CN106040749B - A kind of roughing mill pace control method - Google Patents
A kind of roughing mill pace control method Download PDFInfo
- Publication number
- CN106040749B CN106040749B CN201610450928.9A CN201610450928A CN106040749B CN 106040749 B CN106040749 B CN 106040749B CN 201610450928 A CN201610450928 A CN 201610450928A CN 106040749 B CN106040749 B CN 106040749B
- Authority
- CN
- China
- Prior art keywords
- slab
- milling train
- block
- roughing
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Abstract
The present invention relates to a kind of roughing mill pace control methods, include the following steps:The roughing outlet temperature of slab in roughing producing line is controlled into the lower limit in target temperature range;It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, the mill speed of milling train R1 is not more than 1.5m/s;The mill speed of milling train R2 is 2m/s~3.5m/s, and carries out full de-scaling processing to slab in the operation of rolling of milling train R1 and milling train R2.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 carries out dephosphorization;Multiple spot pendulum steel control is carried out to slab.The roughing mill pace control method can effectively improve roughing rhythm.
Description
Technical field
The present invention relates to technical field of steel rolling, more particularly to a kind of roughing mill pace control method.
Background technology
Since similar think gauge high-grade pipe line steel, wheel steel are required to high heating temperature, low roughing outlet temperature, to protect
Zerolling requirement is demonstrate,proved, rough rolling step needs board briquette being reduced to 880 DEG C~920 DEG C ranges, could meet finish rolling entrance
900~940 DEG C of requirement, roughing region slab temperature drop need to reach 280 DEG C or more.And when being performed according to pervious rolling mill practice
Only need through the cooling to be rolled of R2 extreme traces time forward swing steel, set according to normal two level when rolling, put steel time short then 120s, it is long then
200s.Rolling rhythm only has volume 12/hour.
The rolling rhythm of roughing control method is slower in the prior art, and the production capacity for leading to producing line is relatively low.
Invention content
The present invention provides a kind of roughing mill pace control methods, solve or part solves the control of roughing in the prior art
The rolling rhythm of method is slower, the technical issues of causing the production capacity of producing line relatively low, realizes the technology for effectively improving roughing rhythm
Effect.
A kind of roughing mill pace control method provided by the invention, includes the following steps:
The roughing outlet temperature of slab in roughing producing line is controlled into the lower limit in target temperature range;
It is by the rough rolling process control of the slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, in institute
In the passage of the 2nd, 3 and 4 for stating milling train R2 rollings, entrance and exit of the slab in the milling train R2 carries out dephosphorization;
Multiple spot pendulum steel control is carried out to the slab.
Preferably, the mill speed of the milling train R1 is not more than 1.5m/s;
The mill speed of the milling train R2 is 2m/s~3.5m/s.
Preferably, the slab is carried out at full de-scaling in the operation of rolling of the milling train R1 and the milling train R2
Reason.
Preferably, the roughing producing line includes:4 heating furnaces, connect with the tapping roller-way of the heating furnace it is primary
Dephosphorizing machine, fixed-width pressure machine, the milling train R1, the milling train R2 and roller-way;
The roller-way is sequentially connected 4 heating furnaces, a dephosphorizing machine, fixed-width pressure machine, milling train R1 and the milling train
R2;
Wherein, the heating furnace that will be close to a dephosphorizing machine is denoted as No. 1 stove, will be apart from a dephosphorizing machine most
The remote heating furnace is denoted as No. 4 stoves, and remaining two heating furnaces are denoted as No. 2 stoves and No. 3 stoves.
Preferably, the tapping interval of 4 heating furnaces is:The tail portion of the previous slab removes No. 1 stove
It taps after roller-way, the latter slab starts to tap.
Preferably, multiple spot pendulum steel control is carried out to the slab, including:
Inlet roller way of first block of slab in the milling train R2 carries out pendulum steel;
Inlet roller way of second block of slab in the milling train R1 carries out pendulum steel;
Slab described in third block carries out pendulum steel in the inlet roller way of the fixed-width pressure machine;
The 4th block of slab carries out pendulum steel in the furnace delivery table of No. 1 stove.
Preferably, the pendulum steel time of first block of slab is controlled according to the target temperature range;
When first block of slab is when the inlet roller way of the milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of the milling train R1 starts Speed-up Rolling;
When second block of slab is when the inlet roller way of the milling train R1 starts Speed-up Rolling, slab described in third block exists
The inlet roller way of the fixed-width pressure machine starts the fixed width that raises speed;
When slab described in third block the inlet roller way of the fixed-width pressure machine start raise speed fixed width when, the 4th block of plate
Base starts speed-raising in the tapping roller-way of No. 1 stove and advances.
One or more technical solutions provided herein, have at least the following technical effects or advantages:
As a result of reasonable control roughing outlet temperature, rolling mode-milling train R1 of reasonable design rolls 3 passages, rolls
Machine R2 rolls 5 passages, and multiple spot pendulum steel control is carried out to slab.In this way, efficiently solve roughing control method in the prior art
Rolling rhythm is slower, the technical issues of causing the production capacity of producing line relatively low, realizes the technique effect for effectively improving roughing rhythm.
Description of the drawings
Fig. 1 is the flow chart of roughing mill pace control method provided by the invention;
Fig. 2 is the structure diagram of roughing producing line provided by the invention.
(component that each label represents in attached drawing is followed successively by:1 heating furnace, 2 dephosphorizing machines, 3 fixed-width pressure machines, 4 milling trains
R1,5 milling train R2,6 roller-ways)
Specific embodiment
The embodiment of the present application provides a kind of roughing mill pace control method, solves or part solves in the prior art slightly
The rolling rhythm for rolling control method is slower, the technical issues of causing the production capacity of producing line relatively low, by rationally controlling roughing outlet temperature
Degree, rolling mode-milling train R1 of reasonable design roll 3 passages, and milling train R2 rolls 5 passages, and multiple spot pendulum steel control is carried out to slab,
Realize the technique effect for effectively improving roughing rhythm.
Referring to attached drawing 1, a kind of roughing mill pace control method provided by the invention includes the following steps:
S1:The roughing outlet temperature of slab in roughing producing line is controlled into the lower limit in target temperature range.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be not more than 1.5m/s;The mill speed of milling train R2 is 2m/s~3.5m/s, and the rolling of milling train R1 and milling train R2
Full de-scaling processing is carried out to slab in the process.Milling train R2 rolling the passage of the 2nd, 3 and 4 in, slab milling train R2 entrance and
Outlet carries out dephosphorization.
S3:Multiple spot pendulum steel control is carried out to slab.
Further, referring to attached drawing 2, roughing producing line includes:4 heating furnaces, 1, dephosphorizing machine 2, rolls fixed-width pressure machine 3
Machine R1, milling train R2 and roller-way 6;Roller-way 6 is sequentially connected 4 heating furnaces, 1, dephosphorizing machine 2, fixed-width pressure machine 3, milling train R1 and rolls
Machine R2;Wherein, the heating furnace 1 that will be close to a dephosphorizing machine 2 is denoted as No. 1 stove, by the farthest heating furnace 1 of dephosphorizing machine 2 of distance
No. 4 stoves are denoted as, remaining two heating furnaces 1 are denoted as No. 2 stoves and No. 3 stoves.The tapping interval of 4 heating furnaces 1 is:The tail of previous slab
After portion removes the tapping roller-way 6 of No. 1 stove, latter slab starts to tap.
Further, step S3 includes:
S301:Inlet roller way of first block of slab in milling train R2 carries out pendulum steel;And the pendulum steel time of first block of slab according to
Target temperature range is controlled.
S302:Inlet roller way of second block of slab in milling train R1 carries out pendulum steel;When first block of slab is in the entrance of milling train R2
When roller-way starts Speed-up Rolling, second block of slab starts Speed-up Rolling in the inlet roller way of milling train R1.
S303:Third block slab carries out pendulum steel in the inlet roller way of fixed-width pressure machine 3;When second block of slab is milling train R1's
When inlet roller way starts Speed-up Rolling, third block slab starts the fixed width that raises speed in the inlet roller way of fixed-width pressure machine 3.
S304:4th block of slab carries out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed-width pressure machine 3
When inlet roller way starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
It describes in detail below by specific embodiment to the roughing mill pace control method that the application provides:
Embodiment 1
S1:Target temperature range by slab in roughing producing line is:880 DEG C~920 DEG C, roughing outlet temperature is 880 DEG C.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.4m/s;The mill speed of milling train R2 is 2.2m/s, and to plate in the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling processing.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 is removed
Phosphorus.
S3:Multiple spot pendulum steel control is carried out to slab, specially:S301, first block of slab milling train R2 inlet roller way into
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are in milling train R1
Inlet roller way carry out pendulum steel;When first block of slab is when the inlet roller way of milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, third block slab carry out pendulum steel in the inlet roller way of fixed-width pressure machine 3;
When second block of slab is when the inlet roller way of milling train R1 starts Speed-up Rolling, third block slab is in the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed width pressure
When the inlet roller way of power machine 3 starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
The rolling rhythm of roughing producing line is made to be increased to volume 20/hour by above-mentioned roughing mill pace control method.
Embodiment 2
S1:Target temperature range by slab in roughing producing line is:885 DEG C~910 DEG C, roughing outlet temperature is 885 DEG C.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.3m/s;The mill speed of milling train R2 is 2.5m/s, and to plate in the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling processing.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 is removed
Phosphorus.
S3:Multiple spot pendulum steel control is carried out to slab, specially:S301, first block of slab milling train R2 inlet roller way into
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are in milling train R1
Inlet roller way carry out pendulum steel;When first block of slab is when the inlet roller way of milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, third block slab carry out pendulum steel in the inlet roller way of fixed-width pressure machine 3;
When second block of slab is when the inlet roller way of milling train R1 starts Speed-up Rolling, third block slab is in the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed width pressure
When the inlet roller way of power machine 3 starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
The rolling rhythm of roughing producing line is made to be increased to volume 20/hour by above-mentioned roughing mill pace control method.
Embodiment 3
S1:Target temperature range by slab in roughing producing line is:888 DEG C~915 DEG C, roughing outlet temperature is 888 DEG C.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.2m/s;The mill speed of milling train R2 is 2.8m/s, and to plate in the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling processing.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 is removed
Phosphorus.
S3:Multiple spot pendulum steel control is carried out to slab, specially:S301, first block of slab milling train R2 inlet roller way into
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are in milling train R1
Inlet roller way carry out pendulum steel;When first block of slab is when the inlet roller way of milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, third block slab carry out pendulum steel in the inlet roller way of fixed-width pressure machine 3;
When second block of slab is when the inlet roller way of milling train R1 starts Speed-up Rolling, third block slab is in the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed width pressure
When the inlet roller way of power machine 3 starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
The rolling rhythm of roughing producing line is made to be increased to volume 21/hour by above-mentioned roughing mill pace control method.
Embodiment 4
S1:Target temperature range by slab in roughing producing line is:890 DEG C~917 DEG C, roughing outlet temperature is 890 DEG C.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.0m/s;The mill speed of milling train R2 is 3.2m/s, and to plate in the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling processing.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 is removed
Phosphorus.
S3:Multiple spot pendulum steel control is carried out to slab, specially:S301, first block of slab milling train R2 inlet roller way into
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are in milling train R1
Inlet roller way carry out pendulum steel;When first block of slab is when the inlet roller way of milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, third block slab carry out pendulum steel in the inlet roller way of fixed-width pressure machine 3;
When second block of slab is when the inlet roller way of milling train R1 starts Speed-up Rolling, third block slab is in the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed width pressure
When the inlet roller way of power machine 3 starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
The rolling rhythm of roughing producing line is made to be increased to volume 21/hour by above-mentioned roughing mill pace control method.
Embodiment 5
S1:Target temperature range by slab in roughing producing line is:895 DEG C~905 DEG C, roughing outlet temperature is 895 DEG C.
S2:It is by the rough rolling process control of slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, milling train R1
Mill speed be 1.1m/s;The mill speed of milling train R2 is 3.4m/s, and to plate in the operation of rolling of milling train R1 and milling train R2
Base carries out full de-scaling processing.In the passage of the 2nd, 3 and 4 of milling train R2 rollings, entrance and exit of the slab in milling train R2 is removed
Phosphorus.
S3:Multiple spot pendulum steel control is carried out to slab, specially:S301, first block of slab milling train R2 inlet roller way into
Row pendulum steel;And the pendulum steel time of first block of slab is controlled according to target temperature range.S302, second block of slab are in milling train R1
Inlet roller way carry out pendulum steel;When first block of slab is when the inlet roller way of milling train R2 starts Speed-up Rolling, second block of slab exists
The inlet roller way of milling train R1 starts Speed-up Rolling.S303, third block slab carry out pendulum steel in the inlet roller way of fixed-width pressure machine 3;
When second block of slab is when the inlet roller way of milling train R1 starts Speed-up Rolling, third block slab is in the entrance roller of fixed-width pressure machine 3
Road starts the fixed width that raises speed.S304, the 4th block of slab carry out pendulum steel in the furnace delivery table of No. 1 stove;When third block slab is in fixed width pressure
When the inlet roller way of power machine 3 starts speed-raising fixed width, the 4th block of slab starts speed-raising in the tapping roller-way of No. 1 stove and advances.
The rolling rhythm of roughing producing line is made to be increased to volume 22/hour by above-mentioned roughing mill pace control method.
From above-mentioned 5 embodiments it is found that the roughing mill pace control method of the application offer is by reducing tapping temperature technology,
Heating furnace 1, fixed-width pressure machine 3, milling train R1, milling train R2 carry out multiple spot pendulum steel, milling train R1, milling train R2 mill speeds restriction skill
Art, the exploitation of double technique of scale removal of milling train R2 make rolling rhythm be increased to 20-22 volumes/hour from volume 12/hour.
One or more technical solutions provided herein, have at least the following technical effects or advantages:
As a result of reasonable control roughing outlet temperature, rolling mode-milling train R1 of reasonable design rolls 3 passages, rolls
Machine R2 rolls 5 passages, and multiple spot pendulum steel control is carried out to slab.In this way, efficiently solve roughing control method in the prior art
Rolling rhythm is slower, the technical issues of causing the production capacity of producing line relatively low, realizes the technique effect for effectively improving roughing rhythm.
Above-described specific embodiment has carried out the purpose of the present invention, technical solution and advantageous effect further
It is described in detail, it should be understood that the foregoing is merely the specific embodiment of the present invention, is not limited to this hair
Bright, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in the present invention
Protection domain within.
Claims (4)
- A kind of 1. roughing mill pace control method, which is characterized in that include the following steps:The roughing outlet temperature of slab in roughing producing line is controlled into the lower limit in target temperature range;It is by the rough rolling process control of the slab:Milling train R1 rolls 3 passages, and milling train R2 rolls 5 passages;Wherein, it is rolled described In the passage of the 2nd, 3 and 4 of machine R2 rollings, entrance and exit of the slab in the milling train R2 carries out dephosphorization;Multiple spot pendulum steel control is carried out to the slab;The roughing producing line includes:4 heating furnaces, the tapping with the heating furnace A dephosphorizing machine, fixed-width pressure machine, the milling train R1, the milling train R2 and the roller-way of roller-way connection;The roller-way is sequentially connected 4 heating furnaces, a dephosphorizing machine, fixed-width pressure machine, milling train R1 and the milling train R2;Wherein, it will be close to described once remove The heating furnace of phosphorus machine is denoted as No. 1 stove, and the heating furnace farthest apart from a dephosphorizing machine is denoted as No. 4 stoves, remaining Two heating furnaces are denoted as No. 2 stoves and No. 3 stoves;The tapping interval of 4 heating furnaces is:The tail portion of the previous slab is moved After going out the tapping roller-way of No. 1 stove, the latter slab starts to tap;First block of slab is in the entrance of the milling train R2 Roller-way carries out pendulum steel;Inlet roller way of second block of slab in the milling train R1 carries out pendulum steel;Slab is in institute described in third block The inlet roller way for stating fixed-width pressure machine carries out pendulum steel;The 4th block of slab carries out pendulum steel in the furnace delivery table of No. 1 stove;When For first block of slab when the inlet roller way of the milling train R2 starts Speed-up Rolling, second block of slab is in the milling train R1 Inlet roller way start Speed-up Rolling;When second block of slab is when the inlet roller way of the milling train R1 starts Speed-up Rolling, Slab described in third block starts the fixed width that raises speed in the inlet roller way of the fixed-width pressure machine;When slab described in third block is described fixed When the inlet roller way of wide forcing press starts speed-raising fixed width, the 4th block of slab starts to raise speed in the tapping roller-way of No. 1 stove Advance.
- 2. roughing mill pace control method as described in claim 1, which is characterized in thatThe mill speed of the milling train R1 is not more than 1.5m/s;The mill speed of the milling train R2 is 2m/s~3.5m/s.
- 3. roughing mill pace control method as described in claim 1, which is characterized in thatFull de-scaling processing is carried out to the slab in the operation of rolling of the milling train R1 and the milling train R2.
- 4. roughing mill pace control method as described in claim 1, which is characterized in thatThe pendulum steel time of first block of slab is controlled according to the target temperature range.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610450928.9A CN106040749B (en) | 2016-06-21 | 2016-06-21 | A kind of roughing mill pace control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610450928.9A CN106040749B (en) | 2016-06-21 | 2016-06-21 | A kind of roughing mill pace control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106040749A CN106040749A (en) | 2016-10-26 |
CN106040749B true CN106040749B (en) | 2018-06-22 |
Family
ID=57167894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610450928.9A Active CN106040749B (en) | 2016-06-21 | 2016-06-21 | A kind of roughing mill pace control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106040749B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106424159B (en) * | 2016-11-18 | 2019-07-23 | 首钢京唐钢铁联合有限责任公司 | A method of promoting Strip Roughing rhythm |
CN106583465B (en) * | 2016-11-18 | 2019-03-05 | 首钢京唐钢铁联合有限责任公司 | A kind of method and device improving warm-rolling rhythm |
CN107309278A (en) * | 2017-07-07 | 2017-11-03 | 首钢京唐钢铁联合有限责任公司 | A kind of method of lift line steel production efficiency |
CN112170500B (en) * | 2019-07-01 | 2022-10-14 | 上海梅山钢铁股份有限公司 | Hot continuous rolling production control method for constant-gap structure |
CN110773570B (en) * | 2019-09-20 | 2021-03-19 | 南京钢铁股份有限公司 | Method for improving rolling rhythm of 5m rolling mill |
CN112077149B (en) * | 2020-08-05 | 2022-08-19 | 首钢京唐钢铁联合有限责任公司 | Control system for hot rolling heating furnace tapping rhythm |
CN113843282A (en) * | 2021-09-14 | 2021-12-28 | 南京钢铁股份有限公司 | Online monitoring method for rolling rhythm of medium plate |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1059676A (en) * | 1991-08-01 | 1992-03-25 | 冶金工业部钢铁研究总院 | Cut deal controlled rolling slab is treated warm method and apparatus |
CN202070578U (en) * | 2011-03-30 | 2011-12-14 | 鞍钢股份有限公司 | Intermediate blank cooling device |
CN102430569A (en) * | 2011-11-14 | 2012-05-02 | 湖南华菱湘潭钢铁有限公司 | Device for improving hourly yield of single-chassis medium plate mill and rolling method thereof |
CN102688884A (en) * | 2012-06-11 | 2012-09-26 | 南京钢铁股份有限公司 | Rolling process of limit-specification steel plate of 2800mm double-stand heavy and medium plate mill |
CN103372572A (en) * | 2012-04-28 | 2013-10-30 | 宝山钢铁股份有限公司 | Control method for improving rolling pace of roughing mill |
CN103706645A (en) * | 2013-12-16 | 2014-04-09 | 攀钢集团西昌钢钒有限公司 | Method for shortening temperature holding time of intermediate billet in process of hot continuous rolling |
CN103866204A (en) * | 2014-02-27 | 2014-06-18 | 济钢集团有限公司 | Large-strain X80 dual-phase steel plate produced by virtue of process at low temperature and under high pressure |
CN104438319A (en) * | 2014-10-13 | 2015-03-25 | 首钢京唐钢铁联合有限责任公司 | Rough rolling speed increasing method |
CN104550279A (en) * | 2014-11-26 | 2015-04-29 | 南京钢铁股份有限公司 | De-scaling method for steel plate at TMCP delivery state |
CN104668287A (en) * | 2014-12-09 | 2015-06-03 | 攀钢集团攀枝花钢钒有限公司 | Universal steel rail rolling mill device and steel rail rolling method |
CN104726665A (en) * | 2015-04-03 | 2015-06-24 | 首钢总公司 | Hot rolling technique of X80 pipeline steel coil plate |
CN105039870A (en) * | 2015-08-31 | 2015-11-11 | 山东钢铁股份有限公司 | X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel |
CN105088096A (en) * | 2015-08-31 | 2015-11-25 | 山东钢铁股份有限公司 | X80 pipeline steel with high stress ratio and high arrest toughness and preparation method and application of X80 pipeline steel |
CN105478472A (en) * | 2014-09-19 | 2016-04-13 | 鞍钢股份有限公司 | Hot rolling method for wide and thin size high-strength cold-rolled base plate for automobile |
-
2016
- 2016-06-21 CN CN201610450928.9A patent/CN106040749B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1059676A (en) * | 1991-08-01 | 1992-03-25 | 冶金工业部钢铁研究总院 | Cut deal controlled rolling slab is treated warm method and apparatus |
CN202070578U (en) * | 2011-03-30 | 2011-12-14 | 鞍钢股份有限公司 | Intermediate blank cooling device |
CN102430569A (en) * | 2011-11-14 | 2012-05-02 | 湖南华菱湘潭钢铁有限公司 | Device for improving hourly yield of single-chassis medium plate mill and rolling method thereof |
CN103372572A (en) * | 2012-04-28 | 2013-10-30 | 宝山钢铁股份有限公司 | Control method for improving rolling pace of roughing mill |
CN102688884A (en) * | 2012-06-11 | 2012-09-26 | 南京钢铁股份有限公司 | Rolling process of limit-specification steel plate of 2800mm double-stand heavy and medium plate mill |
CN103706645A (en) * | 2013-12-16 | 2014-04-09 | 攀钢集团西昌钢钒有限公司 | Method for shortening temperature holding time of intermediate billet in process of hot continuous rolling |
CN103866204A (en) * | 2014-02-27 | 2014-06-18 | 济钢集团有限公司 | Large-strain X80 dual-phase steel plate produced by virtue of process at low temperature and under high pressure |
CN105478472A (en) * | 2014-09-19 | 2016-04-13 | 鞍钢股份有限公司 | Hot rolling method for wide and thin size high-strength cold-rolled base plate for automobile |
CN104438319A (en) * | 2014-10-13 | 2015-03-25 | 首钢京唐钢铁联合有限责任公司 | Rough rolling speed increasing method |
CN104550279A (en) * | 2014-11-26 | 2015-04-29 | 南京钢铁股份有限公司 | De-scaling method for steel plate at TMCP delivery state |
CN104668287A (en) * | 2014-12-09 | 2015-06-03 | 攀钢集团攀枝花钢钒有限公司 | Universal steel rail rolling mill device and steel rail rolling method |
CN104726665A (en) * | 2015-04-03 | 2015-06-24 | 首钢总公司 | Hot rolling technique of X80 pipeline steel coil plate |
CN105039870A (en) * | 2015-08-31 | 2015-11-11 | 山东钢铁股份有限公司 | X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel |
CN105088096A (en) * | 2015-08-31 | 2015-11-25 | 山东钢铁股份有限公司 | X80 pipeline steel with high stress ratio and high arrest toughness and preparation method and application of X80 pipeline steel |
Also Published As
Publication number | Publication date |
---|---|
CN106040749A (en) | 2016-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106040749B (en) | A kind of roughing mill pace control method | |
CN103710507B (en) | A kind of preparation method of low nickel duplex stainless steel hot-rolled sheet coil | |
CN104525560B (en) | Effective control method of the 30mm cut deal pitted skins of straight carbon steel/Nb bearing steel 20 | |
CN103484643B (en) | Method for preventing hot rolling edge fractures in oriented silicon steel | |
CN102266866B (en) | Technology for producing hot-rolled pipeline steel of roll mill with single frame furnace | |
CN112267011B (en) | Multifunctional stainless steel plate solid solution heat treatment process and device | |
CN103406352B (en) | Heating and rolling method of Ni36 nickel base alloy plate | |
CN104307890A (en) | Combined controlled rolling and cooling production technology of HRB400 hot rolled ribbed steel bars | |
CN103341498B (en) | Reduce the method for hot rolled steel plate surface oxidation iron sheet thickness | |
CN101386124A (en) | Medium and heavy plate production technique and special production line thereof | |
CN104399745B (en) | A kind of steekle mill production line configuring roughing mill and method of work thereof | |
CN206652838U (en) | A kind of wire rolling process units of low energy consumption | |
CN103920729B (en) | Method for removing red rust defects of high-silicon type high-strength automobile plate | |
CN102059248A (en) | Method for producing titanium coil by using normal hot continuous rolling mill | |
CN102601129A (en) | Controlling method for scales on surface of low-carbon cold heading steel hot-rolled wire rods | |
CN111676355A (en) | Online solution treatment process for austenitic stainless steel plate | |
CN106541099A (en) | It is a kind of to avoid the red method for sending straight dress crackle of surface of steel plate | |
CN101439365B (en) | Method for rolling seamless steel pipe from die-casting hollow steel ingot | |
CN102225432A (en) | Control process for performances of steel plate during hot rolling and flat rolling process of single-stand steckel mill | |
CN103212588B (en) | Method of reducing defect that slag is clamped under surface when carbon manganese steel is rolled in a hot mode | |
CN106583465A (en) | Method and device for increasing hot rolling speed of ferrite | |
CN110153199A (en) | A kind of controlled rolling method of large scale rod bar | |
CN204276517U (en) | A kind of production line that can replace conventional broadband steel hot continuous rolling | |
CN101758069B (en) | Process for rolling high strength pipe steel | |
CN104399748B (en) | A kind of production technology that can replace conventional broadband steel hot continuous rolling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |