CN106081897A - A kind of track crane trolley span correction process - Google Patents

A kind of track crane trolley span correction process Download PDF

Info

Publication number
CN106081897A
CN106081897A CN201610440851.7A CN201610440851A CN106081897A CN 106081897 A CN106081897 A CN 106081897A CN 201610440851 A CN201610440851 A CN 201610440851A CN 106081897 A CN106081897 A CN 106081897A
Authority
CN
China
Prior art keywords
track
doorframe
trolley
correction
firer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610440851.7A
Other languages
Chinese (zh)
Other versions
CN106081897B (en
Inventor
何华文
朱镇
孙泳涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority to CN201610440851.7A priority Critical patent/CN106081897B/en
Publication of CN106081897A publication Critical patent/CN106081897A/en
Application granted granted Critical
Publication of CN106081897B publication Critical patent/CN106081897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/16Travelling gear incorporated in or fitted to trolleys or cranes with means for maintaining alignment between wheels and track

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)
  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The present invention relates to a kind of track crane trolley span correction process, its step is as follows: doorframe top, both sides pull bar operates on process, and dolly rests in side, track crane non-electrical room, utilizes door machine or truck crane lifting trolley non-drag chain side to leave girder doorframe;Mounting process support in the middle of girder doorframe, and utilize jack adjustment girder doorframe to target distance, both ends utilize chain block to coordinate jack to tighten up to inner side;Repetition measurement trolley track related data;It is protected from scalding to correction position bracket cable parcel;Carrying out firer's correction on crossbeam doorframe, it is desirable to temperature must not exceed 600 DEG C, same position firer correction must not exceed 3 times, the parcel slow cooling of orbit correction position;Firer has corrected rear repetition measurement dolly linearity and gauge.It is an advantage of the current invention that: in the case of track crane trolley track completes, can readjust the spacing of track, and the linearity of guarantee track, step is simple, and the trolley track after processing can be fully achieved requirement.

Description

A kind of track crane trolley span correction process
Technical field
The present invention relates to a kind of track crane field, particularly to a kind of track crane trolley span correction process.
Background technology
Track crane is the one of hoisting machinery, including being symmetricly set on the supporting leg doorframe of both sides and being horizontally set with at two supporting leg doors Crossbeam doorframe on frame, dolly is slidably arranged on crossbeam doorframe, due to the deviation in the course of processing, little track on crossbeam doorframe Away from producing bigger deviation, but trolley track is machined to be completed, and to be adjusted trolley span, needs to consider each side Face factor, difficulty is bigger.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of track crane trolley span correction process.
For solving above-mentioned technical problem, the technical scheme is that a kind of track crane trolley span correction process, its wound New point is: its step is as follows:
(1) doorframe top, both sides pull bar is operated on process, by means of positive trolley span;
(2) dolly rests in side, track crane non-electrical room, utilizes door machine or truck crane lifting trolley non-drag chain side to leave girder door Frame;
(3) mounting process support in the middle of girder doorframe, and utilize jack to adjust girder doorframe to target distance, both ends utilization Chain block coordinates jack to tighten up to inner side;
(4) qualified rear repetition measurement trolley track related data is adjusted;
(5) it is protected from scalding to correction position bracket cable parcel;
(6) carrying out firer's correction on crossbeam doorframe, it is desirable to temperature must not exceed 600 DEG C, same position firer must not correct and surpassed Cross 3 times, the parcel slow cooling of orbit correction position;
(7) firer has corrected rear repetition measurement dolly linearity and gauge.
Further, in described step (2), when crossbeam doorframe left under order by dolly, its non-drag chain side wheel with track space is 10~20mm。
Further, in described step (3), dividing plate in the necessary alignment box body in jack jacking position.
It is an advantage of the current invention that: the spacing of track in the case of track crane trolley track completes, can be readjusted, And the linearity of guarantee track, step is simple, and the trolley track after processing can be fully achieved requirement.
Detailed description of the invention
Girder is time general assembly puts in place, if the gauge deviation of dolly is relatively big, need to adjust the size of gauge therefore require two side doors Process operated on by arch pull bar, by means of positive trolley span.But under this state, dolly correction state is undesirable, and rail linearity degree is relatively Difference, carries out firer's correction process according to this state technological requirement to main beam structure;
(1) dolly is rested in side, non-electrical room, treat that firer's timing utilizes door machine or truck crane lifting trolley non-drag chain side to make Wheel and track space (10 ~ 20mm);
(2) mounting process support in the middle of girder, and utilize jack to adjust trolley span target range, it is desirable to jacking position is necessary Dividing plate in alignment box body, both ends utilize chain block tighten up to inner side or pull open laterally;
(3) qualified rear repetition measurement trolley track related data is adjusted;
(4) it is protected from scalding to correction position bracket cable parcel before firer corrects;
(5) orbital position between crossbeam doorframe carries out firer's correction, it is desirable to temperature must not exceed 600 DEG C, same position firer school Just must not exceed 3 times, the parcel slow cooling of orbit correction position;
(6) firer has corrected rear repetition measurement dolly linearity and gauge.
If data qualifier after above-mentioned steps, the overproof 1mm in non-drag chain siding track linearity local, if without level on track crane Take turns therefore can not process.
As a example by the track crane that trolley span is 6900 ± 9mm, whole hang completion after, carry out heavy duty experiment, arrive along electrical side Non-electrical siding track hangs and arranges six monitoring points, track crane gauge Details as Follows table:
Detecting data in upper table and exceeded deviation requirement, need to be adjusted trolley span, according to above-mentioned technique, two lateral bracing struts are adjusted After whole, trolley track arranges a test point, its data such as following table:
Finding out from upper table, correction state is undesirable, need to correct crossbeam doorframe firer;Firer has corrected one group of dolly of rear repetition measurement Gauge, such as following table:
Data are all in tolerance, it is believed that gauge is adjusted in place.
Ultimate principle and the principal character of the present invention have more than been shown and described.Skilled person will appreciate that of the industry, The present invention is not restricted to the described embodiments, the principle that the present invention is simply described described in above-described embodiment and description, Without departing from the spirit and scope, the present invention also has various changes and modifications, and these changes and improvements all fall Enter in scope of the claimed invention.Claimed scope is defined by appending claims and equivalent thereof.

Claims (3)

1. a track crane trolley span correction process, it is characterised in that: its step is as follows:
(1) doorframe top, both sides pull bar is operated on process, by means of positive trolley span;
(2) dolly rests in side, track crane non-electrical room, utilizes door machine or truck crane lifting trolley non-drag chain side to leave girder door Frame;
(3) mounting process support in the middle of girder doorframe, and utilize jack to adjust girder doorframe to target distance, both ends utilization Chain block coordinates jack to tighten up to inner side;
(4) qualified rear repetition measurement trolley track related data is adjusted;
(5) it is protected from scalding to correction position bracket cable parcel;
(6) carrying out firer's correction on crossbeam doorframe, it is desirable to temperature must not exceed 600 DEG C, same position firer must not correct and surpassed Cross 3 times, the parcel slow cooling of orbit correction position;
(7) firer has corrected rear repetition measurement dolly linearity and gauge.
A kind of track crane trolley span correction process the most according to claim 1, it is characterised in that: in described step (2), When crossbeam doorframe left under order by dolly, its non-drag chain side wheel and track space are 10 ~ 20mm.
A kind of track crane trolley span correction process the most according to claim 1, it is characterised in that: in described step (3), Dividing plate in the necessary alignment box body in jack jacking position.
CN201610440851.7A 2016-06-20 2016-06-20 A kind of track crane trolley span correction process Active CN106081897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610440851.7A CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610440851.7A CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Publications (2)

Publication Number Publication Date
CN106081897A true CN106081897A (en) 2016-11-09
CN106081897B CN106081897B (en) 2017-11-28

Family

ID=57236982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610440851.7A Active CN106081897B (en) 2016-06-20 2016-06-20 A kind of track crane trolley span correction process

Country Status (1)

Country Link
CN (1) CN106081897B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210810A (en) * 2006-12-28 2008-07-02 上海宝钢工业检测公司 Hoist-transportating machine rail span, linearity automated detection method
CN102070079A (en) * 2010-12-24 2011-05-25 南通振华重型装备制造有限公司 Assembly process for controlling gauge of rail type container gantry crane trolley
CN202098974U (en) * 2011-05-20 2012-01-04 深圳市崇达电路技术股份有限公司 Traveling track device
CN202265318U (en) * 2011-09-14 2012-06-06 江苏沃得起重机有限公司 Correction auxiliary device for motion bias rail of crane cart
CN103159134A (en) * 2011-12-14 2013-06-19 江苏沃得起重机有限公司 Crane cart running off-rail correction auxiliary device
CN103459297A (en) * 2010-12-22 2013-12-18 科尼起重机设备有限公司 Lifting equipment having adjustable carriage
CN103452018A (en) * 2013-08-20 2013-12-18 中铁十七局集团第二工程有限公司 Track gauge correction method for double-block type ballastless track construction
CN104671106A (en) * 2013-11-29 2015-06-03 哈尔滨恒誉名翔科技有限公司 Crane journey correction system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210810A (en) * 2006-12-28 2008-07-02 上海宝钢工业检测公司 Hoist-transportating machine rail span, linearity automated detection method
CN103459297A (en) * 2010-12-22 2013-12-18 科尼起重机设备有限公司 Lifting equipment having adjustable carriage
CN102070079A (en) * 2010-12-24 2011-05-25 南通振华重型装备制造有限公司 Assembly process for controlling gauge of rail type container gantry crane trolley
CN202098974U (en) * 2011-05-20 2012-01-04 深圳市崇达电路技术股份有限公司 Traveling track device
CN202265318U (en) * 2011-09-14 2012-06-06 江苏沃得起重机有限公司 Correction auxiliary device for motion bias rail of crane cart
CN103159134A (en) * 2011-12-14 2013-06-19 江苏沃得起重机有限公司 Crane cart running off-rail correction auxiliary device
CN103452018A (en) * 2013-08-20 2013-12-18 中铁十七局集团第二工程有限公司 Track gauge correction method for double-block type ballastless track construction
CN104671106A (en) * 2013-11-29 2015-06-03 哈尔滨恒誉名翔科技有限公司 Crane journey correction system

Also Published As

Publication number Publication date
CN106081897B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
US9797714B2 (en) Limit detection system for railway vehicle
CN106335603B (en) A kind of assemble method of corrugated bulkhead block
CN204370822U (en) For the transport adjustment all-in-one of steel girder erection
CN103286284B (en) Continuous bloom caster and overall online quick arc-alignment method thereof
CN204980066U (en) Conveyer belt of adjustable high angle
CN106081897A (en) A kind of track crane trolley span correction process
CN103521559B (en) A kind of apparatus for correcting of piano hand and antidote
WO2016033936A1 (en) Four-wheel positioning method and positioning instrument system applicable to two-post lifter and small scissor lifter
CN104249901A (en) Power distribution switch cabinet in-place mounting platform
CN105347176A (en) Lifting appliance
MX2016000248A (en) Apparatus for lifting a ladle and setting same down again, plant having such an apparatus, and method.
CN106226758A (en) Adjustable laser ranging mechanism
JP2017030945A (en) Method for teaching transfer data to carrier and teaching system
CN104624750A (en) Steel pipe bending machine
CN105127744B (en) Equipment compartment assembly tool and its assemble method under EMUs car
CN202784807U (en) Saddle for transporting vertical steel coils
CN105215634B (en) A kind of small-sized gantry hangs hoisting
CN206794376U (en) A kind of finishing mill kink encoder-mounting bracket
CN105523705B (en) Edge machine replaces supporting rack
CN206521199U (en) A kind of aluminium plate in coil suspender and aluminium plate in coil conveying device
CN206767364U (en) Elevator sliding rack guider
CN205344947U (en) Carry over pinch rolls dolly is used in glass substrate production
PH12019000425A1 (en) Low overhead clearance boring machine and method for assembling the same
CN203612811U (en) Horizontal module hoisting system
CN204397234U (en) Remodeling transformation of the way platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: Farm of Nantong Development Zone in Jiangsu Province, Nantong City, 226000 River Road No. 1

Applicant after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd.

Address before: 226000 Jiangsu city of Nantong province Nantong Zhenhua Road Development Zone No. 1

Applicant before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd.

GR01 Patent grant
GR01 Patent grant