CN106040508A - Paint treatment system and method for paint spray booth - Google Patents

Paint treatment system and method for paint spray booth Download PDF

Info

Publication number
CN106040508A
CN106040508A CN201610629165.4A CN201610629165A CN106040508A CN 106040508 A CN106040508 A CN 106040508A CN 201610629165 A CN201610629165 A CN 201610629165A CN 106040508 A CN106040508 A CN 106040508A
Authority
CN
China
Prior art keywords
paint
gas
air
airduct
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610629165.4A
Other languages
Chinese (zh)
Other versions
CN106040508B (en
Inventor
许弼华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Hongming Ventilation Equipment Co Ltd
Original Assignee
Dongguan Hongming Ventilation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Hongming Ventilation Equipment Co Ltd filed Critical Dongguan Hongming Ventilation Equipment Co Ltd
Priority to CN201610629165.4A priority Critical patent/CN106040508B/en
Publication of CN106040508A publication Critical patent/CN106040508A/en
Application granted granted Critical
Publication of CN106040508B publication Critical patent/CN106040508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/46Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/46Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material
    • B05B14/469Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material wherein the washing material is the spraying material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/60Ventilation arrangements specially adapted therefor

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention provides a paint treatment system and method for a paint spray booth. The paint treatment system is mainly technically characterized in that the system comprises air openings, air pipes, a paint treatment device and a draught fan. The paint treatment device is partitioned into a gas flow decelerating chamber, a gas washing chamber and a gas-liquid separating chamber. The gas flow decelerating chamber and the gas washing chamber are partitioned through a first partition plate, wherein the lower segment of the first partition plate is provided with a shutter air opening. The gas washing chamber and the gas-liquid separating chamber are partitioned through a second partition plate, wherein the upper segment of the second partition plate is provided with a shutter air opening. The top of the gas washing chamber is further provided with atomization spray heads. A first vertical hole plate and a second vertical hole plate are arranged inside the gas-liquid separating chamber in a partitioned manner. The first hole plate extends downwards from the top of the gas-liquid separating chamber, and the second hole plate extends upwards from the bottom of the gas-liquid separating chamber, so that a curved gas flow channel is formed in the gas-liquid separating chamber. Mist with paint is collected through the air openings, subjected to purification for multiple times through the paint treatment device and then discharged through the draught fan. The paint treatment system is simple in structure. The excellent purification effect can be achieved by controlling the air volume and the pressure of the draught fan. In addition, the paint treatment system is low in operation cost.

Description

Paint spray booth paint processing system and paint processing method thereof
Technical field
The present invention relates to containing paint technical field of air purification processing, specifically refer to a kind of paint spray booth paint processing system and It paints processing method.
Background technology
The surface pressure spray process of automobile, refrigerator, air-conditioning, phone housing and notebook accessory etc. is all to make in paint spray booth Industry, during auto spray painting machine people and manual spray gun spray object, part paint directly acts on the table of spraying object Face, and the paint of 30%~about 70% respectively enters in air with coating cloud form, the air around severe contamination and environment;Make Industry is extensively applied water curtain type paint spray booth, coating cloud is carried out purified treatment, but cascade can be formed the paint that falls, the most easily blocking Circulation line, affect the properly functioning of cleaning system, and then affect coating quality;On the other hand recirculating water purification effect can be reduced Rate, promotes recirculated water corruption smelly, adds recirculated water and changes number of times, and impact produces.
Summary of the invention
It is an object of the invention to provide a kind of good purification, the paint spray booth paint processing system of simple in construction and paint thereof Processing method.
For achieving the above object, the technical solution adopted in the present invention is:
Paint spray booth paint processing system, including being arranged in some adjustable air port of paint spray booth, passes through airduct with described air port The paint processing means connected, and the blower fan being connected with the escape pipe of described paint processing means;Described paint processing means Including closed cavity, described closed cavity is open into flow slowing down room, gas scrubbing room and the gas-liquid being arranged in order and divides by partition From room, the top of described flow slowing down room is provided with the air inlet pipe being connected with described airduct;Described flow slowing down room and described gas Being cut off by the first dividing plate between laundry room, the hypomere of described first dividing plate is provided with air grille;Described gas scrubbing room and institute Stating and cut off by second partition between gas-liquid separation chamber, the epimere of described second partition is provided with air grille;Described gas scrubbing The top of room is additionally provided with some atomizing spray heads;Compartment of terrain, described gas-liquid separation indoor is provided with the first vertical orifice plate and the second hole Plate, described first orifice plate is extended by the top down of described gas-liquid separation chamber, and described second orifice plate is by described gas-liquid separation chamber Bottom up extends, and makes described gas-liquid separation chamber form the gas channel curved;Described escape pipe is located at described gas channel Tail end.
Further, described airduct includes the some change level arms being laid in paint spray booth and collects each described change level and prop up Managing and connect the supervisor of described paint processing means, every one-level of each described change level arm is equipped with described air port.
Further, the outer bottom of described paint processing means is provided with circulating water pool, and described circulating water pool is cut off by drainage screen, Described circulating water pool does not filters side and connects with described paint processing means, filters side by circulating pump and described atomizing spray Head connection.
The paint processing method of above-mentioned paint spray booth paint processing system comprises the steps:
The first step, determines air quantity Q1, the Q1=n*V of paint processing means, wherein according to the volume V of paint spray booth and rate of ventilation n N=60~80 times/h;
Second step, determines the stringing of paint locker and air port and airduct each several part caliber according to air quantity Q1, to determine wind speed, its In, wind speed v1=3~5m/s in air port, wind speed v2=6~9 m/s, wind speed v3=8 in the supervisor of airduct in the change level arm of airduct ~12 m/s;
3rd step, determines air quantity Q, Q=(1.05~the 1.15) Q1 of blower fan;
4th step, determines the pressure P of blower fanWind, PWind=(1.05~1.15) PPipe;And system drag overall: PAlways= P1+ P2+ P3; Wherein: P1 is change level arm and supervisor's resistance sum of airduct;P2 is local resistance, including air-valve, elbow, reducing, into or out The resistance sum such as air port, air port;P3 is equipment resistance, including the resistance sum of the paint equipment such as processing system, blower fan;
5th step, the air velocity of flow slowing down room controls 1~3m/s;
6th step, the air velocity of gas scrubbing room controls 1~2m/s, and water speed controls just be atomized;
7th step, realizes air-liquid separation from gas scrubbing room wet gas out through gas-liquid separation chamber and is discharged by blower fan.
Preferably, rate of ventilation n value is n=75 time/h.
Preferably, wind speed v1=4 m/s in air port;Wind speed: v2=7 m/s in the change level arm of airduct;And the master of airduct Wind speed: v3=9.5 m/s in pipe.
The invention has the beneficial effects as follows: by the reasonable stringing in Workpiece painting region and installation air port, sky can will be dispersed in In coating cloud be collected;Band coating cloud air-flow enters after gas reduction chamber, and high velocity air slows down suddenly, and the heavier paint of proportion divides Son separates with air because of inertia, makes air-flow play primary purifying;After entering back into gas scrubbing room, air-flow is by the hundred of the first dividing plate Leaf air port flows to the air grille of second partition, forms air-flow up, atomizing spray head atomized water spray the most from top to bottom, is formed Water, gas convection current, expand gas and water contact area, can remove the harmful substance in air-flow, purification further to air-flow in a large number;Through gas Body laundry room air-flow out contains substantial amounts of moisture, after entering gas-liquid separation chamber, utilizes air velocity, allows gas lead at air-flow Road inner impact the first orifice plate and the second orifice plate, utilize air-liquid density different, makes the liquid globule during clashing into, makes liquid It is attached on orifice plate, makes gas-liquid separation;Air after the most purified is directly got rid of by blower fan.This paint processing system is compared Water curtain type paint spray booth the most more simplifies, and i.e. be can reach by the air quantity and pressure controlling blower fan and is greatly better than GB discharge The air purification effect of standard, and compare water curtain type paint spray booth, operating cost is greatly reduced.
Accompanying drawing explanation
The present invention is further detailed explanation with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is that the paint of the present invention processes overall system architecture schematic diagram;
Fig. 2 is that the paint of the present invention processes components of system as directed structural representation;
Fig. 3 is the structural representation of paint processing means.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described:
Processing system is painted, including the some adjustable wind being arranged in paint spray booth referring to figs. 1 to a kind of paint spray booth shown in Fig. 3 Mouthful 1, the paint processing means 3 being connected by airduct 2 with described air port 1, and with the escape pipe of described paint processing means 3 301 blower fans 4 connected.
Described airduct 2 includes the some change level arms 21 being laid in paint spray booth and collects each described change level arm 21 And connecting the supervisor 22 of described paint processing means 3, every one-level of each described change level arm 21 is equipped with described air port 1.
Described paint processing means 3 includes that closed cavity, described closed cavity are open into the air-flow being arranged in order by partition Reduction chamber 31, gas scrubbing room 32 and gas-liquid separation chamber 33, the top of described flow slowing down room 31 is provided with and is connected with described airduct 2 Air inlet pipe 302;Cut off by the first dividing plate 303 between described flow slowing down room 31 and described gas scrubbing room 32, described the The hypomere of one dividing plate 303 is provided with air grille 304;By second between described gas scrubbing room 32 and described gas-liquid separation chamber 33 Dividing plate 305 cuts off, and the epimere of described second partition 305 is provided with air grille 304;The top of described gas scrubbing room 32 is additionally provided with Some atomizing spray heads 306;In described gas-liquid separation chamber 33, compartment of terrain is provided with the first vertical orifice plate 307 and the second orifice plate 308, Described first orifice plate 307 is extended by the top down of described gas-liquid separation chamber 33, and described second orifice plate 308 is by described gas-liquid separation The bottom up of room 33 extends, and makes described gas-liquid separation chamber 33 form the gas channel curved;Described escape pipe 301 is located at described The tail end of gas channel.
The outer bottom of described paint processing means 3 is provided with circulating water pool 5, and described circulating water pool 5 is cut off by drainage screen 51, institute State circulating water pool 5 not filter side and connect with described paint processing means 3, filter side by circulating pump and described atomizing spray 306 connections.
The paint processing method of this paint spray booth paint processing system is as follows:
One, according to the volume V(m of paint spray booth3/ time) and n(time/h of rate of ventilation) determine the air quantity Q1 painting processing means (m3/ h), Q1=n*V, wherein n=60~80 times/h, typically take n=75 time/h and can reach preferably effect.
Two, determine stringing and air port (must there be regulatory function in air port) of paint locker according to air quantity Q1, then coordinate airduct each Arranging of part caliber determines wind speed, typically to contain stringing and installation air port centered by paint air concentrates the place occurred, Wind speed is defined below: wind speed v1=3~5m/s in air port, about preferably 4 m/s;In the change level arm of airduct wind speed: v2=6~ 9 m/s, about preferably 7 m/s, too greatly, windage is the biggest, it is provided that blower pressure too big, operating cost is high;The least, airduct Equipment investment is the highest;And wind speed: v3=8~12 m/s in the supervisor of airduct, about preferably 9.5 m/s;Airduct tubular typically Based on rectangle, material typically uses galvanized sheet material, and resistance coefficient is less, simultaneously facilitates maintenance.
Three, the air quantity Q of blower fan, usual fan delivery value: Q=(1.05~1.15) Q1 is determined.
Four, the pressure P of blower fan is determinedWind:
The resistance P of airduct: for becoming level arm and supervisor's resistance sum;P1=∑
Local resistance P2: include the resistance sums such as air-valve, elbow, reducing, into or out air port, air port;P2=∑ ; When carrying out airduct resistance and local drag evaluation, if stringing side by side, according to hydrodynamics drag evaluation, select resistance ratios Bigger system calculates;
Equipment resistance P3: include the resistance sum painting the equipment such as processing system, blower fan;
System drag overall: PAlways=P1+ P2+ P3;
Blower pressure: PWind=(1.05~1.15) PPipe.
Five, flow slowing down room, the air velocity in reduction chamber controls, 1~3m/s, to make high velocity air reduce suddenly, allow and contain Dust and gas stream plays primary purifying.
Six, gas scrubbing room: utilizing atomizing spray head to be atomized recirculated water, making gas and water is convection current pattern, expands gas and water and connects Contacting surface is amassed, a large amount of harmful substances removed in air-flow, reaches to purify purpose;Air velocity and circulation water velocity must effectively be joined Close, control, air velocity is too fast, washing, the clarification time too short, do not reach clean-up effect;Gas velocity is spent slowly, and hydraulic pressure is excessive, The resistance making equipment increases, and is greatly increased the operating cost of equipment;General: gas velocity: 1~2m/s, water speed is just atomized, only Change best results.
Seven, gas-liquid separation chamber: from laundry room gas out, containing substantial amounts of moisture, it is necessary to moisture of going out could enter Pipeline is exclusive;The Main Function of gas-liquid separation chamber, it is simply that utilize air velocity, allows air impingement orifice plate, utilizes air-liquid density not With, make the liquid globule during clashing into, make liquid be attached on orifice plate, reach the purpose of gas-liquid separation.
The technical scope that this is novel is not imposed any restrictions by the above, and all foundation the technology of the present invention essence is to above Any amendment, equivalent variations and the modification that embodiment is made, all still falls within the range of this novel technical scheme.

Claims (6)

1. paint spray booth paint processing system, it is characterised in that: include the some adjustable air port being arranged in paint spray booth, with described The paint processing means that air port is connected by airduct, and the blower fan being connected with the escape pipe of described paint processing means;Described Paint processing means includes closed cavity, and described closed cavity is open into flow slowing down room, the gas washing being arranged in order by partition Washing room and gas-liquid separation chamber, the top of described flow slowing down room is provided with the air inlet pipe being connected with described airduct;Described flow slowing down Being cut off by the first dividing plate between room and described gas scrubbing room, the hypomere of described first dividing plate is provided with air grille;Described gas Being cut off by second partition between body laundry room and described gas-liquid separation chamber, the epimere of described second partition is provided with air grille; The top of described gas scrubbing room is additionally provided with some atomizing spray heads;Compartment of terrain, described gas-liquid separation indoor is provided with vertical first Orifice plate and the second orifice plate, described first orifice plate is extended by the top down of described gas-liquid separation chamber, and described second orifice plate is by described The bottom up of gas-liquid separation chamber extends, and makes described gas-liquid separation chamber form the gas channel curved;Described escape pipe is located at institute State the tail end of gas channel.
Paint spray booth the most according to claim 1 paint processing system, it is characterised in that described airduct includes being laid in and sprays paint Some change level arms in room and collect each described change level arm and connect the supervisor of described paint processing means, each described The every one-level becoming level arm is equipped with described air port.
Paint spray booth the most according to claim 1 paint processing system, it is characterised in that the outer bottom of described paint processing means Portion is provided with circulating water pool, and described circulating water pool is cut off by drainage screen, and described circulating water pool does not filters side and processes with described paint Device connects, and filters side and is connected with described atomizing spray head by circulating pump.
4. paint spray booth paint processing method, it is characterised in that comprise the steps:
The first step, determines air quantity Q1, the Q1=n*V of paint processing means, wherein according to the volume V of paint spray booth and rate of ventilation n N=60~80 times/h;
Second step, determines the stringing of paint locker and air port and airduct each several part caliber according to air quantity Q1, to determine wind speed, its In, wind speed v1=3~5m/s in air port, wind speed v2=6~9 m/s, wind speed v3=8 in the supervisor of airduct in the change level arm of airduct ~12 m/s;
3rd step, determines air quantity Q, Q=(1.05~the 1.15) Q1 of blower fan;
4th step, determines the pressure P of blower fanWind, PWind=(1.05~1.15) PPipe;And system drag overall: PAlways= P1+ P2+ P3; Wherein: P1 is change level arm and supervisor's resistance sum of airduct;P2 is local resistance, including air-valve, elbow, reducing, into or out The resistance sum such as air port, air port;P3 is equipment resistance, including the resistance sum of the paint equipment such as processing system, blower fan;
5th step, the air velocity of flow slowing down room controls 1~3m/s;
6th step, the air velocity of gas scrubbing room controls 1~2m/s, and water speed controls just be atomized;
7th step, realizes air-liquid separation from gas scrubbing room wet gas out through gas-liquid separation chamber and is discharged by blower fan.
Paint spray booth the most according to claim 4 paint processing method, it is characterised in that rate of ventilation n value is n=75 time/ h。
6. paint processing method according to the paint spray booth described in claim 4 or 5, it is characterised in that wind speed v1=4 m/ in air port s;Wind speed: v2=7 m/s in the change level arm of airduct;And wind speed: v3=9.5 m/s in the supervisor of airduct.
CN201610629165.4A 2016-08-04 2016-08-04 Paint spray booth paints processing method Active CN106040508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610629165.4A CN106040508B (en) 2016-08-04 2016-08-04 Paint spray booth paints processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610629165.4A CN106040508B (en) 2016-08-04 2016-08-04 Paint spray booth paints processing method

Publications (2)

Publication Number Publication Date
CN106040508A true CN106040508A (en) 2016-10-26
CN106040508B CN106040508B (en) 2018-09-04

Family

ID=57197480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610629165.4A Active CN106040508B (en) 2016-08-04 2016-08-04 Paint spray booth paints processing method

Country Status (1)

Country Link
CN (1) CN106040508B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824644A (en) * 2016-12-30 2017-06-13 天津赛智科技发展有限公司 A kind of paint spray booth of air circulation structure
CN107930940A (en) * 2017-12-27 2018-04-20 湖北三叶机电制造股份有限公司 A kind of top is equipped with the oil spout japanning room of emission-control equipment
CN111167648A (en) * 2018-11-10 2020-05-19 吴任重 Oil filtering method for separating and filtering light oil by utilizing air draft

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2688397Y (en) * 2004-04-12 2005-03-30 刘岗 Painting chamber with water curtain
CN102728510A (en) * 2012-06-28 2012-10-17 大连诚汇机械设备有限公司 Device and method for spraying coating
CN103648661A (en) * 2011-07-08 2014-03-19 优威泰克株式会社 Coating material spray mist treatment method
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN205926157U (en) * 2016-08-04 2017-02-08 东莞市宏铭通风设备有限公司 Spray booth paint processing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2688397Y (en) * 2004-04-12 2005-03-30 刘岗 Painting chamber with water curtain
CN103648661A (en) * 2011-07-08 2014-03-19 优威泰克株式会社 Coating material spray mist treatment method
CN102728510A (en) * 2012-06-28 2012-10-17 大连诚汇机械设备有限公司 Device and method for spraying coating
CN104259040A (en) * 2014-10-30 2015-01-07 江苏诺升环保科技有限公司 Water curtain type coating production line paint spraying room
CN205926157U (en) * 2016-08-04 2017-02-08 东莞市宏铭通风设备有限公司 Spray booth paint processing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824644A (en) * 2016-12-30 2017-06-13 天津赛智科技发展有限公司 A kind of paint spray booth of air circulation structure
CN107930940A (en) * 2017-12-27 2018-04-20 湖北三叶机电制造股份有限公司 A kind of top is equipped with the oil spout japanning room of emission-control equipment
CN111167648A (en) * 2018-11-10 2020-05-19 吴任重 Oil filtering method for separating and filtering light oil by utilizing air draft

Also Published As

Publication number Publication date
CN106040508B (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN201940322U (en) Eddy paint spray chamber
CN106140545B (en) Double air inlet water rotation type water-screen cabinets
CN106040508A (en) Paint treatment system and method for paint spray booth
CN108443975A (en) A kind of air purifier
CN204842066U (en) Water -curtain -type paint spray booth with high -efficient defogging ability
CN205797614U (en) A kind of special totally-enclosed dustless water curtain type paint spray booth of automotive hub
JP5842876B2 (en) Dust collector for painting system
CN213670075U (en) Circulating overflow type spray-painting table water curtain cabinet
CN205926157U (en) Spray booth paint processing system
CN206104221U (en) Two air inlet water rotating formula cascade cabinets
CN207615083U (en) A kind of high-efficiency filtering and purifying structure of flush coater
CN207343099U (en) A kind of paint spray booth
JP6335830B2 (en) Droplet collection device and paint exhaust cleaning device using the droplet collection device
JPS62500291A (en) spray booth
CN203750759U (en) Steam-water separation device for movable water curtain spray booth
CN207204441U (en) A kind of coating cloud acquisition equipment
CN1006854B (en) Blowing-sucking type multi-layed water-ourtain paint-spraying room
CN208365744U (en) A kind of interior automatic control ventilation equipment
CN208991099U (en) A kind of coating painting workshop of environmental protection
CN207308205U (en) A kind of special paint spray booth of water paint
CN201140026Y (en) Coating wire paint mist capturing device of vehicle
CN207253943U (en) Split type oil mist removing device
JPH0670858U (en) Paint mist removal device
CN207941348U (en) A kind of Water curtain machine
CN200988018Y (en) Paint spray booth of purifying paint mist

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant