CN103157658A - Process of rolling stainless steel coil in conventional hot continuous rolling production line - Google Patents

Process of rolling stainless steel coil in conventional hot continuous rolling production line Download PDF

Info

Publication number
CN103157658A
CN103157658A CN2013101263245A CN201310126324A CN103157658A CN 103157658 A CN103157658 A CN 103157658A CN 2013101263245 A CN2013101263245 A CN 2013101263245A CN 201310126324 A CN201310126324 A CN 201310126324A CN 103157658 A CN103157658 A CN 103157658A
Authority
CN
China
Prior art keywords
rolling
slab
stainless steel
roughing
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101263245A
Other languages
Chinese (zh)
Inventor
廖志
刘建华
张结刚
刘助兵
汪净
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lysteel Co Ltd
Original Assignee
Lysteel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lysteel Co Ltd filed Critical Lysteel Co Ltd
Priority to CN2013101263245A priority Critical patent/CN103157658A/en
Publication of CN103157658A publication Critical patent/CN103157658A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a process of rolling a stainless steel coil in a conventional hot continuous rolling production line. A stainless steel slab with the thickness of 150-250mm is placed in a heating furnace, the tapping temperature of the slab is 1200 DEG C-1300 DEG C, the time when the slab is in the furnace is 150-400min, the slab is taken out of the furnace and continuously rolled for 5-7 times after being descaled through a rough rolling descaling machine, and a medium slab is manufactured. The medium slab enters a hot coiling box through a middle roller way for uncoiling, is cropped through a flying shear, and enters a fine continuous rolling mill composed of seven machine frames after being descaled through a fine rolling descaling machine so as to be manufactured into strip steel with the thickness of 2.2-3.5mm. The strip steel enters a coiling machine after being cooled through laminar flow and is coiled to form a steel coil. The rolling process does not need increasing of equipment investment, is stable in rolling, high in comprehensive yield and good in quality of the surface of the strip steel, and has application and popularization value.

Description

A kind of on the conventional hot continuous rolling machine production line technique of rolling stainless-steel roll
?
Technical field
the present invention relates to a kind of stainless rolling mill practice, relate in particular to a kind of on the conventional hot continuous rolling machine production line technique (method) of (or utilizing the conventional hot continuous rolling machine production line) rolling (thin specification) stainless-steel roll.
?
Background technology
at present, domesticly can utilize the conventional hot continuous rolling machine production line to produce stainless enterprise to mainly contain Taiyuan Iron and Steel Co., peace steel, Mei Gang etc., in producing the stainless steel process, ubiquitous problem is: 1. because stainless steel is higher to the stability requirement of heating-up temperature, easily in heating process, produce fine and close oxide layer and cause the de-scaling difficulty; 2. when the thin specification stainless steel of rolling, roll-force is large, head and tail temperature difference is excessive, cause rolling unstable, plate shape is poor, the easy whipping of finish rolling, it is above that its reason is that the high temperature hot deformation resistance due to austenitic stainless steel doubles than straight carbon steel, causes roll-force to increase, directly cause roll wear, also increased the difficulty that plate shape is controlled; 3. stainless steel easily produces and scratches and scroll; 4. stainless steel is high temperature rolling, easily produces at the scene dust pollution, is that long-time baking easily damages because the high temperature production stainless steel makes equipment in addition.
?
Summary of the invention
in order to overcome the deficiencies in the prior art, the object of the present invention is to provide a kind of technique (method) that standby investment can be guaranteed again stainless-steel roll surface quality, plate shape is good and lumber recovery is high rolling on the conventional hot continuous rolling machine line (thin specification) stainless-steel roll of not setting up.
for achieving the above object, the technical solution used in the present invention is: of the present invention a kind of during on the conventional hot continuous rolling machine production line, the technique of rolling stainless-steel roll comprises the steps: the stainless steel slab of 150 ㎜~250 ㎜ thickness is installed to heating furnace, the stainless steel slab is 150min~400min from advancing heating furnace to the time that goes out heating furnace, and the tapping temperature of stainless steel slab is 1200 ℃~1300 ℃.Slab after coming out of the stove send roughing descaler, opens the collector on roughing descaler, and the discharge pressure that makes roughing descaler is 18MPa~20 MPa, to the de-scaling of stainless steel slab.Stainless steel slab after thick de-scaling is sent into to the intermediate blank that roughing mill tandem rolling 5~7 passages are rolled into 30 ㎜~50 ㎜ thickness, and the roughing finishing temperature is controlled at 1020 ℃~1200 ℃, and intermediate blank enters the Coil Box uncoiling by delay table.Intermediate blank after uncoiling is by the flying shear crop, send again the finish rolling descaling mill, open a wherein collector of finish rolling descaling mill, the discharge pressure that makes the finish rolling descaling mill is 18MPa~20 MPa, the finishing tandem rolling unit that the intermediate blank of essence after de-scaling enters seven frames is rolled into the band steel of 2.2 ㎜~3.5 ㎜ thickness, the finishing temperature of finishing tandem rolling unit is 800 ℃~1100 ℃, and the mill speed of controlling the 7th frame F7 of finishing tandem rolling unit is 8 m/s~15 m/s.The band steel shut out from the 7th frame F7 is carried out to laminar flow cooling, cooled band steel is led and entered coiling machine and coil into coil of strip by side, coiling temperature is 500 ℃~800 ℃.
adopt that as above technical scheme provides a kind of on the conventional hot continuous rolling machine production line rolling stainless-steel roll technique compared with prior art, technique effect is:
1. can utilize the rolling of existing conventional hot continuous rolling machine production line, not need to increase equipment investment, save production cost.
2. production is surely suitable, and production efficiency is high, and production capacity reaches 350t/h~360 t/h.
3. finished product rate reaches 95.0~99.0%.
4. the stainless-steel roll surface quality improves, and has the advantages that plate shape is good.
?
The specific embodiment
below in conjunction with embodiment, the specific embodiment of the present invention is described in further detail.
of the present invention a kind of on the conventional hot continuous rolling machine production line technique of rolling stainless-steel roll on existing production line, realize, this cover conventional hot continuous rolling machine production line is the intrinsic equipment of enterprise (applicant), it (mainly) comprises heating furnace, roughing descaler, roughing mill, delay table, Coil Box, finish rolling descaling mill, flying shear, finishing tandem rolling unit, coiling machine and bat winding apparatus, is prior art.
first the stainless steel slab (the external supply of material) of 150 ㎜~250 ㎜ thickness is installed to (best is cold charge) in heating furnace, described heating furnace can be selected walking beam heating furnace, and this heating furnace has preheating section, bringing-up section and soaking zone.The stainless steel slab is packed into after heating furnace, closes the burner on preheating section, opens the burner on bringing-up section, with coal gas (or natural gas etc.), the stainless steel slab is heated.The stainless steel slab is controlled at 150min~400min from entering heating furnace to the time that goes out heating furnace, when the stainless steel slab reaches while coming out of the stove 1200 ℃~1300 ℃ of target temperatures, comes out of the stove.
stainless steel slab after coming out of the stove send the roughing descaler de-scaling, and opening the collector be arranged on roughing descaler, to make the discharge pressure of roughing descaler be 18MPa~20 MPa, and the foreign material that Ex-all stainless steel slab forms on surface because of heating, as iron scale.Stainless steel slab after de-scaling is sent into to the intermediate blank that roughing mill tandem rolling 5~7 passages are rolled into 30 ㎜~50 ㎜ thickness, roughing finishing temperature (RDT) is controlled to 1020 ℃~1200 ℃.Intermediate blank after roughing is entered to the Coil Box uncoiling through delay table, and the intermediate blank after uncoiling is exchanged end to end, to guarantee the even of rolling temperature.
intermediate blank after uncoiling (thickness is 30 ㎜~50 ㎜) is by the flying shear crop, send again the finish rolling descaling mill, open a wherein collector of finish rolling descaling mill, the discharge pressure that makes the finish rolling descaling mill is 18MPa~20 MPa, and the finishing tandem rolling unit that the intermediate blank after smart de-scaling enters seven frames is rolled into the band steel of 2.2 ㎜~3.5 ㎜ thickness.Described finishing tandem rolling unit is by the first frame F1, the second frame F2 ... the 7th frame F7 forms.Control 800 ℃~1100 ℃ of the finishing temperatures (FDT) of finishing tandem rolling unit and the 7th frame F7(end frame well) mill speed 8 m/s~15 m/s, through the rolling parameter of model calculative determination the first frame F1 to the six frame F6.
band steel from the 7th frame F7 shuts out is carried out to laminar flow cooling, cooled band steel (thickness=2.2 ㎜~3.5 ㎜) is entered to coiling machine by the side delivery and coil into coil of strip, coiling temperature is 500 ℃~800 ℃.After strip coiling completes, on step rate, the coil of strip that a tower is arranged is clapped to volume with the bat winding apparatus, guarantee coil of strip appearance quality.
embodiment 1
by the stainless steel slab cold charge of 150 ㎜ thickness to walking beam heating furnace, preheating section burner Close All, stainless steel slab time inside furnace is 200min, slab reaches while coming out of the stove 1230 ℃ of target temperatures comes out of the stove, enter the roughing descaler de-scaling, open the collector on roughing descaler, discharge pressure is 18MPa, laggard roughing mill tandem rolling 5 passages of slab de-scaling are rolled into the intermediate blank of 30 ㎜ thickness, the roughing finishing temperature is 1070 ℃, intermediate blank enters the Coil Box uncoiling by delay table, intermediate blank after uncoiling is sent the finish rolling descaling mill after the flying shear crop, open a wherein collector of finish rolling descaling mill, discharge pressure is 18MPa.The finishing tandem rolling unit that the intermediate blank of essence after de-scaling enters seven frames is rolled into the band steel of 2.2 ㎜ thickness, and the finishing temperature of finishing tandem rolling unit is 1000 ℃, and the 7th frame F7 mill speed is 10m/s.Band after steel goes out F7, adopts the laminar flow cooling system, and the band steel is led and entered coiling machine and coil into coil of strip by side, on step rate, the coil of strip that a tower is arranged is clapped to volume with the bat winding apparatus, and coiling temperature is 600 ℃.Production capacity reaches 355t/h, and finished product rate is 96.5%.
embodiment 2
the stainless steel slab cold charge that 250 ㎜ are thick is to walking beam heating furnace, preheating section burner Close All, stainless steel slab time inside furnace is 300min, slab reaches while coming out of the stove 1270 ℃ of target temperatures comes out of the stove, enter the roughing descaler de-scaling, open the collector on roughing descaler, discharge pressure is 20MPa, laggard roughing mill tandem rolling 7 passages of slab de-scaling are rolled into the intermediate blank of 35 ㎜ thickness, the roughing finishing temperature is 1100 ℃, intermediate blank enters the Coil Box uncoiling by delay table, intermediate blank after uncoiling is sent the finish rolling descaling mill after the flying shear crop, open a wherein collector of finish rolling descaling mill, discharge pressure is 20MPa, the finishing tandem rolling unit that the intermediate blank of essence after de-scaling enters seven frames is rolled into the band steel of 3.5 ㎜ thickness, the finishing temperature of finishing tandem rolling unit is 1100 ℃, the 7th frame F7 mill speed is 13m/s.The band steel goes out after F7 to adopt the laminar flow cooling system, and the band steel is led and entered coiling machine and coil into coil of strip by side, on step rate, the coil of strip that a tower is arranged is clapped to volume with the bat winding apparatus, and coiling temperature is 700 ℃.Production capacity in this embodiment reaches 352 t/h, and finished product rate reaches 98.4%.
embodiment 3
by the stainless steel slab cold charge of 200 ㎜ thickness in walking beam heating furnace, heating furnace preheating section burner Close All, stainless steel slab time inside furnace is 250 min, when reaching while coming out of the stove 1250 ℃ of target temperatures, the stainless steel slab comes out of the stove, stainless steel slab after coming out of the stove enters roughing descaler, open the collector on roughing descaler, discharge pressure is 19MPa.Laggard roughing mill tandem rolling 6 passages of stainless steel slab (slightly) de-scaling are rolled into the intermediate blank of 35 ㎜ thickness, 1150 ℃ of roughing finishing temperatures.Intermediate blank is sent the finish rolling descaling mill after the flying shear crop by delay table, open a wherein collector of finish rolling descaling mill, and discharge pressure is 19MPa.Intermediate blank after (essence) de-scaling enters the band steel that the finishing tandem rolling unit be comprised of seven frames is rolled into 3.0 ㎜ thickness, and the finishing temperature of finishing tandem rolling unit is 950 ℃, and the mill speed of controlling finishing tandem rolling unit the 7th frame F7 is 12m/s.The band steel goes out that to adopt the laminar flow cooling system to carry out after the 7th frame F7 cooling, and cooled band steel is led and entered coiling machine and coil into coil of strip, 650 ℃ of coiling temperatures by side.On step rate, the coil of strip that a tower is arranged is clapped to volume with the bat winding apparatus.Production capacity is 362t/h, and finished product rate reaches 97.3%.

Claims (1)

1. a kind of on the conventional hot continuous rolling machine production line technique of rolling stainless-steel roll, it is characterized in that: the stainless steel slab of 150 ㎜~250 ㎜ thickness is installed in heating furnace, the stainless steel slab from advance heating furnace to the time that goes out heating furnace be 150 min~400 min, the tapping temperature of stainless steel slab is 1200 ℃~1300 ℃, slab after coming out of the stove send roughing descaler, open the collector on roughing descaler, the discharge pressure that makes roughing descaler is 18MPa~20 MPa, to the de-scaling of stainless-steel roll base; Stainless steel slab after thick de-scaling is sent into to the intermediate blank that roughing mill tandem rolling 5~7 passages are rolled into 30 ㎜~50 ㎜ thickness, and the roughing finishing temperature is controlled at 1020 ℃~1200 ℃, and intermediate blank enters the Coil Box uncoiling by delay table; Intermediate blank after uncoiling is by the flying shear crop, send again the finish rolling descaling mill, open a wherein collector of finish rolling descaling mill, the discharge pressure that makes the finish rolling descaling mill is 18MPa~20 MPa, the finishing tandem rolling unit that the intermediate blank of essence after de-scaling enters seven frames is rolled into the band steel of 2.2 ㎜~3.5 ㎜ thickness, the finishing temperature of finishing tandem rolling unit is 800 ℃~1100 ℃, and the mill speed of controlling the 7th frame F7 of finishing tandem rolling unit is 8 m/s~15 m/s; The band steel shut out from the 7th frame F7 is carried out to laminar flow cooling, cooled band steel is led and entered coiling machine and coil into coil of strip by side, coiling temperature is 500 ℃~800 ℃.
CN2013101263245A 2013-04-12 2013-04-12 Process of rolling stainless steel coil in conventional hot continuous rolling production line Pending CN103157658A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101263245A CN103157658A (en) 2013-04-12 2013-04-12 Process of rolling stainless steel coil in conventional hot continuous rolling production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101263245A CN103157658A (en) 2013-04-12 2013-04-12 Process of rolling stainless steel coil in conventional hot continuous rolling production line

Publications (1)

Publication Number Publication Date
CN103157658A true CN103157658A (en) 2013-06-19

Family

ID=48581485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101263245A Pending CN103157658A (en) 2013-04-12 2013-04-12 Process of rolling stainless steel coil in conventional hot continuous rolling production line

Country Status (1)

Country Link
CN (1) CN103157658A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103521518A (en) * 2013-10-14 2014-01-22 云南昆钢新型复合材料开发有限公司 Hot continuous rolling production method of stainless steel composite board strip coil
CN104001717A (en) * 2014-05-26 2014-08-27 张家港浦项不锈钢有限公司 Manufacturing technique of rolled steels
CN104138901A (en) * 2014-07-17 2014-11-12 首钢总公司 Production method of hot-rolled acid pickling band steel with thickness being smaller than or equal to 1.6mm
CN104275350A (en) * 2014-08-06 2015-01-14 振石集团东方特钢股份有限公司 Rolling method of heat-resistant austenitic stainless steel
CN104438373A (en) * 2013-09-18 2015-03-25 攀钢集团攀枝花钢钒有限公司 Strip steel hot continuous rolling method
CN105642672A (en) * 2016-03-09 2016-06-08 首钢京唐钢铁联合有限责任公司 Control method for oxide scale of steel containing phosphorus and boron
CN106180185A (en) * 2016-07-19 2016-12-07 唐山国丰钢铁有限公司 08Al belt steel rolling technique
CN107262532A (en) * 2017-05-31 2017-10-20 舞阳钢铁有限责任公司 A kind of heating rolling production method of ultra-wide stainless steel plate
CN108004370A (en) * 2017-11-27 2018-05-08 湖南华菱涟源钢铁有限公司 A kind of technique with surface control powder method production 6~18mm vehicle structure steel plates
CN109365530A (en) * 2018-10-09 2019-02-22 鞍钢股份有限公司 A kind of high-level non-orientation silicon steel hot continuous rolling process
CN110404970A (en) * 2019-08-01 2019-11-05 响水德丰金属材料有限公司 A kind of stainless steel band hot-roll forming production technology
CN111420985A (en) * 2020-03-31 2020-07-17 湖南华菱湘潭钢铁有限公司 Rolling process of 38CrMoAl round steel
CN111495992A (en) * 2020-05-10 2020-08-07 湖南华菱湘潭钢铁有限公司 High-pressure water descaling system and descaling method for hot-rolled bar
CN112387896A (en) * 2020-09-25 2021-02-23 华东光电集成器件研究所 Metal packaging thick film integrated circuit pin correcting unit
CN112916616A (en) * 2019-09-30 2021-06-08 日照钢铁控股集团有限公司 Process for rolling sheet billet checkered plate by common hot-rolled strip steel production line
CN113290047A (en) * 2021-05-21 2021-08-24 新余钢铁股份有限公司 Processing method of low-carbon acid-washing steel substrate
CN114405993A (en) * 2022-01-28 2022-04-29 中冶赛迪工程技术股份有限公司 Method for head-off rolling of wire and bar production line
CN114618883A (en) * 2020-12-10 2022-06-14 上海梅山钢铁股份有限公司 Method for improving mechanical property uniformity of micro-alloy high-strength steel hot-rolled steel plate
CN114700364A (en) * 2022-03-30 2022-07-05 张家港宏昌钢板有限公司 Method for improving hot rolling stability of 75Cr1 saw blade steel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1614067A (en) * 2004-09-23 2005-05-11 攀钢集团攀枝花钢铁研究院 Superfine crystal particle hot-rolling steel plate with thick specification and production thereof
CN101008043A (en) * 2006-01-27 2007-08-01 宝山钢铁股份有限公司 Process for producing ferritic stainless steel
CN101648211A (en) * 2009-09-10 2010-02-17 山西太钢不锈钢股份有限公司 Rolling method of dual-phase stainless steel hot continuous rolled coil
CN101767106A (en) * 2010-01-20 2010-07-07 武钢集团昆明钢铁股份有限公司 Hot rolling process of stainless plate strip coil
CN102653836A (en) * 2012-05-04 2012-09-05 湖南华菱涟源钢铁有限公司 Manufacturing method of X70 pipeline steel hot rolled steel roll
CN102699030A (en) * 2012-05-30 2012-10-03 东北大学 Preparation method of sheet billet continuous casting and rolling easy-acid washing hot rolling strip steel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1614067A (en) * 2004-09-23 2005-05-11 攀钢集团攀枝花钢铁研究院 Superfine crystal particle hot-rolling steel plate with thick specification and production thereof
CN101008043A (en) * 2006-01-27 2007-08-01 宝山钢铁股份有限公司 Process for producing ferritic stainless steel
CN101648211A (en) * 2009-09-10 2010-02-17 山西太钢不锈钢股份有限公司 Rolling method of dual-phase stainless steel hot continuous rolled coil
CN101767106A (en) * 2010-01-20 2010-07-07 武钢集团昆明钢铁股份有限公司 Hot rolling process of stainless plate strip coil
CN102653836A (en) * 2012-05-04 2012-09-05 湖南华菱涟源钢铁有限公司 Manufacturing method of X70 pipeline steel hot rolled steel roll
CN102699030A (en) * 2012-05-30 2012-10-03 东北大学 Preparation method of sheet billet continuous casting and rolling easy-acid washing hot rolling strip steel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡松涛: "太钢2250mm不锈钢热连轧生产线的工艺及设备", 《轧钢》, vol. 23, no. 5, 31 October 2006 (2006-10-31) *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104438373A (en) * 2013-09-18 2015-03-25 攀钢集团攀枝花钢钒有限公司 Strip steel hot continuous rolling method
CN104438373B (en) * 2013-09-18 2016-07-06 攀钢集团攀枝花钢钒有限公司 A kind of method of hot-continuous-rolling strip steel
CN103521518A (en) * 2013-10-14 2014-01-22 云南昆钢新型复合材料开发有限公司 Hot continuous rolling production method of stainless steel composite board strip coil
CN103521518B (en) * 2013-10-14 2015-08-05 云南昆钢新型复合材料开发有限公司 The hot continuous rolling process of stainless plate strip coil
CN104001717A (en) * 2014-05-26 2014-08-27 张家港浦项不锈钢有限公司 Manufacturing technique of rolled steels
CN104001717B (en) * 2014-05-26 2017-12-15 张家港浦项不锈钢有限公司 The manufacturing process of steel rolling
CN104138901B (en) * 2014-07-17 2016-11-23 首钢总公司 A kind of production method of the hot rolling acid-cleaning strip steel of thickness≤1.6mm
CN104138901A (en) * 2014-07-17 2014-11-12 首钢总公司 Production method of hot-rolled acid pickling band steel with thickness being smaller than or equal to 1.6mm
CN104275350A (en) * 2014-08-06 2015-01-14 振石集团东方特钢股份有限公司 Rolling method of heat-resistant austenitic stainless steel
CN104275350B (en) * 2014-08-06 2016-08-24 振石集团东方特钢股份有限公司 A kind of milling method of heat-resisting austenitic stainless steel
CN105642672A (en) * 2016-03-09 2016-06-08 首钢京唐钢铁联合有限责任公司 Control method for oxide scale of steel containing phosphorus and boron
CN106180185A (en) * 2016-07-19 2016-12-07 唐山国丰钢铁有限公司 08Al belt steel rolling technique
CN107262532A (en) * 2017-05-31 2017-10-20 舞阳钢铁有限责任公司 A kind of heating rolling production method of ultra-wide stainless steel plate
CN108004370A (en) * 2017-11-27 2018-05-08 湖南华菱涟源钢铁有限公司 A kind of technique with surface control powder method production 6~18mm vehicle structure steel plates
CN109365530A (en) * 2018-10-09 2019-02-22 鞍钢股份有限公司 A kind of high-level non-orientation silicon steel hot continuous rolling process
CN109365530B (en) * 2018-10-09 2020-09-01 鞍钢股份有限公司 Hot continuous rolling production method of high-grade non-oriented silicon steel
CN110404970A (en) * 2019-08-01 2019-11-05 响水德丰金属材料有限公司 A kind of stainless steel band hot-roll forming production technology
CN112916616B (en) * 2019-09-30 2022-11-11 日照钢铁控股集团有限公司 Process for rolling sheet billet checkered plate by common hot-rolled strip steel production line
CN112916616A (en) * 2019-09-30 2021-06-08 日照钢铁控股集团有限公司 Process for rolling sheet billet checkered plate by common hot-rolled strip steel production line
CN111420985A (en) * 2020-03-31 2020-07-17 湖南华菱湘潭钢铁有限公司 Rolling process of 38CrMoAl round steel
CN111495992A (en) * 2020-05-10 2020-08-07 湖南华菱湘潭钢铁有限公司 High-pressure water descaling system and descaling method for hot-rolled bar
CN112387896A (en) * 2020-09-25 2021-02-23 华东光电集成器件研究所 Metal packaging thick film integrated circuit pin correcting unit
CN112387896B (en) * 2020-09-25 2024-03-01 华东光电集成器件研究所 Metal packaging thick film integrated circuit leg-leading correction device
CN114618883A (en) * 2020-12-10 2022-06-14 上海梅山钢铁股份有限公司 Method for improving mechanical property uniformity of micro-alloy high-strength steel hot-rolled steel plate
CN114618883B (en) * 2020-12-10 2023-10-10 上海梅山钢铁股份有限公司 Method for improving uniformity of mechanical properties of microalloy high-strength steel hot rolled steel plate
CN113290047A (en) * 2021-05-21 2021-08-24 新余钢铁股份有限公司 Processing method of low-carbon acid-washing steel substrate
CN114405993A (en) * 2022-01-28 2022-04-29 中冶赛迪工程技术股份有限公司 Method for head-off rolling of wire and bar production line
CN114405993B (en) * 2022-01-28 2024-04-02 中冶赛迪工程技术股份有限公司 Method for line bar production line head-removing rolling
CN114700364A (en) * 2022-03-30 2022-07-05 张家港宏昌钢板有限公司 Method for improving hot rolling stability of 75Cr1 saw blade steel

Similar Documents

Publication Publication Date Title
CN103157658A (en) Process of rolling stainless steel coil in conventional hot continuous rolling production line
CN110479762B (en) Hot-rolled strip steel full-continuous production device and method for ferrite rolling
CN1103647C (en) Method and arrangement for producing hot-rolled strip
CN103480647B (en) A kind of device and production method thereof of producing reinforcing bar without heating low temperature Direct Rolling small billet
CN103173598B (en) Annealing-free medium-high carbon steel plate making technology
CN102699028A (en) Method for eliminating linear edge defects of hot-rolled low-carbon steel
CN101809173A (en) The hot-rolling method and the equipment of hot rolling of the band that constitutes by silicon steel or heterogeneous steel
CN101353717A (en) Process for producing high strength hardened and tempered steel by steekle mill on-line quenching
CN103710507A (en) Method for preparing low-nickel duplex stainless steel hot-rolled coil
CN104275350B (en) A kind of milling method of heat-resisting austenitic stainless steel
WO2009036665A1 (en) Method for continuous casting, rolling intermediate and thin sheet
CN109365530A (en) A kind of high-level non-orientation silicon steel hot continuous rolling process
CN100493750C (en) Method for ensuring the uniform temperature of the full-length of the hot fine rolling band steel
CN102059248A (en) Method for producing titanium coil by using normal hot continuous rolling mill
CN111167858A (en) Method for headless rolling of ferrite area of ultrathin strip steel
CN101003051A (en) High efficiency continuous casting and continuous rolling process
CN102366761A (en) Method for preventing end curling of hot-rolled stainless steel
CN105032974B (en) The production method of zirconium and zircaloy band volume
CN101912875B (en) Method for eliminating edge fault of aluminium killed steel with low manganese-sulfur ratio and low carbon
CN110976516B (en) Rolling method for eliminating roll marks on surface of hot-rolled strip steel
CN109201758B (en) ESP endless rolling intermediate finishing mill group and rolling method
CN109482646B (en) Dynamic variable-schedule ferrite rolling method based on endless rolling
CN204276517U (en) A kind of production line that can replace conventional broadband steel hot continuous rolling
CN103433298A (en) Method for controlling tail portion of thin rolled container plate
CN101792847A (en) Direct thermal treatment process technology after rolling steel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130619