CN106012855B - One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method - Google Patents

One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method Download PDF

Info

Publication number
CN106012855B
CN106012855B CN201610452454.1A CN201610452454A CN106012855B CN 106012855 B CN106012855 B CN 106012855B CN 201610452454 A CN201610452454 A CN 201610452454A CN 106012855 B CN106012855 B CN 106012855B
Authority
CN
China
Prior art keywords
rope
head
pull rod
reinforcing pull
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610452454.1A
Other languages
Chinese (zh)
Other versions
CN106012855A (en
Inventor
唐中波
徐国挺
袁英
伏冠西
胡盼
陈刚
张义志
陈永祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201610452454.1A priority Critical patent/CN106012855B/en
Publication of CN106012855A publication Critical patent/CN106012855A/en
Application granted granted Critical
Publication of CN106012855B publication Critical patent/CN106012855B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Abstract

Tunnel Heng Dong is used the invention discloses one kind, overlength, the system and operating method of high inclination-angle tunnel anchorage reinforcing pull rod Fast Installation is realized;It is characterized in that:Comprise the following steps:(1)Putting up platform;(2)Trailer system is arranged;(3)Reinforcing pull rod lifting transport;(4)Reinforcing pull rod is installed;Because overlength, high inclination-angle tunnel anchorage length are long, space is narrow, and the enforcement difficulty that inclination angle is installed greatly for reinforcing pull rod is larger.Pass through the implementation of the present invention:1st, realize and reinforcing pull rod smoothly and quickly can in place be installed in overlength, high inclination-angle tunnel anchorage using the horizontal hole in tunnel.2nd, material used is fewer, and structure type is uncomplicated, reduces haul distance, improves installation effectiveness.3rd, system monolithic stability, it is not easy to occur security incident.

Description

One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operation Method
Technical field
The present invention relates to field of civil engineering, and in particular to one kind realizes that overlength, high inclination-angle tunnel anchorage reinforcing pull rod are quickly pacified The system and operating method of dress.
Background technology
At present, the installation of domestic Tunnel-Type Anchorage of Suspension Bridge anchor system arranges trailer system using at hole mostly, and transport is extremely Installation site, is installed.This method hauling distance is long, and transport is slow, inefficient., can be effectively sharp such as using the present invention Tunnel Heng Dong is used, draw-gear is simple, greatly reduces hauling distance, so as to improve transporting rate, installation rate is also improved therewith, Cost is greatlyd save, shortens the duration.
The content of the invention
It is a kind of using tunnel Heng Dong it is an object of the invention to provide herein, form overlength, high inclination-angle tunnel anchorage reinforcing pull rod Quick-mount system;Make in reinforcing pull rod installation process effectively and to safely perform, so as to ensure construction safety and cost-effective.
The present invention is achieved in that offer one kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, its It is characterised by:Including the platform of appearing being made up of shaped steel, appear its afterbody of platform one 10t head-ropes hoist engine of installation and one 5t rack winches;The lifting of head-rope hoist engine main function reinforcing pull rod and assistant conveyance, rack winch are acted predominantly on In the transport of reinforcing pull rod;One limit rope device is installed in platform termination, limit rope device main function is, when steel cable is toward during decentralization, to prevent it Directly and contact with platform, so that steel cable is impaired by friction;
Hole bottom above platform remotely, sets two directive wheels, and it act as turning to head-rope and pull rope; Pacify a two-door coaster at the top of hole between directive wheel and platform, steel cable will be constructed by coaster;
In tunnel anchorage hole bottom, the place close to bottom sets an anchor point, make as far as possible anchor point and two-door coaster it Between angle of inclination it is enough big, beneficial to reinforcing pull rod transport, anchor be used for head-rope anchoring;Head-rope and pull rope are passed through Directive wheel and two-door coaster, travelling bogie is passed through after by load-bearing again, finally carries out head-rope anchoring.Travelling bogie is by two Pulley connection composition, passes through through head-rope after composition is good, is hung on head-rope.Pull rope passes through rear and travelling bogie tail Portion is connected.
It is a kind of to realize overlength, the operating method of high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, it is characterised in that:Including Following steps:
Step one:Putting up platform:
Go out in Heng Dong at hole, set up the platform of appearing being made up of shaped steel, platform action is mainly used in pre- peace reinforcing pull rod and faced When place, the placement of pull rope hoist engine and head-rope hoist engine, limit rope device are installed;
Step 2:Trailer system is arranged:
(1), stage+module of appearing it is good after, one 10t head-ropes hoist engine and 5t traction elevator are installed in its afterbody Machine;The lifting of head-rope hoist engine main function reinforcing pull rod and assistant conveyance, rack winch main function are reinforcing pull rod Transport.One limit rope device is installed in platform termination, limit rope device main function is, when steel cable is toward during decentralization, to prevent it directly and platform Contact, so that steel cable is impaired by friction;
(2), hole bottom above platform remotely, two directive wheels are set, and it act as making head-rope and pull rope Turn to.Pacify a two-door coaster at the top of hole between directive wheel and platform, steel cable will be constructed by coaster.
(3), in tunnel anchorage hole bottom, the place close to bottom sets an anchor point, and anchor point and two-door cunning are made as far as possible Angle of inclination between car is enough big, is transported beneficial to reinforcing pull rod, and anchor is used for the anchoring of head-rope;By head-rope and pull rope Through directive wheel and two-door coaster, head-rope is passed through into travelling bogie again after, head-rope anchoring is finally carried out;Travelling bogie It is made up of two pulley connections, passes through, hung on head-rope through head-rope after composition is good.Pull rope is by rear with transporting Dolly afterbody is connected;
Step 3:Reinforcing pull rod lifting transport:
Start head-rope hoist engine slowly to transfer steel cable to limit rope device position, with travelling bogie and hanging belt by reinforcing pull rod Connection;Start head-rope hoist engine, head-rope is slowly risen, head-rope hoist engine, its steel are stopped when rising to certain altitude Gradient of restricting is as larger as possible.Start rack winch, by travelling bogie slowly toward decentralization, until installation site.
Step 4:Reinforcing pull rod is installed;
Reinforcing pull rod is transported to installation site, is started head-rope hoist engine, is slowly transferred to stiff skeleton;It will transport small Car and hanging belt separation, are connected with hanging belt with bottle gouard moved by hands, are finely adjusted.
Utilization tunnel Heng Dong of the present invention, forms overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, makes steel Pull bar it is effective and safe be attached to design attitude, so as to ensure construction safety and cost-effective.The invention has the advantages that:
1st, realizing being capable of reinforcing pull rod is smooth and quick peace in place in overlength, high inclination-angle tunnel anchorage using the horizontal hole in tunnel Dress.
2nd, material used is fewer, and structure type is uncomplicated, reduces haul distance, improves installation effectiveness.
3rd, system monolithic stability, it is not easy to occur security incident.
Brief description of the drawings
Fig. 1 is reinforcing pull rod installation system elevation facility layout diagram of the present invention.
In figure:Appear platform 1,10t head-ropes hoist engine 2,5t rack winches 3, directive wheel 4, limit rope device 5, two-door cunning Car 6, anchor point 7, reinforcing pull rod 8, head-rope 9, travelling bogie 10, hanging belt 11, pull rope 12.
Embodiment
Below in conjunction with accompanying drawing 1, the present invention is described in detail, the technical scheme in the embodiment of the present invention is carried out clear Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments. Based on the embodiment in the present invention, it is all that those of ordinary skill in the art are obtained under the premise of creative work is not made Other embodiment, belongs to the scope of protection of the invention.
The present invention provides a kind of using tunnel Heng Dong herein by improving, and forms overlength, high inclination-angle tunnel anchorage reinforcing pull rod fast Fast installation system, make reinforcing pull rod effective and it is safe be attached to design attitude, so as to ensure construction safety and cost-effective.
The specific embodiment of the invention is expanded on further below in conjunction with the accompanying drawings:
One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, as shown in figure 1, including being made up of shaped steel Platform 1 of appearing, platform 1 its afterbody of appearing installs a 10t head-ropes hoist engine 2 and a 5t rack winch 3;Head-rope The lifting of the main function reinforcing pull rod of hoist engine 2 and assistant conveyance, the main function of rack winch 3 are the transport of reinforcing pull rod; A limit rope device 5 is installed in platform termination, and limit rope device main function is, when steel cable is toward during decentralization, to prevent it directly and contact with platform, So that steel cable is impaired by friction;
Hole bottom above platform remotely, sets two directive wheels 4, it act as making 12 turns of head-rope and pull rope To;Pacify a two-door coaster 6 at the top of hole between directive wheel and platform, steel cable will be constructed by coaster;
In tunnel anchorage hole bottom, the place close to bottom sets an anchor point 7, anchor point and two-door coaster 6 is made as far as possible Between angle of inclination it is enough big, transported beneficial to reinforcing pull rod 8, anchor be used for head-rope 9 anchoring;By head-rope and pull rope Through directive wheel 4 and two-door coaster 6, load-bearing is passed through into travelling bogie 10 again after, head-rope anchoring is finally carried out.Transport is small Car is made up of two pulley connections, is passed through, is hung on head-rope through head-rope after composition is good.Pull rope is by rear with transporting Defeated dolly afterbody is connected.
It is described to realize overlength, the operating method of high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, comprise the following steps:
Step one:Putting up platform:
Go out in Heng Dong at hole, set up the platform 1 of appearing being made up of shaped steel, platform action is mainly used in pre- peace reinforcing pull rod and faced When place, the placement of pull rope hoist engine and head-rope hoist engine, limit rope device are installed;
Step 2:Trailer system is arranged:
(1), stage+module of appearing it is good after, one 10t head-ropes hoist engine 2 and 5t traction elevator are installed in its afterbody Machine 3.The lifting of head-rope hoist engine main function reinforcing pull rod and assistant conveyance, rack winch main function are reinforcing pull rod Transport.One limit rope device 5 is installed in platform termination, it is, when steel cable is toward during decentralization, to prevent it directly with putting down to limit rope device main function Platform is contacted, so that steel cable is impaired by friction;
(2), hole bottom above platform remotely, two directive wheels 4 are set, and it act as making head-rope and pull rope 12 turn to.Pacify a two-door coaster 6 at the top of hole between directive wheel and platform, steel cable will be constructed by coaster.
(3), in tunnel anchorage hole bottom, the place close to bottom sets an anchor point 7, and anchor point and two-door cunning are made as far as possible Angle of inclination between car 6 is enough big, is transported beneficial to reinforcing pull rod 8, and anchor is used for the anchoring of head-rope 9.Head-rope and it will lead Messenger passes through directive wheel 4 and two-door coaster 6, and head-rope is passed through into travelling bogie 10 again after, finally carries out head-rope anchoring. Travelling bogie is made up of two pulley connections, is passed through, is hung on head-rope through head-rope after composition is good.Pull rope passes through It is connected afterwards with travelling bogie afterbody;
Step 3:Reinforcing pull rod lifting transport:
Start head-rope hoist engine slowly to transfer steel cable to limit rope device position, drawn steel with travelling bogie and hanging belt 11 Bar is connected.Start head-rope hoist engine, head-rope is slowly risen, head-rope hoist engine is stopped when rising to certain altitude, its Steel cable gradient is as larger as possible.Start rack winch, by travelling bogie slowly toward decentralization, until installation site.
Step 4:Reinforcing pull rod is installed;
Reinforcing pull rod is transported to installation site, is started head-rope hoist engine, is slowly transferred to stiff skeleton.It will transport small Car and hanging belt separation, are connected with hanging belt with bottle gouard moved by hands, are finely adjusted.
The invention has the advantages that:
1st, realizing being capable of reinforcing pull rod is smooth and quick peace in place in overlength, high inclination-angle tunnel anchorage using the horizontal hole in tunnel Dress.
2nd, material used is fewer, and structure type is uncomplicated, reduces haul distance, improves installation effectiveness.
3rd, system monolithic stability, it is not easy to occur security incident.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (1)

1. one kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system, it is characterised in that:Including what is be made up of shaped steel Appear platform(1), platform of appearing(1)Its afterbody installs a 10t head-rope hoist engine(2)With a 5t rack winch(3); Head-rope hoist engine(2)The lifting of main function reinforcing pull rod and assistant conveyance, rack winch(3)Main function is reinforcing pull rod Transport;One limit rope device is installed in platform termination(5), limit rope device main function is, when steel cable is toward during decentralization, to prevent its direct With contact with platform so that steel cable is impaired by friction;
Hole bottom above platform remotely, sets two directive wheels(4), it act as making head-rope and pull rope(12)Turn To;Pacify a two-door coaster at the top of hole between directive wheel and platform(6), steel cable will be constructed by coaster;
In tunnel anchorage hole bottom, the place close to bottom sets an anchor point(7), anchor point and two-door coaster are made as far as possible(6) Between angle of inclination it is enough big, beneficial to reinforcing pull rod(8)Transport, anchor is used for head-rope(9)Anchoring;Head-rope and it will lead Messenger passes through directive wheel(4)And two-door coaster(6), load-bearing is passed through into travelling bogie again after(10), finally carry out head-rope Anchoring;
Travelling bogie is made up of two pulley connections, is passed through, is hung on head-rope through head-rope after composition is good;
Pull rope is connected by rear with travelling bogie afterbody;
It is described to realize that overlength, the operating method of high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system comprise the following steps:
Step one:Putting up platform:
Go out in Heng Dong at hole, set up the platform of appearing being made up of shaped steel(1), it is interim that platform action is mainly used in pre- peace reinforcing pull rod Placement, the placement of pull rope hoist engine and head-rope hoist engine, limit rope device are installed;
Step 2:Trailer system is arranged:
(1), stage+module of appearing it is good after, its afterbody install a 10t head-rope hoist engine(2)With a 5t rack winch (3);The lifting of head-rope hoist engine main function reinforcing pull rod and assistant conveyance, rack winch main function are reinforcing pull rod Transport;One limit rope device is installed in platform termination(5), limit rope device main function be when steel cable toward during decentralization, prevent its directly with Contact with platform, so that steel cable is impaired by friction;
(2), hole bottom above platform remotely, two directive wheels are set(4), it act as making head-rope and pull rope (12)Turn to;Pacify a two-door coaster at the top of hole between directive wheel and platform(6), steel cable will be constructed by coaster;
(3), in tunnel anchorage hole bottom, the place close to bottom sets an anchor point(7), anchor point and two-door coaster are made as far as possible (6)Between angle of inclination it is enough big, beneficial to reinforcing pull rod(8)Transport, anchor is used for head-rope(9)Anchoring;By head-rope Directive wheel is passed through with pull rope(4)And two-door coaster(6), head-rope is passed through into travelling bogie again after(10), finally carry out Head-rope is anchored;Travelling bogie is made up of two pulley connections, is passed through after composition is good through head-rope, is hung over head-rope On;
Pull rope is connected by rear with travelling bogie afterbody;
Step 3:Reinforcing pull rod lifting transport:
Start head-rope hoist engine slowly to transfer steel cable to limit rope device position, with travelling bogie and hanging belt(11)By reinforcing pull rod Connection;
Start head-rope hoist engine, head-rope is slowly risen, head-rope hoist engine, its steel cable are stopped when rising to certain altitude Gradient is as larger as possible;Start rack winch, by travelling bogie slowly toward decentralization, until installation site;
Step 4:Reinforcing pull rod is installed;
Reinforcing pull rod is transported to installation site, is started head-rope hoist engine, is slowly transferred to stiff skeleton;
Travelling bogie and hanging belt are separated, is connected with bottle gouard moved by hands with hanging belt, is finely adjusted.
CN201610452454.1A 2016-06-22 2016-06-22 One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method Active CN106012855B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610452454.1A CN106012855B (en) 2016-06-22 2016-06-22 One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610452454.1A CN106012855B (en) 2016-06-22 2016-06-22 One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method

Publications (2)

Publication Number Publication Date
CN106012855A CN106012855A (en) 2016-10-12
CN106012855B true CN106012855B (en) 2017-09-29

Family

ID=57086969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610452454.1A Active CN106012855B (en) 2016-06-22 2016-06-22 One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method

Country Status (1)

Country Link
CN (1) CN106012855B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227686A (en) * 2017-05-19 2017-10-03 中国建筑第六工程局有限公司 A kind of tunnel-type anchorage pre-stress system locating support construction method
CN107119572B (en) * 2017-06-22 2018-12-18 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN108797347A (en) * 2018-07-20 2018-11-13 中交武汉港湾工程设计研究院有限公司 Cycle is drawn into anchor system
CN108708756A (en) * 2018-08-31 2018-10-26 四川路桥华东建设有限责任公司 A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN109487675A (en) * 2018-12-28 2019-03-19 中铁大桥局集团第八工程有限公司 A kind of Techniques of Tunnel-Type Anchorage for Suspension Bridge cable crane and its construction method
CN109944166B (en) * 2019-04-26 2023-10-24 四川路桥华东建设有限责任公司 Ultra-long large-dip-angle tunnel anchor large-tonnage cable saddle sliding and mounting system and operation method
CN109973130B (en) * 2019-04-26 2023-09-08 四川路桥华东建设有限责任公司 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN110886242B (en) * 2019-12-31 2021-05-14 中铁大桥局集团有限公司 Method for installing composite cable saddle in anchor hole of suspension bridge tunnel in mountainous area
CN112901223A (en) * 2021-02-02 2021-06-04 中铁大桥局集团第五工程有限公司 Tunnel anchor mechanical equipment with ultra-large inclination angle and method for automatically transporting materials
CN113236316A (en) * 2021-05-11 2021-08-10 中交二公局第二工程有限公司 Method for mounting prestressed finished cable of tunnel anchor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101258807B1 (en) * 2012-11-30 2013-04-26 한상국 Tunnel installation method and tunnel installation structure of crossing railroad
CN203487462U (en) * 2013-08-06 2014-03-19 天津鑫坤泰预应力专业技术有限公司 Finished steel strand bundle pushing device
CN103590340A (en) * 2013-10-31 2014-02-19 河北工业大学 Lower guide beam walking type bridge erection machine contraction and folding cantilever beam system
CN204873575U (en) * 2015-08-28 2015-12-16 河南省中原奥起实业有限公司 Can wear combined bridge crane in tunnel

Also Published As

Publication number Publication date
CN106012855A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106012855B (en) One kind realizes overlength, high inclination-angle tunnel anchorage reinforcing pull rod quick-mount system and operating method
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN105401523B (en) Hanging mounting method of long heavy stay cable under space limited condition
CN206129300U (en) Shield constructs to start uses section of jurisdiction conveyer
CN105442458B (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN105236241B (en) A kind of adaptive diagonal special elevator of gradient
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN105460759B (en) A kind of method that main shaft winch tail rope is changed
CN103171975B (en) Method for transporting slope engineering material
CN103362546A (en) Material transporting device for inclined shaft and material transporting method thereof
CN205634654U (en) Sports car structure of cable crane hoist
CN203128099U (en) Slipping type pipeline lifting device
CN205346711U (en) Rocket accessory safety hoisting accessory
CN102320522B (en) Hoisting in-place method for allowing large equipment to pass through ultrahigh hole
CN109914252A (en) A kind of long hoist cable installation method of straddle-type
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN105645275A (en) Cable hoisting crane and construction method thereof
CN215828220U (en) Double-winch lifting system
CN201762053U (en) Simple automatic derrick
CN108018778A (en) The cat road rope in navigable waters does not set up trailer system and cat road rope fast erecting method
CN204750193U (en) Automatic decoupling device device in sub -inclined shaft pittop
CN107988909A (en) A kind of railway convenient beam fast transportation erection trailer
CN202098985U (en) Multi-stage hoisting device of cable crane
CN113605230A (en) Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor
CN207775722U (en) The cat road rope in navigable waters does not set up trailer system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant