CN106012783B - A kind of double-layer stress absorption band integrated construction train - Google Patents
A kind of double-layer stress absorption band integrated construction train Download PDFInfo
- Publication number
- CN106012783B CN106012783B CN201610559363.8A CN201610559363A CN106012783B CN 106012783 B CN106012783 B CN 106012783B CN 201610559363 A CN201610559363 A CN 201610559363A CN 106012783 B CN106012783 B CN 106012783B
- Authority
- CN
- China
- Prior art keywords
- absorption band
- stress absorption
- controller
- valve
- layer stress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Abstract
The invention belongs to field of road, is related to a kind of double-layer stress absorption band integrated construction train, including train body and the railway carriage by train body dragging;Along the axial direction of railway carriage is disposed with the preparation of first layer stress absorption band and making device, second layer stress absorption band prepares and making device and compaction apparatus inside railway carriage;The data collection and control device being connected with the preparation of first layer stress absorption band and making device and the preparation of second layer stress absorption band and making device is additionally provided with inside railway carriage;Data collection and control device includes control cabinet;The computer heating control chip and switch driver that control cabinet is internally provided with controller and is connected respectively with controller.The present invention have it is simple in construction, reasonable in design and using it is easy to operate, using effect is good, can preparation and making easy, that be rapidly completed double-layer stress absorption band, and prepare with paving process it is easily controllable the advantages that.
Description
Technical field
The invention belongs to field of road, is related to road engineering maintenance of equipment, more particularly to a kind of double-layer stress absorbs
Band integrated construction train.
Background technology
The reconstruction technology of " morning-night " refers to keep old pavement globality, take grouting reinforcement under plate, local displacement or
The measures such as repairing, the technology of skin coat is then directly overlayed on Old cement concrete.This mode can make full use of
The structure residual intensity of Old cement concrete, thickness is thinned.But the overlay reflection crack that this technology faces
Problem is always one of problem that highway circle is faced.The presence of reflection crack, the bulk strength of pavement structure is not only broken up,
And because surface water permeates downwards along reflection crack, make surface layer is gradually inharmonious to come off, subgrade strength reduces, and has a strong impact on road surface
Service life.
In order to prevent or delay the early reflection crack problem of old cement concrete road Laying Asphalt Surface Course, researcher is old mixed
Coagulate and stress absorbing layer, geotextile interlayer, grid interlayer are provided between dirt road panel and asphalt overlay, but this full paving
The processing method of formula significantly increases construction costs.Talk to penetrating judgment to award with reference to Tongji University and propose to set local soft interlayer to have
Effect reduces the achievement in research of overlay temperature stress, we have developed double-layer stress absorption band, for old concrete plate seam and
The local disposal in crack.At present, stress absorption band construction machinery is artificial hand, and stress absorption carrying material manually is passed through into hair
The instrument of brush is brushed at pavement crack.This method efficiency is low, and stress absorption carrying material is scattered more, and waste of material is serious.
In addition, painting tool does not have firing equipment, stress absorption band viscosity of material is big, and gradual adhesive aggregation is on painting device in construction, behaviour
It is extremely inconvenient to make.Existing stress absorption band paving equipment is also suitable only for the mechanized construction of individual layer stress absorption band, no
Can solve the problems, such as double-layer stress absorption band integrated construction, have a strong impact on the integration of levels stress-absorbed material, and
Existing equipment is it is difficult to ensure that the thickness and flatness of stress absorption band.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that provide a kind of double-layer stress
Absorption band integrated construction train, its is simple in construction, reasonable in design and use is easy to operate, using effect is good, can be easy, quick
Preparation and the making of double-layer stress absorption band are completed, and is prepared easily controllable with paving process.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of double-layer stress absorption band integrated construction train, it is characterised in that:The double-layer stress absorption band integration
Train of constructing includes train body and the railway carriage dragged by train body;Set gradually inside the railway carriage along the axial direction of railway carriage
There are the preparation of first layer stress absorption band and making device, second layer stress absorption band prepares and making device and compaction apparatus;
It is additionally provided with inside the railway carriage and is prepared with the preparation of first layer stress absorption band and making device and second layer stress absorption band
And the data collection and control device that making device is connected;The data collection and control device includes control cabinet;The control
The computer heating control chip and switch driver that case is internally provided with controller and is connected respectively with controller.
Preferably, first layer stress absorption band of the present invention prepares and making device and the suction of the second ply stress
Take-up preparation and making device include stress absorption band compound preparation facilities, stress absorption band compound making device with
And Fibergrass polyester mat making device;The stress absorption band compound preparation facilities includes pitch heat treatment apparatus, gather materials place
Manage device, device for processing mineral powder and agitated kettle;The pitch heat treatment apparatus, collection material processing device and miberal powder processing dress
Put and connected respectively with agitated kettle;The making device of the stress absorption band compound includes hopper, feed appliance, thickness regulation spiral shell
Bar, helical spreader and shakeout plate;The hopper connects with agitated kettle;The feed appliance includes feed appliance import and sent
Glassware exports;The feed appliance import is stretched into hopper;The helical spreader is placed in feed appliance exit;The thickness regulation
Screw rod is connected with shakeouing plate;The plate that shakeouts is placed in helical spreader end;The Fibergrass polyester mat making device, which is placed in, to be shakeout
Plate end.
Preferably, pitch heat treatment apparatus of the present invention is weighed including Asphaltum heating pot, agitator, first
Sensor, flowline;First temperature sensor, primary heater and Asphaltum heating pot valve;Inside the Asphaltum heating pot
It is provided with agitator, the first temperature sensor and primary heater;First temperature sensor is connected with controller;It is described
Controller is connected by computer heating control chip with primary heater;The Asphaltum heating pot is mutually passed through by flowline with agitated kettle
It is logical;The contact position of the Asphaltum heating pot and flowline is provided with the first weighing sensor;Pitch is provided with the flowline
Heat tank valve;The controller is connected by switch driver with Asphaltum heating pot valve;The controller is weighed with first
Sensor is connected.
Preferably, it is of the present invention collection material processing device include cold burden storehouse, the first discharge nozzle, cold burden storehouse valve,
Drying drum, the second discharge nozzle, drying drum valve, second temperature sensor, secondary heater, hot aggregate bin, the 3rd temperature pass
Sensor, the 3rd heater, hot aggregate bin valve, the 3rd discharge nozzle and the 3rd weighing sensor;The cold burden storehouse passes sequentially through
One discharge nozzle, drying drum, the second discharge nozzle, hot aggregate bin and the 3rd discharge nozzle and agitated kettle connect;First discharging
Cold burden storehouse valve is provided with pipe;Drying drum valve is provided with second discharge nozzle;Set on 3rd discharge nozzle
There is hot aggregate bin valve;The drying drum is internally provided with second temperature sensor and secondary heater;In the hot aggregate bin
Portion is provided with three-temperature sensor, the 3rd weighing sensor and the 3rd heater;The controller respectively with second temperature
Sensor and three-temperature sensor are connected;The controller by computer heating control chip respectively with secondary heater and
Three heaters are connected;The controller by switch driver respectively with cold burden storehouse valve, drying drum valve and hot aggregate bin
Valve is connected.
Preferably, device for processing mineral powder of the present invention includes mineral powder bin, mineral powder bin discharge nozzle, mineral powder bin valve
And second weighing sensor;The mineral powder bin is connected by mineral powder bin discharge nozzle with agitated kettle;The mineral powder bin discharge nozzle
On be provided with mineral powder bin valve;The contact position of the mineral powder bin and mineral powder bin discharge nozzle is provided with the second weighing sensor;It is described
Controller is connected by switch driver with mineral powder bin valve;The controller is connected with the second weighing sensor.
Preferably, agitated kettle of the present invention be internally provided with the 4th temperature sensor, the 4th heater and
Valve;The controller is connected by switch driver with valve;The controller is heated by computer heating control chip and the 4th
Device is connected;The controller is connected with the 4th temperature sensor;The agitated kettle is connected by valve and hopper.
Preferably, hopper of the present invention is internally provided with the 5th temperature sensor and the 5th heater;Institute
Controller is stated by computer heating control chip with the 5th heater to be connected;The controller is connected with the 5th temperature sensor;It is described
Stand flat plate bottom is provided with the 6th temperature sensor and the 6th heater;The controller passes through computer heating control chip and the 6th
Heater is connected;The controller is connected with the 6th temperature sensor.
Preferably, the width of helical spreader of the present invention is 30cm, a diameter of 1cm;The plate of shakeouing
Width is 30cm, thickness 5mm;The Fibergrass polyester mat making device includes Train Wheel and Fibergrass polyester mat roller;It is described
Train Wheel is by treating that making Fibergrass polyester mat is connected with Fibergrass polyester mat roller;Row are driven when the Fibergrass polyester mat roller rotates
Vehicle wheel rotation;Angular adjustment lining is provided between line and horizontal direction between the Train Wheel and Fibergrass polyester mat roller
Device.
Preferably, compaction apparatus of the present invention includes the first compacting steel wheel set gradually along the axial direction of railway carriage
And second compacting steel wheel.
Preferably, be provided with control cabinet of the present invention result output screen, parameter input keyboard and with
The connected controlling switch of controller.
The present invention has advantages below compared with prior art:
The invention provides a kind of double-layer stress absorption band integrated construction train, including train body and by train car
The railway carriage of body dragging;First layer stress absorption band is disposed with inside railway carriage along the axial direction of railway carriage to prepare and making device, the
Two ply stress absorption bands prepare and making device and compaction apparatus;It is additionally provided with inside railway carriage and first layer stress absorption band system
Standby and making device and the data collection and control device that prepared by second layer stress absorption band and making device is connected;Data are adopted
Collection and control device include control cabinet;The computer heating control core that control cabinet is internally provided with controller and is connected respectively with controller
Piece and switch driver.Result output screen, parameter input keyboard and the control being connected with controller are provided with control cabinet
System switch.Double-layer stress absorption band integrated construction train provided by the present invention is in double-layer stress absorption band site operation process
In be related to mixing and stirring, pave, being compacted for first layer stress absorption band compound;First layer Fibergrass polyester mat paves, is compacted;Second
Ply stress absorption band compound is mixed and stirred, paved, being compacted;Second layer Fibergrass polyester mat paves, is compacted;This equipment by this
The process of series is intensive to be automatically performed in a machine, and simple in construction, reasonable in design and installation and use are easy to operate, input
Cost is relatively low, install compact, and private space is smaller.Second, parameter adjustment of the present invention is easy, can to heating-up temperature, the heat time,
The parameters such as stirring duration, stir speed (S.S.) are adjusted, and are provided with control cabinet, and control is simple, can accurately control material
Temperature, mixing time, stir speed (S.S.), while weighing sensor is provided with Asphaltum heating pot, hot aggregate bin and mineral powder bin, can be accurate
First Astronautic Research Institute for Measurement and Test's addition modified pitch, fine aggregate, the weight of miberal powder;In addition Asphaltum heating pot, drying drum, hot aggregate bin, agitated kettle,
Hopper and the temperature sensor shakeout on plate can effectively be monitored to heating-up temperature so that stress absorption band compound mixes and stirs,
Pave, to roll temperature easily controllable.3rd, efficiency of construction of the invention is high, can complete 5 kilometers of double-layer stress per hour and absorb
Band making works.4th, using effect of the present invention is good and practical value is high, good appearance, largely facilitates double-deck answer
The work progress of power absorption band, and work progress is easily controllable, have efficiency of construction height, automation mechanized operation, metering accurate etc.
Advantage, the performance of prepared double-layer stress absorption band can be effectively ensured.In summary, the present invention has considered double-layer stress suction
Take-up material property, convenience for construction, it is simple in construction, reasonable in design and using it is easy to operate, using effect is good, energy is easy, soon
Speed completes the work progress of double-layer stress absorption band, and work progress is easily controllable.
Brief description of the drawings
Fig. 1 is the structural representation of double-layer stress absorption band integrated construction train provided by the present invention;
Fig. 2 is the structural representation of stress absorption band of the present invention preparation and making device;
Fig. 3 is the circuit theory schematic diagram of data collection and control device of the present invention;
Description of reference numerals:
1- train bodies;2- first layers stress absorption band prepares and making device;3- second layers stress absorption band prepare and
Making device;4- compaction apparatus;5- bridges;6- Train Wheels;9- railway carriages;10- Asphaltum heating pots;11- agitators;12- cold burdens
Storehouse;13- mineral powder bins;14- drying drums;15- hot aggregate bins;16- agitated kettles;17- valves;18- hoppers;19- feed appliances;20- spiral shells
Revolve spreader;21- thickness adjusting screw rods;22- shakeouts plate;23- Fibergrass polyester mat rollers;24- angular adjustments serve as a contrast device;25- first
Weighing sensor;The weighing sensors of 26- second;27- control cabinets;29- Asphaltum heating pot valves;30- hot aggregate bin valves;31- ore deposits
Powder cabin valve;The temperature sensors of 32- first;33- the first computer heating control chips;34- switch drivers;35- flowlines;36-
One discharge nozzle;37- cold burdens storehouse valve;The discharge nozzles of 38- second;39- drying drum valves;40- second temperature sensors;41-
Two computer heating control chips;42- three-temperature sensors;The computer heating control chips of 43- the 3rd;The discharge nozzles of 44- the 3rd;The temperature of 45- the 4th
Spend sensor;The computer heating control chips of 46- the 4th;47- mineral powder bin discharge nozzles;The temperature sensors of 48- the 5th;49- slender acanthopanax thermal controls
Coremaking piece;The temperature sensors of 50- the 6th;The computer heating control chips of 51- the 6th;93- first is compacted steel wheel;94- second is compacted steel wheel;
The weighing sensors of 95- the 3rd;96- controllers;98- controlling switches;99- result output screens;100- parameters input keyboard.
Embodiment
The present invention is described in further detail with reference to embodiment:
Embodiment
Referring to Fig. 1, the invention provides a kind of double-layer stress absorption band integrated construction train, double-layer stress absorption band one
Bodyization construction train includes train body 1 and the railway carriage 9 dragged by train body 1;Inside railway carriage 9 along railway carriage 9 axially according to
It is secondary to be provided with first layer stress absorption band preparation and making device 2, the preparation of second layer stress absorption band and making device 3 and pressure
Actual load puts 4;It is additionally provided with inside railway carriage 9 and the preparation of first layer stress absorption band and making device 2 and second layer stress absorption
With the data collection and control device prepared and making device 3 is connected;Data collection and control device includes control cabinet 27;Control
Case 27 is internally provided with controller 96 and the computer heating control chip and switch driver 34 that are connected respectively with controller 96.Control
Result output screen 99, parameter input keyboard 100 and the controlling switch 98 being connected with controller are provided with case 27 processed.
As shown in FIG. 2 and 3, used by the present invention carries prepared by first layer stress absorption band and making device 2 includes
Stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat making device;Should
Power absorption band compound preparation facilities includes pitch heat treatment apparatus, collection material processing device, device for processing mineral powder and stirring
Pot 16;Pitch heat treatment apparatus, collection material processing device and device for processing mineral powder connect with agitated kettle 16 respectively;Stress is inhaled
The making device of take-up compound includes hopper 18, feed appliance 19, thickness adjusting screw rod 21, helical spreader 20 and shakeouts plate
22;Hopper 18 connects with agitated kettle 16;Feed appliance 19 includes feed appliance import and feed appliance exports;Feed appliance import is stretched into
In hopper 18;Helical spreader 20 is placed in feed appliance exit;Thickness adjusting screw rod 21 is connected with shakeouing plate 22;Plate 22 is shakeout to put
In the end of helical spreader 20;Fibergrass polyester mat making device, which is placed in, shakeouts the end of plate 22.
Stress absorption band preparation and making device include Asphaltum heating pot 10, cold burden storehouse 12, the miberal powder from top to bottom installed
Storehouse 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18, helical spreader 20, thickness adjusting screw rod 21, shakeout plate
22nd, Fibergrass polyester mat roller 23, angular adjustment lining cutting 24.
It is provided with Asphaltum heating pot 10 and inserts agitator 11 in Asphaltum heating pot 10 from left to right;Agitator 11 is by driving
Motor is driven, and motor is arranged in the tank body of Asphaltum heating pot 10, and motor connects with controller 96.
The first temperature sensor 32, primary heater, the first computer heating control chip 33, valve are provided with Asphaltum heating pot 10
The 29, first weighing sensor 25 of door, flowline 35;First temperature sensor 32, the first weighing sensor 25, the first computer heating control
Chip 33 connects with controller 96, and the first computer heating control chip 33 is connected with primary heater and drives primary heater to work;
Valve 29 connects with switch driver 34.
The bottom in cold burden storehouse 12 is provided with the first discharge nozzle 36, cold burden storehouse valve 37;Cold burden storehouse valve 37 and switch drive
Device 34 connects.
Second temperature sensor 40, secondary heater, the second computer heating control chip 41, second are provided with drying drum 14
Discharge nozzle 38, drying drum valve 39;Second temperature sensor 40, the second computer heating control chip 41 connect with controller 96;The
Two computer heating control chips 41 are connected with secondary heater and drive secondary heater to work;
Valve 39 connects with switch driver 34.
Three-temperature sensor 42, the 3rd heater, the 3rd computer heating control chip the 43, the 3rd is provided with hot aggregate bin 15 to go out
Expects pipe 44, hot aggregate bin valve 30, the 3rd weighing sensor 95;Hot aggregate bin valve 30 connects with switch driver 34;3rd temperature
Sensor 42, the 3rd computer heating control chip 43, weighing sensor 95 connect with controller 96.3rd computer heating control chip 43 and
Three heaters are connected and drive the 3rd heater to work;
The 4th temperature sensor 45, the 4th heater, the 4th computer heating control chip 46, valve are provided with agitated kettle 16
17;Valve 17 connects with switch driver 34, the 4th temperature sensor 45, the 4th computer heating control chip 46 and the phase of controller 96
Connect.4th computer heating control chip 46 is connected with the 4th heater and drives the 4th heater to work;
The second weighing sensor 26, mineral powder bin valve 31, mineral powder bin discharge nozzle 47 are provided with mineral powder bin 13;Mineral powder bin valve
Door 31 connects with switch driver 34, and the second weighing sensor 26 connects with controller 96.
Asphaltum heating pot 10 is connected by flowline 35 with agitated kettle 16, and cold burden storehouse 12 is by the first discharge nozzle 36 with drying
Roller 14 connects, and drying drum 14 is connected by the second discharge nozzle 38 with hot aggregate bin 15, and hot aggregate bin 15 passes through the 3rd discharge nozzle 44
Connect with agitated kettle 16, mineral powder bin 13 is connected by mineral powder bin discharge nozzle 47 with agitated kettle 16.
Feed appliance 19, the 5th temperature sensor 48, the 5th heater, the 5th computer heating control chip are provided with hopper 18
49;5th temperature sensor 48, the 5th computer heating control chip 49 connect with controller 96.5th computer heating control chip 49 and the 5th
Heater is connected and drives the 5th heater to work;
Helical spreader 20 is arranged on the back lower place of hopper 18, thickness adjusting screw rod 21 and shakeouts plate 22 and is arranged on spiral and pave
The rear of device 20.The width of helical spreader 20 is 30cm, a diameter of 1cm.
Shakeout plate 22 and be provided with the 6th temperature sensor 50, the 6th heater, the 6th computer heating control chip 51;6th temperature
Sensor 50, the 6th computer heating control chip 51 connect with controller 96.The width for shakeouing plate 22 is 30cm, thickness 5mm.6th
Computer heating control chip 51 is connected with the 6th heater and drives the 6th heater to work;
First computer heating control chip 33 of the present invention, the second computer heating control chip 41, the 3rd computer heating control chip
43rd, the 4th computer heating control chip 46, the 5th computer heating control chip 49 and the 6th computer heating control chip 51 can pass through a heating
Control chip is realized, can also be realized by multiple computer heating control chips.
Asphaltum heating pot 10, cold burden storehouse 12, mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18 are common
With the preparation for completing stress absorption band compound.
Hopper 18, feed appliance 19, helical spreader 20, thickness adjusting screw rod 21 and shakeouts plate 22 and completes stress absorption jointly
Making with compound.
Fibergrass polyester mat making device includes Fibergrass polyester mat roller 23 and angular adjustment lining device 24, wherein, polyester glass
Fine cloth roller 23 is used to place the Fibergrass polyester mat for being rolled into volume;Angular adjustment lining device 24 is used to adjust Fibergrass polyester mat paving process
In making angle with road surface;Fibergrass polyester mat roller 23, angular adjustment lining device 24 and Train Wheel 6 complete Fibergrass polyester mat jointly
Making, and by Fibergrass polyester mat be pressed into stress absorption band compound in.
Prepared by second layer stress absorption band and making device 3 is prepared with first layer stress absorption band and the knot of making device 2
Structure is identical, and working method is also identical, is not repeated herein.
Compaction apparatus 4 is located at the rearmost of train body 1, including compacting steel wheel 93 and compacting steel wheel 94, and it completes double-deck
The compacting of stress absorption band compound, ensure in two layers polyester glass-fiber-fabric embedment stress absorption band compound.
Claims (9)
- A kind of 1. double-layer stress absorption band integrated construction train, it is characterised in that:The double-layer stress absorption band integration is applied Work train includes train body(1)And by train body(1)The railway carriage of dragging(9);The railway carriage(9)It is internal along railway carriage(9) Axial direction be disposed with first layer stress absorption band prepare and making device(2), second layer stress absorption band prepare and making Device(3)And compaction apparatus(4);The railway carriage(9)Inside is additionally provided with to be filled with the preparation of first layer stress absorption band and making Put(2)And second layer stress absorption band prepares and making device(3)Connected data collection and control device;The data are adopted Collection and control device include control cabinet(27);The control cabinet(27)It is internally provided with controller(96)And respectively with controller (96)Connected computer heating control chip and switch driver(34);The first layer stress absorption band prepares and making device(2)And second layer stress absorption band prepares and making device (3)Include stress absorption band compound preparation facilities, the making device of stress absorption band compound and Fibergrass polyester mat paving Build device;The stress absorption band compound preparation facilities includes pitch heat treatment apparatus, collection material processing device, miberal powder processing Device and agitated kettle(16);The pitch heat treatment apparatus, collection material processing device and device for processing mineral powder are respectively with stirring Mix pot(16)Connect;The making device of the stress absorption band compound includes hopper(18), feed appliance(19), thickness regulation Screw rod(21), helical spreader(20)And shakeout plate(22);The hopper(18)With agitated kettle(16)Connect;The feeding Device(19)Exported including feed appliance import and feed appliance;Hopper is stretched into the feed appliance import(18)In;The spiral paves Device(20)It is placed in feed appliance exit;The thickness adjusting screw rod(21)With shakeouing plate(22)It is connected;It is described to shakeout plate(22)Put In helical spreader(20)End;The Fibergrass polyester mat making device, which is placed in, shakeouts plate(22)End.
- 2. double-layer stress absorption band integrated construction train according to claim 1, it is characterised in that:The pitch heating Processing unit includes Asphaltum heating pot(10), agitator(11), the first weighing sensor(25), flowline(35);First temperature Sensor(32), primary heater and Asphaltum heating pot valve(29);The Asphaltum heating pot(10)It is internally provided with stirring Device(11), the first temperature sensor(32)And primary heater;First temperature sensor(32)With controller(96)Phase Even;The controller(96)It is connected by computer heating control chip with primary heater;The Asphaltum heating pot(10)By fuel-displaced Pipe(35)With agitated kettle(16)Connect;The Asphaltum heating pot(10)With flowline(35)Contact position be provided with first and weigh Sensor(25);The flowline(35)On be provided with Asphaltum heating pot valve(29);The controller(96)Driven by switching Dynamic device(34)With Asphaltum heating pot valve(29)It is connected;The controller(96)With the first weighing sensor(25)It is connected.
- 3. double-layer stress absorption band integrated construction train according to claim 2, it is characterised in that:The processing of gathering materials Device includes cold burden storehouse(12), the first discharge nozzle(36), cold burden storehouse valve(37), drying drum(14), the second discharge nozzle(38)、 Drying drum valve(39), second temperature sensor(40), secondary heater, hot aggregate bin(15), three-temperature sensor(42)、 3rd heater, hot aggregate bin valve(30), the 3rd discharge nozzle(44)And the 3rd weighing sensor(95);The cold burden storehouse(12) Pass sequentially through the first discharge nozzle(36), drying drum(14), the second discharge nozzle(38), hot aggregate bin(15)And the 3rd discharge nozzle (44)With agitated kettle(16)Connect;First discharge nozzle(36)On be provided with cold burden storehouse valve(37);Second discharging Pipe(38)On be provided with drying drum valve(39);3rd discharge nozzle(44)On be provided with hot aggregate bin valve(30);It is described Drying drum(14)It is internally provided with second temperature sensor(40)And secondary heater;The hot aggregate bin(15)Inside is set There is three-temperature sensor(42), the 3rd weighing sensor(95)And the 3rd heater;The controller(96)Respectively with Two temperature sensors(40)And three-temperature sensor(42)It is connected;The controller(96)Distinguished by computer heating control chip It is connected with secondary heater and the 3rd heater;The controller(96)Pass through switch driver(34)Respectively with cold burden storehouse valve Door(37), drying drum valve(39)And hot aggregate bin valve(30)It is connected.
- 4. double-layer stress absorption band integrated construction train according to claim 3, it is characterised in that:The miberal powder processing Device includes mineral powder bin(13), mineral powder bin discharge nozzle(47), mineral powder bin valve(31)And second weighing sensor(26);It is described Mineral powder bin(13)Pass through mineral powder bin discharge nozzle(47)With agitated kettle(16)Connect;The mineral powder bin discharge nozzle(47)On be provided with Mineral powder bin valve(31);The mineral powder bin(13)With mineral powder bin discharge nozzle(47)Contact position be provided with the second weighing sensor (26);The controller(96)Pass through switch driver(34)With mineral powder bin valve(31)It is connected;The controller(96)With Two weighing sensors(26)It is connected.
- 5. double-layer stress absorption band integrated construction train according to claim 4, it is characterised in that:The agitated kettle (16)It is internally provided with the 4th temperature sensor(45), the 4th heater and valve(17);The controller(96)By opening Close driver(34)With valve(17)It is connected;The controller(96)It is connected by computer heating control chip with the 4th heater;Institute State controller(96)With the 4th temperature sensor(45)It is connected;The agitated kettle(16)Pass through valve(17)With hopper(18)Mutually pass through It is logical.
- 6. the double-layer stress absorption band integrated construction train according to Claims 2 or 3 or 4 or 5, it is characterised in that:Institute State hopper(18)It is internally provided with the 5th temperature sensor(48)And the 5th heater;The controller(96)Controlled by heating Coremaking piece is connected with the 5th heater;The controller(96)With the 5th temperature sensor(48)It is connected;It is described to shakeout plate(22) Bottom is provided with the 6th temperature sensor(50)And the 6th heater;The controller(96)Pass through computer heating control chip and Six heaters are connected;The controller(96)With the 6th temperature sensor(50)It is connected.
- 7. double-layer stress absorption band integrated construction train according to claim 6, it is characterised in that:The spiral paves Device(20)Width be 30cm, a diameter of 1cm;It is described to shakeout plate(22)Width be 30cm, thickness 5mm;The polyester glass Fine cloth making device includes Train Wheel(6)And Fibergrass polyester mat roller(23);The Train Wheel(6)By treating making polyester glass Fine cloth and Fibergrass polyester mat roller(23)It is connected;The Fibergrass polyester mat roller(23)Train Wheel is driven during rotation(6)Rotate;Institute State Train Wheel(6)And Fibergrass polyester mat roller(23)Between line and horizontal direction between be provided with angular adjustment lining device (24).
- 8. double-layer stress absorption band integrated construction train according to claim 7, it is characterised in that:The compaction apparatus (4)Including along railway carriage(9)Axial direction set gradually first compacting steel wheel(93)And second compacting steel wheel(94).
- 9. double-layer stress absorption band integrated construction train according to claim 8, it is characterised in that:The control cabinet (27)On be provided with result output screen(99), parameter input keyboard(100)And the controlling switch being connected with controller(98).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610559363.8A CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610559363.8A CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106012783A CN106012783A (en) | 2016-10-12 |
CN106012783B true CN106012783B (en) | 2018-02-02 |
Family
ID=57118305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610559363.8A Expired - Fee Related CN106012783B (en) | 2016-07-15 | 2016-07-15 | A kind of double-layer stress absorption band integrated construction train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106012783B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867275B (en) * | 2018-08-14 | 2020-08-25 | 深圳市路桥建设集团有限公司 | Cement laying and maintaining device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100558988C (en) * | 2007-07-27 | 2009-11-11 | 长沙中联重工科技发展股份有限公司 | Double-layer lying device for hot in-place regeneration remixer |
KR101031053B1 (en) * | 2008-04-23 | 2011-04-25 | (주)화인코왁 | The movable equipment for the re-construction of damage part in paved road |
CN102787548B (en) * | 2012-08-30 | 2015-04-08 | 重庆交通大学 | In-site heating regeneration maintenance vehicle for asphalt pavements |
CN104727208B (en) * | 2015-03-19 | 2016-08-24 | 山东省路桥集团有限公司 | Sheet pavement in-situ heat regeneration all-in-one and control method |
CN205975317U (en) * | 2016-07-15 | 2017-02-22 | 山西省交通科学研究院 | Double -deck stress absorption zone integrated construction train |
-
2016
- 2016-07-15 CN CN201610559363.8A patent/CN106012783B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106012783A (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201770923U (en) | Ultrathin covering machine for hot in-place recycling of bituminous pavements | |
CN106012783B (en) | A kind of double-layer stress absorption band integrated construction train | |
CN205975318U (en) | Stress absorption zone preparation and making device | |
CN109364814A (en) | Operating method and its device are mixed and stirred in asphalt mixing plant vibration | |
CN107254828A (en) | A kind of complete unit of microwave in-situ heat regeneration and its construction technology | |
CN205636450U (en) | Hot regenerating device of asphalt roads | |
CN104695308B (en) | Asphalt pavement on-site heat recoveryremixer twin-tub agitator kettle | |
CN104596884B (en) | Cold Recycled Mixture with Emulsified Asphalt emulsified asphalt content assaying method and its analyzer | |
CN106968155A (en) | A kind of asphalt-spreader | |
CN205975317U (en) | Double -deck stress absorption zone integrated construction train | |
CN206553898U (en) | A kind of Urban Road Asphalt Pavement Rapid-Repair machine | |
CN106012784B (en) | A kind of stress absorption band prepares and making device | |
CN102912712A (en) | Cold-stirring and cold-paving all-in-one machine | |
CN106565137A (en) | Drag-cup type microwave-induced modified emulsified asphalt thick slurry, and construction method and device thereof | |
CN110055869A (en) | A kind of bituminous pavement apparatus for leveling and its working method | |
CN209222047U (en) | Asphalt mixing plant vibrating mixing device | |
CN206768548U (en) | A kind of asphalt-spreader | |
CN107419706A (en) | The mesoclimate of high altitude localities asphaltic concrete core wall construction builds method | |
CN215790752U (en) | Mixing equipment for asphalt concrete in high-altitude area | |
JPS63110301A (en) | Road surface layer regenerating machine and additive scattering apparatus | |
CN207130588U (en) | A kind of complete unit of microwave in-situ heat regeneration | |
CN206666994U (en) | Bituminous pavement mixing spreads device | |
CN106149520A (en) | The temperature automatically controlled charging gear of paver | |
WO2007000102A1 (en) | A thermal radiation asphalt pavement soften rebuilding system | |
CN207714084U (en) | A kind of a mixing bowl of container-type bituminous mixing plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180202 Termination date: 20180715 |
|
CF01 | Termination of patent right due to non-payment of annual fee |