CN106012731A - Staged implementation method for bituminous pavement - Google Patents

Staged implementation method for bituminous pavement Download PDF

Info

Publication number
CN106012731A
CN106012731A CN201610373917.5A CN201610373917A CN106012731A CN 106012731 A CN106012731 A CN 106012731A CN 201610373917 A CN201610373917 A CN 201610373917A CN 106012731 A CN106012731 A CN 106012731A
Authority
CN
China
Prior art keywords
roadbed
pavement structure
layer
sandy soil
geotextiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610373917.5A
Other languages
Chinese (zh)
Inventor
曹建新
宁平华
彭功勋
熊勇
杨宏助
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City Engineering Design Studies Total Institute
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou City Engineering Design Studies Total Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Engineering Design Studies Total Institute filed Critical Guangzhou City Engineering Design Studies Total Institute
Priority to CN201610373917.5A priority Critical patent/CN106012731A/en
Publication of CN106012731A publication Critical patent/CN106012731A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them

Abstract

The invention discloses a staged implementation method for a bituminous pavement and used in the technical field of urban road roadbeds and pavements. The staged implementation method comprises the following steps that miscellaneous fill of a road is cleared away, and a cleared surface is rolled; a design roadbed is backfilled with roadbed materials to the top of the design roadbed; and a transitional pavement structure is implemented at the top of the roadbed and serves as a temporary pavement in the sedimentation transitional period, and then a perpetual pavement structure is paved after sedimentation is stable. The staged implementation method complies with a sedimentation rule of soft foundations, only local processing is conducted on the soft foundations, staged implementation is conducted on the pavement structure, and in the time period when large sedimentation occurs, the transitional pavement structure which has harmony with a transitional roadbed is adopted; and the perpetual pavement structure is paved on the transitional pavement structure after sedimentation is stable. In this way, coordinated interaction of the roadbed and the pavement structure is ensured. In the whole process, only a bituminous layer of a leveling layer part is added, so that substantial increasing of manufacturing cost is not caused, and the ideas of environment protection and saving are embodied.

