CN106081944A - A kind of abridged edition type hoisting test method of heavy lift carrier - Google Patents

A kind of abridged edition type hoisting test method of heavy lift carrier Download PDF

Info

Publication number
CN106081944A
CN106081944A CN201610295392.8A CN201610295392A CN106081944A CN 106081944 A CN106081944 A CN 106081944A CN 201610295392 A CN201610295392 A CN 201610295392A CN 106081944 A CN106081944 A CN 106081944A
Authority
CN
China
Prior art keywords
crane
test
meters
slowly
luffing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610295392.8A
Other languages
Chinese (zh)
Other versions
CN106081944B (en
Inventor
薛建新
卞广飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGQIANG MARINE HEAVY INDUSTRY CO LTD
Original Assignee
JIANGSU HONGQIANG MARINE HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGQIANG MARINE HEAVY INDUSTRY Co Ltd filed Critical JIANGSU HONGQIANG MARINE HEAVY INDUSTRY Co Ltd
Priority to CN201610295392.8A priority Critical patent/CN106081944B/en
Publication of CN106081944A publication Critical patent/CN106081944A/en
Application granted granted Critical
Publication of CN106081944B publication Critical patent/CN106081944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Abstract

The present invention relates to a kind of abridged edition type hoisting test method of heavy lift carrier, the method comprises the following steps: (1) experiment of weighing lift heavy;(2) overload test;(3) load test;(4) wheels-locked testing;(5) safety feature test;(6) post-test-inspection.It is an advantage of the current invention that: the abridged edition type hoisting test method of heavy lift carrier of the present invention, compared with conventional test methods, need not use extraneous weight, directly use hanging on heavy lift carrier/self-propelled hatchway cover two deck and 1x hanging block, both cost had been reduced, it is greatly reduced labor intensity, and has made easy and simple to handle.

Description

A kind of abridged edition type hoisting test method of heavy lift carrier
Technical field
The invention belongs to technical field of ships, particularly to the abridged edition type lift heavy of a kind of heavy lift carrier
Test method.
Background technology
Along with the needs of marine cause development, operation on the sea is maximized increasingly, and marine large lifting equipment is required more by this Come the highest.Rising on heavy lift carrier makes the manufacture requirements hung high, and difficulty is big, and wherein rising and making the hoisting test hung is of paramount importance one Ring, the purpose of test is the inspection installation integrity of crane, correctness, functional reliability, and verifies whether performance indications accord with Close design and test program requirement.Therefore rising and making the hoisting test hung is a comprehensive complicated engineering.Existing heavy lift carrier Hoisting test method, be usually and from harbour, huge heavy weight be transported to ship, has then used to make and hung and join with huge heavy weight Conjunction is tested, but this test method exists certain defect: in this test method, need to by huge heavy transporting heavy things to ship, Carrying out hoisting test again, process is more complicated, meanwhile, need to use extraneous weight, can increase cost, and transport weight can strengthen labor Fatigue resistance.
Therefore, a kind of cost, labor intensity and easily operated heavy lift carrier of can reducing is researched and developed
Abridged edition type hoisting test method is necessary.
Summary of the invention
The technical problem to be solved in the present invention is to provide one can reduce cost, labor intensity
And the abridged edition type hoisting test method of easily operated heavy lift carrier.
For solving above-mentioned technical problem, the technical scheme is that a kind of abridged edition type hoisting test method of heavy lift carrier, Its innovative point is: the method comprises the following steps:
(1) experiment of weighing lift heavy: weigh through the test lift heavy of shipowner's ship inspection accreditation, hang/self-propelled hatchway cover P25, hang From/self-propelled hatchway cover P26, two deck D5, two deck D 12, two deck D 7, the 1x that two deck D6 and several weight differ Hanging block;
(2) overload test:
A. 1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchcover Plate P26, two deck D 5, two deck D 6, and two deck D 12;1# crane is utilized to winch at FR106 by hatchway cover P26, i.e. Mobile hatchcover stop place, is then superimposed upon P25 block lift heavy on hatch coaming by 1# crane, and locks, then pass through harbour Hanging and D6, D5 and D12 are added on P25 successively, make Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Hang Suspender, main hook slowly rises and rises to 5 meters high, and this position is defined as position A;
B.1# crane main hook load luffing test: after step a terminates, does luffing motion from position A, makes luffing motion reach Big operating angle, is then back to initial position A;
C.1# crane main hook load turning test: after step b terminates, first turn clockwise 360 ° from position A, then during another mistake Pin slowly turns round 360 ° and returns to initial position A, the most slowly falls and removes lift heavy;
D.1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, two deck D 5, and the 1x hanging block of 13.5t;Utilize 1# crane to winch at FR106 by hatchway cover P25, then pass through harbour Hanging and D6 and hanging block are added on P25 successively, make Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Extension hangs Tool, main hook rises after rising to 5 meters and slowly to screw out outboard to arm and beam upright position, then slowly luffing to minimum operating angle Degree, and this position is defined as position B, the most slowly hoist 5 meters after the most slowly declining 5 meters of weight, now the radius of gyration is 33 Rice;
E.1# crane main hook load luffing test: after step d terminates, slowly do luffing from position B and move to touch less than loop wheel machine The least radius of body 9 meters, luffing returns to initial position B to maximum working radius 33 meters the most again;
F.1# crane main hook load turning test: after step e terminates, the most slowly rotates about 70 ° and stops from position B Only, then the most slowly rotating 140 ° of stoppings, then turn clockwise 70 ° and stop, after rotation terminates, arm slowly becomes Width is to the radius of gyration 18 meters, and slowly returns back to initial position FR106 stopping, slowly falling and removes weight;
G.1# crane auxiliary hook hoists test: by arm rotation direction harbour, by the 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 36.5 meters, first auxiliary hook is slowly risen and rise to 5 meters high, the most slowly fall and remove lift heavy;Again with wharf crane by the 1x hanging block of 50t Winch to FR127 on ship away from the position of 3.5 meters, the crane 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 5.1 meters, then Auxiliary hook is slowly increased to 5 meters high, the most slowly falls and remove lift heavy;
H. 1# crane is used instead 2# crane, uses 2# crane to carry out overload test, the test procedure repeat step (a)~ (g);
(3) load test:
A.1# crane single test: lift heavy includes hanging/self-propelled hatchway cover P25, and two deck D 5;Utilize 1# crane Winching at FR106 by hatchway cover P25, be then added on P25 by D5, make Loading Center be positioned at FR106, now crane hoists Radius is 18m;
Hanging lift heavy, after arm rotation outboard to arm and beam upright position, boom position is defined as position C, with normal speed Hoist, turn round, three action joint operations of luffing, lifting altitude peaks, and angle of revolution controls in boom position C70 °, luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 33 meters, continues 15 minutes, finally at initial position Lift heavy is removed by FR106;
B.1# crane second trial: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, diformazan Plate D 5 and two deck D12;1# crane is utilized to winch to, at FR106, then P25, D5 and D12 are added to by hatchway cover P26 On P26, making Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Hang lift heavy, hoist with normal speed, return Turn, three action joint operations of luffing, lifting altitude peaks, 360 °, angle of revolution, and luffing requires to accomplish minimum work Radius 9 meters and maximum working radius 33 meters, continue 15 minutes, finally removed by lift heavy at initial position FR106;
C.1# crane auxiliary hook hoists test: by arm rotation direction harbour, arm is vertical with captain direction, and boom position is defined For position D, lifting by crane lift heavy with auxiliary hook, hoist with normal speed, turn round, three action joint operations of luffing, lifting altitude reaches To peak, angle of revolution controls in boom position D70 °, and luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 36.5 meters, continue 15 minutes, finally at initial position FR106, lift heavy is removed;
D. 1# crane is used instead 2# crane, uses 2# crane to carry out load test, the test procedure repeat step (a)~ (c);
(4) wheels-locked testing:
A. wheels-locked testing of main hook load: in a in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
B. main hook load secondary braking test: in b in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
C. 1# crane is used instead 2# crane, uses 2# crane to carry out wheels-locked testing, the test procedure repeat step (a)~ (b);
(5) safety feature test:
A. emergent stopping is tested: start pumping plant, and carrying out at crane driver's cabin, main junction box, power unit, passage respectively should Anxious button cuts off test, it is ensured that pumping plant can be made to quit work immediately in these position emergency switching-ofves;
B. manual operation of meeting an urgent need is tested: cut off the electricity supply, decide respectively with manual pump hoist, pair hoists, luffing and rotation;
C. load of meeting an urgent need discharges test: first tested by main hook, starts pumping plant, stops, and pass through after lift heavy is lifted by crane 0.5 meter Pressing and emergent discharging button and discharge lift heavy;Again auxiliary hook is tested, start pumping plant, stop after lift heavy is lifted by crane 0.5 meter, and pass through Pressing and emergent discharging button and discharge lift heavy;
(6) post-test-inspection: check that crane structure with or without substantially deformation or is damaged.
It is an advantage of the current invention that: the abridged edition type hoisting test method of heavy lift carrier of the present invention, compared with conventional test methods, Need not use extraneous weight, directly use hanging on heavy lift carrier/self-propelled hatchway cover two deck and 1x hanging block, both reduced Cost, has been greatly reduced labor intensity, and has made easy and simple to handle.
Accompanying drawing explanation
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 to Fig. 8 is the process schematic of the abridged edition type hoisting test method of heavy lift carrier of the present invention.
Detailed description of the invention
The following examples can make professional and technical personnel that the present invention is more fully understood, but the most therefore by this Bright it is limited among described scope of embodiments.
Embodiment
The abridged edition type hoisting test method of the heavy lift carrier of the present embodiment, the method comprises the following steps:
(1) experiment of weighing lift heavy: weighing through the test lift heavy of shipowner's ship inspection accreditation, 90t hangs/self-propelled hatchway cover P25,90t hang/self-propelled hatchway cover P26, the two deck D 7 of the two deck D 12 of the two deck D5 of 34t, 34t, 30t, The two deck D6 of 30t, the 1x hanging block of 13.5t, the 1x hanging block of 45t and the 1x hanging block of 50t.
(2) overload test:
A. 1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchcover Plate P26, two deck D 5, two deck D 6, and two deck D 12;As it is shown in figure 1, utilize 1# crane to be winched to by hatchway cover P26 At FR106, i.e. move hatchcover stop place, then by 1# crane, P25 block lift heavy be superimposed upon on hatch coaming, and lock, D6, D5 and D12 being added on P25 successively by wharf crane, make Loading Center be positioned at FR106, now crane hoists partly Footpath is 18m;Hanging suspender, main hook slowly rises and rises to 5 meters high, and this position is defined as position A;And log is in form 1;
B.1# crane main hook load luffing test: after step a terminates, does luffing motion from position A, makes luffing motion reach Big operating angle, is then back to initial position A;And log is in form 1;
C.1# crane main hook load turning test: after step b terminates, first turn clockwise 360 ° from position A, then during another mistake Pin slowly turns round 360 ° and returns to initial position A, the most slowly falls and removes lift heavy;And log is in form 1;
D.1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, two deck D 5, and the 1x hanging block of 13.5t;As in figure 2 it is shown, utilize 1# crane to winch at FR106 by hatchway cover P25, so D6 and hanging block being added on P25 successively by wharf crane afterwards, make Loading Center be positioned at FR106, now crane hoists radius For 18m;Hanging suspender, main hook rises after rising to 5 meters and slowly to screw out outboard to arm and beam upright position, then slowly luffing to Little operating angle, and this position is defined as position B, the most slowly hoist 5 meters after the most slowly declining 5 meters of weight, now turn round Radius is 33 meters;And log is in form 1;
E.1# crane main hook load luffing test: after step d terminates, slowly do luffing from position B and move to touch less than loop wheel machine The least radius of body 9 meters, luffing returns to initial position B to maximum working radius 33 meters the most again;And log in Form 1;
F.1# crane main hook load turning test: after step e terminates, the most slowly rotates about 70 ° and stops from position B Only, then the most slowly rotating 140 ° of stoppings, then turn clockwise 70 ° and stop, after rotation terminates, arm slowly becomes Width is to the radius of gyration 18 meters, and slowly returns back to initial position FR106 stopping, slowly falling and removes weight;And record test Result is in form 1;
G.1# crane auxiliary hook hoists test: by arm rotation direction harbour, by the 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 36.5 meters, first auxiliary hook is slowly risen and rise to 5 meters high, the most slowly fall and remove lift heavy;Again with wharf crane by the 1x hanging block of 50t Winch to FR127 on ship away from the position of 3.5 meters, the crane 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 5.1 meters, then Auxiliary hook is slowly increased to 5 meters high, the most slowly falls and remove lift heavy;And log is in form 1;
H. 1# crane is used instead 2# crane, uses 2# crane to carry out overload test, as shown in Figure 3 lift heavy is added to as Figure position, the test procedure repeats step (a)~(c), and log is in form 1;As shown in Figure 4 lift heavy is added to as Figure position, the test procedure repeats step (d)~(f), and log is in form 1;2# crane auxiliary hook hoists test work Sequence repeats step g.
(3) load test:
A.1# crane single test: lift heavy includes hanging/self-propelled hatchway cover P25, and two deck D 5;As it is shown in figure 5, it is sharp With 1# crane, hatchway cover P25 is winched at FR106, then D5 is added on P25, make Loading Center be positioned at FR106, now The crane radius that hoists is 18m;Hanging lift heavy, after arm rotation outboard to arm and beam upright position, boom position is defined as Position C, hoists with normal speed, turns round, three action joint operations of luffing, and lifting altitude peaks, angle of revolution Controlling in boom position C70 °, luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 33 meters, continues 15 minutes, Finally at initial position FR106, lift heavy is removed, and record hoist, turn round, derricking speed and hydraulic oil temperature be in form 2;
B.1# crane second trial: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, diformazan Plate D 5 and two deck D12;As shown in Figure 6, utilize 1# crane to winch at FR106 by hatchway cover P26, then by P25, D5 and D12 is added on P26, makes Loading Center be positioned at FR106, and now the crane radius that hoists is 18m;Hang lift heavy, with normal speed Hoist, turn round, three action joint operations of luffing, lifting altitude peaks, 360 °, angle of revolution, and luffing requires to accomplish The minimum radius of clean-up 9 meters and maximum working radius 33 meters, continue 15 minutes, finally removed by lift heavy at initial position FR106, and Record hoists, turns round, derricking speed and hydraulic oil temperature be in form 2;
C.1# crane auxiliary hook hoists test: by arm rotation direction harbour, arm is vertical with captain direction, and boom position is defined For position D, lifting by crane lift heavy with auxiliary hook, hoist with normal speed, turn round, three action joint operations of luffing, lifting altitude reaches To peak, angle of revolution controls in boom position D70 °, and luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 36.5 meters, continue 15 minutes, finally at initial position FR106, lift heavy removed, and record hoist, turn round, derricking speed and Hydraulic oil temperature is in form 2;
D. 1# crane is used instead 2# crane, uses 2# crane to carry out load test, as it is shown in fig. 7, be added to by lift heavy Such as figure position, the test procedure repeat step (a), and record hoist, turn round, derricking speed and hydraulic oil temperature be in form 2;Such as figure Shown in 8, be added to such as figure position by lift heavy, and the test procedure repeats step (b), and record hoist, turn round, derricking speed and liquid Force feed temperature is in form 2;The 2# crane auxiliary hook the test procedure that hoists repeats step (c), and record hoist, turn round, derricking speed with And hydraulic oil temperature is in form 2.
(4) wheels-locked testing:
A. wheels-locked testing of main hook load: in a in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
B. main hook load secondary braking test: in b in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
C. 1# crane is used instead 2# crane, uses 2# crane to carry out wheels-locked testing, the test procedure repeat step (a)~ (b).
(5) safety feature test:
A. emergent stopping is tested: start pumping plant, and carrying out at crane driver's cabin, main junction box, power unit, passage respectively should Anxious button cuts off test, it is ensured that pumping plant can be made to quit work immediately in these position emergency switching-ofves;
B. manual operation of meeting an urgent need is tested: cut off the electricity supply, decide respectively with manual pump hoist, pair hoists, luffing and rotation;
C. load of meeting an urgent need discharges test: first tested by main hook, starts pumping plant, stops, and pass through after lift heavy is lifted by crane 0.5 meter Pressing and emergent discharging button and discharge lift heavy;Again auxiliary hook is tested, start pumping plant, stop after lift heavy is lifted by crane 0.5 meter, and pass through Pressing and emergent discharging button and discharge lift heavy.
(6) post-test-inspection: check that crane structure with or without substantially deformation or is damaged.
Table 1 overload test result
Table 2 stress test result
The ultimate principle of the present invention and principal character and advantages of the present invention have more than been shown and described.The technology people of the industry Member, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrates this described in above-described embodiment and description Bright principle, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, these changes Both fall within scope of the claimed invention with improvement.Claimed scope by appending claims and etc. Effect thing defines.

Claims (1)

1. the abridged edition type hoisting test method of a heavy lift carrier, it is characterised in that: the method comprises the following steps:
(1) experiment of weighing lift heavy: weigh through the test lift heavy of shipowner's ship inspection accreditation, hang/self-propelled hatchway cover P25, hang From/self-propelled hatchway cover P26, two deck D5, two deck D 12, two deck D 7, the 1x that two deck D6 and several weight differ Hanging block;
(2) overload test:
A. 1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchcover Plate P26, two deck D 5, two deck D 6, and two deck D 12;1# crane is utilized to winch at FR106 by hatchway cover P26, i.e. Mobile hatchcover stop place, is then superimposed upon P25 block lift heavy on hatch coaming by 1# crane, and locks, then pass through harbour Hanging and D6, D5 and D12 are added on P25 successively, make Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Hang Suspender, main hook slowly rises and rises to 5 meters high, and this position is defined as position A;
B.1# crane main hook load luffing test: after step a terminates, does luffing motion from position A, makes luffing motion reach Big operating angle, is then back to initial position A;
C.1# crane main hook load turning test: after step b terminates, first turn clockwise 360 ° from position A, then during another mistake Pin slowly turns round 360 ° and returns to initial position A, the most slowly falls and removes lift heavy;
D.1# crane main hook loads the test that hoists: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, two deck D 5, and the 1x hanging block of 13.5t;Utilize 1# crane to winch at FR106 by hatchway cover P25, then pass through harbour Hanging and D6 and hanging block are added on P25 successively, make Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Extension hangs Tool, main hook rises after rising to 5 meters and slowly to screw out outboard to arm and beam upright position, then slowly luffing to minimum operating angle Degree, and this position is defined as position B, the most slowly hoist 5 meters after the most slowly declining 5 meters of weight, now the radius of gyration is 33 Rice;
E.1# crane main hook load luffing test: after step d terminates, slowly do luffing from position B and move to touch less than loop wheel machine The least radius of body 9 meters, luffing returns to initial position B to maximum working radius 33 meters the most again;
F.1# crane main hook load turning test: after step e terminates, the most slowly rotates about 70 ° and stops from position B Only, then the most slowly rotating 140 ° of stoppings, then turn clockwise 70 ° and stop, after rotation terminates, arm slowly becomes Width is to the radius of gyration 18 meters, and slowly returns back to initial position FR106 stopping, slowly falling and removes weight;
G.1# crane auxiliary hook hoists test: by arm rotation direction harbour, by the 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 36.5 meters, first auxiliary hook is slowly risen and rise to 5 meters high, the most slowly fall and remove lift heavy;Again with wharf crane by the 1x hanging block of 50t Winch to FR127 on ship away from the position of 3.5 meters, the crane 1x hanging block of auxiliary hook lifting 50t, the auxiliary hook radius of clean-up 5.1 meters, then Auxiliary hook is slowly increased to 5 meters high, the most slowly falls and remove lift heavy;
H. 1# crane is used instead 2# crane, uses 2# crane to carry out overload test, the test procedure repeat step (a)~ (g);
(3) load test:
A.1# crane single test: lift heavy includes hanging/self-propelled hatchway cover P25, and two deck D 5;Utilize 1# crane Winching at FR106 by hatchway cover P25, be then added on P25 by D5, make Loading Center be positioned at FR106, now crane hoists Radius is 18m;
Hanging lift heavy, after arm rotation outboard to arm and beam upright position, boom position is defined as position C, with normal speed Hoist, turn round, three action joint operations of luffing, lifting altitude peaks, and angle of revolution controls in boom position C70 °, luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 33 meters, continues 15 minutes, finally at initial position Lift heavy is removed by FR106;
B.1# crane second trial: lift heavy includes hanging/self-propelled hatchway cover P25, hangs/self-propelled hatchway cover P26, diformazan Plate D 5 and two deck D12;1# crane is utilized to winch to, at FR106, then P25, D5 and D12 are added to by hatchway cover P26 On P26, making Loading Center be positioned at FR106, now the crane radius that hoists is 18m;Hang lift heavy, hoist with normal speed, return Turn, three action joint operations of luffing, lifting altitude peaks, 360 °, angle of revolution, and luffing requires to accomplish minimum work Radius 9 meters and maximum working radius 33 meters, continue 15 minutes, finally removed by lift heavy at initial position FR106;
C.1# crane auxiliary hook hoists test: by arm rotation direction harbour, arm is vertical with captain direction, and boom position is defined For position D, lifting by crane lift heavy with auxiliary hook, hoist with normal speed, turn round, three action joint operations of luffing, lifting altitude reaches To peak, angle of revolution controls in boom position D70 °, and luffing requires to accomplish the minimum radius of clean-up 9 meters and maximum working radius 36.5 meters, continue 15 minutes, finally at initial position FR106, lift heavy is removed;
D. 1# crane is used instead 2# crane, uses 2# crane to carry out load test, the test procedure repeat step (a)~ (c);
(4) wheels-locked testing:
A. wheels-locked testing of main hook load: in a in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
B. main hook load secondary braking test: in b in step (3), hoist in maximum working radius, maximum and decline respectively Brake during speed, hoist and do 1 brake, decline and do 3 brakes, meanwhile, carry out stopping examination when maximum speed of gyration, maximum luffing Test;
C. 1# crane is used instead 2# crane, uses 2# crane to carry out wheels-locked testing, the test procedure repeat step (a)~ (b);
(5) safety feature test:
A. emergent stopping is tested: start pumping plant, and carrying out at crane driver's cabin, main junction box, power unit, passage respectively should Anxious button cuts off test, it is ensured that pumping plant can be made to quit work immediately in these position emergency switching-ofves;
B. manual operation of meeting an urgent need is tested: cut off the electricity supply, decide respectively with manual pump hoist, pair hoists, luffing and rotation;
C. load of meeting an urgent need discharges test: first tested by main hook, starts pumping plant, stops, and pass through after lift heavy is lifted by crane 0.5 meter Pressing and emergent discharging button and discharge lift heavy;Again auxiliary hook is tested, start pumping plant, stop after lift heavy is lifted by crane 0.5 meter, and pass through Pressing and emergent discharging button and discharge lift heavy;
(6) post-test-inspection: check that crane structure with or without substantially deformation or is damaged.
CN201610295392.8A 2016-05-06 2016-05-06 A kind of abridged edition type hoisting test method of heavy lift carrier Active CN106081944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610295392.8A CN106081944B (en) 2016-05-06 2016-05-06 A kind of abridged edition type hoisting test method of heavy lift carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610295392.8A CN106081944B (en) 2016-05-06 2016-05-06 A kind of abridged edition type hoisting test method of heavy lift carrier

Publications (2)

Publication Number Publication Date
CN106081944A true CN106081944A (en) 2016-11-09
CN106081944B CN106081944B (en) 2019-02-12

Family

ID=57229262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610295392.8A Active CN106081944B (en) 2016-05-06 2016-05-06 A kind of abridged edition type hoisting test method of heavy lift carrier

Country Status (1)

Country Link
CN (1) CN106081944B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111483921A (en) * 2020-04-23 2020-08-04 武汉通联路桥机械技术有限公司 Load test device and test method for hoisting equipment with quasi-diamond structure
CN113247772A (en) * 2021-03-29 2021-08-13 中船澄西船舶修造有限公司 Load test method for crane solid ship after installation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303798A (en) * 2012-03-09 2013-09-18 利勃海尔-韦尔克嫩青有限公司 Crane controller, crane and method for controlling crane
CN103439135A (en) * 2013-09-09 2013-12-11 长沙东屋机电有限责任公司 Test weight modules of bridge crane, and method for forming test load by combining test weight modules
CN203624878U (en) * 2013-10-28 2014-06-04 宁波捷胜海洋开发有限公司 Gantry crane
CN103879904A (en) * 2014-03-17 2014-06-25 江苏华西村海洋工程服务有限公司 Ocean crane ship and moving method thereof
CN104016247A (en) * 2014-06-09 2014-09-03 中联重科股份有限公司 Lifting device of weight rack and crane experiment device
CN105439003A (en) * 2015-12-31 2016-03-30 浙江三一装备有限公司 Crawler crane and hoisting testing device and hoisting method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303798A (en) * 2012-03-09 2013-09-18 利勃海尔-韦尔克嫩青有限公司 Crane controller, crane and method for controlling crane
CN103439135A (en) * 2013-09-09 2013-12-11 长沙东屋机电有限责任公司 Test weight modules of bridge crane, and method for forming test load by combining test weight modules
CN203624878U (en) * 2013-10-28 2014-06-04 宁波捷胜海洋开发有限公司 Gantry crane
CN103879904A (en) * 2014-03-17 2014-06-25 江苏华西村海洋工程服务有限公司 Ocean crane ship and moving method thereof
CN104016247A (en) * 2014-06-09 2014-09-03 中联重科股份有限公司 Lifting device of weight rack and crane experiment device
CN105439003A (en) * 2015-12-31 2016-03-30 浙江三一装备有限公司 Crawler crane and hoisting testing device and hoisting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111483921A (en) * 2020-04-23 2020-08-04 武汉通联路桥机械技术有限公司 Load test device and test method for hoisting equipment with quasi-diamond structure
CN111483921B (en) * 2020-04-23 2021-11-16 武汉通联路桥机械技术有限公司 Load test device and test method for hoisting equipment with quasi-diamond structure
CN113247772A (en) * 2021-03-29 2021-08-13 中船澄西船舶修造有限公司 Load test method for crane solid ship after installation

Also Published As

Publication number Publication date
CN106081944B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN201864494U (en) Marine hydraulic telescopic folding crane
CN106415005A (en) Method and system for de-erection and re-erection of a blade of a wind turbine
CN103640987A (en) Folding arm hydraulic crane
CN106081944A (en) A kind of abridged edition type hoisting test method of heavy lift carrier
CN203558761U (en) Hydraulic knuckle crane
CN204281112U (en) Special lifting lifting system processed by a kind of wheel
CN205045694U (en) Even deck of boat hoist of atress
CN201427842Y (en) Fully rotary crane for ship
CN203975154U (en) Hydraulic gyration hangs the ship raft device for hoisting of holding concurrently
US2361053A (en) Ship cargo rig
CN202022652U (en) Device capable of fast lifting oil tanks in group
CN202169997U (en) Heavy lift vessel with door-shaped trusses
CN204714393U (en) The bull tower crane peculiar to vessel of safety
CN201362566Y (en) Hoisting mechanism of planet three-grade reducer of casting crane
CN110329908A (en) A kind of heavy lift carrier master hangs connection and hangs test method
CN207108302U (en) Possesses the special cantilever crane of port and pier of life-saving functions
CN206466890U (en) A kind of high formula container loop wheel machine hoisting structure of heap
CN104890824A (en) Rocker overturning testing method for jacket launching barge
CN209651755U (en) A kind of novel crawler crane
CN203558758U (en) Marine electric crane
CN201058794Y (en) Slinging matter weight monitoring system for shipboard floating crane
CN107878685B (en) The folding and unfolding of underwater test equipment and bogey
CN206940301U (en) A kind of hydraulic pressure oil transportation crane
Wang et al. Selection and analysis for hydraulic rotary apparatus of the deck hydraulic crane
CN204548415U (en) A kind of box ship assembly type loop wheel machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221118

Address after: No. 1, Hongqiang Avenue, Offshore Ship Industrial Park, Qidong, Nantong, Jiangsu 226000

Patentee after: Jiangsu jiongqiang Marine Equipment Co.,Ltd.

Address before: 226200 No. 1, Hongqiang Avenue, Huiping Town, Nantong City, Jiangsu Province

Patentee before: JIANGSU HONGQIANG MARINE HEAVY INDUSTRY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231031

Address after: No. 1 Hongqiang Avenue, Huiping Town, Qidong City, Nantong City, Jiangsu Province, 226000

Patentee after: JIANGSU HONGQIANG MARINE HEAVY INDUSTRY Co.,Ltd.

Address before: No. 1, Hongqiang Avenue, Offshore Ship Industrial Park, Qidong, Nantong, Jiangsu 226000

Patentee before: Jiangsu jiongqiang Marine Equipment Co.,Ltd.

TR01 Transfer of patent right