CN109958018A - A kind of heavy rainfall urban road water-permeable pavement structure and its construction method - Google Patents

A kind of heavy rainfall urban road water-permeable pavement structure and its construction method Download PDF

Info

Publication number
CN109958018A
CN109958018A CN201910302223.6A CN201910302223A CN109958018A CN 109958018 A CN109958018 A CN 109958018A CN 201910302223 A CN201910302223 A CN 201910302223A CN 109958018 A CN109958018 A CN 109958018A
Authority
CN
China
Prior art keywords
permeable
metalling
heavy rainfall
road
pavement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910302223.6A
Other languages
Chinese (zh)
Inventor
杨建松
孙敦江
吉庆锋
陈红军
余黎明
李辉
杨传峰
王明江
陈长江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Beixin Sifang Engineering Testing And Consulting Co Ltd
Xinjiang Beixin Road and Bridge Group Co Ltd
Original Assignee
Xinjiang Beixin Sifang Engineering Testing And Consulting Co Ltd
Xinjiang Beixin Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Beixin Sifang Engineering Testing And Consulting Co Ltd, Xinjiang Beixin Road and Bridge Group Co Ltd filed Critical Xinjiang Beixin Sifang Engineering Testing And Consulting Co Ltd
Priority to CN201910302223.6A priority Critical patent/CN109958018A/en
Publication of CN109958018A publication Critical patent/CN109958018A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of heavy rainfall urban road water-permeable pavement structure and its construction methods, using metalling as bed course, steel slag gravel mixed layer is as base, permeable concrete is as surface layer, it ensure that entire road structure uniform force, long service life, permeable metalling is laid with above soil matrix, permeable metalling includes the big Stone layer of lower layer and the small particle metalling on upper layer, so that the intensity of road improves, and permeable metalling can be such that rainfall penetrates into soil matrix rapidly, metalling storage capacity is strong, it is able to maintain high intensity, base uses the composition of gravel and steel slag, so that the intensity of entire road structure further increases, surface layer using cement permeable concrete or pitch permeable concrete as road, so that road bearing strength is bigger, the service life is longer, precipitation lower rapidly can seep, guarantee Demand of the heavy rainfall city to road.

Description

A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
Technical field
The present invention relates to water penetration road field, more particularly to a kind of heavy rainfall urban road water-permeable pavement structure and Its construction method.
Background technique
With the development of society, nowadays urban road has been carried out fully hardened, existing urban road mostly uses greatly drip Green concrete, cement concrete, stone slab or cement brick etc. are laid with, and have the advantages that smooth, intensity is high, durability is good, but same When the shortcomings that there is also bad hydraulic permeabilities, the ponding on road surface is difficult to lower infiltration, cause road muddy, especially in heavy rainfall city, Traditional road surface can have ponding for a long time, need manually to carry out ponding cleaning, time-consuming and laborious, and road ponding can pacify driving Some potential safety problems is caused entirely, long-time ponding can also generate certain influence on Road Service Life, reduce the intensity of road, There are problems for traditional impermeability road.
There are also the structure of water penetration road and implementation methods at present, but these water penetration road structures are only applicable to drop The small city of rainfall uses, although can be realized the purpose seeped under ponding, infiltration rate is slow, and lower milliosmolarity is small, is not suitable for The rapid draining of precipitation domain city road, and often intensity is small for these water penetration roads, cannot bear larger pressure, use the longevity It orders short.
Therefore, a kind of heavy rainfall urban road water-permeable pavement structure and its construction method are needed, is able to solve above-mentioned existing There is water penetration road not to be suitable for precipitation city, water penetration road drainage speed is slow, lower milliosmolarity is small, and intensity is low, uses the longevity Order short problem.
Summary of the invention
The object of the present invention is to provide a kind of heavy rainfall urban road water-permeable pavement structure and its construction methods, to solve Above-mentioned existing water penetration road is not suitable for precipitation city, and water penetration road drainage speed is slow, lower milliosmolarity is small, and intensity it is low, The short problem of service life.
To achieve the above object, the present invention provides following schemes:
The present invention provides a kind of heavy rainfall urban road water-permeable pavement structure, including road surface ontology, the road surface ontology Including soil matrix, permeable metalling, base and pervious concrete layer, the soil matrix, the permeable metalling, the base and described Pervious concrete layer is successively laid with from the bottom to top, and anti-filter fabric is equipped between the soil matrix and the permeable metalling;
Wherein, the every side of width of the permeable metalling is wider than the 25~35cm of soil matrix, and the permeable metalling includes The big Stone layer and small particle metalling being successively laid with from the bottom to top, the big Stone layer are layed on the soil matrix Side, the base are layed in the top of the small particle metalling, the width of the width of the base and the permeable metalling Unanimously, the every side of the width of the pervious concrete layer is narrower than the 1~5cm of base.
Preferably, the partial size of the big Stone layer is 30~60mm, and partial size is 60% in the content of 45~60mm ~70%, laying depth is 6~9cm;The partial size of the small particle metalling is 10~25mm, and partial size containing in 15~25mm Amount is 60~80%, and laying depth is 3~6cm.
Preferably, the anti-filter fabric uses non-woven geotextile, and specification is 250~450g/m2
Preferably, the base uses the mixture of gravel and steel slag, and the partial size of steel slag is 5~15mm, the content of steel slag It is 5%~10%, the partial size of gravel is 5~30mm, and laying depth is 3~6cm.
Preferably, the pervious concrete layer uses cement permeable concrete or pitch permeable concrete.
Preferably, the laying depth of the pervious concrete layer (4) is 15~30cm.
A kind of construction method of heavy rainfall urban road water-permeable pavement structure, the construction method the following steps are included:
(1) rammed soil type of foundation;
(2) it is laid with anti-filter fabric;
(3) it is successively laid with big Stone layer and small particle metalling, forms permeable metalling;
(4) it is laid with base, and is rolled;
(5) it is laid with pervious concrete layer, and is conserved.
Preferably, in step (1), the compacted coefficient of soil matrix is 92%~95%.
Preferably, in step (4), the road roller specification that base rolls is 15t~18t, the speed of travel≤4km/h, compacting Coefficient is 92%~95%.
Preferably, it in step (5), conserves to sprinkle water daily 2~5 times, continues 5~7 days.
The present invention achieves following advantageous effects compared with the existing technology:
1, a kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided by the invention, using metalling As bed course, steel slag gravel mixed layer is wider than soil matrix 25 as surface layer, the every side of the width of bed course as base, permeable concrete ~35cm, the every side of the width of concrete layer are narrower than 1~5cm of base, ensure that entire road structure uniform force, stress are not easy to send out Change shape, long service life, and can be subjected to brewing for high-frequency heavy rainfall.
