CN106049678A - II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof - Google Patents

II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof Download PDF

Info

Publication number
CN106049678A
CN106049678A CN201610400734.8A CN201610400734A CN106049678A CN 106049678 A CN106049678 A CN 106049678A CN 201610400734 A CN201610400734 A CN 201610400734A CN 106049678 A CN106049678 A CN 106049678A
Authority
CN
China
Prior art keywords
unit
tube
prefabricated
assembling
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610400734.8A
Other languages
Chinese (zh)
Inventor
马克俭
徐鹏强
吴刚
叶浩文
令狐延
赵勇
朱九洲
房海
张华刚
吴京
林力勋
何永安
王丰娟
李�杰
魏艳辉
陈志鹏
白蓉
刁川
宋金涛
王维奇
李莉
姜岚
陆红娜
陈靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Construction Engineering Group Fourth Construction Co
Prosperous Large Building Science And Technology Ltd
Southeast University
Guizhou University
China Construction Fourth Engineering Division Corp Ltd
Weifang Changda Construction Group Ltd
No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
Guizhou Construction Engineering Group Fourth Construction Co
Prosperous Large Building Science And Technology Ltd
Southeast University
Guizhou University
China Construction Fourth Engineering Division Corp Ltd
Weifang Changda Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Construction Engineering Group Fourth Construction Co, Prosperous Large Building Science And Technology Ltd, Southeast University, Guizhou University, China Construction Fourth Engineering Division Corp Ltd, Weifang Changda Construction Group Ltd filed Critical Guizhou Construction Engineering Group Fourth Construction Co
Priority to CN201610400734.8A priority Critical patent/CN106049678A/en
Publication of CN106049678A publication Critical patent/CN106049678A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • E04B1/3404Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability supported by masts or tower-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/28Cross-ribbed floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention provides an II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure. The structure comprises a unit A, a unit B, a unit C, a unit D and units E which are all prefabricated units and supported by steel tubes. Each crossed joint of each unit is provided with one steel tube, and lifting leveling equipment is arranged at the top ends of the steel tubes. The units E are the minimum unit, and the unit A, the unit B, the unit C and the unit D are all composed of the units E. A floor system with high-rise and ultrahigh-rise concrete space lattice box-type tube-in-tube structures is composed of concrete orthogonal-diagonal open-web lattices and has an excellent three-dimensional mechanical property, the consumption of concrete and steel is reduced, but the number of joints of upper chords and lower chords of the floor system is substantially increased; and the II-type fabricated prefabricated-lattice units are adopted, the units are prefabricated at a prefabricating field and then spliced on site to form the integral fabricated floor system, and the field work amount is substantially reduced.

Description

A kind of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and Manufacture method
Technical field
The present invention relates to technical field of buildings, particularly relate to a kind of concrete orthogonal-diagonal lattice space lattice, specifically refer to one Plant assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and preparation method thereof.
Background technology
Concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structural system, be than traditional concrete frame, barrel structure and The new structural systen that tube-in-tube structural system is superior, and " the Super High concrete orthogonal-diagonal lattice space the most declared Grid boxlike tube-in-tube structure and manufacture method " and " assembly concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and Manufacture method ", in the two patent application, the former mainly introduces the building function of this type of new concrete structure high-rise building Advantage, divides room flexibly such as large bay, and each floor is all free stern layer to be easy to pipeline installation, reach " applicable, economical, green, Attractive in appearance " Architecture Policies, the latter is to introduce this type of new concrete structure how to use assembled integral construction method, i.e. it Superstructure and the mesh type frame structure of periphery, how precasting yard press grid cell prefabricated after, install at the construction field (site), by dress Join all-in-one-piece construction technology and reach industrialized requirement.
Its every layer concrete hollow floor system, is divided into A, B, C tri-class Prefabricated hollow grid cell, the wherein exhibition of A unit plane Open area 81m2, prefabricated unit deadweight 7.3T, precasting yard transports after making, installs the plant equipment related to more.
Former " assembly concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and manufacture method " (i.e. I declared Type), concrete orthogonal-diagonal lattice hollow sandwich panel ceiling for storied building is divided into tri-kinds of prefabricated units of A, B, C, wherein A, B Prefabricated hollow grid Unit is excessive, is unfavorable for that unit in charge of construction utilizes traditional transport and installation to carry out assembly work smoothly.
Summary of the invention
The technical problem to be solved in the present invention is for the weak point existing for prior art, it is provided that a kind of assembling II type Concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and preparation method thereof.
A kind of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and preparation method thereof is hereinafter referred to as Assembling II type and assembling II type manufacture method, it is wherein maximum that this assembling II type is divided into five prefabricated units (A, B, C, D, E unit) A unit planar dimension 9.78m × 4.69m=45.9m2, conduct oneself with dignity 4130kg, than the assembling I type A unit area of plane and prefabricated list Unit's deadweight decline connects by about one time, it is simple to transports and installs, and special proposition " assembles II type concrete orthogonal-diagonal lattice space lattice boxlike cylinder Tube-in-tube structure " in order under the equipment and facility of traditional structure assembling engineering method, it is applied to this type of novel fabricated concrete smoothly Structural system.
In Super High and Tall Office Building are built, apply this type of new structural systen, its construction costs will float downward 20% with On, but the practice of this type of new structural systen, it is necessary to walking assembled integral industrialization road, special proposition " assembles II type concrete Orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure and manufacture method ".
The technical solution of the present invention is to provide following a kind of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike Tube-in-tube structure, including five unit of A, B, C, D and E.
As preferably, five unit of described A, B, C, D and E are prefabricated unit.
As preferably, five unit of described A, B, C, D and E all use steel pipe support, each cross node of unit Having a steel pipe, steel pipe top arranges lifting level device.
As preferably, E unit is minimum unit, and other A, B, C, D unit is formed by E unit.
As preferably, A unit is 8 E unit compositions, and unit B is 6 E unit compositions, and C cell is 4 E unit compositions, D unit is 3 E unit compositions.
As preferably, described minimum E unit is cross structure, including winding up and lower edge.
As preferably, described lower edge is cross, and its cross section 250 × 150 is the most prefabricated, middle part shear connector cubic block 250 × 250 × 100 is also prefabricated, and its top reserves shear connector reinforcing bar.
As preferably, design section of winding up is also 250 × 150, and time prefabricated, top chord section is 250 × 70, its bottom of winding up Reinforcing bar is prefabricated, and it is good that colligation reserved by top of winding up (at the most cast-in-place 8cm thickness) reinforcing bar, and it is good that colligation also reserved by the stirrup that winds up.
As preferably, five unit of A, B, C, D and E install at the scene in place after, then shelve reinforcing bar in each square net Truss floor support plate, and with after sleeve splicing colligation good top chord section internal upper part reinforcing bar, cast concrete, i.e. form superstructure and boxlike Structure is overall.
A kind of manufacture method of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure:
(1) prefabricated concrete orthogonal grid A, B, C, D, E unit is installed in place at the scene;
(2) in each concrete orthogonal grid, shelve steel bar truss floor support plate, and colligation top chord section internal upper part reinforcing bar and with set Cylinder splice bar;
(3) whole building second time casts concrete, i.e. forms superstructure and box structure is overall.
Described concrete orthogonal grid A, B, C, D, E unit makes at precasting yard, and i.e. whole nodes of superstructure are by scene Cast change into prefabricated.
The beneficial effect of employing the technical program:
The high-rise superstructure with Super High concrete space lattice boxlike tube-in-tube structure, it is by concrete orthogonal-diagonal lattice grid on an empty stomach Composition, has excellent three-dimensional mechanical characteristic, concrete and steel and reduces, but the upper and lower chord node of superstructure increases considerably, use Assembling II type prefabricated mesh unit, the prefabricated rear on-site consolidation of precasting yard forms assembled integral superstructure, and on-the-spot work is greatly reduced Measure.
Superstructure concrete orthogonal-diagonal lattice Prefabricated hollow grid cell, is divided into five kinds of prefabricated units of A, B, C, D, E, precasting yard system Job site is transported to after work, in place by construction diagrams lifting.
Prefabricated unit all uses steel pipe support, each cross node of each unit, has a steel pipe, and steel pipe top arranges liter Fall level device, it is simple to adjust and reach to design requirement.
After the installation of all kinds of Prefabricated hollow grid cells is in place, in each square (rhombus) grid, shelve steel bar girder building Board, and upper and lower string reinforcing bar is spliced in upper and lower string assembly position, and the upper reinforcement that will wind up penetrates in reserved stirrup, secondary waters After concrete processed maintenance, remove supporting steel pipe, i.e. form concrete orthogonal-diagonal lattice hollow sandwich panel ceiling for storied building.
This assembling II type is divided into five prefabricated units (A, B, C, D, E unit) maximum of which A unit planar dimension 9.78m ×4.69m=45.9m2, conduct oneself with dignity 4130kg, connects by about one time, just than the assembling I type A unit area of plane and prefabricated unit deadweight decline In transport and installation, special proposition " assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure " is in order in conventional junction Under the equipment of structure assembling engineering method and facility, it is applied to this type of novel fabricated concrete structural system smoothly.
In Super High and Tall Office Building are built, apply this type of new structural systen, its construction costs will float downward 20% with On.
Accompanying drawing explanation
Fig. 1: Super High orthogonal-diagonal lattice concrete space lattice boxlike tube-in-tube structure index bed structural plan.
Fig. 2: Super High orthogonal-diagonal lattice concrete space lattice boxlike tube-in-tube structure periphery grid type framework outer tube structure Layout drawing.
Fig. 3: Super High assembling II type concrete orthogonal-diagonal lattice hollow floor system is along 45°Directional profile figure.
Fig. 4: assembling II type orthogonal-diagonal lattice concrete space lattice boxlike tube-in-tube structure, floor concrete empty stomach sandwich plate Prefabricated A, B, C, D, E unit arranges sketch.
The grid plan network schematic diagram of A unit in Fig. 5: Fig. 4.
The grid plan network schematic diagram of unit B in Fig. 6: Fig. 4.
The grid plan network schematic diagram of C cell in Fig. 7: Fig. 4.
The grid plan network schematic diagram of D unit in Fig. 8: Fig. 4.
The grid plan network schematic diagram of E unit in Fig. 9: Fig. 4.
E unit shaft mapping in Figure 10: Fig. 9.
E cellular construction schematic diagram in Figure 11: Fig. 9.
Detailed description of the invention
For purposes of illustration only, below in conjunction with the accompanying drawings, the assembling II type concrete orthogonal-diagonal lattice space lattice boxlike cylinder to invention Tube-in-tube structure and preparation method thereof elaborates.
A kind of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure, including five lists of A, B, C, D and E Unit.
Five unit of A, B, C, D and E are prefabricated unit, all use steel pipe support, and each cross node of unit has A piece steel pipe, steel pipe top arranges lifting level device.
E unit is minimum unit, and other A, B, C, D unit is formed by E unit;A unit is 8 E unit compositions, and B is mono- Unit is 6 E unit compositions, and C cell is 4 E unit compositions, and D unit is 3 E unit compositions.
A kind of manufacture method of assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure:
(1) prefabricated concrete orthogonal grid A, B, C, D, E unit is installed in place at the scene;
(2) in each concrete orthogonal grid, shelve steel bar truss floor support plate, and colligation top chord section internal upper part reinforcing bar and with set Cylinder splice bar;
(3) whole building second time casts concrete, i.e. forms superstructure and box structure is overall.
Described concrete orthogonal grid A, B, C, D, E unit makes at precasting yard, and i.e. whole nodes of superstructure are by scene Cast change into prefabricated.
Embodiment:
Accompanying drawing 1 is the structural system of the superstructure of Super High multi-functional commercial office building building complex index bed, and it uses diagram mixed Solidifying soil orthogonal-diagonal lattice hollow floor system, its central authorities are rigidly connected on concrete net format box trestle for concrete core cylinder surrounding.
As shown in Figure 2, i.e. superstructure becomes grid boxlike urceolus with extranets form frame set, thus forms grid boxlike cylinder Tube-in-tube structure, high building typical floor plan is square 36m × 36m=1296m2, every floor lid removes Core Walls Structure (207.4m2) building function To determine, periphery 1089m2Its plane function of the building of area can comprehensively use.
Accompanying drawing 3 be superstructure be L=10800 along 45 °, left and right sides directional profile, its depth i.e. superstructure span, superstructure thickness h= 400(L/27), headroom 2295 × 100 on an empty stomach, it is used as every floor pipeline facility.This type of new structural systen composition exists with structure Being described in detail in the patent that in October, 2015 declares, this type of new structure increases number due to gridding, node than conventional structure Times, use in-situ casting to take a lot of work expense material, therefore declaring structural system simultaneously, also declare and " assemble I type concrete orthogonal-diagonal lattice space Grid boxlike tube-in-tube structure and manufacture method ", superstructure is divided into tri-kinds of precast concretes of A, B, C grid cell on an empty stomach by it, but Wherein A unit is excessive, and developed area reaches 81m2, conduct oneself with dignity 7.3T, hinders assembled integral operation and carries out, and special proposition " assembles II type Concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure ".
As shown in Figure 4, every floor lid concrete empty stomach grid prefabricated unit is divided into A, B, C, D, E five kinds, maximum A unit 12, each 1 of B, C cell, D unit 2, minimum E unit 27, totally 43.These concrete units make at precasting yard, i.e. Whole nodes of superstructure are changed into prefabricated by in-situ casting.
Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9 are respectively A, B, C, D, E unit grid plane graph, and as can be seen from Figure 10, E unit is Junior unit, other A, B, C, D unit is formed by it;If A is 8 E unit compositions, B is 6, and C is 4, and D is 3.
Described in Figure 10 and Figure 11, described minimum E unit is that cross structure includes winding up and lower edge, and described lower edge is cross Shape, its cross section 250 × 150 is the most prefabricated, and middle part shear connector cubic block 250 × 250 × 100 is also prefabricated, and its top reserves Shear connector reinforcing bar, design section of winding up is also 250 × 150, and time prefabricated, top chord section is 250 × 70, and its bottom reinforcement bars that winds up is Prefabricated, it is good that colligation reserved by top of winding up (at the most cast-in-place 8cm thickness) reinforcing bar, and it is good that colligation also reserved by the stirrup that winds up, and these unit are existing After field installation is in place, then in each square net, shelve steel bar truss floor support plate, and with in the sleeve splicing good top chord section of colligation After upper reinforcement, cast concrete, i.e. form superstructure and box structure is overall.
In the above-described embodiments, the preferred forms of the present invention is described, it is obvious that at the invention structure of the present invention Under think of, still can make a lot of change, here, it should be noted that any change made under the inventive concept of the present invention all incite somebody to action Fall within the scope of protection of the present invention.

Claims (10)

1. assembling an II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure, it is characterized in that: include A, B, C, D and Five unit of E.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 1, its feature It is: five unit of described A, B, C, D and E are prefabricated unit.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 1, its feature Being: five unit of described A, B, C, D and E all use steel pipe support, each cross node of unit has a steel pipe, steel pipe Top arranges lifting level device.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 1, its feature It is: E unit is minimum unit that other A, B, C, D unit is formed by E unit.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 4, its feature Being: A unit is 8 E unit compositions, unit B is 6 E unit compositions, and C cell is 4 E unit compositions, and D unit is that 3 E are mono- Unit's composition.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 5, its feature It is: described minimum E unit is cross structure, including winding up and lower edge.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 6, its feature Being: described lower edge is cross, its cross section 250 × 150 is the most prefabricated, and middle part shear connector cubic block 250 × 250 × 100 is also Prefabricated, its top reserves shear connector reinforcing bar.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 7, its feature Being: design section of winding up is also 250 × 150, and time prefabricated, top chord section is 250 × 70, its bottom reinforcement bars that winds up is prefabricated, winds up It is good that colligation reserved by top (at the most cast-in-place 8cm thickness) reinforcing bar, and it is good that colligation also reserved by the stirrup that winds up.
Assembling II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure the most according to claim 8, its feature Be: five unit of A, B, C, D and E install at the scene in place after, then in each square net, shelve steel bar truss floor support plate, and use After sleeve splicing colligation good top chord section internal upper part reinforcing bar, cast concrete, i.e. form superstructure and box structure is overall.
10. assemble a manufacture method for II type concrete orthogonal-diagonal lattice space lattice boxlike tube-in-tube structure, it is characterized in that:
(1) prefabricated concrete orthogonal grid A, B, C, D, E unit is installed in place at the scene;
(2) in each concrete orthogonal grid, shelve steel bar truss floor support plate, and colligation top chord section internal upper part reinforcing bar and with set Cylinder splice bar;
(3) whole building second time casts concrete, i.e. forms superstructure and box structure is overall.
Described concrete orthogonal grid A, B, C, D, E unit makes at precasting yard, and i.e. whole nodes of superstructure are by in-situ casting Change into prefabricated.
CN201610400734.8A 2016-06-08 2016-06-08 II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof Pending CN106049678A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610400734.8A CN106049678A (en) 2016-06-08 2016-06-08 II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610400734.8A CN106049678A (en) 2016-06-08 2016-06-08 II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN106049678A true CN106049678A (en) 2016-10-26

Family

ID=57171217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610400734.8A Pending CN106049678A (en) 2016-06-08 2016-06-08 II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN106049678A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442523A (en) * 2018-03-27 2018-08-24 湖南金海钢结构股份有限公司 Compound orthogonal-diagonal lattice space steel lattice boxlike tube-in-tube structure and production method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454217A (en) * 2011-11-08 2012-05-16 浙江东南网架股份有限公司 Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN105275121A (en) * 2014-05-28 2016-01-27 南京中建化工设备制造有限公司 Three-layer T-shaped steel vierendeel beam and manufacturing method thereof
CN105625566A (en) * 2015-12-31 2016-06-01 潍坊昌大建设集团有限公司 Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454217A (en) * 2011-11-08 2012-05-16 浙江东南网架股份有限公司 Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN105275121A (en) * 2014-05-28 2016-01-27 南京中建化工设备制造有限公司 Three-layer T-shaped steel vierendeel beam and manufacturing method thereof
CN105625566A (en) * 2015-12-31 2016-06-01 潍坊昌大建设集团有限公司 Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
建筑施工手册(第二版)编写组: "《建筑施工手册(第二版)中册》", 31 December 1988 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442523A (en) * 2018-03-27 2018-08-24 湖南金海钢结构股份有限公司 Compound orthogonal-diagonal lattice space steel lattice boxlike tube-in-tube structure and production method

Similar Documents

Publication Publication Date Title
US9388561B2 (en) Modular construction mold apparatus and method for constructing concrete buildings and structures
EP2848750B1 (en) Method of casting in-situ steel wire mesh cement slab with spliced rack and suspended formwork
CN101586366B (en) Connecting structure and construction method of precast concrete plates and beams, and building comprising same
CN105625568B (en) Assembly concrete orthogonal spatial space lattice boxlike tube-in-tube structure
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN106436894B (en) A kind of prefabricated dwelling house and its method of construction
CN103015747A (en) Full-assembled integral pouring composite house and construction method thereof
CN102477781A (en) Integrally assembled steel-concrete superposed component and manufacturing method thereof
CN105952060A (en) Precast beam reinforcement cage component and assembling method thereof
KR102619713B1 (en) Structure construction method for multiple buildings with wall structure
CN105297893A (en) Tenon-and-mortise type concrete superposed beam cross connection structure and construction method thereof
CN201261913Y (en) Connection structure between precast concrete board and girder, and building having the same
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN108612244A (en) Integral prefabricated floor and its construction method
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN205329970U (en) Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof
CN106049678A (en) II-type fabricated concrete orthogonal-diagonal space lattice box-type tube-in-tube structure and manufacturing method thereof
Iori et al. Pier Luigi Nervi: his construction system for shell and spatial structures
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN205224271U (en) Mortise type concrete superposed beam cross connection structure
CN105951995A (en) Prefabricated concrete III orthogonal-diagonal space lattice box type tube-in-tube structure and manufacturing method thereof
CN106245772A (en) Assembly concrete orthogonal spatial space lattice boxlike bundled tube structure and manufacture method
CN210369491U (en) Floor board of integrated house
CN106223465A (en) Assembly concrete orthogonal-diagonal lattice space lattice boxlike bundled tube structure and manufacture method
CN210105041U (en) Self-supporting prefabricated steel reinforced concrete wallboard component, wall and structural system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026