Description

A kind of method of bituminous paving time phasing
Technical field
The present invention is used for urban roadbed pavement technique field, a kind of method particularly relating to bituminous paving time phasing.
Background technology
Roadbed and road surface, be independent individuality, interact again, and Subgrade on Pavement impact is bearing capacity and settlement after construction, and road surface is the interception for water to the impact of roadbed, and the two together form road and plays the basis of self function.Bituminous paving is the main pavement structure form of urban road, generally, the permanent disposal all put things right once and for all due to roadbed, its bearing capacity is made to reach highway loading requirement, settlement after construction is effectively controlled, ensure that the use function of urban road, therefore, current Urban Road Asphalt Pavement structure substantially uses the method once implemented.The most either roadbed or road surface, acceptance index requires that it must carry out appropriate process when being completed, thus also requires that from checking and accepting and disposably implemented.
Some Special Roadbeds are difficult to disposably and permanently property and process, such as: thickness (several meter even more than ten rice) miscellaneous fill is distributed in the range of roadbed, is just difficult to its appropriate disposal.Miscellaneous fill is a kind of special soils, complicated component, its composition includes common sand, residual soil, building waste (concrete block, fragment of brick, cinder etc.), house refuse (cloth, skin material, bottle, plastics etc.), Organic substance etc., soil property is loose and the most uneven, under highway loading effect, even if the soil property under banketing is fine, bearing capacity is enough, still can produce bigger settlement after construction and differential settlement, generally should not be as subgrade soils.If processing in the usual way, then need to carry out changing to fill out or basement process.For deep miscellaneous fill, especially to the deep miscellaneous fill in the middle of city, all change the cost filled out the highest, it is also possible to cause destruction or the unstability of surrounding building, may not implement;And if take composite foundation or discharging consolidation mode to process, for the miscellaneous fill of complicated component be also difficult to carry out composite foundation cannot pile, discharging consolidation then cannot set up drainage channel smoothly.Therefore, duration, cost, environmental protection, technology etc., everyway limits the realization that deep miscellaneous fill disposably and permanently processes.
In the case, disposable pavement structure of implementing also faces problems: excessive sedimentation may result in pavement deflection, road hydrops etc.;Differential settlement more will make road surface subside, rupture.Therefore, thinking of breaking the normal procedure and the restriction of existing specification, it is necessary for taking technological means the most flexibly and effectively.
Summary of the invention
For solving the problems referred to above, the present invention provides a kind of method of bituminous paving time phasing, its reinforcement pavement structure, can ensure that again the stability after reinforcement (settling basicly stable), save duration and cost on the whole, and decrease remaining native process, embody the theory of environmental protection.
The technical solution adopted for the present invention to solve the technical problems is: a kind of method of bituminous paving time phasing, comprises the following steps:
S10. remove the miscellaneous fill of road, the surface after removing is rolled;
The most backfilled roadbed supported material is to design roadbed top;
S30. transitional pavement structure is implemented at roadbed top, and crossing property pavement structure as temporary pavement, after settlement stability, overlays Permanence Pavement structure in the sedimentation transition period on crossing property pavement structure again.
It is further used as the improvement of technical solution of the present invention, including step S11. Roll geotextiles of rear making.
It is further used as the improvement of technical solution of the present invention, in step S20, at roadbed material of an above back-filling in layers of geotextiles and is compacted successively;Laying secondary geotextiles at a roadbed material top of backfill, secondary geotextiles upper berth secondary roadbed material is to design roadbed top.
It is further used as the improvement of technical solution of the present invention, the most alternately backfills sandy soil layer, aggregate chips layer formation sandy soil aggregate chips layer during a roadbed material backfill, then backfill aggregate chips layer at sandy soil aggregate chips layer top.
Being further used as the improvement of technical solution of the present invention, at secondary geotextiles upper berth sandy soil and be compacted during the backfill of secondary roadbed material, secondary geotextiles is from roadbed two on the side to sandy soil bound edge, and then making residue sandy soil is to design roadbed top.
It is further used as the improvement of technical solution of the present invention, in step S10, miscellaneous fill removes the degree of depth is 2m, step S20 alternately backfills during roadbed material backfill 30cm sandy soil layer, the sandy soil aggregate chips layer of 10cm aggregate chips layer formation 1.5m successively, sandy soil aggregate chips layer top is by the aggregate chips layer of the thickness backfill 50cm of every layer of 10cm, being compacted at secondary geotextiles upper berth 50cm sandy soil a point two-layer during backfill of secondary roadbed material, secondary geotextiles is to the 50cm a length of 1m of sandy soil bound edge.
The urban road sedimentation transition period being further used as the improvement of technical solution of the present invention, secondary distributor road and ratings above is 2 years, and the urban road sedimentation transition period of not enough secondary distributor road grade is 1 year.
Being further used as the improvement of technical solution of the present invention, transitional pavement structure includes cutting optimal and middle surface layer, and Permanence Pavement structure includes leveling layer and upper layer.
Being further used as the improvement of technical solution of the present invention, in step S30 after settlement stability, before overlaying Permanence Pavement structure on crossing property pavement structure again, the surface to transitional pavement structure carries out purified treatment.
Beneficial effects of the present invention: the present invention is by with upper type, comply with the settlement law of soft foundation, soft foundation is only carried out Local treatment, road pavement structure time phasing, within the time period that there will be bigger sedimentation, employing and " transitional " roadbed have the transitional pavement structure of harmony;After settlement stability, cambic pavement structure overlays permanent pavement structure again.Thus, it is ensured that the coordination linkage of roadbed and pavement structure, whole process only increases the part bitumen layer of leveling layer, do not causes being substantially improved of cost, embody the theory of environmental protection, saving.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is subgrade treatment structure schematic diagram of the present invention;
Fig. 2 is the present invention crossing property pavement structure and Permanence Pavement structural relation figure.
Detailed description of the invention
With reference to Fig. 1, Fig. 2, that show the concrete structure of the preferred embodiments of the invention.Will be detailed below the construction features of each element of the present invention, and if when being described direction (upper and lower, left and right, before and after), be with the structure shown in Fig. 1 for reference to describing, but the actually used direction of the present invention be not limited thereto.
A kind of method that the invention provides bituminous paving time phasing, comprises the following steps:
S10. remove the miscellaneous fill in road 2.0m depth bounds, the surface after removing is rolled;
S11. rolling geotextiles 1 of rear making, the effect of a geotextiles 1 is diffusion-induced stress, compatible deformation, the differential settlement of suppression lower floor miscellaneous fill, and is to a certain degree reducing settlement after construction;
S20. at roadbed material of a geotextiles more than 1 back-filling in layers and it is compacted successively, 30cm sandy soil layer 2 is alternately backfilled successively during roadbed material backfill, 10cm aggregate chips layer 3 forms the sandy soil aggregate chips layer 4 of 1.5m, sandy soil aggregate chips layer 4 top is by the aggregate chips layer 5 of the thickness backfill 50cm of every layer of 10cm, secondary geotextiles 6 is laid at a roadbed material top of backfill, secondary geotextiles 6 upper berth secondary roadbed material is to design roadbed top, it is compacted at secondary geotextiles 6 upper berth 50cm sandy soil 7 a point two-layer during backfill of secondary roadbed material, secondary geotextiles 6 from roadbed two on the side to sandy soil bound edge, secondary geotextiles 6 is to the 50cm a length of 1m of sandy soil bound edge, then making residue sandy soil 8 is to design roadbed top;
S30. transitional pavement structure 9 is implemented at roadbed top, transitional pavement structure 9 includes cutting optimal and middle surface layer, crossing property pavement structure 9 is settling the transition period as temporary pavement, after settlement stability, the surface of transitional pavement structure 9 is carried out purified treatment, overlaying Permanence Pavement structure 10 on crossing property pavement structure 9 again, Permanence Pavement structure 10 includes leveling layer and upper layer, lays according to actual measurement vertical, horizontal settling height after the transition period.When the settling height recorded is less than the maximum compacted depth of upper layer, leveling layer can use and upper layer same material, simultaneously making;When the settling height recorded is more than the maximum compacted depth of upper layer, leveling layer should be independently arranged.Wherein, the urban road sedimentation transition period of secondary distributor road and ratings above is 2 years, and the urban road sedimentation transition period of not enough secondary distributor road grade is 1 year.
The technical program is beneficial in that, respect objective condition, from the thinking to block up, to transform simply, the thinking be adjusted to combining the two ways of dredging and plugging, letting nature take its course: the defect that deep miscellaneous fill soft foundation settlement after construction is bigger than normal is considered " process " the most simply, but change from the offensive to the defensive, take the strategy dredged, change by suitable roadbed material part and fill out, time phasing pavement structure again, first implementation section pavement structure, within certain transition period, it is allowed to it is along with subgrade settlement (including differential settlement);After transition period, wait to settle basicly stable, then implement remaining pavement structure.Thus, reinforcement pavement structure, can ensure that again the stability after reinforcement (settling basicly stable), save duration and cost on the whole, and decrease the process of remaining soil, embody the theory of environmental protection.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement on the premise of spirit of the present invention, and modification or the replacement of these equivalents are all contained in the application claim limited range.

Claims (9)

1. the method for a bituminous paving time phasing, it is characterised in that comprise the following steps:
S10. remove the miscellaneous fill of road, the surface after removing is rolled;
The most backfilled roadbed supported material is to design roadbed top;
S30. transitional pavement structure is implemented at roadbed top, and crossing property pavement structure as temporary pavement, after settlement stability, overlays Permanence Pavement structure in the sedimentation transition period on crossing property pavement structure again.
The method of bituminous paving time phasing the most according to claim 1, it is characterised in that: include that step S11. rolls geotextiles of rear making.
The method of bituminous paving time phasing the most according to claim 2, it is characterised in that: in step S20, at roadbed material of an above back-filling in layers of geotextiles and it is compacted successively;Laying secondary geotextiles at a roadbed material top of backfill, secondary geotextiles upper berth secondary roadbed material is to design roadbed top.
The method of bituminous paving time phasing the most according to claim 3, it is characterised in that: the most alternately backfill sandy soil layer during a roadbed material backfill, aggregate chips layer forms sandy soil aggregate chips layer, then backfills aggregate chips layer at sandy soil aggregate chips layer top.
The method of bituminous paving time phasing the most according to claim 4, it is characterized in that: at secondary geotextiles upper berth sandy soil and be compacted during the backfill of secondary roadbed material, secondary geotextiles is from roadbed two on the side to sandy soil bound edge, and then making residue sandy soil is to design roadbed top.
The method of bituminous paving time phasing the most according to claim 5, it is characterized in that: in step S10, miscellaneous fill removes the degree of depth is 2m, step S20 alternately backfills during roadbed material backfill 30cm sandy soil layer, the sandy soil aggregate chips layer of 10cm aggregate chips layer formation 1.5m successively, sandy soil aggregate chips layer top is by the aggregate chips layer of the thickness backfill 50cm of every layer of 10cm, being compacted at secondary geotextiles upper berth 50cm sandy soil a point two-layer during backfill of secondary roadbed material, secondary geotextiles is to the 50cm a length of 1m of sandy soil bound edge.
The method of bituminous paving time phasing the most according to claim 1, it is characterised in that: the urban road sedimentation transition period of secondary distributor road and ratings above is 2 years, and the urban road sedimentation transition period of not enough secondary distributor road grade is 1 year.
The method of bituminous paving time phasing the most according to claim 1, it is characterised in that: transitional pavement structure includes cutting optimal and middle surface layer, and Permanence Pavement structure includes leveling layer and upper layer.
The method of bituminous paving time phasing the most according to claim 1, it is characterised in that: in step S30 after settlement stability, before overlaying Permanence Pavement structure on crossing property pavement structure again, the surface to transitional pavement structure carries out purified treatment.
CN201610373917.5A 2016-05-30 2016-05-30 Staged implementation method for bituminous pavement Pending CN106012731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610373917.5A CN106012731A (en) 2016-05-30 2016-05-30 Staged implementation method for bituminous pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610373917.5A CN106012731A (en) 2016-05-30 2016-05-30 Staged implementation method for bituminous pavement

Publications (1)

Publication Number Publication Date
CN106012731A true CN106012731A (en) 2016-10-12

Family

ID=57091508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610373917.5A Pending CN106012731A (en) 2016-05-30 2016-05-30 Staged implementation method for bituminous pavement

Country Status (1)

Country Link
CN (1) CN106012731A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908630A (en) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 Factory road structure and secondary permanent-temporary combined layered construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5086917B2 (en) * 2008-06-26 2012-11-28 姫路市 Repair method for asphalt pavement
CN103741569A (en) * 2013-12-18 2014-04-23 山东省交通科学研究所 Drainage crack resistance based old road expansion splicing structure and method
CN103806432A (en) * 2014-01-25 2014-05-21 西安科技大学 Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region
CN103898925A (en) * 2014-04-18 2014-07-02 重庆诚邦路面材料有限公司 Installation method for anti-sedimentation well cover
CN104762858A (en) * 2015-03-16 2015-07-08 夏旻淑 Asphalt concrete construction method for soft soil matrix pavement
CN105297571A (en) * 2015-11-20 2016-02-03 安徽省交通控股集团有限公司 Mudstone filled roadbed structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5086917B2 (en) * 2008-06-26 2012-11-28 姫路市 Repair method for asphalt pavement
CN103741569A (en) * 2013-12-18 2014-04-23 山东省交通科学研究所 Drainage crack resistance based old road expansion splicing structure and method
CN103806432A (en) * 2014-01-25 2014-05-21 西安科技大学 Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region
CN103898925A (en) * 2014-04-18 2014-07-02 重庆诚邦路面材料有限公司 Installation method for anti-sedimentation well cover
CN104762858A (en) * 2015-03-16 2015-07-08 夏旻淑 Asphalt concrete construction method for soft soil matrix pavement
CN105297571A (en) * 2015-11-20 2016-02-03 安徽省交通控股集团有限公司 Mudstone filled roadbed structure and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘云: "某公路沥青混凝土路面采用分期实施技术的分析", 《建材与装饰》 *
江正荣: "《地基与基础工程施工禁忌手册》", 31 January 2006 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908630A (en) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 Factory road structure and secondary permanent-temporary combined layered construction method

Similar Documents

Publication Publication Date Title
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN101343852B (en) Method for filling highroad roadbed by waste steel slags
CN102296507B (en) Treatment method of subgrade cracks
CN203383119U (en) Novel widening structure of highway embankment
CN102747662A (en) Construction method for sand-filling subgrade
CN105926406A (en) Splicing method and structure for new and old roads in reconstruction and extension of pavement
CN102704364B (en) Clay serging tailings subgrade structure and construction method thereof
CN104631254A (en) Construction method of geogrid reinforced clay edge-covered tailing subgrade
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN107761501A (en) A kind of road construction method
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN106592608A (en) Differential settlement control method for new foundation and old roadbed of utility tunnel
CN109914173A (en) Foam lightweight soil pours platform back structure and its construction method in Expressway Extension Project
CN104746412A (en) Construction method of collapsible loess embankment
CN205399440U (en) Inflation dirt road moat structure
CN107700299A (en) A kind of elevated bridge lower floor road structure and its construction method
CN110670436A (en) Structure for preventing urban road subgrade from non-uniform settlement and construction method thereof
CN214782984U (en) Road repairing structure of sponge city
CN106012731A (en) Staged implementation method for bituminous pavement
CN112211053A (en) Construction method for widening roadbed
CN106381774B (en) Construction method and device with film geotextiles reinforcing flexible foundation
CN202766944U (en) Enhanced subgrade drainage system of three-dimensional composite geonet
CN112681022B (en) Construction method for roadbed structure with existing operation railway side width and elevated track
CN107858886B (en) Viaduct foundation peripheral ground road and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Cao Jianxin

Inventor after: Ning Pinghua

Inventor after: Yi Yingfeng

Inventor after: Xiong Yong

Inventor after: Yang Hongzhu

Inventor after: Peng Gongxun

Inventor before: Cao Jianxin

Inventor before: Ning Pinghua

Inventor before: Peng Gongxun

Inventor before: Xiong Yong

Inventor before: Yang Hongzhu

COR Change of bibliographic data
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Applicant after: Guangzhou municipal engineering design and Research Institute Co., Ltd.

Address before: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Applicant before: Guangzhou City Engineering Design studies total institute

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012