2, a kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided by the invention, in the upper of soil matrix Side is laid with anti-filter fabric, and permeable metalling is laid on anti-filter fabric, and permeable metalling includes the big Stone layer of lower layer With the small particle metalling on upper layer, big Stone layer partial size is 30~60mm, and partial size is 60% in the content of 45~60mm ~70%, laying depth is 6~9cm, and the partial size of small particle metalling is 10~25mm, and content of the partial size in 15~25mm is 60~80%, laying depth is 3~6cm, this intensity for allowing for road improves, and permeable metalling can be such that rainfall seeps rapidly Enter into soil matrix, metalling storage capacity is strong, is able to maintain high intensity, and anti-filter fabric can stop the dirt in lower infiltration to enter In soil matrix, good water penetration is remained.
3, a kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided by the invention, base use gravel The composition of stone and steel slag, the partial size of steel slag are 5~15mm, and the content of steel slag is 5%~10%, the partial size of gravel is 5~ 30mm, laying depth are 3~6cm, so that the intensity of entire road structure further increases, meanwhile, the combination of gravel and steel slag Base's compacting factor is 92%~95%, improves water penetration on the basis of proof strength.
4, a kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided by the invention, it is saturating using cement The laying depth of the surface layer of aqueous concrete or pitch permeable concrete as road, concrete is 15~30cm, makes to attain the Way Road bearing strength is bigger, and the service life is longer, and precipitation lower rapidly can seep, and ensure that demand of the heavy rainfall city to road.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of heavy rainfall urban road water-permeable pavement structure provided by the invention and its construction method road structure Cross-sectional view;
Fig. 2 is a kind of heavy rainfall urban road water-permeable pavement structure and its construction method construction method provided by the invention Flow chart;
In figure: 1: soil matrix, 2: permeable metalling, 21: big Stone layer, 22: small particle metalling, 3: base, 4: thoroughly Water coagulation soil layer, 5: anti-filter fabric.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of heavy rainfall urban road water-permeable pavement structure and its construction methods, pass through paving If the permeable metalling and gravel of big Stone and small particle rubble composition and the base of steel slag composition, improve permeable road The intensity and water permeability of line structure are not suitable for precipitation city, water penetration road drainage to solve existing water penetration road Speed is slow, lower milliosmolarity is small, and the problem that intensity is low, service life is short.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Embodiment 1:
The present embodiment provides a kind of heavy rainfall urban road water-permeable pavement structures, as shown in Figure 1, include road surface ontology, Road surface ontology includes soil matrix 1, permeable metalling 2, base 3 and pervious concrete layer 4, regard permeable metalling 2 as setting cushion In the top of soil matrix 1, the every side of width of permeable metalling 2 is wider than the side 25cm of soil matrix 1, permeable metalling 2 include by down toward On the big Stone layer 21 and small particle metalling 22 that are successively laid with, the metalling of two kinds of different-grain diameters can either guarantee road The stabilization of structure, while seepage velocity and moisture storage capacity are improved, nonwoven geotechnique is equipped between big Stone layer 21 and soil matrix 1 Cloth is 300g/m as anti-filter fabric 5, the specification of geotextiles2, it can prevent rain impurities in water from damaging to soil matrix 1 in this way, And then the intensity of road structure is reduced, base 3 is laid on the top of permeable metalling 2, the width of base 3 and permeable metalling 2 Equivalent width, pervious concrete layer 4 is laid on the top of base 3, and the every side of the width of pervious concrete layer 4 is narrower than base 3 Side 3cm, every layer of width is arranged in this way so that road structure is integrally more uniformly stressed, the vertical side that road can bear To bigger with the pressure of horizontal direction.
Specifically, the partial size of big Stone layer 21 is 30~60mm, and partial size is 60% in the content of 45~60mm, paving If with a thickness of 6cm;The partial size of small particle metalling 22 is 10~25mm, and partial size is 60% in the content of 15~25mm, is laid with With a thickness of 4cm, big Stone is laid on bottom small particle rubble and is laid on upper layer, so that entire permeable 2 structure of metalling is more Add stabilization, for a long time using being not susceptible to deformation, and the gap between rubble can make rainwater is lower rapidly to seep, the big partial size of bottom Gap between rubble can be improved water space, and penetrate into rainwater quickly in soil matrix 1;Base 3 is using gravel and steel slag Mixture, the partial size of steel slag are 5~15mm, and the content of steel slag is 6%, and the partial size of gravel is 5~30mm, laying depth 4cm, The addition of steel slag is so that base layer structure is firmer, and the steel slag of small particle and gravel can make base even closer, can bear Bigger pressure, and steel slag and gravel will not hinder the lower infiltration of rainwater, good water permeability;Pervious concrete layer 4 is permeable using cement Property concrete, the laying depth of cement permeable concrete is 15cm.
Further, the construction method of above-mentioned heavy rainfall urban road water-permeable pavement structure, as shown in Fig. 2, clear first Plain soil is managed out as soil matrix 1, soil matrix is tamped using ramming machine, compacted coefficient is controlled 93%, both can guarantee soil in this way Base is firm, also helps the infiltration of rainwater, selects 300g/m2Non-woven geotextile be laid on soil matrix 1 as anti-filter fabric 5, Process of deployment is answered smooth, and it is 30~60mm by partial size, and content of the partial size in 45~60mm is that joint is available, which to tie up silk and fix, 60% big Stone is uniformly paved in geotextiles using road-metal spreading machine, and paving thickness 6cm forms big Stone Layer 21, the every side of width of big Stone layer is 30cm wider than soil matrix, is then 10~25mm by partial size, and partial size is in 15~25mm Content be 60% small particle rubble uniformly paved above big Stone layer using road-metal spreading machine, laying depth is 4cm forms small particle metalling 22, then is laid on small particle metalling 22 for the mixture of gravel and steel slag as base 3 Top, the partial size of steel slag are 5~15mm, and the content of steel slag is 6%, and the partial size of gravel is 5~30mm, laying depth 4cm, paving It sprinkles water in base 3 after and if is compacted using 15t road roller, the speed of travel control of road roller is in 4km/h, compacting Coefficient keeps each layer foundation structure more firm until 92%, through compacting, and finally the formwork on ground, selects cement water penetration Concrete beats ash as surface layer, using pump truck, forms pervious concrete layer, sprinkles water 3 times and conserved daily after molding, continuous to support Shield 7 days, can be obtained water-permeable pavement structure.
A kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided in this embodiment, such road surface are suitable For the public places such as city bypass, sidewalk or square hard surface, the pressure of lesser vertical direction can satisfy, it can Meeting brewing for high-frequency precipitation, long service life, seepage velocity is fast, there is very big booster action to source is adjustably lauched, It can also absorb sound simultaneously, advantageously reduce noise.
Embodiment 2:
The present embodiment provides a kind of heavy rainfall urban road water-permeable pavement structures, as shown in Figure 1, include road surface ontology, Road surface ontology includes soil matrix 1, permeable metalling 2, base 3 and pervious concrete layer 4, regard permeable metalling 2 as setting cushion In the top of soil matrix 1, the every side of width of permeable metalling 2 is wider than the side 35cm of soil matrix 1, permeable metalling 2 include by down toward On the big Stone layer 21 and small particle metalling 22 that are successively laid with, the metalling of two kinds of different-grain diameters can either guarantee road The stabilization of structure, while seepage velocity and moisture storage capacity are improved, nonwoven geotechnique is equipped between big Stone layer 21 and soil matrix 1 Cloth is 400g/m as anti-filter fabric 5, the specification of geotextiles2, it can prevent rain impurities in water from damaging to soil matrix 1 in this way, And then the intensity of road structure is reduced, base 3 is laid on the top of permeable metalling 2, the width of base 3 and permeable metalling 2 Equivalent width, pervious concrete layer 4 is laid on the top of base 3, and the every side of the width of pervious concrete layer 4 is narrower than base 3 Side 3cm, every layer of width is arranged in this way so that road structure is integrally more uniformly stressed, the vertical side that road can bear To bigger with the pressure of horizontal direction.
Specifically, the partial size of big Stone layer 21 is 30~60mm, and partial size is 70% in the content of 45~60mm, paving If with a thickness of 9cm;The partial size of small particle metalling 22 is 10~25mm, and partial size is 60% in the content of 15~25mm, is laid with With a thickness of 6cm, big Stone is laid on bottom small particle rubble and is laid on upper layer, so that entire permeable 2 structure of metalling is more Add stabilization, for a long time using being not susceptible to deformation, and the gap between rubble can make rainwater is lower rapidly to seep, the big partial size of bottom Gap between rubble can be improved water space, and penetrate into rainwater quickly in soil matrix 1;Base 3 is using gravel and steel slag Mixture, the partial size of steel slag are 5~15mm, and the content of steel slag is 8%, and the partial size of gravel is 5~30mm, laying depth 6cm, The addition of steel slag is so that base layer structure is firmer, and the steel slag of small particle and gravel can make base even closer, can bear Bigger pressure, and steel slag and gravel will not hinder the lower infiltration of rainwater, good water permeability;Pervious concrete layer 4 is permeable using pitch Property concrete, the laying depth of pitch permeable concrete is 25cm.
Further, the construction method of above-mentioned heavy rainfall urban road water-permeable pavement structure, as shown in Fig. 2, clear first Plain soil is managed out as soil matrix 1, soil matrix is tamped using ramming machine, compacted coefficient is controlled 95%, both can guarantee soil in this way Base is firm, also helps the infiltration of rainwater, selects 400g/m2Non-woven geotextile be laid on soil matrix 1 as anti-filter fabric 5, Process of deployment is answered smooth, and it is 30~60mm by partial size, and content of the partial size in 45~60mm is that joint is available, which to tie up silk and fix, 70% big Stone is uniformly paved in geotextiles using road-metal spreading machine, and paving thickness 9cm forms big Stone Layer 21, the every side of width of big Stone layer is 35cm wider than soil matrix, is then 10~25mm by partial size, and partial size is in 15~25mm Content be 60% small particle rubble uniformly paved above big Stone layer using road-metal spreading machine, laying depth is 6cm forms small particle metalling 22, then is laid on small particle metalling 22 for the mixture of gravel and steel slag as base 3 Top, the partial size of steel slag are 5~15mm, and the content of steel slag is 8%, and the partial size of gravel is 5~30mm, laying depth 6cm, paving It sprinkles water in base 3 after and if is compacted using 18t road roller, the speed of travel control of road roller is in 4km/h, compacting Coefficient keeps each layer foundation structure more firm until 95%, through compacting, finally selects pitch permeable concrete as face Layer forms pervious concrete layer using bituminous concrete paver asphalt permeable concrete, to temperature be down to 60 DEG C with Under, water-permeable pavement structure can be obtained.
A kind of heavy rainfall urban road water-permeable pavement structure and its construction method provided in this embodiment, such road surface are suitable For the hard surface of municipal highway, the pressure of biggish vertical direction can satisfy, can satisfy rushing for high-frequency precipitation Bubble, long service life, seepage velocity is fast, has very big booster action to source is adjustably lauched, while can also absorb sound, is conducive to subtract Few noise.
It should be noted that a kind of heavy rainfall urban road water-permeable pavement structure provided by the invention and its construction method In, required big Stone, small particle rubble and gravel and steel-slag mixture can be transferred through gradation and obtain, and cement is permeable Property concrete and pitch permeable concrete are also existing quotient's concrete, and therefore, the specific preparation method of material is in the present invention not It is repeating.
The heavy rainfall urban road water-permeable pavement structure that embodiment 1 and embodiment 2 are provided and traditional water penetration road Face structure compares experiment, chooses the test site that 4 pieces of areas are 5m × 5m, and the geology of 4 pieces of test sites is identical, 1 piece of test site is laid with the heavy rainfall urban road water-permeable pavement structure that embodiment 1 provides, and is laid with the 2nd piece of test site The heavy rainfall urban road water-permeable pavement structure that embodiment 2 provides, it is permeable using conventional method laying the 3rd piece of test site Property pavement structure as reference examples 1, water-permeable pavement structure is laid with as reference examples using conventional method the 4th piece of test site 2。
Wherein, reference examples 1 and reference examples 2 are using permeable whole road surface provided by prior art CN201610069680.1 Construction method construction, permeable whole road surface is made, the permeable fractured-rock layer thickness of blotter and embodiment 1 in reference examples 1 Identical, the fine sand screed-coat in reference examples 1 is identical as the groundwork thickness of embodiment 1, the primary colors pervious bed in reference examples 1 and implementation The pervious concrete layer thickness of example 1 is identical, and both remaining construction methods are all the same;Blotter and embodiment 2 in reference examples 2 Permeable fractured-rock layer thickness it is identical, the fine sand screed-coat in reference examples 2 is identical as the groundwork thickness of embodiment 2, in reference examples 2 Primary colors pervious bed is identical as the pervious concrete layer thickness of embodiment 2, and both remaining construction methods are all the same, at 4 pieces of test sites After ground reaches use state, heavy rainfall is simulated using water spray, simulation vehicle to run, logging are rolled using road roller It is as follows:
By above-mentioned test result can be seen that heavy rainfall urban road water-permeable pavement structure provided by the invention and its The water-permeable pavement that construction method obtains, compared to existing traditional porous pavement, water penetration is more preferable, seepage velocity faster, And water percolating capacity is bigger, and overall structure is also more firm, washing away for high-frequency heavy rainfall and rolling for larger pressure are coped with, The service life is longer for entire pavement structure, has very big booster action to source is adjustably lauched, while can also absorb sound, is conducive to subtract Few noise.
Invention applies a specific example illustrates the principle and implementation of the invention, above embodiments are said It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation Thought of the invention, there will be changes in the specific implementation manner and application range.To sum up, the content of the present specification should not manage Solution is limitation of the present invention.

Claims (10)

1. a kind of heavy rainfall urban road water-permeable pavement structure, including road surface ontology, it is characterised in that: the road surface ontology packet Include soil matrix (1), permeable metalling (2), base (3) and pervious concrete layer (4), the soil matrix (1), the permeable metalling (2), the base (3) and the pervious concrete layer (4) are successively laid with from the bottom to top, the soil matrix (1) and described permeable broken Anti-filter fabric (5) are equipped between rock layers (2);
Wherein, the every side of width of the permeable metalling (2) is wider than (1) 25~35cm of soil matrix, the permeable metalling (2) Including the big Stone layer (21) being successively laid with from the bottom to top and small particle metalling (22), the big Stone layer (21) It is layed in above the soil matrix (1), the base (3) is layed in the top of the small particle metalling (22), the base (3) Width and the permeable metalling (2) equivalent width, the every side of width of the pervious concrete layer (4) is narrower than the base (3) 1~5cm.
2. a kind of heavy rainfall urban road water-permeable pavement structure according to claim 1, it is characterised in that: the big grain The partial size of diameter metalling (21) be 30~60mm, and partial size 45~60mm content be 60%~70%, laying depth be 6~ 9cm;The partial size of the small particle metalling (22) is 10~25mm, and partial size is 60~80% in the content of 15~25mm, paving If with a thickness of 3~6cm.
3. a kind of heavy rainfall urban road water-permeable pavement structure according to claim 1, it is characterised in that: the anti-filter Fabric (5) uses non-woven geotextile, and specification is 250~450g/m2
4. a kind of heavy rainfall urban road water-permeable pavement structure according to claim 1, it is characterised in that: the base (3) mixture of gravel and steel slag is used, the partial size of steel slag is 5~15mm, and the content of steel slag is 5%~10%, the grain of gravel Diameter is 5~30mm, and laying depth is 3~6cm.
5. a kind of heavy rainfall urban road water-permeable pavement structure according to claim 1, it is characterised in that: described permeable Concrete layer (4) uses cement permeable concrete or pitch permeable concrete.
6. a kind of heavy rainfall urban road water-permeable pavement structure according to claim 1, it is characterised in that: described permeable The laying depth of concrete layer (4) is 15~30cm.
7. a kind of construction method of the heavy rainfall urban road water-permeable pavement structure as described in claim 1~6 is any, special Sign is: the construction method the following steps are included:
(1) rammed soil type of foundation;
(2) it is laid with anti-filter fabric;
(3) it is successively laid with big Stone layer and small particle metalling, forms permeable metalling;
(4) it is laid with base, and is rolled;
(5) it is laid with pervious concrete layer, is conserved to using the road surface of cement permeable concrete.
8. a kind of construction method of heavy rainfall urban road water-permeable pavement structure according to claim 7, feature exist In: in step (1), the compacted coefficient of soil matrix is 92%~95%.
9. a kind of construction method of heavy rainfall urban road water-permeable pavement structure according to claim 7, feature exist In: in step (4), road roller specification that base rolls is 15t~18t, the speed of travel≤4km/h, compacting factor is 92%~ 95%.
10. a kind of construction method of heavy rainfall urban road water-permeable pavement structure according to claim 7, feature exist In: in step (5), conserves to sprinkle water daily 2~5 times, continue 5~7 days.
CN201910302223.6A 2019-04-16 2019-04-16 A kind of heavy rainfall urban road water-permeable pavement structure and its construction method Pending CN109958018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302223.6A CN109958018A (en) 2019-04-16 2019-04-16 A kind of heavy rainfall urban road water-permeable pavement structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302223.6A CN109958018A (en) 2019-04-16 2019-04-16 A kind of heavy rainfall urban road water-permeable pavement structure and its construction method

Publications (1)

Publication Number Publication Date
CN109958018A true CN109958018A (en) 2019-07-02

Family

ID=67026209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302223.6A Pending CN109958018A (en) 2019-04-16 2019-04-16 A kind of heavy rainfall urban road water-permeable pavement structure and its construction method

Country Status (1)

Country Link
CN (1) CN109958018A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252115A (en) * 2020-10-29 2021-01-22 中国十九冶集团有限公司 Road structure of recoverable rainwater in sponge city
CN112624707A (en) * 2021-01-04 2021-04-09 新疆互力佳源环保科技有限公司 Cement-stabilized steel slag gravel pavement base mixture and preparation method thereof
CN114525708A (en) * 2022-02-28 2022-05-24 上海占弘水性高分子材料有限公司 Colored anti-skidding terrace suitable for sponge city and construction process thereof
CN114606823A (en) * 2020-12-09 2022-06-10 上海力阳道路加固科技股份有限公司 Cement-based pervious concrete pavement structure and laying method thereof
CN114763685A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Anti-deformation road structure
CN114763687A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Anti-settlement road structure
CN114763684A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Method for building road on soft foundation and road built by method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201785689U (en) * 2010-04-23 2011-04-06 北京市市政工程研究院 Large-gap water draining and noise reducing asphalt pavement built by utilizing steel slags
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN206902493U (en) * 2017-06-16 2018-01-19 沈阳福瑞园林装饰工程有限公司 A kind of undisguised material permeable concrete ground structure
CN207812211U (en) * 2018-01-23 2018-09-04 中国电力工程顾问集团华东电力设计院有限公司 Prevent the full pervious concrete inspection road of the colour of surface gathered water
KR101923862B1 (en) * 2018-06-27 2018-11-29 이성우 Multi-layered water permeable block forming apparatus having reinforcing layer and Multi-layered water permeable block made with the apparatus
CN208235250U (en) * 2018-05-21 2018-12-14 山东弘衡再生资源科技有限公司 A kind of porous pavement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201785689U (en) * 2010-04-23 2011-04-06 北京市市政工程研究院 Large-gap water draining and noise reducing asphalt pavement built by utilizing steel slags
CN206902493U (en) * 2017-06-16 2018-01-19 沈阳福瑞园林装饰工程有限公司 A kind of undisguised material permeable concrete ground structure
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN207812211U (en) * 2018-01-23 2018-09-04 中国电力工程顾问集团华东电力设计院有限公司 Prevent the full pervious concrete inspection road of the colour of surface gathered water
CN208235250U (en) * 2018-05-21 2018-12-14 山东弘衡再生资源科技有限公司 A kind of porous pavement
KR101923862B1 (en) * 2018-06-27 2018-11-29 이성우 Multi-layered water permeable block forming apparatus having reinforcing layer and Multi-layered water permeable block made with the apparatus

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252115A (en) * 2020-10-29 2021-01-22 中国十九冶集团有限公司 Road structure of recoverable rainwater in sponge city
CN114606823A (en) * 2020-12-09 2022-06-10 上海力阳道路加固科技股份有限公司 Cement-based pervious concrete pavement structure and laying method thereof
CN114606823B (en) * 2020-12-09 2023-11-28 上海力阳道路加固科技股份有限公司 Cement-based permeable concrete pavement structure and paving method thereof
CN112624707A (en) * 2021-01-04 2021-04-09 新疆互力佳源环保科技有限公司 Cement-stabilized steel slag gravel pavement base mixture and preparation method thereof
CN114763685A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Anti-deformation road structure
CN114763687A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Anti-settlement road structure
CN114763684A (en) * 2021-01-11 2022-07-19 新疆北新路桥集团股份有限公司 Method for building road on soft foundation and road built by method
CN114525708A (en) * 2022-02-28 2022-05-24 上海占弘水性高分子材料有限公司 Colored anti-skidding terrace suitable for sponge city and construction process thereof

Similar Documents

Publication Publication Date Title
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN106049217B (en) Fabricated permeable paving method and block and paving structure
CN103669145B (en) A kind of paving method of permeable pavement structure
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN103510441A (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN105463967A (en) Water-permeable wear-resistant garden path and construction method thereof
CN105887609A (en) Method for constructing ecological infiltration pavement in sponge city
CN206256334U (en) A kind of novel environment friendly paving structure
CN107938456B (en) Construction method for filling river channel
CN105908588A (en) Permeable pavement system for weakly-permeable soil regions
CN109944125B (en) Asphalt concrete pavement structure and paving process thereof
CN103669167A (en) Permeable pavement structure
CN211815260U (en) Permeable pavement convenient for recovering water permeability
CN211199978U (en) Pavement paving structure for permeable sidewalk
CN110670436B (en) Structure for preventing urban road subgrade from being unevenly settled and construction method thereof
CN110042723B (en) Construction method of full-prefabricated assembled permeable road
CN213772779U (en) Concrete road surface structure permeates water
CN214271530U (en) Soft basic district road structure based on building rubbish is laid
CN210684359U (en) Road bed is used in road and bridge construction
CN211142682U (en) Structure for preventing urban road subgrade from non-uniform settlement
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN106192645A (en) A kind of wind field road construction method
CN214992805U (en) Gardens concrete road that permeates water
CN214613380U (en) Highway subgrade settlement-preventing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190702