CN106013180B - A kind of deep fill slope pile foundation stabilized control system - Google Patents

A kind of deep fill slope pile foundation stabilized control system Download PDF

Info

Publication number
CN106013180B
CN106013180B CN201610373291.8A CN201610373291A CN106013180B CN 106013180 B CN106013180 B CN 106013180B CN 201610373291 A CN201610373291 A CN 201610373291A CN 106013180 B CN106013180 B CN 106013180B
Authority
CN
China
Prior art keywords
pile
friction pile
soil body
anchor pole
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610373291.8A
Other languages
Chinese (zh)
Other versions
CN106013180A (en
Inventor
刘明维
李辉
梁越
王俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Seekon Consulting Center
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201610373291.8A priority Critical patent/CN106013180B/en
Publication of CN106013180A publication Critical patent/CN106013180A/en
Application granted granted Critical
Publication of CN106013180B publication Critical patent/CN106013180B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Invention provides a kind of deep fill slope pile foundation stabilized control system, including anchorage pier, anchor pole, friction pile and tension device.The friction pile is a reinforced concrete pile arranged vertically.The friction pile is arranged on the middle and lower part of landslide areas, and wherein slip mass is slided along sliding surface, and the lower floor of sliding surface is to stablize the soil body or rock.The lower end of the friction pile is deeply to stablizing in the soil body or rock.The anchorage pier is embedded in the stable soil body or rock.The anchor pole is arranged perpendicular to friction pile.Friction pile top is fixed in one end of the anchor pole, and the other end is horizontal to be run through the landslide soil body and be fixed in anchorage pier.The tension device is installed on anchor pole, and in slip mass.The configuration of the present invention is simple, it is easy for construction, and construction efficiency is high, can effectively prevent the slip of side slope.

Description

A kind of deep fill slope pile foundation stabilized control system
Technical field
The present invention relates to soil-slope, landslide control technology, and in particular to a kind of deep fill slope pile foundation stabilized control system.
Background technology
At present, for the land-based area structure formed by deep fill slopes, the large deformation of slopes is backfilled, unstability is land-based area knot Structure can not normal use even one of major control factors of unstability, deformation for bank slope of the presence and feature of backfill, Failure mode and its scale have conclusive control action.When the angle of former slope surface is in a certain scope, or deep fill slopes It is especially true during formation critical slip surface, absolute control action is played to the stability of slopes;Since backfill soil property is more loose Soft, the side slope for backfilling formation is more easy to large deformation and unstability be in the presence of, thus it is such to be slid along deep fill slope sliding surface The most important Damage Types of slopes and controlling object.
It is more typical slopes unstability type in engineering to be slided along slopes caused by the sliding of deep fill slope sliding surface.It is but existing Having control method and technology to be disturbed there is construction side slope Rock And Soil, big, quantities is big, time-consuming, of high cost, and can The problems such as skid resistance of offer is limited, consolidation effect is not ideal enough.Wherein, anchoring is commonly used in slope and land slide prevention and cure project , one of main technical measures, it is tightly locked together on stratum by embedded anchor pole in the earth formation;But tradition Anchoring process its be to provide anchor force at all, the cunning of side slope is prevented by the anchor force rather than skid resistance of anchor pole indirectly It is dynamic, and the anchor force that can be provided is limited, thus the consolidation effect that land-based area structure side slope is formed to backfill is not ideal enough.Together When, rock and soil slope landslide control engineering is also subject to the factors such as formation lithology, Rock-soil Mass Structure, geological structure, hydrogeology Influence, and violent earthquake may be subject to act on, constitute a threat to engineering safety.
The content of the invention
Present invention aim to address the deficiency of traditional anchoring process, there is provided what a kind of anchoring structure was combined with friction pile Pile foundation stabilized control system.
To realize that the technical solution that the object of the invention uses is a kind of such, deep fill slope pile foundation stabilized control system, Including anchorage pier, anchor pole, friction pile and tension device.The friction pile is a reinforced concrete pile arranged vertically.It is described anti- Sliding pile is arranged on the middle and lower part of landslide areas, and wherein slip mass is slided along sliding surface, and the lower floor of sliding surface is to stablize the soil body or rock Stone.The lower end of the friction pile is deeply to stablizing in the soil body or rock.
The anchorage pier is embedded in the stable soil body or rock.The anchor pole is arranged perpendicular to friction pile.The one of the anchor pole Friction pile top is fixed at end, and the other end is horizontal to be run through the landslide soil body and be fixed in anchorage pier.The tension device is installed on anchor On bar, and in slip mass.Hinge is additionally provided with the anchor pole.The hinge is close to friction pile.
Further, the upper end of the friction pile also has the pile cover for being higher by slip mass surface.
Further, the anchorage pier is placed at least 1m below the stable soil body or rock.
Further, the anchorage pier is square or cuboid.The friction pile is cylinder or rectangular column.
Further, the friction pile is deeply to stablizing at least 2m in the soil body or rock.
The solution have the advantages that unquestionable, cooperated by anchor pole and friction pile, and make anchor pole and antiskid Stake is mutually perpendicular to.Wherein certain depth within the soil body is stablized in friction pile insertion, and then ensures the stability of pile foundation;Set among anchor pole Put hinge and tension device, it is ensured that the stabilization of pile foundation, reduces pile foundation level displacement.The configuration of the present invention is simple, easy for construction, cost is low It is honest and clean, project progress can be made substantially to accelerate.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is sectional view at A-A in Fig. 1.
In figure:Anchorage pier 1, anchor pole 2, friction pile 3, slip mass 4, sliding surface 5, tension device 6, the stable soil body or rock 7, stake Cap 8, hinge 9.
Embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all be included within the scope of the present invention.
Referring to Fig. 1 and Fig. 2, the present embodiment provides a kind of deep fill slope pile foundation stabilized control system, including anchorage pier 1, anchor pole 2nd, friction pile 3 and tension device 6.The friction pile 3 is a cylindrical type arranged vertically or rectangle reinforced concrete pile.It is described anti- Sliding pile 3 is arranged on the middle and lower part of landslide areas, and wherein slip mass 4 is slided along sliding surface 5, and the lower floor of sliding surface 5 is to stablize the soil body Or rock 7.The surface of wherein common slip mass 4 is an inclined-plane, and sliding surface 5 is an arcwall face.It is first when setting friction pile 3 Punched first with drilling machine, punching depth should arrive the lower floor of sliding surface 5, steel reinforcement cage then be placed in hole, then pour coagulation Soil forms friction pile 3.The lower end of the friction pile 3 is deeply to stablizing in the soil body or rock 7, to ensure the stability of its own. The upper end of the friction pile 3 also has the pile cover 8 for being higher by 4 surface of slip mass.
The anchorage pier 1 is embedded in the stable soil body or rock 7, its position should be placed in the stable soil body or rock 7 with down toward Few 1m.The level height of the anchorage pier 1 is with the upper end of friction pile 3 substantially in same position.The anchor pole 2 is perpendicular to friction pile 3 arrangements.3 top of friction pile is fixed in one end of the anchor pole 2, and (end cross of anchor pole 2 runs through friction pile 3, and is provided with anchor Head), the other end is horizontal to be run through the landslide soil body 4 and is fixed in anchorage pier 1.The tension device 6 is installed on anchor pole 2, and is in In slip mass 4.Hinge 9 is additionally provided with the anchor pole 2, the hinge 9 is close to friction pile 3.Hinge 9 can be true with tension device 6 The stabilization of friction pile 3 is protected, reduces the horizontal displacement of friction pile 3.

Claims (5)

  1. A kind of 1. deep fill slope pile foundation stabilized control system, it is characterised in that:Including anchorage pier (1), anchor pole (2), friction pile (3) and Tension device (6);The friction pile (3) is a reinforced concrete pile arranged vertically;The friction pile (3) is arranged on landslide area The middle and lower part in domain, wherein slip mass (4) are slided along sliding surface (5), and the lower floor of sliding surface (5) is to stablize the soil body or rock (7);Institute The lower end of friction pile (3) is stated deeply to stablizing in the soil body or rock (7);
    The anchorage pier (1) is embedded in the stable soil body or rock (7);The anchor pole (2) is arranged perpendicular to friction pile (3);It is described Friction pile (3) top is fixed in one end of anchor pole (2), and the other end is horizontal to be run through the landslide soil body (4) and be fixed on anchorage pier (1) It is interior;The tension device (6) is installed on anchor pole (2), and in slip mass (4);Hinge is additionally provided with the anchor pole (2) (9);The hinge (9) is close to friction pile (3).
  2. A kind of 2. deep fill slope pile foundation stabilized control system according to claim 1, it is characterised in that:The friction pile (3) Upper end also have and be higher by the pile cover (8) on slip mass (4) surface.
  3. A kind of 3. deep fill slope pile foundation stabilized control system according to claim 1, it is characterised in that:The anchorage pier (1) It is placed in the stable soil body or rock (7) at least 1m below.
  4. A kind of 4. deep fill slope pile foundation stabilized control system according to claim 1, it is characterised in that:The anchorage pier (1) For square or cuboid;The friction pile (3) is cylinder or rectangular column.
  5. A kind of 5. deep fill slope pile foundation stabilized control system according to claim 1, it is characterised in that:The friction pile (3) Deeply to stablizing at least 2m in the soil body or rock (7).
CN201610373291.8A 2016-05-31 2016-05-31 A kind of deep fill slope pile foundation stabilized control system Expired - Fee Related CN106013180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610373291.8A CN106013180B (en) 2016-05-31 2016-05-31 A kind of deep fill slope pile foundation stabilized control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610373291.8A CN106013180B (en) 2016-05-31 2016-05-31 A kind of deep fill slope pile foundation stabilized control system

Publications (2)

Publication Number Publication Date
CN106013180A CN106013180A (en) 2016-10-12
CN106013180B true CN106013180B (en) 2018-04-17

Family

ID=57091568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610373291.8A Expired - Fee Related CN106013180B (en) 2016-05-31 2016-05-31 A kind of deep fill slope pile foundation stabilized control system

Country Status (1)

Country Link
CN (1) CN106013180B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938685A (en) * 2017-06-20 2018-04-20 重庆市高新工程勘察设计院有限公司 A kind of new diagonal brace composite support device
CN108660866B (en) * 2018-06-10 2024-01-05 中铁二院工程集团有限责任公司 Anti-slip deformation roadbed reinforcing structure of high-speed railway in rock mass landslide area
CN110130228A (en) * 2019-05-27 2019-08-16 国核电力规划设计研究院重庆有限公司 It is a kind of to beat card stress control method and the device for drawing bracing wire based on suspension bridge and shaft tower
CN110512614B (en) * 2019-08-09 2021-02-02 天津建工城市建设发展有限公司 Easily-assembled and disassembled foundation pit supporting structure and construction method
CN111021376A (en) * 2019-12-18 2020-04-17 中国地质科学院探矿工艺研究所 Three-dimensional frame pile body structure for deep landslide treatment and construction process thereof
CN111980038B (en) * 2020-09-01 2021-08-17 宁波大学 Landslide prevention structure and construction method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5336730Y2 (en) * 1975-06-06 1978-09-07
CN100497844C (en) * 2007-02-14 2009-06-10 中铁西北科学研究院有限公司 Multi-anchoring point antisliding pile adapted to multilayer slide surface and deep sliding face
CN101761085B (en) * 2009-12-18 2011-05-25 铁道第三勘察设计院集团有限公司 Built-in anchor head embedded-type anchoring pile
CN202323964U (en) * 2011-05-06 2012-07-11 北方工业大学 Device for protecting soft rock side slope
CN102493465A (en) * 2011-12-12 2012-06-13 中国建筑西南勘察设计研究院有限公司 Anchorage type anchor pile retaining structure for soil filling field
CN203684221U (en) * 2014-01-17 2014-07-02 中交第四航务工程勘察设计院有限公司 Screw pile anchorage structure for sheet-pile wharf
CN203891037U (en) * 2014-05-14 2014-10-22 河海大学 Anchor bolt and tree pile combined retaining structure

Also Published As

Publication number Publication date
CN106013180A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013180B (en) A kind of deep fill slope pile foundation stabilized control system
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN109826667A (en) The I-shaped checkdam of coal mine underground reservoir
CN106759390B (en) A kind of rubble-non-uniform pile composite construction and its construction method with draining and AsA -GSH cycle
CN104790408B (en) Irregular foundation pit construction method
AU2017246937B2 (en) Interlocking stabilization system for stabilizing slope, unrestrained earth or the like
CN103526773A (en) Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof
Hirkane et al. Ground improvement techniques
CN208309299U (en) A kind of Karst region railway bed substrate antidumping foundation reinforcing structure
CN205875178U (en) Concrete anchor draws cling compound system
RU2354778C2 (en) Method of soil stabilisation
CN208899521U (en) A kind of peg board formula concrete retaining wall of Anti-inclining
JP7115817B2 (en) Reinforced soil wall using large sandbags and retaining method using large sandbags
RU2536538C1 (en) Method for reduction of deformations of motor and railway roads on permafrost soils that thaw out in process of operation
US20120163923A1 (en) Structure supporting system
US20190003142A1 (en) Block Retaining Wall with Micro-Pile Soldier Piles
KR101938460B1 (en) Stabilization method of mine cavern
Kath et al. Engineering impacts of karst: three engineering case studies in cambrian and ordovician carbonates of the valley and ridge province
JP6679287B2 (en) Liquefaction countermeasure construction method for underground structures
CN105714846B (en) A kind of gravity retaining wall and its construction method
KR102285192B1 (en) A Eco-friendly retain wall structure
JP6013745B2 (en) Ground improvement method
JP2013108299A (en) Soil improvement method for preventing liquefaction upon earthquake
JP5266099B2 (en) Design method of pullout resistor for earth retaining
Sarker et al. A review on ground improvement techniques to improve soil stability against liquefaction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200414

Address after: 400000 No. 66, Xuefu Avenue, Nan'an District, Chongqing

Co-patentee after: Chongqing Seekon Consulting Center

Patentee after: CHONGQING JIAOTONG University

Address before: 400074 No. 66, Xuefu Avenue, Nan'an District, Chongqing

Patentee before: CHONGQING JIAOTONG University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

CF01 Termination of patent right due to non-payment of annual fee