CN106013618B - A kind of prestress steel ledges for building - Google Patents

A kind of prestress steel ledges for building Download PDF

Info

Publication number
CN106013618B
CN106013618B CN201610588280.1A CN201610588280A CN106013618B CN 106013618 B CN106013618 B CN 106013618B CN 201610588280 A CN201610588280 A CN 201610588280A CN 106013618 B CN106013618 B CN 106013618B
Authority
CN
China
Prior art keywords
tensioning
platform
stirrup
boss
prestressing force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610588280.1A
Other languages
Chinese (zh)
Other versions
CN106013618A (en
Inventor
李化明
宛立东
王秀锋
苗泽善
赵朝军
都书阁
赵艳
孟祥华
李喆
江桂鹏
张守良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Shengda Construction And Installation Engineering Co ltd
Original Assignee
Jiamusi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiamusi University filed Critical Jiamusi University
Priority to CN201610588280.1A priority Critical patent/CN106013618B/en
Publication of CN106013618A publication Critical patent/CN106013618A/en
Application granted granted Critical
Publication of CN106013618B publication Critical patent/CN106013618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of prestress steel ledges for building, it includes two and answers stirrup and the pre- more deformed bars for answering stirrup of connection two in advance;Prestressing force stirrup includes a cylindric tensioning platform, is arranged on the tensioning boss of tensioning platform middle inside, is arranged on the tensioning platform outside neck corresponding with tensioning lug boss position and is arranged on the welding boss of tensioning table top;Tensioning mesa base is provided with concrete embedding groove, is respectively arranged with corresponding reinforced hole on tensioning platform and tensioning boss, deformed bar is plugged in reinforced hole;Stirrup is answered to be integrally formed for steel construction in advance, the height of tensioning platform is the 1/3 of prestressing force stirrup height;The present invention can provide stable prestressing force to concrete, convenient and swift in connection and installation, and cost is cheap, be easy to produce use in enormous quantities.

Description

A kind of prestress steel ledges for building
Technical field
The invention belongs to construction building technical field, more particularly to a kind of prestress steel ledges for building.
Background technology
In construction, in order to make the bulk strength of concreting higher, it is necessary to by concreting in reinforced frame In.For used concrete steel ledges due to designing existing defects, prestressing force is not up to standard in production, causes coagulation in the market The phenomenon that native component easily fracture occurs in use, cracked;The construction usage of high intensity, and reinforced frame can not be adapted to Between lack rational structure so that between each other connection it is not firm, installation it is not convenient enough.
The content of the invention
The technical problem to be solved in the present invention is, in view of the shortcomings of the prior art, providing a kind of prestress steel ledges for building.
To achieve the above object, present invention employs following technical scheme:
A kind of prestress steel ledges for building, it includes two and answers stirrup and pre- answer stirrup more of connection two in advance in advance Stress reinforcing bar 7;
Prestressing force stirrup include a cylindric tensioning platform 1, be arranged on the middle inside of tensioning platform 1 tensioning boss 2, It is arranged on the outside of tensioning platform 1 neck 3 corresponding with the position of tensioning boss 2 and is arranged on the welding at the top of tensioning platform 1 Boss 6;The bottom of tensioning platform 1 is provided with concrete embedding groove 4, is respectively arranged with tensioning platform 1 and tensioning boss 2 corresponding Reinforced hole 5, reinforced hole 5 be used for insert deformed bar 7, concrete embedding groove 4 is dovetail groove, and dovetail groove is put down relative to tensioning The excircle of platform 1 and the line in the center of circle tilt 15 °;
Stirrup is answered to be integrally formed for steel construction in advance, the height of tensioning platform 1 is the 1/3 of prestressing force stirrup height.
The present invention is by the way that deformed bar 7 to be penetrated to the reinforced hole 5 on tensioning platform 1 and tensioning boss 2, to prestress steel Muscle 7 provides prestressing force, forms leverage between tensioning platform 1 and tensioning boss 2 so that through tensioning boss 2 and tensioning The reinforcing bar of platform 1 is fixed more firm, strengthens the prestressing force of whole reinforced frame;It is arranged on the concrete of the bottom surface of tensioning platform 1 Inlay slot cross-section to be trapezoidal, after concrete solidify inside concrete embedding groove, trapezoidal embedding groove be advantageous to concrete and Tensioning platform 1 combines more firm, and when whole reinforced frame is connected with other concrete components, tensioning platform 1 inserts the coagulation Native component, the holding of neck 3 set on tensioning platform 1 is in the concrete component to be connected so that integrated connection is more stable;And And it can play elevator groove, lifting easy to operation as pouring in operation;Whole tensioning platform 1 is integrally formed using steel construction, So that integral rigidity is stronger.In addition, when two reinforced frames are docked, welding boss 6 is welded and fixed, when two welding When boss 6 docks, the outside of welding boss 6 forms the welding groove for welding so that welding is more stable, and it is convex to avoid solder joint Rise, the problem of influenceing the stability of follow-up placing concrete;Simple in construction, practical and convenient and cost of the invention is cheap, is easy to Produce in enormous quantities and use.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of tensioning platform of the present invention;
The structural representation of concrete embedding groove of the present invention during Fig. 3;
The structural representation of reinforced hole of the present invention during Fig. 4.
In the accompanying drawings, 1 tensioning platform, 2 tensioning boss, 3 necks, 4 concrete embedding grooves, 5 reinforced holes, 6 welding boss, 7 Deformed bar.
Embodiment
The embodiment provided below in conjunction with accompanying drawing 1 to 4, further illustrate the embodiment of the present invention.The present invention's It is not limited to the following description.
As Figure 1-4:A kind of prestress steel ledges for building, it includes two and answers stirrup and connection two in advance should in advance More deformed bars 7 of stirrup.
Further, prestressing force stirrup includes a cylindric tensioning platform 1, is arranged on of the middle inside of tensioning platform 1 Boss 2 is drawn, the outside of tensioning platform 1 neck 3 corresponding with the position of tensioning boss 2 is arranged on and is arranged on tensioning platform 1 and push up The welding boss 6 in portion;When two reinforced frames are docked, welding boss 6 is welded and fixed, when two welding boss 6 are right When connecing, the outside of welding boss 6 forms the welding groove for welding so that welding is more stable, and avoids solder joint projection, influences The stability of follow-up placing concrete;The bottom of tensioning platform 1 is provided with concrete embedding groove 4, tensioning platform 1 and tensioning boss 2 On be respectively arranged with corresponding reinforced hole 5, deformed bar 7 is plugged in reinforced hole 5, and concrete embedding groove 4 is dovetail groove, Dovetail groove tilts 15 ° relative to the excircle of tensioning platform 1 and the line in the center of circle, inclined dovetail groove to the grasping force of concrete more By force.
Further, stirrup is answered to be integrally formed for steel construction in advance, the height of tensioning platform 1 is the 1/3 of prestressing force stirrup height; This structure proportion is the optimal proportion of tensioning platform 1, and the prestressing force using whole reinforced frame during this ratio is optimal.
The present invention is by the way that deformed bar 7 to be penetrated to the reinforced hole 5 on tensioning platform 1 and tensioning boss 2, to prestress steel Muscle 7 provides prestressing force, forms leverage between tensioning platform 1 and tensioning boss 2 so that through tensioning boss 2 and tensioning The reinforcing bar of platform 1 is fixed more firm, strengthens the prestressing force of whole reinforced frame;It is arranged on the concrete of the bottom surface of tensioning platform 1 Inlay slot cross-section to be trapezoidal, after concrete solidify inside concrete embedding groove, trapezoidal embedding groove be advantageous to concrete and Tensioning platform 1 combines more firm, and when whole reinforced frame is connected with other concrete components, tensioning platform 1 inserts the coagulation Native component, the holding of neck 3 set on tensioning platform 1 is in the concrete component to be connected so that integrated connection is more stable;And And it can play elevator groove, lifting easy to operation as pouring in operation;Whole tensioning platform 1 is integrally formed using steel construction, So that integral rigidity is stronger.Simple in construction, practical and convenient and cost of the invention is cheap, is easy to produce use in enormous quantities.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to is assert The specific implementation of the present invention is confined to these explanations.For general technical staff of the technical field of the invention, On the premise of not departing from present inventive concept, some simple deduction or replace can also be made, should all be considered as belonging to the present invention's Protection domain.

Claims (1)

  1. A kind of 1. prestress steel ledges for building, it is characterised in that:It includes two prestressing force stirrups and connection two in advance should More deformed bars of power stirrup(7);
    The prestressing force stirrup includes a cylindric tensioning platform(1), be arranged on tensioning platform(1)The tensioning of middle inside is convex Platform(2), be arranged on tensioning platform(1)Outside and tensioning boss(2)The corresponding neck in position(3)And it is arranged on tensioning platform (1)The welding boss at top(6);The tensioning platform(1)Bottom is provided with concrete embedding groove(4), the tensioning platform(1) With tensioning boss(2)On be respectively arranged with corresponding reinforced hole(5), the deformed bar(7)It is plugged in reinforced hole(5) In, the concrete embedding groove(4)For dovetail groove, the dovetail groove is relative to tensioning platform(1)Excircle and the line in the center of circle Tilt 15 °;
    Prestressing force stirrup is integrally formed for steel construction, tensioning platform(1)Height be prestressing force stirrup height 1/3.
CN201610588280.1A 2016-07-25 2016-07-25 A kind of prestress steel ledges for building Active CN106013618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610588280.1A CN106013618B (en) 2016-07-25 2016-07-25 A kind of prestress steel ledges for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610588280.1A CN106013618B (en) 2016-07-25 2016-07-25 A kind of prestress steel ledges for building

Publications (2)

Publication Number Publication Date
CN106013618A CN106013618A (en) 2016-10-12
CN106013618B true CN106013618B (en) 2018-01-16

Family

ID=57117557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610588280.1A Active CN106013618B (en) 2016-07-25 2016-07-25 A kind of prestress steel ledges for building

Country Status (1)

Country Link
CN (1) CN106013618B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2831934B2 (en) * 1994-06-17 1998-12-02 株式会社ピー・エス How to build substructure
CN201574608U (en) * 2009-07-17 2010-09-08 三明市龙盛精密铸钢有限公司 Novel prestress pole connecting disk
DE102012001109A1 (en) * 2012-01-23 2013-07-25 Drössler GmbH Umwelttechnik hybrid tower
CN204955096U (en) * 2015-07-15 2016-01-13 成都银线电杆有限公司 Annular prestressed concrete pole frock

Also Published As

Publication number Publication date
CN106013618A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN203007846U (en) Y-type block template and support system
CN209723009U (en) A kind of precast pier and the novel insertion slot type attachment device of cushion cap
CN106013618B (en) A kind of prestress steel ledges for building
CN203889888U (en) Steel plate hoisting clamp
CN205955226U (en) Prestressing steel frame for building
CN204232676U (en) Can as the Ergonomic chair of rocking chair
CN211007061U (en) Connecting device for jacking frame and ball joint of welding ball net rack
CN204691030U (en) A kind of beams and slabs
CN207004010U (en) A kind of building bearing post pours mould
CN204898530U (en) Pier shaft template is strengthened to steel construction
CN206408949U (en) A kind of steel construction box column lifts butt joint auxiliary device
CN203891346U (en) High-strength steel wire horse stool with negative floor bars
CN204326122U (en) Foundation pile pressure-resistant static load test girder connector
CN211313485U (en) Building is strutted with strengthening rib
CN205088785U (en) Reinforced concrete frame
CN206396889U (en) A kind of building bearing structural member
CN211472203U (en) Pier bent cap steel form supports staple bolt
CN206529700U (en) Pier cap beam construction supporting structure
CN108252539A (en) Hoisting structure and hanging device
CN204151676U (en) A kind of prestressing force box hat concrete pylon structure for Cable-stayed Bridge with Slanted Pylon
CN207419234U (en) A kind of concrete pier base moulding bed for the assembly of large-scale steel structure body
CN204282210U (en) New bridge crashworthy guardrail base
CN206844662U (en) A kind of civil engineering load-bearing hanger reinforced joint
CN207917683U (en) A kind of ton of bucket gantry
CN210848980U (en) Double-block pillow mould shell manufacturing mould

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Huaming

Inventor after: Jiang Guipeng

Inventor after: Zhang Shouliang

Inventor after: Wan Li Dong

Inventor after: Wang Xiufeng

Inventor after: Miao Zeshan

Inventor after: Zhao Chaojun

Inventor after: Du Shuge

Inventor after: Zhao Yan

Inventor after: Meng Xianghua

Inventor after: Li Zhe

Inventor before: Zhang Shouliang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171221

Address after: No. 148, Xuefu Road, Xiangyang District, Jiamusi, Heilongjiang

Applicant after: JIAMUSI University

Address before: 150300, Heping Street, Heping District, Heilongjiang, Harbin Province, building 9-1, No. A

Applicant before: HARBIN JINYU TECHNOLOGY DEVELOPMENT Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240329

Address after: Building 1, No. 64 Dazhong Road, Dacun Village, Chendai Town, Jinjiang City, Quanzhou City, Fujian Province, 362200

Patentee after: Quanzhou Adiyun Technology Co.,Ltd.

Country or region after: China

Address before: 154007 No. 148, Xuefu Road, Xiangyang District, Heilongjiang, Jiamusi

Patentee before: JIAMUSI University

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240619

Address after: 434300 Group 1, Wanzhong Village, Buhe Town, Gong'an County, Jingzhou City, Hubei Province

Patentee after: Fu Guihua

Country or region after: China

Address before: Building 1, No. 64 Dazhong Road, Dacun Village, Chendai Town, Jinjiang City, Quanzhou City, Fujian Province, 362200

Patentee before: Quanzhou Adiyun Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240717

Address after: Room 801, Unit 1, Building 33, Wangzhai New Village, No. 116 Dong'an Road, Guangyang District, Langfang City, Hebei Province 065000

Patentee after: Langfang Shengda Construction and Installation Engineering Co.,Ltd.

Country or region after: China

Address before: 434300 Group 1, Wanzhong Village, Buhe Town, Gong'an County, Jingzhou City, Hubei Province

Patentee before: Fu Guihua

Country or region before: China

TR01 Transfer of patent right