CN106040749A - Rough rolling rhythm control method - Google Patents
Rough rolling rhythm control method Download PDFInfo
- Publication number
- CN106040749A CN106040749A CN201610450928.9A CN201610450928A CN106040749A CN 106040749 A CN106040749 A CN 106040749A CN 201610450928 A CN201610450928 A CN 201610450928A CN 106040749 A CN106040749 A CN 106040749A
- Authority
- CN
- China
- Prior art keywords
- slab
- milling train
- rolling
- block
- speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005096 rolling process Methods 0.000 title claims abstract description 90
- 238000000034 method Methods 0.000 title claims abstract description 40
- 230000033764 rhythmic process Effects 0.000 title abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 60
- 239000010959 steel Substances 0.000 claims abstract description 60
- 238000003801 milling Methods 0.000 claims description 126
- 238000010438 heat treatment Methods 0.000 claims description 22
- 238000010079 rubber tapping Methods 0.000 claims description 20
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 6
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 description 5
- 229910052698 phosphorus Inorganic materials 0.000 description 5
- 239000011574 phosphorus Substances 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 239000004484 Briquette Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Abstract
The invention relates to a rough rolling rhythm control method, which comprises the following steps: controlling the rough rolling outlet temperature of the plate blank in the rough rolling production line to be at the lower limit of the target temperature range; the rough rolling process of the plate blank is controlled as follows: rolling by a rolling mill R1 for 3 passes, and rolling by a rolling mill R2 for 5 passes; wherein the rolling speed of the rolling mill R1 is not more than 1.5 m/s; the rolling speed of the rolling mill R2 is 2-3.5 m/s, and the slabs are subjected to full scale removal treatment in the rolling process of the rolling mill R1 and the rolling mill R2. In the 2 nd, 3 rd and 4 th passes of rolling by the rolling mill R2, the slab is dephosphorized at the inlet and the outlet of the rolling mill R2; and carrying out multipoint swing steel control on the plate blank. The rough rolling rhythm control method can effectively improve the rough rolling rhythm.
Description
Technical field
The present invention relates to technical field of steel rolling, particularly to a kind of roughing mill pace control method.
Background technology
Owing to similar think gauge high-grade pipe line steel, wheel steel are required to high heating-up temperature, low roughing outlet temperature, for protecting
Card zerolling requirement, rough rolling step needs board briquette is reduced to 880 DEG C~920 DEG C of scopes, could meet finish rolling entrance
The requirement of 900~940 DEG C, roughing region slab temperature drop needs to reach more than 280 DEG C.And when performing according to former rolling mill practice
Have only to by time forward swing steel cooling to be rolled of R2 extreme trace, when setting rolling according to normal two grades, put steel time short then 120s, long then
200s.Rolling rhythm only has 12 volumes/hour.
In prior art, the rolling rhythm of roughing control method is relatively slow, causes the production capacity producing line relatively low.
Summary of the invention
The invention provides a kind of roughing mill pace control method, solve or part solves roughing in prior art and controls
The rolling rhythm of method is relatively slow, causes the technical problem that the production capacity of product line is relatively low, it is achieved that be effectively improved the technology of roughing rhythm
Effect.
A kind of roughing mill pace control method that the present invention provides, comprises the following steps:
The roughing outlet temperature that roughing is produced slab in line controls the lower limit at target temperature range;
By the rough rolling process control of described slab it is: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, in institute
Stating in the 2nd, 3 and 4 passages of milling train R2 rolling, described slab carries out dephosphorization at the entrance and exit of described milling train R2;
Described slab carries out multiple spot pendulum steel control.
As preferably, the mill speed of described milling train R1 is not more than 1.5m/s;
The mill speed of described milling train R2 is 2m/s~3.5m/s.
As preferably, in the operation of rolling of described milling train R1 and described milling train R2, described slab is carried out at full de-scaling
Reason.
As preferably, described roughing is produced line and is included: 4 heating furnaces are connected once with the tapping roller-way of described heating furnace
Dephosphorizing machine, fixed-width pressure machine, described milling train R1, described milling train R2 and roller-way;
Described roller-way is sequentially connected with described 4 heating furnaces, dephosphorizing machine, fixed-width pressure machine, milling train R1 and described milling train
R2;
Wherein, the described heating furnace that will be close to a described dephosphorizing machine is designated as No. 1 stove, will apart from a described dephosphorizing machine
Remote described heating furnace is designated as No. 4 stoves, remains two described heating furnaces and is designated as No. 2 stoves and No. 3 stoves.
