CN106081897B - A kind of track crane trolley span correction process - Google Patents

A kind of track crane trolley span correction process Download PDF

Info

Publication number
CN106081897B
CN106081897B CN201610440851.7A CN201610440851A CN106081897B CN 106081897 B CN106081897 B CN 106081897B CN 201610440851 A CN201610440851 A CN 201610440851A CN 106081897 B CN106081897 B CN 106081897B
Authority
CN
China
Prior art keywords
track
trolley
correction
doorframe
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610440851.7A
Other languages
Chinese (zh)
Other versions
CN106081897A (en
Inventor
何华文
朱镇
孙泳涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd filed Critical Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Priority to CN201610440851.7A priority Critical patent/CN106081897B/en
Publication of CN106081897A publication Critical patent/CN106081897A/en
Application granted granted Critical
Publication of CN106081897B publication Critical patent/CN106081897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/16Travelling gear incorporated in or fitted to trolleys or cranes with means for maintaining alignment between wheels and track

Abstract

The present invention relates to a kind of track crane trolley span correction process, its step are as follows:Processing is operated on to both sides doorframe top pull bar, dolly rests in track crane non-electrical room side, and girder doorframe is left using door machine or the non-drag chain side of truck crane lifting trolley;Mounting process supports among girder doorframe, and adjusts girder doorframe to target spacing, both ends using jack and coordinate jack to be tightened up to inner side using chain block;Repetition measurement trolley track related data;Correction position bracket cable parcel is protected from scalding;Firework correction is carried out on crossbeam doorframe, it is desirable to which temperature must not exceed 600 DEG C, and same position firework correction must not exceed 3 times, the parcel slow cooling of orbit correction position;Repetition measurement dolly linearity and gauge after the completion of firework correction.The advantage of the invention is that:The spacing of track in the case where track crane trolley track has completed, can be readjusted, and ensures the linearity of track, step is simple, and requirement can be fully achieved in the trolley track after processing.

Description

A kind of track crane trolley span correction process
Technical field
The present invention relates to a kind of track crane field, more particularly to a kind of track crane trolley span correction process.
Background technology
Track crane is one kind of hoisting machinery, including is symmetricly set on the supporting leg doorframe of both sides and is horizontally set with two supporting leg doors Crossbeam doorframe on frame, dolly are slidably arranged on crossbeam doorframe, due to the deviation in process, small track on crossbeam doorframe Away from can produce larger deviation, but the machined completion of trolley track, to be adjusted to trolley span, it is necessary to consider each side Face factor, difficulty are larger.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of track crane trolley span correction process.
In order to solve the above technical problems, the technical scheme is that:A kind of track crane trolley span correction process, it is created New point is:Its step is as follows:
(1)Processing is operated on to both sides doorframe top pull bar, by means of positive trolley span;
(2)Dolly rests in track crane non-electrical room side, and master is left using door machine or the non-drag chain side of truck crane lifting trolley Liangmen frame;
(3)Mounting process supports among girder doorframe, and adjusts girder doorframe to target spacing, both ends using jack Jack is coordinated to be tightened up to inner side using chain block;
(4)Adjust qualified rear repetition measurement trolley track related data;
(5)Correction position bracket cable parcel is protected from scalding;
(6)Firework correction is carried out on crossbeam doorframe, it is desirable to which temperature must not exceed 600 DEG C, and same position firework correction is not Must be more than 3 times, the parcel slow cooling of orbit correction position;
(7)Repetition measurement dolly linearity and gauge after the completion of firework correction.
Further, the step(2)In, during dolly distancing crossbeam doorframe, its non-drag chain side wheel and interorbital away from for 10~20mm。
Further, the step(3)In, dividing plate in the necessary alignment box body in jack jacking position.
The advantage of the invention is that:In the case where track crane trolley track has completed, the spacing of track can be readjusted, And ensureing the linearity of track, step is simple, and requirement can be fully achieved in the trolley track after processing.
Embodiment
Girder general assembly in place when, if the gauge deviation of dolly is larger, need to adjust gauge size thus require to two side doors Arch pull bar operates on processing, by means of positive trolley span.But under this state dolly correction state it is undesirable, rail linearity degree compared with Difference, firework correction processing is carried out to main beam structure according to this state technological requirement;
(1)Dolly is rested in into non-electrical room side, door machine or truck crane lifting trolley non-drag chain are utilized when firework correction Side make wheel and interorbital away from(10~20mm);
(2)Mounting process supports among girder, and utilizes jack adjustment trolley span target range, it is desirable to jacks position Dividing plate in necessary alignment box body, both ends are tightened up to inner side using chain block or pulled open laterally;
(3)Adjust qualified rear repetition measurement trolley track related data;
(4)Correction position bracket cable parcel is protected from scalding before firework correction;
(5)Orbital position between crossbeam doorframe carries out firework correction, it is desirable to which temperature must not exceed 600 DEG C, same position fire Work correction must not exceed 3 times, the parcel slow cooling of orbit correction position;
(6)Repetition measurement dolly linearity and gauge after the completion of firework correction.
If the data qualifier after above-mentioned steps, the local overproof 1mm of non-drag chain siding track linearity, if without level on track crane Take turns therefore can not process.
By trolley span be 6900 ± 9mm track crane exemplified by, it is whole hang completion after, carry out heavily loaded experiment, arrived along electrical side Non-electrical siding track, which is hung, sets six monitoring points, track crane gauge Details as Follows table:
Data are detected in upper table and exceed deviation requirement, trolley span need to be adjusted, according to above-mentioned technique, the adjustment of two lateral bracing struts Afterwards, a test point, its data such as following table are set on trolley track:
As can be seen from the above table, correction state is undesirable, need to be to crossbeam doorframe firework correction;One group of dolly of repetition measurement after the completion of firework correction Gauge, such as following table:
Data are in tolerance, it is believed that gauge has been adjusted in place.
The general principle and principal character of the present invention has been shown and described above.It should be understood by those skilled in the art that The present invention is not limited to the above embodiments, merely illustrating the principles of the invention described in above-described embodiment and specification, Without departing from the spirit and scope, various changes and modifications of the present invention are possible, and these changes and improvements all fall Enter in scope of the claimed invention.The scope of the present invention is defined by the appended claims and its equivalents.

Claims (3)

  1. A kind of 1. track crane trolley span correction process, it is characterised in that:Its step is as follows:
    (1)Processing is operated on to both sides girder doorframe top pull bar, by means of positive trolley span;
    (2)Dolly rests in track crane non-electrical room side, and girder door is left using door machine or the non-drag chain side of truck crane lifting trolley Frame;
    (3)Mounting process supports among girder doorframe, and adjusts girder doorframe to target spacing using jack, girder doorframe Both ends coordinate jack to be tightened up to inner side using chain block;
    (4)Adjust qualified rear repetition measurement trolley track related data;
    (5)Correction position bracket cable parcel is protected from scalding;
    (6)Firework correction is carried out on girder doorframe, it is desirable to which temperature must not exceed 600 DEG C, and same position firework correction must not surpass Cross 3 times, the parcel slow cooling of trolley track correction position;
    (7)The linearity and gauge of repetition measurement trolley track after the completion of firework correction.
  2. A kind of 2. track crane trolley span correction process according to claim 1, it is characterised in that:The step(2)In, When dolly is transferred from girder doorframe, the spacing of its non-drag chain side wheel and trolley track is 10 ~ 20mm.
  3. A kind of 3. track crane trolley span correction process according to claim 1, it is characterised in that:The step(3)In, Dividing plate in the necessary alignment box body in jack jacking position.
CN201610440851.7A 2016-06-20 2016-06-20 A kind of track crane trolley span correction process Active CN106081897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610440851.7A CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610440851.7A CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Publications (2)

Publication Number Publication Date
CN106081897A CN106081897A (en) 2016-11-09
CN106081897B true CN106081897B (en) 2017-11-28

Family

ID=57236982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610440851.7A Active CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Country Status (1)

Country Link
CN (1) CN106081897B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100573045C (en) * 2006-12-28 2009-12-23 上海宝钢工业检测公司 Hoist-transportating machine rail span, linearity automated detection method
US9663331B2 (en) * 2010-12-22 2017-05-30 Konecranes Plc Lifting device with an adjustable carriage
CN102070079A (en) * 2010-12-24 2011-05-25 南通振华重型装备制造有限公司 Assembly process for controlling gauge of rail type container gantry crane trolley
CN202098974U (en) * 2011-05-20 2012-01-04 深圳市崇达电路技术股份有限公司 Traveling track device
CN202265318U (en) * 2011-09-14 2012-06-06 江苏沃得起重机有限公司 Correction auxiliary device for motion bias rail of crane cart
CN103159134A (en) * 2011-12-14 2013-06-19 江苏沃得起重机有限公司 Crane cart running off-rail correction auxiliary device
CN103452018B (en) * 2013-08-20 2015-07-15 中铁十七局集团第二工程有限公司 Track gauge correction method for double-block type ballastless track construction
CN104671106A (en) * 2013-11-29 2015-06-03 哈尔滨恒誉名翔科技有限公司 Crane journey correction system

Also Published As

Publication number Publication date
CN106081897A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN204370822U (en) For the transport adjustment all-in-one of steel girder erection
CN103286284B (en) Continuous bloom caster and overall online quick arc-alignment method thereof
WO2012062150A1 (en) Automobile lifting device in transport apparatus in automobile production and operation method therefor
CN204980066U (en) Conveyer belt of adjustable high angle
CN106995186A (en) Building materials transporting equipment for building and its method of work provided with pressure sensor
CN106081897B (en) A kind of track crane trolley span correction process
CN206705188U (en) A kind of turning device and suspender
CN109179121B (en) Debugging device for construction elevator cage
CN106315407B (en) Ultra-large type crane girder slides method for dismounting in small space
CN108821134A (en) A kind of Architectural Equipment hanging apparatus
WO2016033936A1 (en) Four-wheel positioning method and positioning instrument system applicable to two-post lifter and small scissor lifter
CN202479271U (en) Flange strip leveling correcting device
CN205472146U (en) Organic tenant's ladder sedan -chair frame
CN103968212A (en) Mechanical device installing frame
CN206985523U (en) A kind of gantry crane Suspension hook structure
CN203830937U (en) Auxiliary device for butt welding of sectional materials
CN205169507U (en) A grass -hopper that is used for shell after investment casting dewaxing
CN104709854A (en) Large glass-lined pot overturning technology
KR100774392B1 (en) Layout system for workplace of vehicle
CN207511452U (en) A kind of aluminium section material automatic piling system
CN106219205B (en) A kind of kiln furnitures deviation correction mechanism in dalle production process
CN207452184U (en) A kind of aluminium sheet annealing furnace
CN110005437A (en) For mid-board, its installation equipment and the installation method in tunnel
CN205344947U (en) Carry over pinch rolls dolly is used in glass substrate production
CN103662853B (en) A kind of metal coiled material piler coiled material fender guard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: Farm of Nantong Development Zone in Jiangsu Province, Nantong City, 226000 River Road No. 1

Applicant after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd.

Address before: 226000 Jiangsu city of Nantong province Nantong Zhenhua Road Development Zone No. 1

Applicant before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd.

GR01 Patent grant
GR01 Patent grant