CN106044544B - The installation method of towering noble metal tower mast sling system - Google Patents

The installation method of towering noble metal tower mast sling system Download PDF

Info

Publication number
CN106044544B
CN106044544B CN201610191698.9A CN201610191698A CN106044544B CN 106044544 B CN106044544 B CN 106044544B CN 201610191698 A CN201610191698 A CN 201610191698A CN 106044544 B CN106044544 B CN 106044544B
Authority
CN
China
Prior art keywords
noble metal
tower mast
metal tower
towering noble
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610191698.9A
Other languages
Chinese (zh)
Other versions
CN106044544A (en
Inventor
王辉平
邓惠根
连珍
刘淳
江旖旎
周漪芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201610191698.9A priority Critical patent/CN106044544B/en
Publication of CN106044544A publication Critical patent/CN106044544A/en
Application granted granted Critical
Publication of CN106044544B publication Critical patent/CN106044544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/28Duplicate, e.g. pivoted, members engaging the loads from two sides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of installation methods of towering contactless sling system of noble metal tower mast, the rod piece of four vertical expandable types by opening contactless suspender, contactless insurance support, lower part hoop;The claw-like plug-in type overhanging stress levers support of contactless suspender is inserted into the preformed hole of towering noble metal tower mast lower part;Lower part hoop is connected to the rod piece of four vertical expandable types;Contactless insurance support is extended in place;The upper flange plate of towering noble metal tower mast is aligned with the bolt hole of lower flange with guide rod;The tight flange plate bolt of bolt; between the two gap of upper flange plate and lower flange that fan-shaped wedge is inserted in after connection; the present invention can accomplish the lossless towering noble metal tower mast of lifting; it can support, towering noble metal tower mast is protected not damaged by external force friction; it is set there are enough safeties in hoisting process, it can be achieved that the horizontal and vertical movement of towering noble metal tower mast under the conditions of lossless, precisely installation be primary in place, the dismounting of suspender high-altitude is quick and easy.

Description

The installation method of towering noble metal tower mast sling system
Technical field
The present invention relates to a kind of installation methods of towering noble metal tower mast sling system.
Background technique
Frequently encountered in architectural engineering can not by the mechanical equipments such as tower crane to tower mast carry out mechanical erection, live tower crane without The problems such as local attached wall, often through dead man by lifting component, splicing, the spies such as that there are difficulty of construction coefficients is big, danger coefficient is high Point.On the other hand, tower mast rod piece is more, assembled complicated.The requirement of its technique is also higher, more particularly to the towering tower mast knot of noble metal Structure, the more common tower mast of artistic component composition is increasingly complex, and the requirement for semi-finished product protection is more harsh, and on-site hoisting is necessary Accomplish lossless lifting.
The hoisting technology in China also has variation with rapid changepl. never-ending changes and improvements with the emergence of architectural engineering, can substantially be summarized as benefit With mast lifting, crane hanging component, grid lifting, auxiliary device lifting, traction armed lever and traction rope lifting etc. modes, but no matter All there is following technology drawback in the hoisting technology of which kind of form:
1, it needs to lift by crane after carrying out binding and fixing to component, different degrees of damage can be had to hanging piece surface, currently, also There is no a kind of lifting device of suitable lossless formula;
2, component need to be split into multiple unit multiple bearings, installation speed is slow;
3, upper air installing need to set up the mating scaffold equipment of 50m or more;
4, can not an integral hoisting, need that component is transported to eminence, difficulty of construction in advance using vertical transport equipment It increases;
5, high-altitude dismounting is inconvenient, and safety is insufficient.
So above-mentioned existing hoisting technology is unable to satisfy the lifting demand of noble metal tower mast, to guarantee that surface is gilded layer And exquisite carve is injury-free during integral hoisting, cannot be lifted using traditional binding mode, and therefore, mesh Before need the lossless mating suspender of formula integral hoisting of design specialized noble metal tower mast.
Summary of the invention
The purpose of the present invention is to provide a kind of installation methods of towering noble metal tower mast sling system, can be realized to height It alarms the blind of noble metal tower mast and wears installation and verticality adjustment.
To solve the above problems, the present invention provides a kind of installation method of towering noble metal tower mast sling system, comprising:
Open rod piece, the insurance support, lower part hoop of four vertical expandable types of suspender;
The claw-like plug-in type overhanging stress levers support of suspender is inserted into the preformed hole of towering noble metal tower mast lower part;
Lower part hoop is connected to the rod piece of four vertical expandable types;
Insurance support is extended in place, it is fixed to support towering noble metal tower mast;
Suspender is lifted into position to be installed with crane;
Using the guide rod on flange plate bolt by the lower flange of the upper flange plate of towering noble metal tower mast and position to be installed After the bolt hole alignment of disk, suspender is removed from towering noble metal tower mast;
The tight flange plate bolt of bolt, upper flange plate is connected with lower flange;
It will need to adjust between the two gap of the upper flange plate and lower flange that fan-shaped wedge is inserted in after connection At verticality.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, insurance support is extended in place, After fixed the step of supporting towering noble metal tower mast, further includes:
Tower mast bolt claw-like plug-in type overhanging stress levers support is connected and fixed with towering noble metal tower mast.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, the insurance support is transmission Formula insurance support or rod-pulling type insurance support.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, when insurance support is biography When dynamic formula insurance support, insurance support is extended in place, comprising:
The flexible of flexible balancing pole is controlled by transmission device, engages latch with the tooth socket of corresponding position.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, when insurance support is drawing When rod type safety supports, insurance support is extended in place, comprising:
Movable cross bar is stretched and positioned by wirerope, telescopic device and pulley structure.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, the tight flange plate bolt of bolt will After the step of upper flange plate is connected with lower flange, further includes:
Upper cover plate is installed at the preformed hole position of the lower part of towering noble metal tower mast.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, when every vertical expandable type Rod piece on when being respectively arranged with a L shape angle bar, lower part hoop is connected to the rod piece of four vertical expandable types, comprising:
Two free ends of each L shape angle bar are passed through bolt respectively to connect with a transverse bar member.
Further, in the installation method of above-mentioned towering noble metal tower mast sling system, using on flange plate bolt The upper flange plate of towering noble metal tower mast is aligned by guide rod with the bolt hole of the lower flange at position to be installed, comprising:
Upper flange plate hole location is detected using the guide rod on lower flange, by lower flange entirety during blind wear Guide rod is inserted into upper flange plate when guide rod touches the hole location of upper flange plate by asymptotic movement.
Compared with prior art, the present invention by open suspender four vertical expandable types rod piece, insurance support, under Portion's hoop;The claw-like plug-in type overhanging stress levers support of suspender is inserted into the preformed hole of towering noble metal tower mast lower part;It will Lower part hoop is connected to the rod piece of four vertical expandable types;Insurance support is extended in place, it is fixed to support towering noble metal tower Mast;Suspender is lifted into position to be installed with crane;Using the guide rod on flange plate bolt by the upper method of towering noble metal tower mast After blue disk is aligned with the bolt hole of the lower flange at position to be installed, suspender is removed from towering noble metal tower mast;The tight flange of bolt Valve snail bolt connects upper flange plate with lower flange, and fan-shaped wedge is inserted in the upper flange plate and lower flange after connection It needing to adjust at verticality between the two gap of disk, the present invention can accomplish the lossless towering noble metal tower mast of lifting, can support, It protects towering noble metal tower mast not damaged by external force friction, it is made to have enough safeties in hoisting process, it can be achieved that lossless Under the conditions of towering noble metal tower mast horizontal and vertical movement, precisely installation is primary in place, the dismounting of suspender high-altitude is quick, side Just, it realizes that primary lifting is completed, reduces towering noble metal tower mast in high-altitude vertical transport and assembling operation time, improve it The safety of high-altitude application, the present invention can use suspender and lifting rope and integrally lift by crane to towering noble metal tower mast, avoid height Idle job is dangerous, highly-safe without setting up more than 50 meters high scaffolds.
Detailed description of the invention
Fig. 1 is the structure chart of the towering noble metal tower mast sling system of one embodiment of the invention;
Fig. 2 is that the blind of one embodiment of the invention wears installation guide frame figure;
Fig. 3 is the structure chart of the antitorque hanging dish-type hoop of cross of one embodiment of the invention;
Fig. 4 is the connection of the antitorque hanging dish-type hoop of cross of one embodiment of the invention and the rod piece of four vertical expandable types Schematic diagram;
Fig. 5 is the structure chart of the driven type insurance support of one embodiment of the invention;
Fig. 6 is the structure chart of the rod-pulling type insurance support of one embodiment of the invention;
Fig. 7 is the closure schematic diagram of the lower part hoop of one embodiment of the invention;
Fig. 8 is the dismounting schematic diagram of the lower part hoop of one embodiment of the invention;
Fig. 9 is the structure chart of the claw-like plug-in type overhanging stress levers support of one embodiment of the invention;
Figure 10 is the structure chart into formula double flange that covers of one embodiment of the invention;
Figure 11 is that the assembling tower mast on ground of one embodiment of the invention finishes suspender schematic diagram in place;
Figure 12 is that claw-like plug-in type overhanging stress levers support is inserted into towering noble metal tower mast by one embodiment of the invention Schematic diagram in the preformed hole of lower part;
Figure 13 is the schematic diagram of the rod piece that lower part hoop is connected to four vertical expandable types of one embodiment of the invention;
Figure 14 is the schematic diagram extended insurance support in place of one embodiment of the invention;
Figure 15 is the schematic diagram that suspender is lifted into position to be installed with crane of one embodiment of the invention;
Figure 16 is the schematic diagram for removing suspender from towering noble metal tower mast of one embodiment of the invention;
Figure 17 is the preformed hole position installation upper cover plate of the lower part in towering noble metal tower mast of one embodiment of the invention Schematic diagram;
Figure 18 is that the guide rod of one embodiment of the invention and flange bolt dismantle schematic diagram;
Figure 19 is the schematic diagram of the fan-shaped wedge of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Fig. 1,2 and 19, the present invention provides a kind of towering noble metal tower mast sling system, comprising:
Suspender, the suspender includes the antitorque hanging dish-type hoop 3 of cross for being set to top, with the antitorque hanging dish-type of the cross The rod piece 5 for four vertical expandable types that hoop 1 connects, the insurance support 2 being connect with 5 middle and upper part of rod piece, with the bar The lower part hoop 3 of 5 middle and lower part of part connection, and the claw-like plug-in type overhanging stress levers support 4 being connect with 5 bottom of rod piece, Wherein, the insurance support 2, for the support that the middle and upper part to the towering noble metal tower mast 6 carries out, the claw-like plug-in type Overhang stress levers support 4, is supported for the lower part to the towering noble metal tower mast 6;Here, the cross at top is antitorque Hanging dish-type hoop 1 and lower loop hoop 3 is integral encircles system, guarantees suspender overall stability, the insurance support 2 of middle and upper part, The lower part hoop 3 of middle and lower part and the claw-like plug-in type overhanging stress levers support 4 of bottom form three-point support trimming moment, guarantee The safety of hoisting process can be accomplished the lossless towering noble metal tower mast 6 of lifting, can be supported, protect towering noble metal by suspender Tower mast 6 is not damaged by external force friction, so that it is had enough safeties in hoisting process, it can be achieved that towering expensive under the conditions of lossless The horizontal and vertical movement of metal tower mast, precisely installation are primary in place, the dismounting of suspender high-altitude is quick and easy, realize primary lifting It completes, reduces towering noble metal tower mast in high-altitude vertical transport and assembling operation time, improve the safety of its high-altitude application Property, the present invention can use suspender and lifting rope and integrally lift by crane to towering noble metal tower mast, avoids high altitude operation dangerous, be not necessarily to More than 50 meters high scaffolds are set up, it is highly-safe,
Blind to wear installation guide frame, the blind installation guide frame of wearing includes the bottom for being set to towering noble metal tower mast 6 Upper flange plate 7, be set to the lower flange 8 at position to be installed, wherein respectively correspond on the upper flange plate 7 and lower flange 8 It is provided with bolt hole 9, internal screw thread is provided in the bolt hole 9, ring flange is installed in the bolt hole 9 of the lower flange 8 Bolt 10 is provided with external screw thread on the flange plate bolt 10, for the bolt on the upper flange plate 7 and lower flange 8 The separate screw cap end of the screw-internal thread fit in hole 9, the flange plate bolt 10 is connected with guide rod 11;
Fan-shaped wedge 200, be inserted in connection after the upper flange plate 7 and lower flange 8 the two gap between, the fan The limiting slot 201 with the flange plate bolt 10 cooperation is provided on shape wedge 200, the upper flange plate 7 and lower flange 8 pass through The flange plate bolt 10 is connected with the internal screw thread of the bolt hole 9 on lower flange 8.Here, when guide rod is convenient for blind wear, detection Upper flange plate hole location can detect upper flange disk docking location using guide rod in hoisting process, pass through journey blind The middle asymptotic movement of entirety touches upper flange plate hole location, forms the whole connection of two-way ring flange, guide rod up and down, has The feature of effect preventing bolt deflection direction in hoisting process and causing upper flange perforation difficulty, is realized guide rod centrum is former It makes benefit in order and imports upper flange plate, it can be by the bolt hole on the external screw thread and the upper flange plate and lower flange on bolt It is threadedly engaged, the tight flange plate bolt of bolt carries out dismounting guide rod.Towering noble metal tower mast is fixed on position to be installed, accomplishes height The disposable location and installation of noble metal tower mast is alarmmed, in addition, the thickness due to fan-shaped wedge 200 is gradually incremented by by one end to the other end, The two of upper flange plate and lower flange after connection is inserted by relatively thin one end by one or more fan-shaped wedges 200 It between gap, may be implemented to finely tune the verticality of towering noble metal tower mast, guarantee the installation balance of towering noble metal tower mast It spends, thus realize that the installation operation of towering noble metal tower mast is simple by numerous change, it is efficient, quick, stable.
Preferably, as shown in figure 3, the antitorque hanging dish-type hoop 1 of the cross includes:
Cross hang 12 is formed by two cross angle steel interconnections;
With the top hoop 13 of the support connection.Here, the antitorque hanging dish-type hoop design of cross can be effective against and hang The torque of dress process acts on, and plays antitorque effect.
Preferably, as shown in figure 3, the shape of the top hoop 13 is square, to guarantee the antitorque hanging dish-type ring of cross The torsional strength of hoop.
Preferably, as shown in figure 3, one of each angle of the top hoop 13 of the square and the cross hang from It is connected by end, to be further ensured that the torsional strength of the antitorque hanging dish-type hoop of cross.
Preferably, as shown in figure 3, being additionally provided with lifting rope hole 14 in the cross hang, lifting rope is worn when facilitating lifting.
Preferably, as shown in figure 3, the rod piece 5 of every vertical expandable type, respectively with one of the cross hang 12 from It is connected by end, guarantees the torsional strength of suspender, can not reverse.
Preferably, as shown in figure 4, the rod piece 5 of every vertical expandable type passes through adjustable code part 15 and the cross-shaped The free end connection of support 12, facilitates freely being unfolded and being closed for the rod piece of every vertical expandable type.
Preferably, the insurance support is driven type insurance support or rod-pulling type insurance support.
Preferably, as shown in figure 5, driven type insurance support 2 includes the rod piece 5 for being set to the vertical expandable type On transmission device 21, four flexible balancing poles 22 being connect with the transmission device 21, four latches 23, each 23 He of latch Every flexible balancing pole 22 is set on the rod piece 5 of a vertical expandable type, is provided on every flexible balancing pole 22 With the tooth socket of one of latch cooperation, the free end of every flexible balancing pole 22 is provided with an a quarter close ring 24, Rubber ring is provided in each a quarter close ring 24.Here, controlling the flexible of flexible balancing pole by transmission device, make card Tooth engages with the tooth socket of corresponding position, to adjust four flexible balancing pole collapsing lengths, the free end of four balancing poles is formed Close ring, close ring most inner side use rubber ring, the middle and upper part of towering noble metal tower mast can be fixed on the closed circle In ring, realizes the insurance clamping to towering noble metal tower mast, accomplish lossless fixation, prevent tower mast in hoisting process because shaking Lateral tilt, collision greatly.
Preferably, as shown in fig. 6, rod-pulling type insurance support 2 includes the rod piece 5 for being respectively arranged at vertical expandable type On pulley 25, four movable cross bars 26, the telescopic device 27 being set on movable cross bar 26, with the telescopic device 27 and sliding The wirerope 28 of 25 connection of wheel, wherein every movable cross bar 26 is flexibly connected with the rod piece 5 of a vertical expandable type, and every The free end of movable cross bar 26 is provided with an a quarter close ring 24, is provided with rubber in each a quarter close ring 24 Circle.Here, cross bar is stretched and is positioned by wirerope, telescopic device and pulley structure, to adjust four movable transverses The collapsing length of bar, the free end of four cross bars form close ring, and close ring most inner side uses rubber ring, can will be towering expensive The middle and upper part of metal tower mast is fixed in the close ring, is realized the insurance clamping to towering noble metal tower mast, is accomplished lossless It is fixed, prevent tower mast lateral tilt, collision due to shaking is excessive in hoisting process.
Preferably, as shown in fig. 7, the lower part hoop 3 includes four transverse directions connecting with the rod piece 5 of vertical expandable type Rod piece 31 encircles design to be formed with top hoop 13 up and down, is formed whole.
Preferably, as shown in fig. 7, being respectively arranged with a L shape angle bar 32 on the rod piece 5 of every vertical expandable type, often Two free ends of a L shape angle bar 32 are connect with a transverse bar member 31 respectively, thus guarantee the rod piece of vertical expandable type with The bonding strength of transverse bar member.
Preferably, two free ends of each L shape angle bar 32 pass through bolt 33 respectively and connect with a transverse bar member 31, from And realize and conveniently as shown in Figure 8 remove lower part hoop completely in the towering noble metal tower mast of fixation your towering gold fixed Lower part hoop is loaded onto again after belonging to tower mast, then is lifted by crane.
Preferably, as shown in figure 9, claw-like plug-in type overhangs stress levers support 4, including four claw-like support levers 41, Every claw-like support lever 41 is connect with the rod piece 5 of a vertical expandable type, reserved for extending into towering noble metal tower mast 6 Kong Zhong.
Preferably, the extensible connection of rod piece 5 of every claw-like support lever 41 and a vertical expandable type, facilitates every Support lever is extend into towering noble metal tower mast preformed hole.
Preferably, it is additionally provided with bolt hole in every claw-like support lever 41, facilitates every support lever to extend into towering After in noble metal tower mast preformed hole, by the cooperation of tower mast bolt and the bolt hole, every support lever is fixed on towering On noble metal tower mast.
Preferably, as shown in figs. 2 and 10, the shape of the guide rod 11 be it is cone-shaped, top point lower part is thick, i.e., with it is described The connecting pin of flange bolt 10 is thicker, and the free end far from the flange bolt 10 is thinner, and it is accurate and primary in place to meet it It is required that.
Preferably, as shown in figure 18, dismountable two components are made with the flange bolt 10 in the guide rod 11, with Guide rod is removed in the tight flange plate bolt of bolt.
Preferably, as shown in Figure 10, the system also includes be set to the blind of towering noble metal tower mast bottom 6 to wear peace Fill the outer cover 61 outside guide frame, for accommodate it is blind wear installation guide frame, here, not destroy the aesthetics of tower mast moulding, It is ad hoc count it is a kind of cover into formula double flange, upper flange plate and lower flange can be hidden in tower mast bottom completely.
Preferably, as shown in figure 19, the limiting slot 201 is U-shaped, to preferably cooperate limit with flange plate bolt 10 Position.
Preferably, the internal diameter of the limiting slot 201 is equal to the outer diameter of the flange plate bolt 10, prevents the fan-shaped wedge 200 arbitrarily slide between the upper flange plate 7 and the two gap of lower flange 8.
Preferably, the fan-shaped wedge 200 is 1/1st to eight/6th fan-shaped, to realize to towering noble metal tower mast Verticality make precise fine-adjustment, guarantee the degree of balance of installation of towering noble metal tower mast.
The installation method of above-mentioned towering noble metal tower mast sling system is as follows:
Step 1: as shown in figure 11, opening rod piece 5, insurance support 2, lower loop of four vertical expandable types of suspender Hoop 3;At this point, expansion of the claw-like plug-in type overhanging stress levers support 4 of suspender also with the rod piece of four vertical expandable types And it opens;
Step 2: as shown in figure 12, the claw-like plug-in type overhanging stress levers support of suspender is inserted into towering noble metal tower In the preformed hole 62 of 6 lower part of mast, thus, lower part overhanging stress support is formed, suspender and towering noble metal tower mast form entirety, excellent Choosing, tower mast bolt claw-like plug-in type overhanging stress levers support will be connected and fixed with towering noble metal tower mast, to improve branch Support effect;
Step 3: as shown in figure 13, lower part hoop 3 to be connected to the rod piece 5 of four vertical expandable types;
Step 4: as shown in figure 14, insurance support 2 is extended in place, it is fixed to support towering noble metal tower mast 6, to prevent Its lateral tilt, collision, it is preferred that insurance support provides the selective use of two schemes, can be insurance support, is also possible to Rod-pulling type insurance support;
Step 5: as shown in figure 15, suspender is lifted into position to be installed with crane;
Step 6: as shown in Fig. 2 and 15, using the guide rod 11 on flange plate bolt by the upper of towering noble metal tower mast 6 After ring flange 7 is aligned with the bolt hole 9 of the lower flange 8 at position to be installed, as shown in figure 16 by suspender from towering noble metal tower mast 6 Upper dismounting, to accomplish the disposable location and installation of towering noble metal tower mast, operation is efficient, quick, stable by numerous change letter;
Step 7: the tight flange plate bolt 10 of bolt, upper flange plate 7 and lower flange 8 are connected, realize towering noble metal Tower mast is fixed on position to be installed;
Step 8: as shown in figure 19, the upper flange plate 7 and lower flange 8 after fan-shaped wedge 200 to be inserted in connection It needs to adjust at verticality between the two gap, the verticality of towering noble metal tower mast is finely tuned in realization, is guaranteed towering expensive The degree of balance of installation of metal tower mast.
It preferably, further include step 8: as shown in figure 17, in the lower part of towering noble metal tower mast 6 after above-mentioned 7th step 62 position of preformed hole install upper cover plate 63, with cover it is blind wear installation guide frame, achieve the effect that it is overall beautiful, to complete The lifting of tower mast.
In conclusion the present invention is by opening the rod piece of four vertical expandable types of suspender, insurance supports, lower loop Hoop;The claw-like plug-in type overhanging stress levers support of suspender is inserted into the preformed hole of towering noble metal tower mast lower part;By lower part Hoop is connected to the rod piece of four vertical expandable types;Insurance support is extended in place, it is fixed to support towering noble metal tower mast;With Suspender is lifted into position to be installed by crane;Using the guide rod on flange plate bolt by the upper flange plate of towering noble metal tower mast with After the bolt hole alignment of the lower flange at position to be installed, suspender is removed from towering noble metal tower mast;The tight flange plate bolt of bolt, To connect upper flange plate with lower flange, fan-shaped wedge is inserted in the two of the upper flange plate and lower flange after connection Need to adjust at verticality between gap, the present invention can accomplish the towering noble metal tower mast of lossless lifting, can support, protect it is towering Noble metal tower mast is not damaged by external force friction, so that it is had enough safeties in hoisting process, it can be achieved that under the conditions of lossless The horizontal and vertical movement of towering noble metal tower mast, precisely installation are primary in place, the dismounting of suspender high-altitude is quick and easy, realize one Secondary lifting is completed, and is reduced towering noble metal tower mast in high-altitude vertical transport and assembling operation time, is improved its high-altitude application Safety, the present invention can use suspender and lifting rope and integrally lifts by crane to towering noble metal tower mast, and high altitude operation is avoided to endanger Danger, it is highly-safe without setting up more than 50 meters high scaffolds.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (4)

1. a kind of installation method of towering noble metal tower mast sling system characterized by comprising
Open rod piece, the insurance support, lower part hoop of four vertical expandable types of suspender;
The claw-like plug-in type overhanging stress levers support of suspender is inserted into the preformed hole of towering noble metal tower mast lower part;
Lower part hoop is connected to the rod piece of four vertical expandable types;
Insurance support is extended in place, it is fixed to support towering noble metal tower mast, wherein the insurance support is driven type insurance branch Support or rod-pulling type insurance support, the insurance support is driven type insurance support or rod-pulling type insurance support, when insurance branch When support is driven type insurance support, insurance support is extended in place, comprising: stretching for flexible balancing pole is controlled by transmission device Contracting, engages latch with the tooth socket of corresponding position, to adjust four flexible balancing pole collapsing lengths, the freedom of four balancing poles End forms close ring, and close ring most inner side uses rubber ring, the middle and upper part of towering noble metal tower mast is fixed on described In close ring, the insurance clamping to towering noble metal tower mast is realized;It, will when insurance support is rod-pulling type insurance support Insurance support extends in place, comprising: and movable cross bar is stretched and positioned by wirerope, telescopic device and pulley structure, To adjust the collapsing length of four movable cross bars, the free end of four cross bars forms close ring, and close ring most inner side is adopted With rubber ring, the middle and upper part of towering noble metal tower mast is fixed in the close ring, is realized to towering noble metal tower mast Insurance clamping;Insurance support is extended in place, after fixed the step of supporting towering noble metal tower mast, further includes: by tower mast Bolt claw-like plug-in type overhanging stress levers support is connected and fixed with towering noble metal tower mast;
Suspender is lifted into position to be installed with crane;
Using the guide rod on flange plate bolt by the lower flange at the upper flange plate of towering noble metal tower mast and position to be installed After bolt hole alignment, suspender is removed from towering noble metal tower mast;
The tight flange plate bolt of bolt, upper flange plate is connected with lower flange;
Needs adjustment between the two gap of the upper flange plate and lower flange that fan-shaped wedge is inserted in after connection is vertical At degree.
2. the installation method of towering noble metal tower mast sling system as described in claim 1, which is characterized in that the tight ring flange of bolt Bolt, after the step of upper flange plate is connected with lower flange, further includes:
Upper cover plate is installed at the preformed hole position of the lower part of towering noble metal tower mast.
3. the installation method of towering noble metal tower mast sling system as described in claim 1, which is characterized in that when every it is vertical When being respectively arranged with a L shape angle bar on the rod piece of expandable type, lower part hoop is connected to the bar of four vertical expandable types Part, comprising:
Two free ends of each L shape angle bar are passed through bolt respectively to connect with a transverse bar member.
4. the installation method of towering noble metal tower mast sling system as described in claim 1, which is characterized in that utilize ring flange The upper flange plate of towering noble metal tower mast is aligned by the guide rod on bolt with the bolt hole of the lower flange at position to be installed, packet It includes:
Upper flange plate hole location is detected using the guide rod on lower flange, it is during blind wear that lower flange is integrally asymptotic It is mobile, when guide rod touches the hole location of upper flange plate, guide rod is inserted into upper flange plate.
CN201610191698.9A 2016-03-30 2016-03-30 The installation method of towering noble metal tower mast sling system Active CN106044544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610191698.9A CN106044544B (en) 2016-03-30 2016-03-30 The installation method of towering noble metal tower mast sling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610191698.9A CN106044544B (en) 2016-03-30 2016-03-30 The installation method of towering noble metal tower mast sling system

Publications (2)

Publication Number Publication Date
CN106044544A CN106044544A (en) 2016-10-26
CN106044544B true CN106044544B (en) 2019-02-19

Family

ID=57484159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610191698.9A Active CN106044544B (en) 2016-03-30 2016-03-30 The installation method of towering noble metal tower mast sling system

Country Status (1)

Country Link
CN (1) CN106044544B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113562600A (en) * 2021-07-29 2021-10-29 泰州市祥泰设备配套有限公司 Lifting appliance for hoisting large-tonnage equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2821070A1 (en) * 2001-02-19 2002-08-23 Alpi Ind Sarl Semi-automatic mechanical cross bars for handling flexible containers in a support frame, uses arms with grips at the end with a linkage from the lifting eye to close grips during lifting and release them when the load is lowered
US8393659B2 (en) * 2011-03-23 2013-03-12 Brad Stroh Material handling system
CN202967884U (en) * 2012-12-05 2013-06-05 嘉兴顺联橡塑机械有限公司 Four-claw fixture device
CN103723622A (en) * 2014-01-20 2014-04-16 方大特钢科技股份有限公司 Three-fork connecting rod self-adjustment type roll lifting appliance
CN204096903U (en) * 2014-08-12 2015-01-14 中国南方电网有限责任公司超高压输电公司天生桥局 A kind of change of current becomes winding hoisting structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493996A (en) * 2011-12-20 2012-06-13 重庆长安汽车股份有限公司 Special-shaped assembly bolt

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2821070A1 (en) * 2001-02-19 2002-08-23 Alpi Ind Sarl Semi-automatic mechanical cross bars for handling flexible containers in a support frame, uses arms with grips at the end with a linkage from the lifting eye to close grips during lifting and release them when the load is lowered
US8393659B2 (en) * 2011-03-23 2013-03-12 Brad Stroh Material handling system
CN202967884U (en) * 2012-12-05 2013-06-05 嘉兴顺联橡塑机械有限公司 Four-claw fixture device
CN103723622A (en) * 2014-01-20 2014-04-16 方大特钢科技股份有限公司 Three-fork connecting rod self-adjustment type roll lifting appliance
CN204096903U (en) * 2014-08-12 2015-01-14 中国南方电网有限责任公司超高压输电公司天生桥局 A kind of change of current becomes winding hoisting structure

Also Published As

Publication number Publication date
CN106044544A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
EP2402278A1 (en) Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
US8317244B1 (en) Apparatus and method for positioning an object in a building
US11092139B2 (en) Rotor blade replacement system
CN204435979U (en) A kind of protection device for installing of electric power facility
US20180238071A1 (en) System and method for installing a tensioning tendon in a wind turbine tower
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN107337125B (en) Flexible sliding platform girder steel handling apparatus and girder steel handling method
CN106044544B (en) The installation method of towering noble metal tower mast sling system
CN106044564B (en) The blind installation method for wearing installation guide frame
CN207684728U (en) Towering noble metal tower mast sling system
CN105858437A (en) Automatic lifting appliance for balancing weight
CN106044549B (en) It covers and wears installation guide frame into formula double flange bolt is blind
CN106049970B (en) The installation method of the towering contactless sling system of noble metal tower mast
CN106044543B (en) The towering contactless sling system of noble metal tower mast
CN106049971B (en) The installation method of the towering contactless suspender of noble metal tower mast
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN106044542B (en) Towering noble metal tower mast sling system
AU2015200998A1 (en) Method and system for installation and removal of ballast
CN208135719U (en) Claw-like plug-in type overhangs stress lever support structure
CN208218200U (en) Towering noble metal tower mast sling system
CN207684735U (en) It covers and wears installation guide frame into formula double flange bolt is blind
CN106049969B (en) The towering contactless suspender of noble metal tower mast
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN104088468B (en) A kind of steel work Multi-section column lifting automatic decoupling device
CN205857889U (en) The towering contactless suspender of noble metal tower mast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant