CN106013396A
CN106013396A CN201610601152.6A CN201610601152A CN106013396A CN 106013396 A CN106013396 A CN 106013396A CN 201610601152 A CN201610601152 A CN 201610601152A CN 106013396 A CN106013396 A CN 106013396A
Authority
CN
China
Prior art keywords
pipe
thermosetting resin
flexible pipe
base plate
resin flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610601152.6A
Other languages
Chinese (zh)
Inventor
赵西增
侯宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhoushan Zhihai Technology Development Co Ltd
Original Assignee
Zhoushan Zhihai Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Zhihai Technology Development Co Ltd filed Critical Zhoushan Zhihai Technology Development Co Ltd
Priority to CN201610601152.6A priority Critical patent/CN106013396A/en
Publication of CN106013396A publication Critical patent/CN106013396A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • E03F2003/065Refurbishing of sewer pipes, e.g. by coating, lining

Abstract

Provided is a municipal sewer bifurcated pipe repairing device. The municipal sewer bifurcated pipe repairing device is characterized in that the device comprises a pipe winding device, a first compressed air unit, a connecting pipe and a base plate, a thermosetting resin hose is wound on the pipe winding device, a fixing support is installed on the base plate, the connecting pipe penetrates through the fixing support, and an elbow is movably installed at one end of the connecting pipe; a motor is installed on the base plate, turbine worm lifting rods which are driven by the motor for rising and falling are installed on the base plate, and a rubber pad is installed on the top of each turbine worm lifting rod; a hose inflating pipe is connected to the first compressed air unit and extends to the elbow end of the connecting pipe, a steam pipe is installed at the elbow end of the connecting pipe, and the steam pipe is connected to the pipe winding device. Compared with the prior art, the municipal sewer bifurcated pipe repairing device has the advantages that technological excavation of a sleeve is less, the repairing speed is high, and the efficiency is high; meanwhile, the environment is not destroyed, road traffic is not affected, and the municipal sewer bifurcated pipe repairing device is suitable for application and popularization.

