0.000 title claims abstract description 12
- 230000007704 transition Effects 0.000 claims abstract description 11
- 238000002360 preparation method Methods 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 26
- 239000010959 steel Substances 0.000 claims description 26
- 239000004519 grease Substances 0.000 claims description 9
- 238000005461 lubrication Methods 0.000 claims description 9
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 6
- 238000001816 cooling Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000004804 winding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
- B63C2005/025—Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls
- B63C2005/027—Stages, platforms, or seats suspended adjacent ship hulls on cables, chains, or the like, e.g. boatswain's chairs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses process of jacking is played in a kind of large-scale crane span structure depressed place with hinge handoff functionality, the theoretical foundation including crane span structure lifting, the condition of crane span structure lifting and preparation, crane span structure examination raising, crane span structure rise and rise to transition point, crane span structure raising in place.The advantage of the invention is that:The present invention is safe to use, saves resource, solves the puzzlement of Large bridge frame integral hoisting difficulty, and the construction of large dredger crane span structure from now on is worth with important references.
Description
Technical field
The present invention relates to modern ships and ocean engineering structure method of construction, more particularly to a kind of band hinge handoff functionality
Large-scale crane span structure depressed place in rise process of jacking.
Background technology
5000KW reamers power from navigating cutter suction dredger, be a double paddles, double rotation diversion tubes, full power driven from
Navigate cutter suction dredger, and as the cutter suction dredger of third place in the world, Asia first, the design and construction of the ship fill in China and exist
Blank in Dredging Field.1600 tons of the bridge frame is limited more than gantry crane.Forms of motion is rotates around hinge, rotation angle
23 degree, the nearly 20m of maximum lifting height.But there is certain difficulty in terms of crane span structure raising, in order to ensure smooth construction, also for
The construction of similar item or engineering provides reference from now on, and the present inventor designs a kind of large-scale crane span structure depressed place with hinge handoff functionality
Interior process of jacking.
The content of the invention
The technical problem to be solved in the present invention is to provide it is a kind of can ensure smooth raising with the big of hinge handoff functionality
Process of jacking is played in type crane span structure depressed place.
In order to solve the above technical problems, the technical scheme is that:A kind of large-scale crane span structure depressed place with hinge handoff functionality
Interior process of jacking, innovative point are:Theoretical foundation including crane span structure lifting, the condition of crane span structure lifting and preparation, crane span structure try
Liter, crane span structure, which rise, rises to transition point, crane span structure raising in place, is as follows:
(1)The theoretical foundation of crane span structure lifting:
Select gantry crane raising scheme, gantry crane Design cooling load 500t;
Due to gantry crane raising maximum height limit 58m, and fixed pulley drift angle cannot be too big on hull, and crane span structure can not once rise and be raised to
Position, therefore increase the process of a middle transition, in two steps 10 degree of first time, 13 degree for the second time, carry out lifting crane span structure to upper hinge
It is horizontal;
(2)The condition of crane span structure lifting and preparation:
Bridge trunnion is in upper hinge;
Crane span structure itself is in heeling condition;
Portal frame lifting pulley, swing pulley assembling finishes, function test in place, oiling grease lubrication;
Crane span structure lifting pulley assembling finish, function test in place, oiling grease lubrication;
After compensation of undulation oil cylinder leading block assembling finishes, function test in place, oiling grease lubrication;
Frock is ready to;
(3)Crane span structure tries raising:
The pedestal of the fixed voussoir of navigation for pedestal and crane span structure of the bolt at upper hinge that lock on portal frame is installed;
In place, rigging head is poured into a mould at steel wire rope both ends to wirerope-winding;
With the help of gantry crane, using steel wire rope, pico- raising crane span structure leaves crane span structure and puts 2 centimeters of pier, stops 3 minutes, observation
The working condition of steel wire rope;
Continuation lifting crane span structure, which leaves, puts 20 centimeters of pier, stops 10 minutes, observes the working condition of steel wire rope;
(4)Crane span structure rises and rises to transition point:
Such as without exception, raising crane span structure to mid-transition point;
It is put into high support and spot welding;
The rigging head of that section of steel wire rope after cast interception, and connected in hanging beam steel wire rope;
Prepare raising again;
(5)Crane span structure raising is in place:
The step of repeating examination raising observes the situation of steel wire rope;
Raising crane span structure is inserted into locking bolt to original locking socket position;
Raising puts down locking bolt briquetting afterwards in place, is put into navigation locking voussoir, taps fastening and locked, crane span structure installs
Finish.
Further, 300m steel wire ropes are chosen, diametral strength is identical with the hoist rope that former ship is selected, and is 76mm,
BS=4400KN。
Further, the stage crane span structure between two steps is supported with height, is repeatedly tested a little in implementation process, it is ensured that
Starting substep promotion after the security of raising.
Further, steel wire rope live will intercept, and socket wants cast-in-place.
The advantage of the invention is that:
The present invention is safe to use, saves resource, solves the puzzlement of Large bridge frame integral hoisting difficulty, to large dredger from now on
The construction of crane span structure is worth with important references.
Description of the drawings
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is the crane span structure lifting overall plan figure of the present invention.
Fig. 2 is that the crane span structure hoist rope of the present invention moves towards figure.
The crane span structure that Fig. 3 is the present invention is in hinge switching state schematic diagram.
The crane span structure that Fig. 4 is the present invention is in raising transition state schematic diagram.
The crane span structure that Fig. 5 is the present invention is in horizontality schematic diagram.
Specific embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this
It is bright to be limited among the embodiment described scope.
As shown in Figure 1, playing process of jacking in a kind of large-scale crane span structure depressed place with hinge handoff functionality, include the theory of crane span structure lifting
Basis, the condition of crane span structure lifting and preparation, crane span structure examination raising, crane span structure rise and rise to transition point, crane span structure raising in place, and specific steps are such as
Under:
(1)The theoretical foundation of crane span structure lifting:
Select gantry crane raising scheme, gantry crane Design cooling load 500t;
Due to gantry crane raising maximum height limit 58m, and fixed pulley drift angle cannot be too big on hull, and crane span structure can not once rise and be raised to
Position, therefore increase the process of a middle transition, in two steps 10 degree of first time, 13 degree for the second time, carry out lifting crane span structure to upper hinge
It is horizontal;
(2)The condition of crane span structure lifting and preparation:
Bridge trunnion is in upper hinge;
Crane span structure itself is in heeling condition;
Portal frame lifting pulley, swing pulley assembling finishes, function test in place, oiling grease lubrication;
Crane span structure lifting pulley assembling finish, function test in place, oiling grease lubrication;
After compensation of undulation oil cylinder leading block assembling finishes, function test in place, oiling grease lubrication;
Frock is ready to;
(3)As shown in figure 3, crane span structure tries raising:
The pedestal of the fixed voussoir of navigation for pedestal and crane span structure of the bolt at upper hinge that lock on portal frame is installed;
As shown in Fig. 2, wirerope-winding is in place, steel wire rope both ends cast rigging head;
With the help of gantry crane, using steel wire rope, pico- raising crane span structure leaves crane span structure and puts 2 centimeters of pier, stops 3 minutes, observation
The working condition of steel wire rope;
Continuation lifting crane span structure, which leaves, puts 20 centimeters of pier, stops 10 minutes, observes the working condition of steel wire rope;
(4)As shown in figure 4, crane span structure, which rises, rises to transition point:
Such as without exception, raising crane span structure to mid-transition point;
It is put into high support and spot welding;
The rigging head of that section of steel wire rope after cast interception, and connected in hanging beam steel wire rope;
Prepare raising again;
(5)As shown in figure 5, crane span structure raising is in place:
The step of repeating examination raising observes the situation of steel wire rope;
Raising crane span structure is inserted into locking bolt to original locking socket position;
Raising puts down locking bolt briquetting afterwards in place, is put into navigation locking voussoir, taps fastening and locked, crane span structure installs
Finish.
Stage crane span structure between two steps is supported with height, is repeatedly tested a little in implementation process, it is ensured that the peace of raising
Quan Xinghou is starting substep promotion, chooses 300m steel wire ropes, diametral strength is identical with the hoist rope that former ship is selected, and is
76mm, BS=4400KN, steel wire rope live will intercept, and socket wants cast-in-place.
Basic principle of the invention and main feature and advantages of the present invention has been shown and described above.The skill of the industry
Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the above embodiments and description only describe
The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these
Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and
Its equivalent thereof.
Claims (4)
1. play process of jacking in a kind of large-scale crane span structure depressed place with hinge handoff functionality, feature in:Theoretical base including crane span structure lifting
Plinth, the condition of crane span structure lifting and preparation, crane span structure examination raising, crane span structure rise and rise to transition point, crane span structure raising in place, and specific steps are such as
Under:
(1)The theoretical foundation of crane span structure lifting:
Select gantry crane raising scheme, gantry crane Design cooling load 500t;
Due to gantry crane raising maximum height limit 58m, and fixed pulley drift angle cannot be too big on hull, and crane span structure can not once rise and be raised to
Position, therefore increase the process of a middle transition, in two steps 10 degree of first time, 13 degree for the second time, carry out lifting crane span structure to upper hinge
It is horizontal;
(2)The condition of crane span structure lifting and preparation:
Bridge trunnion is in upper hinge;
Crane span structure itself is in heeling condition;
Portal frame lifting pulley, swing pulley assembling finishes, function test in place, oiling grease lubrication;
Crane span structure lifting pulley assembling finish, function test in place, oiling grease lubrication;
After compensation of undulation oil cylinder leading block assembling finishes, function test in place, oiling grease lubrication;
Frock is ready to;
(3)Crane span structure tries raising:
The pedestal of the fixed voussoir of navigation for pedestal and crane span structure of the bolt at upper hinge that lock on portal frame is installed;
In place, rigging head is poured into a mould at steel wire rope both ends to wirerope-winding;
With the help of gantry crane, using steel wire rope, pico- raising crane span structure leaves crane span structure and puts 2 centimeters of pier, stops 3 minutes, observation
The working condition of steel wire rope;
Continuation lifting crane span structure, which leaves, puts 20 centimeters of pier, stops 10 minutes, observes the working condition of steel wire rope;
(4)Crane span structure rises and rises to transition point:
Such as without exception, raising crane span structure to mid-transition point;
It is put into high support and spot welding;
The rigging head of that section of steel wire rope after cast interception, and connected in hanging beam steel wire rope;
Prepare raising again;
(5)Crane span structure raising is in place:
The step of repeating examination raising observes the situation of steel wire rope;
Raising crane span structure is inserted into locking bolt to original locking socket position;
Raising puts down locking bolt briquetting afterwards in place, is put into navigation locking voussoir, taps fastening and locked, crane span structure installs
Finish.
2. play process of jacking in a kind of large-scale crane span structure depressed place with hinge handoff functionality according to claim 1, feature in:Choosing
300m steel wire ropes are taken, diametral strength is identical with the hoist rope that former ship is selected, and is 76mm, BS=4400KN.
3. play process of jacking in a kind of large-scale crane span structure depressed place with hinge handoff functionality according to claim 2, feature in:Two
Stage crane span structure between step is supported with height, is repeatedly tested a little in implementation process, it is ensured that opened after the security of raising
Begin to be promoted step by step.
4. play process of jacking in a kind of large-scale crane span structure depressed place with hinge handoff functionality according to claim 3, feature in:Steel
Cord live will intercept, and socket wants cast-in-place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711036723.7A CN108045527B (en) | 2017-10-30 | 2017-10-30 | Lifting process in large-scale bridge dock with hinge point switching function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711036723.7A CN108045527B (en) | 2017-10-30 | 2017-10-30 | Lifting process in large-scale bridge dock with hinge point switching function |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108045527A true CN108045527A (en) | 2018-05-18 |
CN108045527B CN108045527B (en) | 2020-02-14 |
Family
ID=62118616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711036723.7A Active CN108045527B (en) | 2017-10-30 | 2017-10-30 | Lifting process in large-scale bridge dock with hinge point switching function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108045527B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112173035A (en) * | 2020-10-16 | 2021-01-05 | 上海振华重工(集团)股份有限公司 | Construction method of pipe joint sinking ship in limited area |
CN114016559A (en) * | 2021-10-26 | 2022-02-08 | 广州文冲船厂有限责任公司 | Method for mounting reamer beam of cutter suction dredger |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204057697U (en) * | 2014-08-19 | 2014-12-31 | 河南省三马起重机械有限公司 | A kind of transfer crane crane span structure |
CN204980867U (en) * | 2015-08-26 | 2016-01-20 | 上海航盛船舶设计有限公司 | Ship portal device is inhaled to hank |
CN205820738U (en) * | 2016-07-28 | 2016-12-21 | 青岛海西重机有限责任公司 | A kind of jack up lifting device of bank bridge |
US20180022420A1 (en) * | 2014-12-29 | 2018-01-25 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Method for installing gantry tower crane for use in cargo tank checking |
CN207419566U (en) * | 2017-10-30 | 2018-05-29 | 中交上航局航道建设有限公司 | It is a kind of to twist the jacking system for inhaling ship |
-
2017
- 2017-10-30 CN CN201711036723.7A patent/CN108045527B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204057697U (en) * | 2014-08-19 | 2014-12-31 | 河南省三马起重机械有限公司 | A kind of transfer crane crane span structure |
US20180022420A1 (en) * | 2014-12-29 | 2018-01-25 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Method for installing gantry tower crane for use in cargo tank checking |
CN204980867U (en) * | 2015-08-26 | 2016-01-20 | 上海航盛船舶设计有限公司 | Ship portal device is inhaled to hank |
CN205820738U (en) * | 2016-07-28 | 2016-12-21 | 青岛海西重机有限责任公司 | A kind of jack up lifting device of bank bridge |
CN207419566U (en) * | 2017-10-30 | 2018-05-29 | 中交上航局航道建设有限公司 | It is a kind of to twist the jacking system for inhaling ship |
Non-Patent Citations (1)
Title |
---|
柳杨等: "绞吸式挖泥船门架结构强度分析", 《江苏船舶》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112173035A (en) * | 2020-10-16 | 2021-01-05 | 上海振华重工(集团)股份有限公司 | Construction method of pipe joint sinking ship in limited area |
CN112173035B (en) * | 2020-10-16 | 2021-07-23 | 上海振华重工(集团)股份有限公司 | Construction method of pipe joint sinking ship in limited area |
CN114016559A (en) * | 2021-10-26 | 2022-02-08 | 广州文冲船厂有限责任公司 | Method for mounting reamer beam of cutter suction dredger |
Also Published As
Publication number | Publication date |
---|---|
CN108045527B (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104925677B (en) | A kind of large-scale superelevation lifting altitude crane barge | |
CN108455451B (en) | A kind of 600 tons of gantry cranes hold the method for hanging installation superelevation flare tower | |
CN104961043B (en) | A kind of crane barge and its Multifunctional hanging hook, Multifunctional hanging hook group | |
CN103964316B (en) | Multifunctional and multipurpose high pedestal jib crane | |
CN105417403B (en) | A kind of method that ultra-high ultra-large floating crane is installed in dock | |
CN108045527A (en) | Process of jacking is played in a kind of large-scale crane span structure depressed place with hinge handoff functionality | |
CN105905815A (en) | Work method of seating-type self-balance holding pole | |
CN206799021U (en) | A kind of full circle swinging traveling derrick crane | |
CN102094422A (en) | Full-revolving variable amplitude pile driving frame and using method thereof | |
CN210620067U (en) | Jacking device is changed to marine crane slewing bearing | |
CN207312977U (en) | A kind of special construction apparatus suitable for prestressed concrete wind tower Wall Construction | |
CN205740058U (en) | A kind of fixed double leval jib gantry crane | |
CN211444779U (en) | Middle and small single-beam crane for subway slag tapping | |
CN202730653U (en) | Wide-angle swinging and hoisting hydraulic cable-across crane | |
CN204675608U (en) | A kind of crane barge and Multifunctional hanging hook, Multifunctional hanging hook group | |
EP3980363B1 (en) | Hoisting crane for use on an offshore vessel and method of operation | |
CN201686393U (en) | Derrick mast hoisting tool | |
CN205500609U (en) | Stage machine installation is put with ring hoist and mount | |
CN104310217B (en) | Gear rope device for the load test apparatus of jack-up unit cantilever beam | |
CN221343571U (en) | Construction hoist ware | |
CN108033368A (en) | A kind of gib arm of crane head assembly and crane | |
CN108677749B (en) | PLC frequency conversion control system for bridge swivel construction | |
CN205772948U (en) | Super High Core Walls Structure soil dead man | |
CN104326375A (en) | Four-bar link gantry crane | |
CN115385239B (en) | Complementary dismantling construction method for tower crane under unconventional working condition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |