CN203891037U - Anchor bolt and tree pile combined retaining structure - Google Patents
Anchor bolt and tree pile combined retaining structure Download PDFInfo
- Publication number
- CN203891037U CN203891037U CN201420248026.3U CN201420248026U CN203891037U CN 203891037 U CN203891037 U CN 203891037U CN 201420248026 U CN201420248026 U CN 201420248026U CN 203891037 U CN203891037 U CN 203891037U
- Authority
- CN
- China
- Prior art keywords
- pile
- anchor
- soil
- tree root
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本实用新型涉及一种锚杆-树根桩复合挡土结构,包括由作为竖向挡土结构的双排树根桩和作为外拉系统的侧向倾斜锚杆,通过桩顶横梁连接并沿需要整治的滑坡松动土体范围通长布置;横梁与树根桩之间采用铰接的连接方式,横梁与锚杆之间的连接是刚性连接;作为外拉系统的土层锚杆,其一端(锚头)通过桩顶横梁(压顶梁,腰梁)与树根桩相连,另一端为锚固体,锚固体设在稳定土层中;树根桩桩顶采用现浇混凝土横梁将树根桩和锚杆连为一体,树根桩成两排平行布置,前后两排桩距取5~7倍桩径,纵向桩中心距取1.0~1.2m。本实用新型结构整体受力条件好,具有较强空间效应,可以充分发挥土层自稳性,有效的解决了土质边坡发生失稳滑坡防治中常用抗滑桩开挖面过大,对边坡土层扰动强烈,施工困难等问题,并可以有效降低成本,提高效率。
The utility model relates to an anchor rod-tree root pile composite soil retaining structure, which consists of double rows of tree root piles as a vertical soil retaining structure and laterally inclined anchor rods as an external tension system, which are connected by a beam on the top of the pile and along the The loose soil of the landslide that needs to be rectified is arranged throughout the length; the connection between the beam and the root pile is hinged, and the connection between the beam and the anchor is a rigid connection; Anchor head) is connected to the root pile through the pile top beam (top beam, waist beam), and the other end is an anchor, which is set in a stable soil layer; the top of the tree root pile uses a cast-in-place concrete beam to connect the root pile and The anchor rods are connected as a whole, and the tree root piles are arranged in two parallel rows. The distance between the front and rear rows of piles is 5 to 7 times the pile diameter, and the distance between the centers of the longitudinal piles is 1.0 to 1.2m. The structure of the utility model has good stress conditions as a whole, has a strong spatial effect, can give full play to the self-stability of the soil layer, and effectively solves the problem that the excavation surface of the anti-slide piles commonly used in the prevention and control of unstable landslides on soil slopes is too large, and the opposite sides Slope soil disturbance is strong, construction is difficult and other problems, and can effectively reduce costs and improve efficiency.
Description
技术领域technical field
本实用新型涉及岩土工程技术领域,具体来说涉及一种土坡稳定加固和支护结构,在危险边坡(可能滑动,已经滑动)的区域,通过劈裂灌浆打设竖向树根桩挡土结构,并通过桩顶横梁和斜向土层锚杆组合,形成复合挡土结构,大大提高加固和支护能力。The utility model relates to the technical field of geotechnical engineering, in particular to a soil slope stability reinforcement and support structure, in which a vertical tree root pile is laid by splitting grouting in the area of a dangerous slope (possibly sliding, already sliding) The soil retaining structure is combined with the pile top beam and the inclined soil layer anchor to form a composite soil retaining structure, which greatly improves the reinforcement and support capacity.
背景技术Background technique
挡土结构,又可称为支护结构,围护结构,在岩土工程领域主要应用于边坡稳定,基坑支护,洞室开挖,海岸工程。根据其作用领域不同而具有不同形式:当主要用于边坡稳定时,有挡土墙,抗滑桩,锚杆挡墙等形式;当用于基坑开挖的支护时,有悬臂式围护结构,重力式围护结构,内撑式围护结构,拉锚式围护结构,土钉墙围护结构及门架式,沉井,拱式组合围护,喷锚网围护等;在海岸工程中,主要有板桩坞墙,防波堤等;洞室开挖工程中,有衬砌,竖向支撑等。Retaining structure, also known as support structure, enclosure structure, is mainly used in slope stability, foundation pit support, cavern excavation, and coastal engineering in the field of geotechnical engineering. It has different forms according to its different fields of action: when it is mainly used for slope stability, there are retaining walls, anti-slide piles, anchor retaining walls, etc.; when it is used for the support of foundation pit excavation, there are cantilever Enclosure structure, gravity enclosure structure, inner support enclosure structure, anchor enclosure structure, soil nail wall enclosure structure and gantry type, caisson, arch composite enclosure, shotcrete anchor net enclosure, etc. ; In coastal engineering, there are mainly sheet pile dock walls, breakwaters, etc.; in cavern excavation engineering, there are linings, vertical supports, etc.
目前,边坡稳定结构有很多,常用的有抗滑桩、锚杆、挡土墙。抗滑桩桩径大,施工难度大,造价高,对土层扰动大,工作面要求高。锚杆对单纯土层,小型土坡滑坡抗滑效果比较明显,对大型滑坡效果不稳定。刚性挡土墙土方开挖量大,扰动大,需要开挖底板,造价高。而且对已经发生滑坡的区域,开挖土坡会造成滑坡的进一步加大。如何有效的治理滑坡且不对滑坡周围土层造成大的扰动,避免进一步破坏,而且如何提高施工效率,方便施工,节约成本是需要考虑的。At present, there are many slope stabilization structures, commonly used are anti-slide piles, anchor rods, and retaining walls. Anti-slide piles have large pile diameters, difficult construction, high cost, large disturbance to the soil layer, and high requirements for the working face. The anti-sliding effect of anchor rods on simple soil layers and small-scale soil slope landslides is relatively obvious, but the effect on large-scale landslides is unstable. The excavation volume of the rigid retaining wall is large, the disturbance is large, the floor needs to be excavated, and the cost is high. Moreover, for areas where landslides have already occurred, excavating soil slopes will further increase the landslides. How to effectively control the landslide without causing major disturbance to the soil around the landslide, avoiding further damage, and how to improve construction efficiency, facilitate construction, and save costs need to be considered.
鉴于传统挡土结构存在造价高,施工难度大,成本较高和效率低等不足,在充分考虑树根桩的横向抗滑能力和锚杆的抗拉性能,本实用新型提出了一种锚杆-树根桩复合挡土结构,可充分调动滑坡土体的自稳能力,而且造价低,施工简便,空间效果明显。且对膨胀土边坡,劈裂灌浆为技术基础的树根桩能够形成复合土体,增加树根桩的抗滑能力。此外,树根桩施工简便,设桩位置灵活,对土层扰动小;树根桩施工过程中特殊的二次高压注浆技术,经劈裂注浆形成的桩周复合土体,能使桩体可靠地锚固在土体中并提高土体强度。In view of the shortcomings of traditional retaining structures such as high cost, difficult construction, high cost and low efficiency, the utility model proposes a - The tree root pile composite soil retaining structure can fully mobilize the self-stabilizing ability of the landslide soil, and has low cost, simple construction and obvious spatial effect. And for expansive soil slopes, root piles based on split grouting technology can form a composite soil body and increase the anti-sliding ability of tree root piles. In addition, the tree root pile is easy to construct, the pile location is flexible, and the disturbance to the soil layer is small; the special secondary high-pressure grouting technology in the tree root pile construction process, the composite soil around the pile formed by split grouting, can make the pile The body is reliably anchored in the soil and improves the strength of the soil.
发明内容Contents of the invention
本实用新型提供一种锚杆-树根桩复合挡土结构,通过在边坡设置双排树根桩作为竖向挡土结构,通过桩顶横梁和土层锚杆形成复合挡土结构,可以充分发挥土层自稳性,有效的解决了土质边坡发生失稳滑坡防治中常用抗滑桩开挖面过大,对边坡土层扰动强烈,施工困难等问题,并可以有效降低成本,提高效率。The utility model provides an anchor rod-tree root pile composite soil retaining structure, by setting double rows of tree root piles on the side slope as a vertical soil retaining structure, and forming a composite soil retaining structure through pile top beams and soil layer anchor rods, which can Give full play to the self-stability of the soil layer, effectively solve the problems of excessive excavation surface of anti-slide piles commonly used in the prevention and control of landslides, strong disturbance to the slope soil layer, and difficult construction, and can effectively reduce costs. Improve efficiency.
为了解决上述问题,本实用新型采用如下技术方案:In order to solve the above problems, the utility model adopts the following technical solutions:
一种锚杆-树根桩复合挡土结构,包括由作为竖向挡土结构的双排树根桩和作为外拉系统的侧向倾斜锚杆,通过桩顶横梁联结并沿需要整治的滑坡松动土体范围通长布置。横梁与树根桩之间采用铰接的连接方式,横梁与锚杆之间的连接是刚性连接;作为外拉系统的土层锚杆,其一端通过桩顶横梁与树根桩相连,另一端为锚固体,锚固体设在稳定土层中;树根桩桩顶采用现浇混凝土横梁将树根桩和锚杆连为一体,横梁几何尺寸根据树根桩和锚杆尺寸综合确定,以保证桩-锚杆形成复合结构,发挥空间挡土效应。树根桩成两排平行布置,前后两排桩距取5~7倍桩径,纵向桩中心距取1.0~1.2m。树根桩的桩长和桩径根据滑坡现场土质及边坡几何尺寸情况,结合滑坡土压力计算结果,根据树根桩设计规范综合设计采用不同桩长和桩径,保证埋深足够深度以提供相应抗滑力。An anchor rod-tree root pile composite soil retaining structure, including a double row of tree root piles as a vertical soil retaining structure and a laterally inclined anchor rod as an external tension system, connected by a beam on the top of the pile and along the landslide that needs to be remediated The range of loose soil is generally arranged. The connection between the beam and the root pile is hinged, and the connection between the beam and the anchor is a rigid connection; as the soil anchor of the external tension system, one end is connected to the root pile through the beam on the top of the pile, and the other end is Anchoring body, the anchoring body is set in the stable soil layer; the top of the tree root pile uses a cast-in-place concrete beam to connect the root pile and the anchor rod as a whole, and the geometric size of the beam is determined comprehensively according to the size of the tree root pile and the anchor rod to ensure - Anchor rods form a composite structure to play a space retaining effect. The tree root piles are arranged in two parallel rows, the distance between the front and rear rows of piles is 5 to 7 times the pile diameter, and the distance between the centers of the longitudinal piles is 1.0 to 1.2m. The pile length and pile diameter of the tree root pile are based on the soil quality of the landslide site and the geometric dimensions of the slope, combined with the calculation results of the landslide soil pressure, and according to the comprehensive design of the tree root pile design code, different pile lengths and pile diameters are used to ensure that the buried depth is sufficient to provide Corresponding anti-skid force.
所述的树根桩长取10~15m,树根桩孔径150mm~250mm。The length of the root pile is 10-15m, and the diameter of the root pile is 150mm-250mm.
土层锚杆长度宜根据滑坡土质及滑坡几何尺寸,综合桩-梁-锚杆复合挡土结构计算结果,参考土层锚杆设计规范综合确定,以确保锚杆深入滑床,提供足够握裹力,每根锚杆长10~20m,孔径100~150mm,倾斜锚杆与竖向树根桩之间的夹角为45°。The length of the anchor in the soil layer should be comprehensively determined according to the soil quality of the landslide and the geometric dimensions of the landslide, the calculation results of the composite pile-beam-anchor composite retaining structure, and reference to the design code for the anchor in the soil layer, so as to ensure that the anchor goes deep into the slide bed and provides sufficient grip. Each bolt is 10-20m long, the hole diameter is 100-150mm, and the angle between the inclined bolt and the vertical tree root pile is 45°.
本实用新型的有益效果是:The beneficial effects of the utility model are:
树根桩作为微型桩,施工机具轻便,成孔尺寸小,和一般大直径抗滑桩相比,施工简便,设桩位置灵活,对土层扰动小,可以避免由于施工引起的二次滑坡;The tree root pile is a micro-pile, the construction equipment is light, and the hole size is small. Compared with the general large-diameter anti-slide pile, the construction is simple, the pile position is flexible, and the disturbance to the soil layer is small, which can avoid secondary landslides caused by construction;
树根桩施工过程中特殊的二次高压注浆技术,经劈裂注浆形成的桩周复合土体,能使桩体可靠地锚固在土体中并提高土体强度。不仅起到了作为抗滑桩的作用,而且复合土体可以更有效地提高滑坡土体强度,从而提高边坡稳定性。The special secondary high-pressure grouting technology in the tree root pile construction process, the composite soil around the pile formed by splitting grouting can make the pile body reliably anchored in the soil and improve the strength of the soil. Not only does it function as an anti-slide pile, but the composite soil can more effectively increase the strength of the landslide soil, thereby improving the stability of the slope.
双排树根桩竖向挡土结构和拉锚杆式挡土结构的结合,整个复合结构较单独抗滑桩或者单独锚杆的横向刚度显著提高,侧向变形小,支护深度和支护范围都加大;当双排树根桩承受滑坡水平推力作用时,通过桩顶横梁将部分下滑力传递到土层锚杆,再通过土层锚杆传递到稳定土层中,结构整体受力条件好,可以充分发挥结构和土体的共同作用,调动土体的自稳能力。The combination of the vertical soil retaining structure of double-row tree root piles and the pull-anchor type soil retaining structure, compared with the single anti-slide pile or single anchor, the transverse stiffness of the whole composite structure is significantly improved, the lateral deformation is small, and the support depth and support The range is enlarged; when the double-row tree root piles bear the horizontal thrust of the landslide, part of the sliding force is transmitted to the soil anchor through the pile top beam, and then transmitted to the stable soil layer through the soil anchor, and the overall structure is stressed If the conditions are good, the combined effect of the structure and the soil can be fully exerted, and the self-stabilizing ability of the soil can be mobilized.
附图说明Description of drawings
图1是本实用新型所述的锚杆-树根桩复合挡土结构的剖面示意图Fig. 1 is the schematic sectional view of the anchor rod-tree root pile composite retaining structure described in the present invention
图2是本实用新型所描述的桩顶横梁的剖面示意图Fig. 2 is a schematic sectional view of the pile top beam described in the utility model
图3是树根桩施工工艺流程图Figure 3 is a flow chart of tree root pile construction process
图4是锚杆施工工艺流程图Figure 4 is a flow chart of the bolt construction process
图中:1、树根桩,2、桩顶横梁,3、锚杆,4、滑动面或潜在滑动面。In the figure: 1. Tree root pile, 2. Pile top beam, 3. Anchor rod, 4. Sliding surface or potential sliding surface.
具体实施方式Detailed ways
根据下述实施例,可以更好地理解本实用新型,实施例所描述的具体内容仅用于说明本实用新型,而不应当也不会限制权利要求书中所描述的权利范围。According to the following examples, the utility model can be better understood. The specific content described in the examples is only for illustrating the utility model, and should not and will not limit the scope of rights described in the claims.
参看图1,图2,一种新型锚杆-树根桩复合挡土结构,包括以下部分:树根桩1,桩顶横梁2,锚杆3,4是滑动面或潜在滑动面。通过桩顶横梁联系并沿需要整治的滑坡松动土体范围通长布置,横梁与树根桩1之间采用铰接的连接方式;横梁与锚杆3之间的连接是刚性连接,作为外拉系统的土层锚杆,其一端(锚头)通过桩顶横梁(压顶梁,腰梁)与树根桩1相连;另一端为锚固体,锚固体设在稳定土层中,树根桩桩顶采用现浇混凝土横梁将树根桩和锚杆3连为一体,树根桩1成两排平行布置,前后两排桩距取5~7倍桩径,纵向桩中心距取1.0~1.2m。Referring to Fig. 1 and Fig. 2, a novel anchor rod-tree root pile composite soil retaining structure includes the following parts: tree root pile 1, pile top beam 2, and anchor rods 3 and 4 are sliding surfaces or potential sliding surfaces. Connected by pile top beams and arranged along the entire length of the landslide loose soil to be rectified, the beams and tree root piles 1 are connected in a hinged connection; the connection between the beams and anchor rods 3 is a rigid connection, as an external tension system The soil layer anchor rod, one end (anchor head) is connected with the tree root pile 1 through the pile top crossbeam (top beam, waist beam); the other end is an anchor, and the anchor is arranged in the stable soil layer, and the tree root pile Use cast-in-place concrete beams to connect tree root piles and anchor rods 3 into one body, and tree root piles 1 are arranged in parallel in two rows.
其中树根桩1的桩长10m,孔径200mm,成两排平行布置,前后桩距1.40m,纵向桩中心距1.0m。Among them, the pile length of tree root pile 1 is 10m, the hole diameter is 200mm, and it is arranged in parallel in two rows.
其中锚杆3每根长17m,孔径110mm。锚杆3与树根桩1之间的夹角为45°。Wherein the anchor rods 3 each have a length of 17m and an aperture of 110mm. The angle between the anchor rod 3 and the tree root pile 1 is 45°.
其中桩顶用横梁将树根桩1和锚杆3连为一体;横梁厚250mm,长80m,宽1.7m,肋梁高550m,宽250mm。Among them, the root pile 1 and the anchor rod 3 are connected together by a beam on the top of the pile; the beam is 250mm thick, 80m long, and 1.7m wide, and the rib beam is 550m high and 250mm wide.
其中横梁高程以下边坡做干砌护坡,块石厚300mm,碎石垫层厚100mm,勒脚为500×700浆砌毛石。Among them, the slope below the beam elevation is to be dry-built slope protection, the thickness of the block stone is 300mm, the thickness of the crushed stone cushion is 100mm, and the foot is 500×700 masonry rubble.
其中排水沟呈“V”形,底宽300mm,厚80mm,沟高300mm,全长253m。Among them, the drainage ditch is "V" shaped, with a bottom width of 300mm, a thickness of 80mm, a ditch height of 300mm, and a total length of 253m.
一种锚杆-树根桩复合挡土结构的施工方法,施工步骤如下:A construction method of an anchor rod-tree root pile composite retaining structure, the construction steps are as follows:
步骤一,树根桩施工Step 1, tree root pile construction
树根桩施工采用间隔跳打法平行方向推进,其施工工艺流程如图3所示。The construction of tree root piles is carried out in a parallel direction by jumping at intervals, and the construction process is shown in Figure 3.
步骤二,锚杆施工Step two, anchor construction
锚杆施工也采取间隔跳打法平行方向推进,起施工工艺流程如图4所示。The bolt construction is also carried out in a parallel direction by jumping at intervals, and the construction process is shown in Figure 4.
步骤三,横梁Step three, beam
1.基槽开挖1. Foundation trench excavation
2.砖地模砌筑2. Brick floor formwork masonry
3.钢筋加工及钢筋笼绑扎安放3. Steel bar processing and steel cage binding and placement
4.横梁砼浇筑4. Concrete pouring of beams
步骤四,干砌毛石护坡,毛石护坡砌筑按自西向东自坡下向坡上的顺序施工。铺100mm厚碎石垫层后立即干砌毛石;干砌毛石厚300mm。护坡砌筑完毕,渠底开始施工浆砌勒脚,勒脚为500×700mm浆砌毛石。Step 4, dry rubble slope protection, rubble slope protection masonry is constructed in the order from west to east, from downhill to uphill. Immediately after paving the 100mm thick crushed stone cushion, lay rubble; the thickness of dry rubble is 300mm. After the slope protection has been built, the canal bottom starts to be constructed with mortared stones of 500×700mm.
以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本领域的技术人员在本实用新型所揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应该以权利要求书所限定的保护范围为准。The above is only a specific embodiment of the utility model, but the scope of protection of the utility model is not limited thereto, and any skilled person familiar with the art can easily think of changes within the technical scope disclosed in the utility model Or replacement, all should be covered within the scope of protection of the present utility model. Therefore, the protection scope of the present utility model should be determined by the protection scope defined in the claims.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420248026.3U CN203891037U (en) | 2014-05-14 | 2014-05-14 | Anchor bolt and tree pile combined retaining structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420248026.3U CN203891037U (en) | 2014-05-14 | 2014-05-14 | Anchor bolt and tree pile combined retaining structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203891037U true CN203891037U (en) | 2014-10-22 |
Family
ID=51717458
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420248026.3U Expired - Fee Related CN203891037U (en) | 2014-05-14 | 2014-05-14 | Anchor bolt and tree pile combined retaining structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203891037U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106013180A (en) * | 2016-05-31 | 2016-10-12 | 重庆交通大学 | Novel stability control system for pile foundation in deep filling slope |
| CN109183819A (en) * | 2018-11-12 | 2019-01-11 | 攀钢集团矿业有限公司 | A kind of refuse dump granular media slope reinforcement component and reinforcement means |
| CN112554243A (en) * | 2020-11-27 | 2021-03-26 | 苏州市中坚建设工程有限责任公司 | Construction process of prestressed anti-floating anchor cable of tree root pile |
| CN112832191A (en) * | 2021-01-13 | 2021-05-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Dyke heightening and reinforcing structure |
-
2014
- 2014-05-14 CN CN201420248026.3U patent/CN203891037U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106013180A (en) * | 2016-05-31 | 2016-10-12 | 重庆交通大学 | Novel stability control system for pile foundation in deep filling slope |
| CN109183819A (en) * | 2018-11-12 | 2019-01-11 | 攀钢集团矿业有限公司 | A kind of refuse dump granular media slope reinforcement component and reinforcement means |
| CN112554243A (en) * | 2020-11-27 | 2021-03-26 | 苏州市中坚建设工程有限责任公司 | Construction process of prestressed anti-floating anchor cable of tree root pile |
| CN112832191A (en) * | 2021-01-13 | 2021-05-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Dyke heightening and reinforcing structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103758134B (en) | A kind of construction method combining Double-row Piles Support system | |
| CN1837512B (en) | Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same | |
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| CN103711135B (en) | Anti-slide pile with arch-connected structure | |
| CN103485363B (en) | Three-dimensional continuous frame formula reinforced concrete structure retaining wall | |
| CN203729308U (en) | Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall | |
| CN102134998A (en) | Construction method for wind-blown sand tunnel | |
| CN106522270A (en) | Pile foundation and retaining wall anti-earthquake retaining structure comprising EPS buffer layers and construction method | |
| CN115455528B (en) | A slope protection chair type anchor pile combination structure and its calculation method | |
| CN102691302B (en) | Concrete structure for supporting deep foundation pit | |
| CN202323970U (en) | Combined reinforcement system for side slope | |
| CN104018490A (en) | Z-shaped rectangular-section anti-skidding pile and construction method thereof | |
| CN105970973A (en) | Soft soil foundation pit double-row piles supporting structure considering soil-arch and deformation space effect | |
| CN205259193U (en) | A splayed supporting construction for foundation ditch engineering | |
| CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
| CN202730796U (en) | Existing retaining wall rib plate type unloading reinforcing structure | |
| CN211571778U (en) | Miniature pile retaining wall | |
| CN205502063U (en) | Combined type retaining structure | |
| CN204282395U (en) | A kind of stake holder counterfort retaining wall | |
| CN203498863U (en) | Three-dimensional continuous-frame-type reinforced concrete structural retaining wall | |
| CN206189447U (en) | Partly strut formula retaining wall | |
| CN205822207U (en) | A kind of steel-pipe pile truss protecting side slope | |
| CN105696701B (en) | A kind of suitable slope shear wall building development platform and its construction method | |
| CN102235017B (en) | Lateral force resisting method for soft soil foundation building | |
| CN219262379U (en) | A Double-Arch Tunnel Portal Structure Suitable for Biased Terrain |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141022 Termination date: 20180514 |