Description

Municipal sewer bifurcated pipe prosthetic device and construction method thereof
Technical field
The invention belongs to municipal works technical field, be specifically related to a kind of municipal sewer bifurcated pipe prosthetic device and construction method thereof.
Background technology
Urban drainage pipe network is the indispensable important infrastructure of modern city, it it is the basic industry that urban economy development is had impact of overall importance, guiding, it is water pollution control in urban areas and Urban Waterlogging, the backbone of flood control, is the important symbol weighing modern city level.At present, in China most cities, the reparation of drainage pipeline is all the method for pipe laying again after employing is excavated, and along with the progress of urbanization, City Buried Pipeline is intricate, the load of urban road is increasingly severe so that underground utilities exist substantial amounts of technical problem during repairing.
Public announcement of a patent application CN103672297A discloses a kind of non-excavating underground pipe line protection device.It can prevent the underground piping conquassation owing to borehole well instability causes, injure by a crashing object, the accident such as local deformation, it is to avoid to reparation, the replacing of underground piping or again pass through new pipeline.Its technical scheme is: protection device is made up of underground piping, plugging device, protection pipeline;Underground piping is through protection pipe interior; the length of protection pipeline is equal to needing underground piping length to be protected; plugging device is installed at the two ends of protection pipeline, and the annular space between protection pipeline and underground piping is full of fluid, and the pressure of fluid is less than or equal to underground piping interior media pressure;Plugging device is made up of card tile structure or flange arrangement and y-type seal ring, Pressure gauge, fluid inlet conduit, O RunddichtringO, it is achieved the sealing to annular fluid, and pressure detecting and fluid supplement.
The most perfect along with urban construction, a kind of trenchless pipelaying is provided, repaiies pipe and change traffic after Manifold technology does not affects with it, pipelaying rate is fast, efficiency is high, without environmental disruption, the pipe repairing method of a series of advantage such as normal work, life of not affecting people is increasingly favored by underground piping Industry regulatory bodies.
Summary of the invention
The shortcoming that the present invention is directed to prior art, it is proposed that a kind of municipal sewer bifurcated pipe prosthetic device and construction method thereof, this device and method simple in construction, easy to operate, it is suitable for promoting the use of.
For realizing the purpose of the present invention, the technical solution used in the present invention is:
Municipal sewer bifurcated pipe prosthetic device, it is characterized in that: including that tube rolling device, air compressor one, connecting tube and base plate, described tube rolling device upper plate have thermosetting resin flexible pipe, fixed support is arranged on described substrate, described connecting tube passes fixed support, and its one end is movably installed with elbow;Being also equipped with motor on described base plate, the turbine and worm elevating lever lifted by driven by motor is arranged on base plate, and described turbine and worm elevating lever top is provided with rubber blanket;Flexible pipe gas tube it is communicated with along the elbow end reaching connecting tube on described air compressor one, the elbow end of described connecting tube is provided with steam pipe, described steam pipe is connected to above tube rolling device, on described base plate, photographic head is installed, connect on photographic head and have holding wire to connect external monitor, described base plate end is provided with baffle plate, and described photographic head side is additionally provided with LED.
Preferentially, described turbine and worm elevating lever quantity is four, and in rectangular layout, transversal stretching device is arranged between turbine and worm elevating lever.
Preferentially, described transversal stretching device being provided with air bag, air bag connects has airbag inflation pipe, air compressor two to be connected with described airbag inflation pipe.
Preferentially, described fixed support is provided with retainer ring and clasps airbag inflation pipe and flexible pipe gas tube.
Based on said apparatus, the present invention also proposes a kind of sewer bifurcated pipe restorative procedure, it is characterised in that comprise the following steps:
1) excavate vertical channel at bifurcated pipe side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and on tube rolling device, intercept the thermosetting resin flexible pipe of corresponding length, thermosetting resin flexible pipe will be intercepted and arrive elbow end through connecting tube, to turn in thermosetting resin hose end, and side draw 4 is fixed on rubber blanket in the upper place of turning over;
3) turbine and worm elevating lever and fixed support is driven to advance in main sewer pipe by base plate, make the elbow end alignment bifurcated pipe arrival end of connecting tube, monitoring main sewer pipe inner case in real time by the photographic head on base plate, baffle plate blocks foreign material, prevents main sewer pipe from having foreign material;
4) starting driven by motor turbine and worm elevating lever to rise, withstand on main sewer pipe by 4 of the thermosetting resin flexible pipe being fixed on rubber blanket, now thermosetting resin hose end is fixed;
5) start to blow to air bag qi of chong channel ascending adversely pipe by air compressor two, make airbag inflation block connection tube bend ends;
6) connecting flexible pipe gas tube by air compressor one to start to blow, tube rolling device constantly carries thermosetting resin flexible pipe to the elbow end of connecting tube simultaneously, and thermosetting resin flexible pipe is constantly blowed and turns over, makes thermosetting resin flexible pipe be covered with bifurcated pipe inwall by gas;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make the thermosetting resin flexible pipe being fitted in bifurcated pipe internal face solidify to form new pipeline;
8) base plate and connecting tube being removed main sewer pipe, construction completes.
Compared with prior art, the invention have the advantage that this device repaiies Manifold technology excavation little, repair speed soon, efficiency is high;Meanwhile, not welding, do not affect road traffic and pass through, be suitable for promoting the use of.
Accompanying drawing explanation
The most next the accompanying drawing by means of embodiment carries out brief description to the present invention.In accompanying drawing:
Fig. 1 shows that the structure of municipal sewer bifurcated pipe prosthetic device of the present invention arranges schematic diagram;
Fig. 2 shows that Fig. 1's disassembles schematic diagram further;
Fig. 3 shows principle schematic time the present invention constructs.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in those skilled in the art and are further appreciated by the present invention, but limit the present invention the most in any form.It should be pointed out that, to those skilled in the art, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement.These broadly fall into protection scope of the present invention.
Embodiment 1
As shown in the figure, municipal sewer bifurcated pipe prosthetic device, including tube rolling device 3, air compressor 1, connecting tube 7 and base plate 61, described tube rolling device 1 upper plate has thermosetting resin flexible pipe 1, fixed support 8 is arranged on above described base plate 61, described connecting tube 7 is through fixed support 8, and its one end is movably installed with elbow.Elbow is arranged on above connecting tube 7 by screw thread rotation, its movable dismounting, and adjustable-angle, and tube rolling device 3 is electronic tube rolling device.
Being also equipped with motor 11 on base plate 61, motor 11 controls motor for PLC, is connected with external power source by circuit group.On described base plate 61, photographic head 21 is installed, connect on photographic head 21 and have holding wire to connect external monitor, interior construction situation can be checked the moment by external monitor, described base plate 61 end is provided with baffle plate 30, described photographic head 21 side is additionally provided with LED 31, when carrying on construction work at night, LED 31 can be opened illumination.
The turbine and worm elevating lever 12 being driven lifting by motor 11 is arranged on base plate 61, and described turbine and worm elevating lever 12 top is provided with rubber blanket 16;Being communicated with flexible pipe gas tube 4 on described air compressor 1 along reaching the elbow end of connecting tube 7, the elbow end of described connecting tube 7 is provided with steam pipe (not shown), and described steam pipe is connected to above tube rolling device 3.
Steam pipe turbine and worm elevating lever 12 quantity is four, and in rectangular layout, transversal stretching device 17 is arranged between turbine and worm elevating lever 12.Transversal stretching device 17 can laterally drive turbine and worm elevating lever 12 to do lateral displacement, expands the spacing between turbine and worm elevating lever 12, so can meet the main sewer pipe of different bore.Air bag 15 is installed on transversal stretching device 17, air bag 15 connects airbag inflation pipe 6, air compressor 25 is connected with described airbag inflation pipe 6, the elbow terminal block of connecting tube 7 can be lived by air bag 15 inflation, so when flexible pipe gas tube 4 is blown, air-flow can be blocked, make air-flow blow away to bifurcated pipe 10 direction.Retainer ring 9 is installed on fixed support 8 and clasps airbag inflation pipe 6 and flexible pipe gas tube 4.
Based on said apparatus, the present invention also proposes a kind of sewer bifurcated pipe restorative procedure, it is characterised in that comprise the following steps:
1) excavating vertical channel at bifurcated pipe 10 side in advance, and make vertical channel connect main sewer pipe, digging diameter connects with main sewer pipe at 600mm-700mm, excavation, it is simple to device enters;
2) preset measure required repair pipeline length and on tube rolling device 1, intercept the thermosetting resin flexible pipe 1 of corresponding length, intercepting thermosetting resin flexible pipe 1 is arrived elbow end through connecting tube 7, to turn on thermosetting resin flexible pipe 1 end, and side draw 4 is fixed on rubber blanket 16 in the upper place of turning over;Meanwhile, base plate 61 being pre-installed fixed support 8 and turbine and worm elevating lever 12 and motor 11, connecting tube 7 segment section bends, it is simple to connecting tube 7 connects outside (asking emphasis refering to Fig. 1).
3) driving turbine and worm elevating lever 12 and fixed support 8 to advance in main sewer pipe by base plate 61, being provided with pulley 20 bottom base plate 61 can quickly propel, and makes elbow end alignment bifurcated pipe 10 arrival end of connecting tube 7;Main sewer pipe inner case is monitored in real time by the photographic head 21 on base plate 61;Baffle plate 30 blocks foreign material, prevents main sewer pipe from having foreign material;
4) starting motor 11 drives turbine and worm elevating lever 12 to rise, and withstands on main sewer pipe by 4 of the thermosetting resin flexible pipe 1 being fixed on rubber blanket 16, and now (asking emphasis refering to Fig. 3) is fixed in thermosetting resin flexible pipe 1 end;
5) start to blow by 25 pairs of air bag qi of chong channel ascending adversely pipes 6 of air compressor, make air bag 15 expand and block connecting tube 7 elbow end;
6) connect flexible pipe gas tube 4 by air compressor 1 to start to blow, tube rolling device 3 constantly carries thermosetting resin flexible pipe 1 to the elbow end of connecting tube 7 simultaneously, thermosetting resin flexible pipe 1 is constantly blowed and turns over by gas, makes thermosetting resin flexible pipe 1 be covered with bifurcated pipe 10 inwall;
7) steam pipe being connected heating furnace, start steam pipe is carried steam, thermosetting resin flexible pipe 1 heat solidifies automatically, makes the thermosetting resin flexible pipe 1 being fitted in bifurcated pipe 10 internal face solidify to form new pipeline;
8) equipment and the connecting tube 7 by base plate 61 and being mounted above removes main sewer pipe, and construction completes.

Claims (1)

1. sewer bifurcated pipe restorative procedure, it is characterised in that comprise the following steps:
1) excavate vertical channel at bifurcated pipe (10) side in advance, and make vertical channel connect main sewer pipe;
2) preset measure required repair pipeline length and at the upper thermosetting resin flexible pipe (1) intercepting corresponding length of tube rolling device (1), thermosetting resin flexible pipe (1) will be intercepted and arrive elbow end through connecting tube (7), to turn on thermosetting resin flexible pipe (1) end, and side draw 4 is fixed on rubber blanket (16) in the upper place of turning over;
3) turbine and worm elevating lever (12) and fixed support (8) is driven to advance in main sewer pipe by base plate (61), make elbow end alignment bifurcated pipe (10) arrival end of connecting tube (7), main sewer pipe inner case is monitored in real time by the photographic head (21) on base plate (61), baffle plate (30) blocks foreign material, prevents main sewer pipe from having foreign material;
4) starting motor (11) drives turbine and worm elevating lever (12) to rise, and withstands on main sewer pipe by 4 of the thermosetting resin flexible pipe (1) being fixed on rubber blanket (16), and now thermosetting resin flexible pipe (1) end is fixed;
5) start air bag qi of chong channel ascending adversely pipe (6) to blow by air compressor two (5), make air bag (15) expand and block connecting tube (7) elbow end;
6) connect flexible pipe gas tube (4) by air compressor one (2) to start to blow, tube rolling device (3) constantly carries thermosetting resin flexible pipe (1) to the elbow end of connecting tube (7) simultaneously, thermosetting resin flexible pipe (1) is constantly blowed and turns over by gas, makes thermosetting resin flexible pipe (1) be covered with bifurcated pipe (10) inwall;
7) steam pipe is connected heating furnace, start steam pipe is carried steam, make the thermosetting resin flexible pipe (1) being fitted in bifurcated pipe (10) internal face solidify to form new pipeline;
8) base plate (61) and connecting tube (7) being removed main sewer pipe, construction completes.
CN201610601152.6A 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe repairing device and construction method thereof Pending CN106013396A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610601152.6A CN106013396A (en) 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe repairing device and construction method thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510459607.0A CN105065845A (en) 2015-07-31 2015-07-31 Repairing device for municipal sewer bifurcated pipes and construction method of bifurcated pipes
CN201610601152.6A CN106013396A (en) 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe repairing device and construction method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510459607.0A Division CN105065845A (en) 2015-07-31 2015-07-31 Repairing device for municipal sewer bifurcated pipes and construction method of bifurcated pipes

Publications (1)

Publication Number Publication Date
CN106013396A true CN106013396A (en) 2016-10-12

Family

ID=54495291

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201510459607.0A Pending CN105065845A (en) 2015-07-31 2015-07-31 Repairing device for municipal sewer bifurcated pipes and construction method of bifurcated pipes
CN201610601218.1A Pending CN106065981A (en) 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe prosthetic device and construction method thereof
CN201610601152.6A Pending CN106013396A (en) 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe repairing device and construction method thereof

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201510459607.0A Pending CN105065845A (en) 2015-07-31 2015-07-31 Repairing device for municipal sewer bifurcated pipes and construction method of bifurcated pipes
CN201610601218.1A Pending CN106065981A (en) 2015-07-31 2015-07-31 Municipal sewer bifurcated pipe prosthetic device and construction method thereof

Country Status (1)

Country Link
CN (3) CN105065845A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764233B (en) * 2016-12-22 2018-10-09 温州煜阳市政园林工程有限公司 Municipal sewer pipe prosthetic device and its construction method
CN107676569B (en) * 2017-11-13 2019-05-21 张振海 The construction method of heat distribution pipeline original position liner reparation
CN109038351A (en) * 2018-07-05 2018-12-18 国网天津市电力公司 A kind of cable duct bank prosthetic device
CN115875533B (en) * 2023-03-03 2023-05-09 济南和立新材料有限公司 Lining pipe and repairing method thereof

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5816293A (en) * 1996-03-27 1998-10-06 Kiest, Jr.; Larry W. Apparatus for installation of a liner within a pipeline
JP3221857B2 (en) * 1998-06-16 2001-10-22 管水工業株式会社 Branch pipe lining device
US6539979B1 (en) * 2001-08-10 2003-04-01 Insituform (Netherlands) B.V. Pressurized bladder canister for installation of cured in place pipe
AU2006299938B2 (en) * 2005-02-09 2011-05-26 Ina Acquisition Corp. Exhaust and/or condensate port for cured in place liners and installation methods and apparatus
CN101634374A (en) * 2009-08-21 2010-01-27 管丽环境技术(上海)有限公司 Underground pipeline excavation-restoration construction method of stage temperature-control field pipe-making
US8439605B2 (en) * 2010-03-09 2013-05-14 Michels Corporation Apparatus for everting a liner into a pipe and pressure connector for the same
US8869839B1 (en) * 2010-03-25 2014-10-28 Perma-Liner Industries, Llc Method and device for repairing piping
CN101900239B (en) * 2010-05-26 2011-11-02 林永志 Method for repairing drainage pipeline without water supply suspended
CN201858482U (en) * 2010-10-19 2011-06-08 大庆石油管理局 Straight-through type hose liner turning device
CN102287603A (en) * 2011-08-11 2011-12-21 海宁管丽科技新材料有限公司 Non-excavate inner lining repairing method for repairing lower branch drain of urban road
CN102649317A (en) * 2011-10-21 2012-08-29 宁克远 Thermocuring process for CIPP (Cured In Place Pipe) pull-in method lining repair
CN103899879B (en) * 2014-04-16 2015-09-30 浙江凯胜园林市政建设有限公司 For repairing device and the restorative procedure thereof of pipe-repairing interface
CN104315299A (en) * 2014-09-15 2015-01-28 道雨耐节能科技(上海)有限公司 Non-excavation airbag type pipeline repair device
CN204829109U (en) * 2015-07-31 2015-12-02 舟山市智海技术开发有限公司 Municipal administration sewer bifurcated pipe prosthetic devices

Also Published As

Publication number Publication date
CN106065981A (en) 2016-11-02
CN105065845A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN106013396A (en) Municipal sewer bifurcated pipe repairing device and construction method thereof
CN109868882B (en) A kind of drainage pipeline local route repair system and method
CN210179167U (en) Pipeline structure deformation non-excavation prosthetic devices
CN113958795A (en) Non-excavation ultraviolet curing repair construction method for pipeline
CN207261914U (en) Pipeline non-excavation rehabilitation device
CN109680782A (en) Urban groundwater drainage pipeline networks restorative procedure
CN104278732A (en) Temporary drainage facility for urban drainage pipeline rehabilitation
CN104196108B (en) The servicing unit that a kind of pipeline is connected with manhole well seat
CN214563115U (en) Glue pouring production line for trenchless hose repair
CN204829109U (en) Municipal administration sewer bifurcated pipe prosthetic devices
CN202153172U (en) Device for detecting plugging and sealing of sewage pipeline and inspection well by all-air-bag method
CN106838464B (en) A kind of long-distance transmission pipeline and π type compensator floating on water surface installation methods
CN203820812U (en) Device for repairing copper cooling stave of blast furnace
CN102313629B (en) Outfit for detecting plugging and choking of sewage pipelines and inspection wells by full air bag method
CN107781569A (en) A kind of construction method of no-dig technique expansion closing-type pipe-repairing
CN106149844A (en) Building sewer bifurcated pipe prosthetic device and construction method thereof
CN204826141U (en) Highway sewer bifurcated pipe prosthetic devices
CN105202307A (en) Integrated repairing device and method for urban drainage pipeline junction
CN105064485B (en) Highway sewer bifurcated pipe prosthetic device and construction method thereof
CN206017815U (en) A kind of coal gas push-pull valve
CN203907111U (en) Pipeline intercepting ball
CN202188945U (en) Detection device for plugging and sealing of plastic sewage wellhead and pipeline by using air bag and steel plate respectively
CN105114754A (en) Repairing device for bifurcated pipe of sewer and construction method thereof
CN210128176U (en) CIPP (cleaning in place) overturning method pipeline repair material turning auxiliary device
CN103469894A (en) Auxiliary device used for jacking up grouting of steel frame column and using method of auxiliary device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161012

WD01 Invention patent application deemed withdrawn after publication