As preferably, the tapping interval of described 4 heating furnaces is: the afterbody of previous described slab removes described No. 1 stove
After tapping roller-way, slab described in rear starts tapping.
As preferably, described slab is carried out multiple spot pendulum steel and controls, including:
First block of described slab carries out putting steel at the inlet roller way of described milling train R2;
Second block of described slab carries out putting steel at the inlet roller way of described milling train R1;
3rd block of described slab carries out putting steel at the inlet roller way of described fixed-width pressure machine;
4th block of described slab carries out putting steel at the furnace delivery table of described No. 1 stove.
As preferably, the pendulum steel time of first block of described slab is controlled according to described target temperature range;
When first block of described slab starts Speed-up Rolling at the inlet roller way of described milling train R2, second block of described slab exists
The inlet roller way of described milling train R1 starts Speed-up Rolling;
When second block of described slab starts Speed-up Rolling at the inlet roller way of described milling train R1, the 3rd block of described slab exists
The inlet roller way of described fixed-width pressure machine starts the fixed width that raises speed;
When the 3rd block of described slab starts to raise speed fixed width at the inlet roller way of described fixed-width pressure machine, the 4th block of described plate
Base starts speed-raising advance at the tapping roller-way of described No. 1 stove.
One or more technical schemes provided herein, at least have the following technical effect that or advantage:
Owing to have employed conservative control roughing outlet temperature, rolling mode reasonable in design-milling train R1 rolls 3 passages, rolls
Machine R2 rolls 5 passages, slab carries out multiple spot pendulum steel and controls.So, roughing control method in prior art is efficiently solved
Rolling rhythm is relatively slow, causes the technical problem that the production capacity of product line is relatively low, it is achieved that be effectively improved the technique effect of roughing rhythm.
Accompanying drawing explanation
The flow chart of the roughing mill pace control method that Fig. 1 provides for the present invention;
Fig. 2 produces the structural representation of line for the roughing that the present invention provides.
(parts that in accompanying drawing, each label represents are followed successively by: 1 heating furnace, 2 dephosphorizing machines, 3 fixed-width pressure machines, 4 milling trains
R1,5 milling train R2,6 roller-ways)
Detailed description of the invention
The embodiment of the present application provides a kind of roughing mill pace control method, solves or part solves in prior art thick
The rolling rhythm rolling control method is relatively slow, causes the technical problem that the production capacity of product line is relatively low, by conservative control roughing outlet temperature
Degree, rolling mode reasonable in design-milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages, slab carries out multiple spot pendulum steel and controls,
Achieve the technique effect being effectively improved roughing rhythm.
See accompanying drawing 1, a kind of roughing mill pace control method that the present invention provides, comprise the following steps:
S1: the roughing outlet temperature that roughing is produced slab in line controls the lower limit at target temperature range.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be not more than 1.5m/s;The mill speed of milling train R2 is 2m/s~3.5m/s, and milling train R1 and the rolling of milling train R2
During slab carried out full de-scaling process.Milling train R2 rolling the 2nd, 3 and 4 passages in, slab milling train R2 entrance and
Outlet carries out dephosphorization.
S3: slab is carried out multiple spot pendulum steel and controls.
Further, seeing accompanying drawing 2, roughing is produced line and is included: 1, dephosphorizing machine 2 of 4 heating furnaces, fixed-width pressure machine 3,
Milling train R1, milling train R2 and roller-way 6;Roller-way 6 be sequentially connected with 1, dephosphorizing machine 2 of 4 heating furnaces, fixed-width pressure machine 3, milling train R1 and
Milling train R2;Wherein, the heating furnace 1 that will be close to a dephosphorizing machine 2 is designated as No. 1 stove, by heating furnace farthest for dephosphorizing machine 2 of distance
1 is designated as No. 4 stoves, remains two heating furnaces 1 and is designated as No. 2 stoves and No. 3 stoves.The tapping interval of 4 heating furnaces 1 is: previous slab
After the tapping roller-way 6 of afterbody No. 1 stove of removal, a rear slab starts tapping.
Further, step S3 includes:
S301: the first block of slab carries out putting steel at the inlet roller way of milling train R2;And the pendulum steel time of first block of slab according to
Target temperature range is controlled.
S302: the second block of slab carries out putting steel at the inlet roller way of milling train R1;When first block of slab is at the entrance of milling train R2
When roller-way starts Speed-up Rolling, second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1.
S303: the three block of slab carries out putting steel at the inlet roller way of fixed-width pressure machine 3;When second block of slab is milling train R1's
When inlet roller way starts Speed-up Rolling, the 3rd block of slab starts, at the inlet roller way of fixed-width pressure machine 3, the fixed width that raises speed.
S304: the four block of slab carries out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is at fixed-width pressure machine 3
Inlet roller way start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The roughing mill pace control method provided the application below by specific embodiment describes in detail:
Embodiment 1
S1: roughing is produced the target temperature range of slab in line is: 880 DEG C~920 DEG C, roughing outlet temperature is 880 DEG C.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.4m/s;The mill speed of milling train R2 is to plate in 2.2m/s, and the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling process.In the 2nd, 3 and 4 passages of milling train R2 rolling, slab removes at the entrance and exit of milling train R2
Phosphorus.
S3: slab is carried out multiple spot pendulum steel and controls, particularly as follows: S301, first block of slab enter at the inlet roller way of milling train R2
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are at milling train R1
Inlet roller way carry out put steel;When first block of slab starts Speed-up Rolling at the inlet roller way of milling train R2, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, the 3rd block of slab carry out putting steel at the inlet roller way of fixed-width pressure machine 3;
When second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1, the 3rd block of slab is at the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is in fixed width pressure
The inlet roller way of power machine 3 start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The rolling rhythm making roughing produce line by above-mentioned roughing mill pace control method has brought up to 20 volumes/hour.
Embodiment 2
S1: roughing is produced the target temperature range of slab in line is: 885 DEG C~910 DEG C, roughing outlet temperature is 885 DEG C.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.3m/s;The mill speed of milling train R2 is to plate in 2.5m/s, and the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling process.In the 2nd, 3 and 4 passages of milling train R2 rolling, slab removes at the entrance and exit of milling train R2
Phosphorus.
S3: slab is carried out multiple spot pendulum steel and controls, particularly as follows: S301, first block of slab enter at the inlet roller way of milling train R2
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are at milling train R1
Inlet roller way carry out put steel;When first block of slab starts Speed-up Rolling at the inlet roller way of milling train R2, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, the 3rd block of slab carry out putting steel at the inlet roller way of fixed-width pressure machine 3;
When second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1, the 3rd block of slab is at the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is in fixed width pressure
The inlet roller way of power machine 3 start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The rolling rhythm making roughing produce line by above-mentioned roughing mill pace control method has brought up to 20 volumes/hour.
Embodiment 3
S1: roughing is produced the target temperature range of slab in line is: 888 DEG C~915 DEG C, roughing outlet temperature is 888 DEG C.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.2m/s;The mill speed of milling train R2 is to plate in 2.8m/s, and the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling process.In the 2nd, 3 and 4 passages of milling train R2 rolling, slab removes at the entrance and exit of milling train R2
Phosphorus.
S3: slab is carried out multiple spot pendulum steel and controls, particularly as follows: S301, first block of slab enter at the inlet roller way of milling train R2
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are at milling train R1
Inlet roller way carry out put steel;When first block of slab starts Speed-up Rolling at the inlet roller way of milling train R2, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, the 3rd block of slab carry out putting steel at the inlet roller way of fixed-width pressure machine 3;
When second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1, the 3rd block of slab is at the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is in fixed width pressure
The inlet roller way of power machine 3 start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The rolling rhythm making roughing produce line by above-mentioned roughing mill pace control method has brought up to 21 volumes/hour.
Embodiment 4
S1: roughing is produced the target temperature range of slab in line is: 890 DEG C~917 DEG C, roughing outlet temperature is 890 DEG C.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.0m/s;The mill speed of milling train R2 is to plate in 3.2m/s, and the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling process.In the 2nd, 3 and 4 passages of milling train R2 rolling, slab removes at the entrance and exit of milling train R2
Phosphorus.
S3: slab is carried out multiple spot pendulum steel and controls, particularly as follows: S301, first block of slab enter at the inlet roller way of milling train R2
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are at milling train R1
Inlet roller way carry out put steel;When first block of slab starts Speed-up Rolling at the inlet roller way of milling train R2, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, the 3rd block of slab carry out putting steel at the inlet roller way of fixed-width pressure machine 3;
When second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1, the 3rd block of slab is at the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is in fixed width pressure
The inlet roller way of power machine 3 start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The rolling rhythm making roughing produce line by above-mentioned roughing mill pace control method has brought up to 21 volumes/hour.
Embodiment 5
S1: roughing is produced the target temperature range of slab in line is: 895 DEG C~905 DEG C, roughing outlet temperature is 895 DEG C.
S2: by the rough rolling process control of slab be: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.1m/s;The mill speed of milling train R2 is to plate in 3.4m/s, and the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling process.In the 2nd, 3 and 4 passages of milling train R2 rolling, slab removes at the entrance and exit of milling train R2
Phosphorus.
S3: slab is carried out multiple spot pendulum steel and controls, particularly as follows: S301, first block of slab enter at the inlet roller way of milling train R2
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are at milling train R1
Inlet roller way carry out put steel;When first block of slab starts Speed-up Rolling at the inlet roller way of milling train R2, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, the 3rd block of slab carry out putting steel at the inlet roller way of fixed-width pressure machine 3;
When second block of slab starts Speed-up Rolling at the inlet roller way of milling train R1, the 3rd block of slab is at the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out putting steel at the furnace delivery table of No. 1 stove;When the 3rd block of slab is in fixed width pressure
The inlet roller way of power machine 3 start to raise speed fixed width time, the 4th block of slab starts speed-raising at the tapping roller-way of No. 1 stove and advances.
The rolling rhythm making roughing produce line by above-mentioned roughing mill pace control method has brought up to 22 volumes/hour.
Knowable to above-mentioned 5 embodiments, the application provide roughing mill pace control method by reduce tapping temperature technology,
Multiple spot pendulum steel, milling train R1, the restriction skill of milling train R2 mill speed is carried out at heating furnace 1, fixed-width pressure machine 3, milling train R1, milling train R2
Art, the exploitation of double technique of scale removal of milling train R2 makes rolling rhythm bring up to 20-22 volume/hour from 12 volumes/hour.
One or more technical schemes provided herein, at least have the following technical effect that or advantage:
Owing to have employed conservative control roughing outlet temperature, rolling mode reasonable in design-milling train R1 rolls 3 passages, rolls
Machine R2 rolls 5 passages, slab carries out multiple spot pendulum steel and controls.So, roughing control method in prior art is efficiently solved
Rolling rhythm is relatively slow, causes the technical problem that the production capacity of product line is relatively low, it is achieved that be effectively improved the technique effect of roughing rhythm.
Above-described detailed description of the invention, has been carried out the purpose of the present invention, technical scheme and beneficial effect further
Describe in detail, be it should be understood that the detailed description of the invention that the foregoing is only the present invention, be not limited to this
Bright, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, should be included in the present invention
Protection domain within.
Claims (7)
1. a roughing mill pace control method, it is characterised in that comprise the following steps:
The roughing outlet temperature that roughing is produced slab in line controls the lower limit at target temperature range;
By the rough rolling process control of described slab it is: milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, roll described
In 2nd, 3 and 4 passages of machine R2 rolling, described slab carries out dephosphorization at the entrance and exit of described milling train R2;
Described slab carries out multiple spot pendulum steel control.
2. roughing mill pace control method as claimed in claim 1, it is characterised in that
The mill speed of described milling train R1 is not more than 1.5m/s;
The mill speed of described milling train R2 is 2m/s~3.5m/s.
3. roughing mill pace control method as claimed in claim 1, it is characterised in that
In the operation of rolling of described milling train R1 and described milling train R2, described slab is carried out full de-scaling process.
4. roughing mill pace control method as claimed in claim 1, it is characterised in that
Described roughing is produced line and is included: a dephosphorizing machine that 4 heating furnaces are connected with the tapping roller-way of described heating furnace, fixed width pressure
Power machine, described milling train R1, described milling train R2 and roller-way;
Described roller-way is sequentially connected with described 4 heating furnaces, dephosphorizing machine, fixed-width pressure machine, a milling train R1 and described milling train R2;
Wherein, the described heating furnace that will be close to a described dephosphorizing machine is designated as No. 1 stove, by farthest apart from a described dephosphorizing machine
Described heating furnace is designated as No. 4 stoves, remains two described heating furnaces and is designated as No. 2 stoves and No. 3 stoves.
