CN106049883A - 混凝土构件新型吊点施工工艺 - Google Patents
混凝土构件新型吊点施工工艺 Download PDFInfo
- Publication number
- CN106049883A CN106049883A CN201610347721.9A CN201610347721A CN106049883A CN 106049883 A CN106049883 A CN 106049883A CN 201610347721 A CN201610347721 A CN 201610347721A CN 106049883 A CN106049883 A CN 106049883A
- Authority
- CN
- China
- Prior art keywords
- bolt
- suspension centre
- component
- nut
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了混凝土构件新型吊点施工工艺,采用预埋螺栓代替拉环作为构件的起吊受力点,螺母替代挂钩作为吊具,在构件制作过程中通过定位杠上悬挂定位螺栓与圆台螺母确保吊点的平面位置和高度的准确性,使用期间用橡胶塞塞堵吊点螺栓并用砂浆封堵,通过本发明的工艺彻底解决了以往混凝土构件吊点位置偏差大、吊点处有返锈现象等质量通病,提高了构件的观感质量和耐久性,赢得了业主单位的赞誉,提高了企业的市场竞争力,同时也为各行业的混凝土构件吊点形式提供了一种全新的思路。
Description
技术领域
本发明涉及一种码头工程技术领域,尤其涉及一种混凝土构件新型吊点施工工艺。
背景技术
多年来,码头工程中诸如电缆沟盖板等小型混凝土构件一直采用常规的拉环式吊点,即在构件中预埋铁质拉环的做法。依照此工艺进行施工,由于拉环顶部为小半径圆弧在加工时易出现尺寸偏差;拉环圆弧结构不利于定位安装;拉环底部与构件钢筋相连在浇筑混凝土过程中易发生跑位等原因造成构件成品的吊点位置难以控制。同时,吊点材质为钢材,在制作、安装的过程中易发生锈蚀,即使在安装完毕后采用砂浆对吊孔进行封堵,由于吊点处的混凝土保护层偏薄趋近于零保护层,所以不能避免在长期使用过程中吊点钢筋发生锈蚀并表现为吊点处混凝土发生返锈的现象。
发明内容
本发明旨在解决现有技术的不足,而提供一种混凝土构件新型吊点施工工艺,将一种在工程中经常采用的螺栓连接引用到构件吊点工艺中,创新出一种全新的吊点形式—螺栓式吊点。
本发明为实现上述目的,采用以下技术方案:混凝土构件新型吊点施工工艺,采用预埋螺栓代替拉环作为构件的起吊受力点,螺母替代挂钩作为吊具,在构件制作过程中通过定位杠上悬挂定位螺栓与圆台螺母确保吊点的平面位置和高度的准确性,使用期间用橡胶塞塞堵吊点螺栓并用砂浆封堵,其特征在于,包括以下操作步骤:
(1)、采用定型钢模板,在构件四周加设防锈蚀的镀锌护边角钢,角钢上焊接螺母并通过螺栓与定型钢模板相连,并进行钢筋绑扎;
(2)、在模板上支立吊架横梁并安装定位螺栓,定位螺栓下部通过圆台螺母与吊点螺栓连接,通过定位螺栓调节圆台螺母的升降以控制吊点螺栓的高度,待圆台螺母顶面与构件顶面平齐后,将吊点螺栓与钢筋绑扎以进行稳固;
(3)、在对吊点螺栓位置进行确认后,进行混凝土浇筑;
(4)、在混凝土初凝后,将吊架、定位螺栓、圆台螺母拆除;
(5)、待混凝土强度达到70%以上,使用螺母吊具进行出槽存放或安装;
(6)、在构件安装正位并检查合格后,在吊点螺栓上涂抹黄油做防锈处理,然后用橡胶塞塞堵吊点孔,最后使用水泥砂浆进行封堵。
作为优选,所述步骤(2)中的圆台螺母采用倒锥型的圆台螺母。
作为优选,所述步骤(3)中的混凝土浇筑采用浇筑时人工分灰,不允许使用混凝土搅拌车直接向盖板模板内倾倒混凝土以防吊点位置偏移。
本发明的有益效果是:本发明彻底解决了以往混凝土构件吊点位置偏差大、吊点处有返锈现象等质量通病,提高了构件的观感质量和耐久性,赢得了业主单位的赞誉,提高了企业的市场竞争力,同时也为各行业的混凝土构件吊点形式提供了一种全新的思路。
具体实施方式
下面结合实施例对本发明作进一步说明:
实施例1
混凝土构件新型吊点施工工艺,采用预埋螺栓代替拉环作为构件的起吊受力点,螺母替代挂钩作为吊具,在构件制作过程中通过定位杠上悬挂定位螺栓与圆台螺母确保吊点的平面位置和高度的准确性,使用期间用橡胶塞塞堵吊点螺栓并用砂浆封堵,具体包括以下操作步骤:
(1)、采用定型钢模板,在构件四周加设防锈蚀的镀锌护边角钢,角钢上焊接螺母并通过螺栓与定型钢模板相连,并进行钢筋绑扎;
(2)、在模板上支立吊架横梁并安装定位螺栓,定位螺栓下部通过圆台螺母与吊点螺栓连接,通过定位螺栓调节圆台螺母的升降以控制吊点螺栓的高度,待圆台螺母顶面与构件顶面平齐后,将吊点螺栓与钢筋绑扎以进行稳固;
(3)、在对吊点螺栓位置进行确认后,进行混凝土浇筑,混凝土浇筑采用浇筑时人工分灰,不允许使用混凝土搅拌车直接向盖板模板内倾倒混凝土以防吊点位置偏移;
(4)、在混凝土初凝后,将吊架、定位螺栓、圆台螺母拆除;
(5)、待混凝土强度达到70%以上,使用螺母吊具进行出槽存放或安装;
(6)、在构件安装正位并检查合格后,在吊点螺栓上涂抹黄油做防锈处理,然后用橡胶塞塞堵吊点孔,最后使用水泥砂浆进行封堵。
所述步骤(2)中的圆台螺母采用倒锥型的圆台螺母。
上面对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。
Claims (3)
1.混凝土构件新型吊点施工工艺,采用预埋螺栓代替拉环作为构件的起吊受力点,螺母替代挂钩作为吊具,在构件制作过程中通过定位杠上悬挂定位螺栓与圆台螺母确保吊点的平面位置和高度的准确性,使用期间用橡胶塞塞堵吊点螺栓并用砂浆封堵,其特征在于,包括以下操作步骤:
(1)、采用定型钢模板,在构件四周加设防锈蚀的镀锌护边角钢,角钢上焊接螺母并通过螺栓与定型钢模板相连,并进行钢筋绑扎;
(2)、在模板上支立吊架横梁并安装定位螺栓,定位螺栓下部通过圆台螺母与吊点螺栓连接,通过定位螺栓调节圆台螺母的升降以控制吊点螺栓的高度,待圆台螺母顶面与构件顶面平齐后,将吊点螺栓与钢筋绑扎以进行稳固;
(3)、在对吊点螺栓位置进行确认后,进行混凝土浇筑;
(4)、在混凝土初凝后,将吊架、定位螺栓、圆台螺母拆除;
(5)、待混凝土强度达到70%以上,使用螺母吊具进行出槽存放或安装;
(6)、在构件安装正位并检查合格后,在吊点螺栓上涂抹黄油做防锈处理,然后用橡胶塞塞堵吊点孔,最后使用水泥砂浆进行封堵。
2.根据权利要求1所述的混凝土构件新型吊点施工工艺,其特征在于,所述步骤(2)中的圆台螺母采用倒锥型的圆台螺母。
3.根据权利要求1所述的混凝土构件新型吊点施工工艺,其特征在于,所述步骤(3)中的混凝土浇筑采用浇筑时人工分灰,不允许使用混凝土搅拌车直接向盖板模板内倾倒混凝土以防吊点位置偏移。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610347721.9A CN106049883A (zh) | 2016-05-23 | 2016-05-23 | 混凝土构件新型吊点施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610347721.9A CN106049883A (zh) | 2016-05-23 | 2016-05-23 | 混凝土构件新型吊点施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106049883A true CN106049883A (zh) | 2016-10-26 |
Family
ID=57174233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610347721.9A Withdrawn CN106049883A (zh) | 2016-05-23 | 2016-05-23 | 混凝土构件新型吊点施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049883A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4338715A (en) * | 1980-06-12 | 1982-07-13 | Koppers Company, Inc. | Method for inserting a void plug into a lift insert for a concrete product |
CN2885970Y (zh) * | 2006-03-16 | 2007-04-04 | 润弘精密工程事业股份有限公司 | 预埋吊点的墙板结构 |
CN201176366Y (zh) * | 2007-12-17 | 2009-01-07 | 贵阳铝镁设计研究院 | 建筑物内增设的悬挂运输设备吊点结构 |
EP2110486A2 (de) * | 2008-04-16 | 2009-10-21 | Ankaba Ankertechnik und Bauhandel AG | Aufzugsmontageanker |
CN202609773U (zh) * | 2012-05-29 | 2012-12-19 | 中国海洋石油总公司 | 插销式吊点 |
JP2014122104A (ja) * | 2012-12-21 | 2014-07-03 | Toda Constr Co Ltd | 不整型体用の吊治具とその吊持方法 |
-
2016
- 2016-05-23 CN CN201610347721.9A patent/CN106049883A/zh not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4338715A (en) * | 1980-06-12 | 1982-07-13 | Koppers Company, Inc. | Method for inserting a void plug into a lift insert for a concrete product |
CN2885970Y (zh) * | 2006-03-16 | 2007-04-04 | 润弘精密工程事业股份有限公司 | 预埋吊点的墙板结构 |
CN201176366Y (zh) * | 2007-12-17 | 2009-01-07 | 贵阳铝镁设计研究院 | 建筑物内增设的悬挂运输设备吊点结构 |
EP2110486A2 (de) * | 2008-04-16 | 2009-10-21 | Ankaba Ankertechnik und Bauhandel AG | Aufzugsmontageanker |
CN202609773U (zh) * | 2012-05-29 | 2012-12-19 | 中国海洋石油总公司 | 插销式吊点 |
JP2014122104A (ja) * | 2012-12-21 | 2014-07-03 | Toda Constr Co Ltd | 不整型体用の吊治具とその吊持方法 |
Non-Patent Citations (1)
Title |
---|
高平原等: "混凝土构件新型吊点施工方法", 《水运工程》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20170226702A1 (en) | Lifting of concrete components | |
CN109537895A (zh) | 一种装配整体式框架现浇核心筒结构梁板柱安装方法 | |
CN105064579A (zh) | 一种保证卫生间止水坎台浇筑成型的施工方法 | |
CN105618725A (zh) | 复合砌筑的中小型钢包工作衬 | |
CN106049883A (zh) | 混凝土构件新型吊点施工工艺 | |
CN110725324A (zh) | 一种剪力墙高肢导墙转换支撑结构及其施工方法 | |
CN204590344U (zh) | 板材幕墙抗震连接组合挂件 | |
CN106567548A (zh) | 方形原煤斗分段安装工法 | |
CN104931338A (zh) | 任意角度回弹测试砼试块的固定装置及其制作和使用方法 | |
MY197305A (en) | Method for handling slag pot or ladle and pyrometallurgy tools | |
CN204690801U (zh) | 地下室顶板后浇带吊支模结构 | |
CN203891470U (zh) | 一种剪力墙模板用紧固螺栓 | |
CN205171834U (zh) | 密封防滑预应力张拉端锚具 | |
CN207063177U (zh) | 现浇混凝土楼板用吊挂预埋件 | |
CN205742548U (zh) | 一种预埋于混凝土中的抗剪栓钉 | |
CN202401026U (zh) | 滑轮吊装烟道弯管安装施工设备 | |
CN206571135U (zh) | 一种不影响施工的外脚手架连墙件 | |
CN205840190U (zh) | 一种销键连接预制梯段的安装结构 | |
CN207363110U (zh) | 新型水泥支撑梁 | |
CN104074279B (zh) | 一种适用于连接工型和t型钢条的连接结构 | |
CN208734052U (zh) | 预制装配式建筑施工外脚手架连墙构件 | |
CN208267372U (zh) | 一种组合式降板吊模 | |
CN208844800U (zh) | 一种简易的成品化浇筑支撑工具 | |
CN206539044U (zh) | 用于工字钢构件的安全带挂设装置 | |
CN207293927U (zh) | 一种船用临时吊具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20161026 |
|
WW01 | Invention patent application withdrawn after publication |