CN205975318U - Stress absorption zone preparation and making device - Google Patents

Stress absorption zone preparation and making device Download PDF

Info

Publication number
CN205975318U
CN205975318U CN201620748459.4U CN201620748459U CN205975318U CN 205975318 U CN205975318 U CN 205975318U CN 201620748459 U CN201620748459 U CN 201620748459U CN 205975318 U CN205975318 U CN 205975318U
Authority
CN
China
Prior art keywords
stress absorption
absorption band
valve
making device
temperature sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620748459.4U
Other languages
Chinese (zh)
Inventor
沈佳
王新生
尹志钢
徐晓洛
王慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201620748459.4U priority Critical patent/CN205975318U/en
Application granted granted Critical
Publication of CN205975318U publication Critical patent/CN205975318U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model provides a stress absorption zone preparation and making device, includes making device, fiberglass -polyester paving mat making device and the data acquisition and the controlling means of stress absorption zone mixture preparation facilities, stress absorption zone mixture, stress absorption zone mixture preparation facilities includes that pitch adds heat treatment device, the processing apparatus that gathers materials, powdered ore processing apparatus and link up the agitated kettle mutually with the three respectively, the making device of stress absorption zone mixture includes hopper, feeder, thickness adjusting screw, helical spreader and shakeouts the board, the hopper link up with the agitated kettle mutually, the feeder import is stretched into in the hopper, helical spreader arranges the feeder exit in, thickness adjusting screw with shakeout the board and link to each other, shakeout the board and arrange the helical spreader end in, fiberglass -polyester paving mat making device is arranged in and is shakeout the board end, data acquisition and controlling means include controller and the heating control chip and the switch driver that link to each other with the controller. The utility model has the advantages of simple structure, use easy and simple to handle, can improve the efficiency of construction.

Description

A kind of stress absorption band preparation and making device
Technical field
This utility model belongs to field of road, is related to a kind of road maintenance equipment, more particularly, to a kind of stress absorption Band preparation and making device.
Background technology
The reconstruction technology of " paracetamol " refers to keep old pavement globality, take grouting reinforcement under plate, local displacement or The measures such as repairing, then directly overlay the technology of skin coat on Old cement concrete.This mode can make full use of The structure residual intensity of Old cement concrete, thinning thickness.But the overlay reflection crack that this technology faces Problem is always one of difficult problem that highway circle is faced.The presence of reflection crack, has not only broken up the bulk strength of pavement structure, And because surface water permeates downwards along reflection crack, making that surface layer is gradually inharmonious to come off, subgrade strength reduces, and has a strong impact on road surface Service life.
In order to prevent or delaying the early reflection crack problem of old cement concrete road Laying Asphalt Surface Course, research worker is old mixed It is provided with stress absorbing layer, geotextile interlayer, grid interlayer between solidifying dirt road panel and asphalt overlay, but this full paving The processing method of formula significantly increases construction costs.Talk in conjunction with Tongji University and award the soft interlayer in proposition setting local to penetrating judgment and can have Effect reduces the achievement in research of overlay temperature stress, develops stress absorption band, for the office of old concrete plate seam and crack Portion disposes.At present, stress absorption band construction machinery is artificial manual type, the manually instrument by hairbrush by stress absorption carrying material It is brushed at pavement crack.This method efficiency is low, and stress absorption carrying material is scattered more, and waste of material is serious.Additionally, brushing Instrument does not have firing equipment, and stress absorption band viscosity of material is big, and in construction, gradually adhesive aggregation, on painting device, operates extremely not Just.Existing stress absorption band paving equipment is also suitable only for the mechanized construction of monolayer stress absorption band it is impossible to solve to answer The problem of power absorption band integrated construction, has had a strong impact on the integration of levels stress-absorbed material, and existing equipment has been difficult to The thickness of proof stress absorption band and flatness.
Utility model content
Technical problem to be solved in the utility model is, for above-mentioned deficiency of the prior art, to provide a kind of stress Absorption band preparation and making device, its structure simple, reasonable in design and using easy and simple to handle, can improve efficiency of construction, using imitate Really good, energy is easy, be rapidly completed preparation and the making of stress absorption band, and prepares easily controllable with paving process.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that:
A kind of preparation of stress absorption band and making device it is characterised in that:Described stress absorption band preparation and making device Including stress absorption band compound preparation facilitiess, the making device of stress absorption band compound, Fibergrass polyester mat making device with And respectively the data acquisition that is connected with the making device of stress absorption band compound preparation facilitiess and stress absorption band compound and Control device;Described stress absorption band compound preparation facilitiess include Colophonium heat treatment apparatus, collection material processing device, at breeze Reason device and agitated kettle;Described Colophonium heat treatment apparatus, collection material processing device and device for processing mineral powder respectively with stirring Pot connects;The making device of described stress absorption band compound includes hopper, feed appliance, thickness adjusted screw rod, spiral pave Device and shakeout plate;Described hopper and agitated kettle connect;Described feed appliance includes feed appliance import and feed appliance outlet;Institute State feed appliance import to stretch in hopper;Described helical spreader is placed in feed appliance exit;Described thickness adjusted screw rod with shakeout Plate is connected;The described plate that shakeouts is placed in helical spreader end;Described Fibergrass polyester mat making device is placed in and shakeouts plate end;Described Data collection and control device includes controller and the computer heating control chip being connected respectively and switch driver with controller.
Preferably, the Colophonium heat treatment apparatus that this utility model is adopted include Asphaltum heating pot, agitator, first LOAD CELLS, flowline;First temperature sensor, primary heater and Asphaltum heating pot valve;Described Asphaltum heating pot It is internally provided with agitator, the first temperature sensor and primary heater;Described first temperature sensor is connected with controller; Described controller is connected with primary heater by computer heating control chip;Described Asphaltum heating pot passes through flowline and agitated kettle phase Insertion;Described Asphaltum heating pot is provided with the first LOAD CELLS with the contact position of flowline;It is provided with drip on described flowline Blue or green heating tank valve;Described controller is connected with Asphaltum heating pot valve by switch driver;Described controller and the first title Retransmit sensor to be connected.
Preferably, the collection material processing device that this utility model is adopted includes cold burden storehouse, the first discharge nozzle, cold burden storehouse valve Door, drying drum, the second discharge nozzle, drying drum valve, second temperature sensor, secondary heater, hot aggregate bin, the 3rd temperature Sensor, the 3rd heater, hot aggregate bin valve, the 3rd discharge nozzle and the 3rd LOAD CELLS;Described cold burden storehouse passes sequentially through First discharge nozzle, drying drum, the second discharge nozzle, hot aggregate bin and the 3rd discharge nozzle and agitated kettle connect;Described first goes out Cold burden storehouse valve is provided with expects pipe;It is provided with drying drum valve on described second discharge nozzle;Set on described 3rd discharge nozzle It is equipped with hot aggregate bin valve;Described drying drum is internally provided with second temperature sensor and secondary heater;Described hot aggregate bin It is internally provided with three-temperature sensor, the 3rd LOAD CELLS and the 3rd heater;Described controller is warm with second respectively Degree sensor and three-temperature sensor are connected;Described controller pass through computer heating control chip respectively with secondary heater and 3rd heater is connected;Described controller pass through switch driver respectively with cold burden storehouse valve, drying drum valve and hot material Storehouse valve is connected.
Preferably, the device for processing mineral powder that this utility model is adopted includes mineral powder bin, mineral powder bin discharge nozzle, mineral powder bin Valve and the second LOAD CELLS;Described mineral powder bin is connected by mineral powder bin discharge nozzle and agitated kettle;Described mineral powder bin goes out Mineral powder bin valve is provided with expects pipe;Described mineral powder bin is provided with the second LOAD CELLS with the contact position of mineral powder bin discharge nozzle; Described controller is connected with mineral powder bin valve by switch driver;Described controller is connected with the second LOAD CELLS.
Preferably, the agitated kettle that this utility model is adopted is internally provided with the 4th temperature sensor, the 4th heater And valve;Described controller is connected with valve by switch driver;Described controller passes through computer heating control chip and the 4th Heater is connected;Described controller is connected with the 4th temperature sensor;Described agitated kettle is connected with hopper by valve.
Preferably, the hopper that this utility model is adopted is internally provided with the 5th temperature sensor and the 5th heating Device;Described controller is connected with the 5th heater by computer heating control chip;Described controller is connected with the 5th temperature sensor.
Preferably, the stand flat plate bottom that this utility model is adopted is provided with the 6th temperature sensor and the 6th heating Device;Described controller is connected with the 6th heater by computer heating control chip;Described controller is connected with the 6th temperature sensor.
Preferably, the width of helical spreader that this utility model is adopted is 30cm, a diameter of 1cm;Described shakeout The width of plate is 30cm, and thickness is 5mm.
Preferably, the Fibergrass polyester mat making device that this utility model is adopted includes rolling wheel and Fibergrass polyester mat Roller;Described rolling wheel is connected with Fibergrass polyester mat roller by treating making Fibergrass polyester mat;Described Fibergrass polyester mat roller turns Rolling wheel is driven to rotate when dynamic.
Preferably, the Fibergrass polyester mat making device that this utility model is adopted also includes support;Described rolling wheel with And Fibergrass polyester mat roller is respectively placed on support;Line between described rolling wheel and Fibergrass polyester mat roller and level side To between be provided with angular adjustment lining device.
This utility model compared with prior art has advantages below:
This utility model provides a kind of stress absorption band preparation and making device, including the preparation of stress absorption band compound Device, the making device of stress absorption band compound, Fibergrass polyester mat making device and respectively with stress absorption band compound The data collection and control device that preparation facilitiess are connected with the making device of stress absorption band compound;Stress absorption band compound Preparation facilitiess include Colophonium heat treatment apparatus, collection material processing device, device for processing mineral powder and agitated kettle;Colophonium heat treated Device, collection material processing device and device for processing mineral powder are connected with agitated kettle respectively;The making dress of stress absorption band compound Put including hopper, feed appliance, thickness adjusted screw rod, helical spreader and shakeout plate;Hopper is connected with agitated kettle;Feed appliance Including feed appliance import and feed appliance outlet;Feed appliance import is stretched in hopper;Helical spreader is placed in feed appliance exit; Thickness adjusted screw rod is connected with shakeouing plate;Shakeout plate and be placed in helical spreader end;Fibergrass polyester mat making device is placed in and shakeouts Plate end;Data collection and control device includes controller and the computer heating control chip being connected respectively and switch with controller Driver.Stress absorption band preparation provided by the utility model and making device are mixed to the material needed for stress absorption band With, pave and be compacted, intensive be automatically performed in a machine, structure is simple, reasonable in design and installs and using operation letter Just, input cost is relatively low, install compact, and private space is less.Meanwhile, this utility model parameter adjustment is easy, can be to heating temperature The parameters such as degree, heat time heating time, stirring persistent period, stir speed (S.S.) are adjusted, and are provided with control chamber, control simple, energy Precise control material temperature, mixing time, stir speed (S.S.), are provided with Asphaltum heating pot, hot aggregate bin and mineral powder bin simultaneously and weigh Sensor, accurately the First Astronautic Research Institute for Measurement and Test can add modified pitch, fine aggregate, the weight of breeze;In addition Asphaltum heating pot, drying drum, Hot aggregate bin, agitated kettle, hopper and heating-up temperature effectively can be monitored for the temperature sensor shakeout on plate so that stress absorption Band compound mixes and stirs, paves, to roll temperature easily controllable.3rd, this utility model efficiency of construction is high, can complete 5 per hour public In stress absorption band making work.4th, using effect of the present utility model is good and practical value is high, good looking appearance, greatly The work progress of stress absorption band is facilitated on degree, and work progress is easily controllable, there is efficiency of construction height, automatization behaviour The advantages of make, measure accurate, can be effectively ensured the performance of prepared stress absorption band.In sum, this utility model is comprehensively examined Considered stress absorption band material behavior, structure simple, reasonable in design and using easy and simple to handle, using effect is good, energy is easy, quickly Complete the work progress of stress absorption band, and work progress be easily controllable, be capable of the integrated construction of stress absorption band, Improve efficiency of construction it is ensured that the whole degree of stress absorption tape thickness peace meets design requirement..
Brief description
Fig. 1 is the structural representation of stress absorption band preparation provided by the utility model and making device;
Fig. 2 is the circuit theory schematic diagram of the control device that this utility model is adopted;
Description of reference numerals:
7- rolling wheel;10- Asphaltum heating pot;11- agitator;12- cold burden storehouse;13- mineral powder bin;14- drying drum;15- Hot aggregate bin;16- agitated kettle;17- valve;18- hopper;19- feed appliance;20- helical spreader;21- thickness adjusted screw rod;22- Shakeout plate;23- Fibergrass polyester mat roller;24- angular adjustment serves as a contrast device;25- first LOAD CELLS;26- second LOAD CELLS; 29- Asphaltum heating pot valve;30- hot aggregate bin valve;31- mineral powder bin valve;32- first temperature sensor;33- first heating control Coremaking piece;34- switch driver;35- flowline;36- first discharge nozzle;37- cold burden storehouse valve;38- second discharge nozzle;39- Drying drum valve;40- second temperature sensor;41- the second computer heating control chip;42- three-temperature sensor;43- the 3rd Computer heating control chip;44- the 3rd discharge nozzle;45- the 4th temperature sensor;46- the 4th computer heating control chip;47- mineral powder bin goes out Expects pipe;48- the 5th temperature sensor;49- the 5th computer heating control chip;50- the 6th temperature sensor;51- the 6th computer heating control Chip;95- the 3rd LOAD CELLS;96- controller.
Specific embodiment
With reference to embodiment, this utility model is described in further detail:
Embodiment
As shown in Figure 1 and Figure 2, this utility model provides a kind of stress absorption band preparation and making device, this device Including stress absorption band compound preparation facilitiess, the making device of stress absorption band compound, Fibergrass polyester mat making device with And respectively the data acquisition that is connected with the making device of stress absorption band compound preparation facilitiess and stress absorption band compound and Control device;Stress absorption band compound preparation facilitiess include Colophonium heat treatment apparatus, collection material processing device, breeze process dress Put and agitated kettle 16;Colophonium heat treatment apparatus, collection material processing device and device for processing mineral powder respectively with agitated kettle 16 phase Insertion;The making device of stress absorption band compound includes hopper 18, feed appliance 19, thickness adjusted screw rod 21, helical spreader 20 and shakeout plate 22;Hopper 18 is connected with agitated kettle 16;Feed appliance 19 includes feed appliance import and feed appliance outlet;Send Glassware import is stretched in hopper 18;Helical spreader 20 is placed in feed appliance exit;Thickness adjusted screw rod 21 with shakeout plate 22 phase Even;Fibergrass polyester mat making device is placed in and shakeouts plate 22 end;Shakeout plate 22 and be placed in helical spreader 20 end;Data acquisition and Control device includes controller 96 and the computer heating control chip being connected respectively and switch driver 34 with controller 96.
Asphaltum heating pot 10 that stress absorption band preparation and making device include from top to bottom installing, cold burden storehouse 12, breeze Storehouse 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18, helical spreader 20, thickness adjusted screw rod 21, shakeout plate 22nd, Fibergrass polyester mat roller 23, angular adjustment lining cutting 24.
It is provided with Asphaltum heating pot 10 and insert agitator 11 in Asphaltum heating pot 10 from left to right;Agitator 11 is by driving Motor is driven, and motor is arranged in the tank body of Asphaltum heating pot 10, and motor is connected with controller 96.
It is provided with the first temperature sensor 32, primary heater, the first computer heating control chip 33, valve in Asphaltum heating pot 10 Door the 29, first LOAD CELLS 25, flowline 35;First temperature sensor 32, the first LOAD CELLS 25, the first computer heating control Chip 33 is connected with controller 96, and the first computer heating control chip 33 is connected with primary heater and drives primary heater to work; Valve 29 is connected with switch driver 34.
The bottom in cold burden storehouse 12 is provided with the first discharge nozzle 36, cold burden storehouse valve 37;Cold burden storehouse valve 37 and switch drive Device 34 connects.
It is provided with second temperature sensor 40, secondary heater, the second computer heating control chip 41, second in drying drum 14 Discharge nozzle 38, drying drum valve 39;Second temperature sensor 40, the second computer heating control chip 41 are connected with controller 96;The Two computer heating control chips 41 are connected with secondary heater and drive secondary heater to work;
Valve 39 is connected with switch driver 34.
It is provided with three-temperature sensor 42, the 3rd heater, the 3rd computer heating control chip the 43, the 3rd go out in hot aggregate bin 15 Expects pipe 44, hot aggregate bin valve 30, the 3rd LOAD CELLS 95;Hot aggregate bin valve 30 is connected with switch driver 34;3rd temperature Sensor 42, the 3rd computer heating control chip 43, LOAD CELLS 95 are connected with controller 96.3rd computer heating control chip 43 and Three heaters are connected and drive the 3rd heater work;
It is provided with the 4th temperature sensor 45, the 4th heater, the 4th computer heating control chip 46, valve in agitated kettle 16 17;Valve 17 is connected with switch driver 34, the 4th temperature sensor 45, the 4th computer heating control chip 46 and controller 96 phase Connect.4th computer heating control chip 46 is connected with the 4th heater and drives the 4th heater work;
It is provided with the second LOAD CELLS 26, mineral powder bin valve 31, mineral powder bin discharge nozzle 47 in mineral powder bin 13;Mineral powder bin valve Door 31 is connected with switch driver 34, and the second LOAD CELLS 26 is connected with controller 96.
Asphaltum heating pot 10 is connected with agitated kettle 16 by flowline 35, and cold burden storehouse 12 is passed through the first discharge nozzle 36 and is dried Cylinder 14 connects, and drying drum 14 is connected with hot aggregate bin 15 by the second discharge nozzle 38, and hot aggregate bin 15 passes through the 3rd discharge nozzle 44 Connect with agitated kettle 16, mineral powder bin 13 is connected with agitated kettle 16 by mineral powder bin discharge nozzle 47.
It is provided with feed appliance 19, the 5th temperature sensor 48, the 5th heater, the 5th computer heating control chip in hopper 18 49;5th temperature sensor 48, the 5th computer heating control chip 49 are connected with controller 96.5th computer heating control chip 49 and the 5th Heater is connected and drives the 5th heater work;
Helical spreader 20 is arranged on hopper 18 back lower place, thickness adjusted screw rod 21 and shakeout plate 22 and be arranged on spiral and pave The rear of device 20.Helical spreader 20 width be 30cm, a diameter of 1cm.
Shakeout plate 22 and be provided with the 6th temperature sensor 50, the 6th heater, the 6th computer heating control chip 51;6th temperature Sensor 50, the 6th computer heating control chip 51 are connected with controller 96.The width shakeouing plate 22 is 30cm, and thickness is 5mm.6th Computer heating control chip 51 is connected with the 6th heater and drives the 6th heater work;
The first computer heating control chip 33 that this utility model is adopted, the second computer heating control chip 41, the 3rd computer heating control Chip 43, the 4th computer heating control chip 46, the 5th computer heating control chip 49 and the 6th computer heating control chip 51 can pass through one Computer heating control chip is realized, and also can be realized by multiple computer heating control chips.
Asphaltum heating pot 10, cold burden storehouse 12, mineral powder bin 13, drying drum 14, hot aggregate bin 15, agitated kettle 16, hopper 18 is altogether With the preparation completing stress absorption band compound.
Hopper 18, feed appliance 19, helical spreader 20, thickness adjusted screw rod 21 and shakeout plate 22 and jointly complete stress absorption Making with compound.
Fibergrass polyester mat making device includes Fibergrass polyester mat roller 23 and angular adjustment lining device 24, wherein, polyester glass Fine cloth roller 23 is used for placing the Fibergrass polyester mat being rolled into volume;Angular adjustment lining device 24 is used for adjusting Fibergrass polyester mat paving process In making angle with road surface;Fibergrass polyester mat roller 23, angular adjustment lining device 24 and rolling wheel 7 complete Fibergrass polyester mat jointly Making, and by Fibergrass polyester mat be pressed into stress absorption band compound in.

Claims (10)

1. a kind of preparation of stress absorption band and making device it is characterised in that:Described stress absorption band preparation and making device bag Include stress absorption band compound preparation facilitiess, the making device of stress absorption band compound, Fibergrass polyester mat making device and The data acquisition being connected with the making device of stress absorption band compound preparation facilitiess and stress absorption band compound respectively and control Device processed;Described stress absorption band compound preparation facilitiess include Colophonium heat treatment apparatus, collection material processing device, breeze process Device and agitated kettle(16);Described Colophonium heat treatment apparatus, collection material processing device and device for processing mineral powder respectively with stir Mix pot(16)Connect;The making device of described stress absorption band compound includes hopper(18), feed appliance(19), thickness adjusted Screw rod(21), helical spreader(20)And shakeout plate(22);Described hopper(18)With agitated kettle(16)Connect;Described feeding Device(19)Including feed appliance import and feed appliance outlet;Hopper is stretched in described feed appliance import(18)In;Described spiral paves Device(20)It is placed in feed appliance exit;Described thickness adjusted screw rod(21)With shakeout plate(22)It is connected;Described shakeout plate(22)Put In helical spreader(20)End;Described Fibergrass polyester mat making device is placed in and shakeouts plate(22)End;Described data acquisition and Control device includes controller(96)And respectively with controller(96)Connected computer heating control chip and switch driver (34).
2. stress absorption band according to claim 1 preparation and making device it is characterised in that:Described Colophonium heat treated Device includes Asphaltum heating pot(10), agitator(11), the first LOAD CELLS(25), flowline(35);First temperature sensing Device(32), primary heater and Asphaltum heating pot valve(29);Described Asphaltum heating pot(10)It is internally provided with agitator (11), the first temperature sensor(32)And primary heater;Described first temperature sensor(32)With controller(96)It is connected; Described controller(96)It is connected with primary heater by computer heating control chip;Described Asphaltum heating pot(10)By flowline (35)With agitated kettle(16)Connect;Described Asphaltum heating pot(10)With flowline(35)Contact position be provided with first and weigh biography Sensor(25);Described flowline(35)On be provided with Asphaltum heating pot valve(29);Described controller(96)By switch drive Device(34)With Asphaltum heating pot valve(29)It is connected;Described controller(96)With the first LOAD CELLS(25)It is connected.
3. stress absorption band according to claim 2 preparation and making device it is characterised in that:Described collection material processing device Including cold burden storehouse(12), the first discharge nozzle(36), cold burden storehouse valve(37), drying drum(14), the second discharge nozzle(38), be dried Cylinder valve(39), second temperature sensor(40), secondary heater, hot aggregate bin(15), three-temperature sensor(42), the 3rd Heater, hot aggregate bin valve(30), the 3rd discharge nozzle(44)And the 3rd LOAD CELLS(95);Described cold burden storehouse(12)Successively By the first discharge nozzle(36), drying drum(14), the second discharge nozzle(38), hot aggregate bin(15)And the 3rd discharge nozzle(44)With Agitated kettle(16)Connect;Described first discharge nozzle(36)On be provided with cold burden storehouse valve(37);Described second discharge nozzle(38) On be provided with drying drum valve(39);Described 3rd discharge nozzle(44)On be provided with hot aggregate bin valve(30);Described dry rolling Cylinder(14)It is internally provided with second temperature sensor(40)And secondary heater;Described hot aggregate bin(15)It is internally provided with the 3rd Temperature sensor(42), the 3rd LOAD CELLS(95)And the 3rd heater;Described controller(96)Respectively with second temperature Sensor(40)And three-temperature sensor(42)It is connected;Described controller(96)By computer heating control chip respectively with second Heater and the 3rd heater are connected;Described controller(96)By switch driver(34)Respectively with cold burden storehouse valve (37), drying drum valve(39)And hot aggregate bin valve(30)It is connected.
4. stress absorption band according to claim 3 preparation and making device it is characterised in that:Described device for processing mineral powder Including mineral powder bin(13), mineral powder bin discharge nozzle(47), mineral powder bin valve(31)And second LOAD CELLS(26);Described breeze Storehouse(13)By mineral powder bin discharge nozzle(47)With agitated kettle(16)Connect;Described mineral powder bin discharge nozzle(47)On be provided with breeze Storehouse valve(31);Described mineral powder bin(13)With mineral powder bin discharge nozzle(47)Contact position be provided with the second LOAD CELLS(26); Described controller(96)By switch driver(34)With mineral powder bin valve(31)It is connected;Described controller(96)Weigh with second Sensor(26)It is connected.
5. stress absorption band according to claim 4 preparation and making device it is characterised in that:Described agitated kettle(16)Interior Portion is provided with the 4th temperature sensor(45), the 4th heater and valve(17);Described controller(96)By switch drive Device(34)With valve(17)It is connected;Described controller(96)It is connected with the 4th heater by computer heating control chip;Described control Device(96)With the 4th temperature sensor(45)It is connected;Described agitated kettle(16)By valve(17)With hopper(18)Connect.
6. according to claim 1 or 2 or 3 or 4 or 5 stress absorption band preparation and making device it is characterised in that:Described Hopper(18)It is internally provided with the 5th temperature sensor(48)And the 5th heater;Described controller(96)By computer heating control Chip is connected with the 5th heater;Described controller(96)With the 5th temperature sensor(48)It is connected.
7. stress absorption band according to claim 6 preparation and making device it is characterised in that:Described shakeout plate(22)Bottom Portion is provided with the 6th temperature sensor(50)And the 6th heater;Described controller(96)By computer heating control chip and the 6th Heater is connected;Described controller(96)With the 6th temperature sensor(50)It is connected.
8. stress absorption band according to claim 7 preparation and making device it is characterised in that:Described helical spreader (20)Width be 30cm, a diameter of 1cm;Described shakeout plate(22)Width be 30cm, thickness be 5mm.
9. stress absorption band according to claim 8 preparation and making device it is characterised in that:Described Fibergrass polyester mat paving Build device and include rolling wheel(7)And Fibergrass polyester mat roller(23);Described rolling wheel(7)By treat making Fibergrass polyester mat with Fibergrass polyester mat roller(23)It is connected;Described Fibergrass polyester mat roller(23)Rolling wheel is driven during rotation(7)Rotate.
10. stress absorption band according to claim 9 preparation and making device it is characterised in that:Described Fibergrass polyester mat Making device also includes support;Described rolling wheel(7)And Fibergrass polyester mat roller(23)It is respectively placed on support;Described rolling Wheel(7)And Fibergrass polyester mat roller(23)Between line and horizontal direction between be provided with angular adjustment lining device(24).
CN201620748459.4U 2016-07-15 2016-07-15 Stress absorption zone preparation and making device Withdrawn - After Issue CN205975318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620748459.4U CN205975318U (en) 2016-07-15 2016-07-15 Stress absorption zone preparation and making device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620748459.4U CN205975318U (en) 2016-07-15 2016-07-15 Stress absorption zone preparation and making device

Publications (1)

Publication Number Publication Date
CN205975318U true CN205975318U (en) 2017-02-22

Family

ID=58024805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620748459.4U Withdrawn - After Issue CN205975318U (en) 2016-07-15 2016-07-15 Stress absorption zone preparation and making device

Country Status (1)

Country Link
CN (1) CN205975318U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012784A (en) * 2016-07-15 2016-10-12 山西省交通科学研究院 Stress absorption band preparing and paving device
CN113355994A (en) * 2021-06-17 2021-09-07 安徽金瑞电子玻纤有限公司 Polyester glass fiber cloth and oil cloth integrated construction device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012784A (en) * 2016-07-15 2016-10-12 山西省交通科学研究院 Stress absorption band preparing and paving device
CN106012784B (en) * 2016-07-15 2018-02-02 山西省交通科学研究院 A kind of stress absorption band prepares and making device
CN113355994A (en) * 2021-06-17 2021-09-07 安徽金瑞电子玻纤有限公司 Polyester glass fiber cloth and oil cloth integrated construction device

Similar Documents

Publication Publication Date Title
CN102011362B (en) Hot in-place recycling ultrathin overlaying machine of bituminous pavement and construction method thereof
CN205975318U (en) Stress absorption zone preparation and making device
CN110318322A (en) A kind of town road asphalt paving device
CN109853349A (en) Asphalt pavement pit repairing machine and method for repairing and mending
CN104211326B (en) A kind of warm-mixed recycled asphalt mixture and preparation method thereof
CN109763395A (en) Double steel wheels and pneumatic-tired rollers are formed a team to Asphalt Concrete Pavement Compaction construction
CN108221560A (en) The construction technology on rubber powder modified asphalt road surface
CN109811610A (en) Road reconstruction method and apparatus for construction of the highway
CN205975317U (en) Double -deck stress absorption zone integrated construction train
CN206553898U (en) A kind of Urban Road Asphalt Pavement Rapid-Repair machine
CN106968155A (en) A kind of asphalt-spreader
CN206267001U (en) Highway maintenance equipment
CN106012783B (en) A kind of double-layer stress absorption band integrated construction train
CN203247251U (en) Device for cooling fermented grains and mixing distiller's yeast
CN106012784B (en) A kind of stress absorption band prepares and making device
CN110055869A (en) A kind of bituminous pavement apparatus for leveling and its working method
CN104695308A (en) Double-cylinder mixing pot of hot in-place recycling remixer for asphalt pavement
CN205205625U (en) Equipment is glued with automatic glue mixing , shop to multi -functional road surface superthin layer
CN107419706A (en) The mesoclimate of high altitude localities asphaltic concrete core wall construction builds method
CN209222047U (en) Asphalt mixing plant vibrating mixing device
CN104631266A (en) Normal-temperature asphalt pavement cold-mixed and cold-paved construction technology
CN215790752U (en) Mixing equipment for asphalt concrete in high-altitude area
CN206768548U (en) A kind of asphalt-spreader
CN206971058U (en) A kind of new bituminous concrete paver
CN212103555U (en) Asphalt paving device for highway maintenance construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170222

Effective date of abandoning: 20180202