5. roughing mill pace control method as claimed in claim 4, it is characterised in that
The tapping interval of described 4 heating furnaces is: after the afterbody of previous described slab removes the tapping roller-way of described No. 1 stove, after
Slab described in one starts tapping.
6. roughing mill pace control method as claimed in claim 4, it is characterised in that described slab is carried out multiple spot pendulum steel control
System, including:
First block of described slab carries out putting steel at the inlet roller way of described milling train R2;
Second block of described slab carries out putting steel at the inlet roller way of described milling train R1;
3rd block of described slab carries out putting steel at the inlet roller way of described fixed-width pressure machine;
4th block of described slab carries out putting steel at the furnace delivery table of described No. 1 stove.
7. roughing mill pace control method as claimed in claim 6, it is characterised in that
The pendulum steel time of first block of described slab is controlled according to described target temperature range;
When first block of described slab starts Speed-up Rolling at the inlet roller way of described milling train R2, second block of described slab is described
The inlet roller way of milling train R1 starts Speed-up Rolling;
When second block of described slab starts Speed-up Rolling at the inlet roller way of described milling train R1, the 3rd block of described slab is described
The inlet roller way of fixed-width pressure machine starts the fixed width that raises speed;
When the 3rd block of described slab starts to raise speed fixed width at the inlet roller way of described fixed-width pressure machine, the 4th block of described slab exists
The tapping roller-way of described No. 1 stove starts speed-raising and advances.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610450928.9A CN106040749B (en) | 2016-06-21 | 2016-06-21 | Rough rolling rhythm control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610450928.9A CN106040749B (en) | 2016-06-21 | 2016-06-21 | Rough rolling rhythm control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106040749A true CN106040749A (en) | 2016-10-26 |
CN106040749B CN106040749B (en) | 2018-06-22 |
Family
ID=57167894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610450928.9A Active CN106040749B (en) | 2016-06-21 | 2016-06-21 | Rough rolling rhythm control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106040749B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106424159A (en) * | 2016-11-18 | 2017-02-22 | 首钢京唐钢铁联合有限责任公司 | Method for improving rough rolling rhythm of strip steel |
CN106583465A (en) * | 2016-11-18 | 2017-04-26 | 首钢京唐钢铁联合有限责任公司 | Method and device for improving ferrite hot rolling rhythm |
CN107309278A (en) * | 2017-07-07 | 2017-11-03 | 首钢京唐钢铁联合有限责任公司 | Method for improving production efficiency of pipeline steel |
CN110773570A (en) * | 2019-09-20 | 2020-02-11 | 南京钢铁股份有限公司 | Method for improving rolling rhythm of 5m rolling mill |
CN112077149A (en) * | 2020-08-05 | 2020-12-15 | 首钢京唐钢铁联合有限责任公司 | Control system for hot rolling heating furnace tapping rhythm |
CN112170500A (en) * | 2019-07-01 | 2021-01-05 | 上海梅山钢铁股份有限公司 | Hot continuous rolling production control method for constant-gap structure |
CN113843282A (en) * | 2021-09-14 | 2021-12-28 | 南京钢铁股份有限公司 | Online monitoring method for rolling rhythm of medium plate |
CN114985492A (en) * | 2022-05-12 | 2022-09-02 | 首钢京唐钢铁联合有限责任公司 | Steel feeding method of descaling machine |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1059676A (en) * | 1991-08-01 | 1992-03-25 | 冶金工业部钢铁研究总院 | Cut deal controlled rolling slab is treated warm method and apparatus |
CN202070578U (en) * | 2011-03-30 | 2011-12-14 | 鞍钢股份有限公司 | Intermediate billet cooling device |
CN102430569A (en) * | 2011-11-14 | 2012-05-02 | 湖南华菱湘潭钢铁有限公司 | Device for improving hourly output of single-stand medium plate rolling mill and rolling method |
CN102688884A (en) * | 2012-06-11 | 2012-09-26 | 南京钢铁股份有限公司 | Rolling process of limit-specification steel plate of 2800mm double-stand heavy and medium plate mill |
CN103372572A (en) * | 2012-04-28 | 2013-10-30 | 宝山钢铁股份有限公司 | Control method for improving rolling pace of roughing mill |
CN103706645A (en) * | 2013-12-16 | 2014-04-09 | 攀钢集团西昌钢钒有限公司 | Method for shortening temperature holding time of intermediate billet in process of hot continuous rolling |
CN103866204A (en) * | 2014-02-27 | 2014-06-18 | 济钢集团有限公司 | Large-strain X80 dual-phase steel plate produced by virtue of process at low temperature and under high pressure |
CN104438319A (en) * | 2014-10-13 | 2015-03-25 | 首钢京唐钢铁联合有限责任公司 | Method for improving rough rolling rhythm |
CN104550279A (en) * | 2014-11-26 | 2015-04-29 | 南京钢铁股份有限公司 | De-scaling method for steel plate at TMCP delivery state |
CN104668287A (en) * | 2014-12-09 | 2015-06-03 | 攀钢集团攀枝花钢钒有限公司 | Universal steel rail rolling mill device and steel rail rolling method |
CN104726665A (en) * | 2015-04-03 | 2015-06-24 | 首钢总公司 | Hot rolling technique of X80 pipeline steel coil plate |
CN105039870A (en) * | 2015-08-31 | 2015-11-11 | 山东钢铁股份有限公司 | X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel |
CN105088096A (en) * | 2015-08-31 | 2015-11-25 | 山东钢铁股份有限公司 | X80 pipeline steel with high stress ratio and high arrest toughness and preparation method and application of X80 pipeline steel |
CN105478472A (en) * | 2014-09-19 | 2016-04-13 | 鞍钢股份有限公司 | Hot rolling method of wide and thin high-strength cold-rolled substrate for automobile |
-
2016
- 2016-06-21 CN CN201610450928.9A patent/CN106040749B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1059676A (en) * | 1991-08-01 | 1992-03-25 | 冶金工业部钢铁研究总院 | Cut deal controlled rolling slab is treated warm method and apparatus |
CN202070578U (en) * | 2011-03-30 | 2011-12-14 | 鞍钢股份有限公司 | Intermediate billet cooling device |
CN102430569A (en) * | 2011-11-14 | 2012-05-02 | 湖南华菱湘潭钢铁有限公司 | Device for improving hourly output of single-stand medium plate rolling mill and rolling method |
CN103372572A (en) * | 2012-04-28 | 2013-10-30 | 宝山钢铁股份有限公司 | Control method for improving rolling pace of roughing mill |
CN102688884A (en) * | 2012-06-11 | 2012-09-26 | 南京钢铁股份有限公司 | Rolling process of limit-specification steel plate of 2800mm double-stand heavy and medium plate mill |
CN103706645A (en) * | 2013-12-16 | 2014-04-09 | 攀钢集团西昌钢钒有限公司 | Method for shortening temperature holding time of intermediate billet in process of hot continuous rolling |
CN103866204A (en) * | 2014-02-27 | 2014-06-18 | 济钢集团有限公司 | Large-strain X80 dual-phase steel plate produced by virtue of process at low temperature and under high pressure |
CN105478472A (en) * | 2014-09-19 | 2016-04-13 | 鞍钢股份有限公司 | Hot rolling method of wide and thin high-strength cold-rolled substrate for automobile |
CN104438319A (en) * | 2014-10-13 | 2015-03-25 | 首钢京唐钢铁联合有限责任公司 | Method for improving rough rolling rhythm |
CN104550279A (en) * | 2014-11-26 | 2015-04-29 | 南京钢铁股份有限公司 | De-scaling method for steel plate at TMCP delivery state |
CN104668287A (en) * | 2014-12-09 | 2015-06-03 | 攀钢集团攀枝花钢钒有限公司 | Universal steel rail rolling mill device and steel rail rolling method |
CN104726665A (en) * | 2015-04-03 | 2015-06-24 | 首钢总公司 | Hot rolling technique of X80 pipeline steel coil plate |
CN105039870A (en) * | 2015-08-31 | 2015-11-11 | 山东钢铁股份有限公司 | X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel |
CN105088096A (en) * | 2015-08-31 | 2015-11-25 | 山东钢铁股份有限公司 | X80 pipeline steel with high stress ratio and high arrest toughness and preparation method and application of X80 pipeline steel |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106424159A (en) * | 2016-11-18 | 2017-02-22 | 首钢京唐钢铁联合有限责任公司 | Method for improving rough rolling rhythm of strip steel |
CN106583465A (en) * | 2016-11-18 | 2017-04-26 | 首钢京唐钢铁联合有限责任公司 | Method and device for improving ferrite hot rolling rhythm |
CN106424159B (en) * | 2016-11-18 | 2019-07-23 | 首钢京唐钢铁联合有限责任公司 | Method for improving rough rolling rhythm of strip steel |
CN107309278A (en) * | 2017-07-07 | 2017-11-03 | 首钢京唐钢铁联合有限责任公司 | Method for improving production efficiency of pipeline steel |
CN112170500A (en) * | 2019-07-01 | 2021-01-05 | 上海梅山钢铁股份有限公司 | Hot continuous rolling production control method for constant-gap structure |
CN110773570A (en) * | 2019-09-20 | 2020-02-11 | 南京钢铁股份有限公司 | Method for improving rolling rhythm of 5m rolling mill |
CN112077149A (en) * | 2020-08-05 | 2020-12-15 | 首钢京唐钢铁联合有限责任公司 | Control system for hot rolling heating furnace tapping rhythm |
CN112077149B (en) * | 2020-08-05 | 2022-08-19 | 首钢京唐钢铁联合有限责任公司 | Control system for hot rolling heating furnace tapping rhythm |
CN113843282A (en) * | 2021-09-14 | 2021-12-28 | 南京钢铁股份有限公司 | Online monitoring method for rolling rhythm of medium plate |
CN113843282B (en) * | 2021-09-14 | 2024-08-13 | 南京钢铁股份有限公司 | Online monitoring method for rolling rhythm of medium plate |
CN114985492A (en) * | 2022-05-12 | 2022-09-02 | 首钢京唐钢铁联合有限责任公司 | Steel feeding method of descaling machine |
Also Published As
Publication number | Publication date |
---|---|
CN106040749B (en) | 2018-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106040749A (en) | Rough rolling rhythm control method | |
CN104525560B (en) | Effective control method of the 30mm cut deal pitted skins of straight carbon steel/Nb bearing steel 20 | |
CN100580102C (en) | Process for producing high strength hardened and tempered steel by steekle mill on-line quenching | |
CN103484643B (en) | Method for preventing hot rolling edge fractures in oriented silicon steel | |
CN103710507B (en) | A kind of preparation method of low nickel duplex stainless steel hot-rolled sheet coil | |
CN102266866B (en) | Technology for producing hot-rolled pipeline steel of roll mill with single frame furnace | |
CN103157658A (en) | Process for rolling stainless steel coil on conventional hot continuous rolling production line | |
CN112267011B (en) | Multifunctional stainless steel plate solid solution heat treatment process and device | |
CN103372572A (en) | Control method for improving rolling pace of roughing mill | |
CN101386124A (en) | Medium and heavy plate production technique and special production line thereof | |
CN102179406A (en) | Method for rolling thin high-strength steel plate of single-frame steckel mill | |
CN102059248A (en) | Method for producing titanium coil by using normal hot continuous rolling mill | |
CN102513370A (en) | Control process for single-stand Steckel mill to produce special-purpose pipeline steel | |
CN102806233B (en) | Controlled rolling and controlled cooling process for manufacturing double-phase steel by single-shelf steckel mill | |
CN102601129A (en) | Controlling method for scales on surface of low-carbon cold heading steel hot-rolled wire rods | |
CN106583465B (en) | Method and device for improving ferrite hot rolling rhythm | |
CN102888506A (en) | Method for controlling position of plate blank at extraction end of heating furnace | |
CN102225432A (en) | Control process for performances of steel plate during hot rolling and flat rolling process of single-stand steckel mill | |
CN110153199A (en) | A kind of controlled rolling method of large scale rod bar | |
CN102151696A (en) | Temperature control rolling method for Q345 steel plate | |
CN103599929B (en) | Rolling method capable of eliminating black spots on surface of hot-rolling ultra-low carbon steel plate after acid pickling | |
CN202963027U (en) | Heat treatment device producing minor-diameter high-strength high-ductility steel | |
CN103706645A (en) | Method for shortening temperature holding time of intermediate billet in process of hot continuous rolling | |
CN202322933U (en) | Production system of high-toughness ultrahigh-intensity steel | |
CN103409686A (en) | Production method of Q345D steel plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |