CN105986623A - 一种混凝土预埋件施工工法 - Google Patents
一种混凝土预埋件施工工法 Download PDFInfo
- Publication number
- CN105986623A CN105986623A CN201510092449.XA CN201510092449A CN105986623A CN 105986623 A CN105986623 A CN 105986623A CN 201510092449 A CN201510092449 A CN 201510092449A CN 105986623 A CN105986623 A CN 105986623A
- Authority
- CN
- China
- Prior art keywords
- concrete
- fitting
- construction
- built
- assembling die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明涉及一种建筑领域,特别涉及一种混凝土预埋件施工工法,包括以下步骤:步骤S101,钢筋、钢板下料加工;步骤S102,焊接;步骤S103,组模并安装预埋件;步骤S104,对照施工图校对预埋件尺寸和位置;步骤S105,浇筑混凝土;步骤S106,混凝土养护;步骤S107,拆模;步骤S108,修补处理。本发明的优势是:本发明的施工方法操作简单,施工成本低,并可以提高了混凝土结构的外观质量及施工质量,实现外观及质量双控的目的,本发明方法具有很强的适用性和推广性,可广泛应用于预制混凝土预埋件施工中。
Description
技术领域
本发明涉及一种建筑领域,特别涉及一种混凝土预埋件施工工法。
背景技术
浇混凝土结构柱、墙、梁中的预埋件,传统的施工做法是把预埋件的腿绑扎或点焊在拄、墙、梁的主筋上。这种施工方法往往在混凝土的振捣过程中,预埋件的位置容易被振位移了.难以保证其预埋件位置的准确性。待安装施工时,多数需要进行剔凿,而剔凿出来的预埋件既不平整。也不规范,且多数还不符合设计位置要求,有的还找不到了,需要进行植筋或栽膨胀螺栓等方式处理。这样,不仅影响建筑工程的外观质量。严重的还会影响结构强度。同时增加了工作量和浪费材料。
发明内容
本发明了提供了一种混凝土预埋件施工工法,解决上述出现的问题。
本发明采取的技术方案是:一种混凝土预埋件施工工法,包括以下步骤:步骤S101,钢筋、钢板下料加工;步骤S102,焊接;步骤S103,组模并安装预埋件;步骤S104,对照施工图校对预埋件尺寸和位置;步骤S105,浇筑混凝土;步骤S106,混凝土养护;步骤S107,拆模;步骤S108,修补处理。
所述钢筋、钢板下料加工,预埋件施工前,应首先了解其型式、位置和数量,然后按标准要求制作预埋件,预埋件的原材料应确保合格,加工前必须检查其合格证,进行必要的力学性能试验及化学成分分析,同时观感质量必须合格,表面无明显锈蚀现象。
所述焊接,预埋件焊接前,必须检查钢筋钢板的品种是否符合设计要求及强制性标准规定,对不符合要求者,需查明原因,妥善解决。
所述组模并安装预埋件,组合模具,根据预埋件的位置选择合适的固定方式。
所述浇筑混凝土,采用由下至上的浇筑方式,利用液压装置把混凝土从料斗中泵入组合模具中,通过组合模具的玻璃面观测是否有气泡生成,如有气泡生成,可通过敲击组合模具去除气泡。
所述混凝土养护,利用组合模具自带养护装置进行养护,养护静停期间应保持环境温度不低于5℃,灌筑结束4~6h且混凝土终凝后方可升温,升温速度不宜大于10℃/h,恒温期间混凝土内部温度不宜超过60℃,最大不得超过65℃,恒温养护时间应根据构件脱模强度要求、混凝土配合比情况以及环境条件等通过试验确定,降温速度不宜大于10℃/h。
所述拆模,按利用液压装置使组合模具分离,分离的组合模具要及时进行清理,去除板面上残余的混凝土,刷油,存放好,对损坏的模板进行修复。
本发明的优势是:本发明的施工方法操作简单,施工成本低,并可以提高了混凝土结构的外观质量及施工质量,实现外观及质量双控的目的,本发明方法具有很强的适用性和推广性,可广泛应用于预制混凝土预埋件施工中。
附图说明
附图为一种混凝土预埋件施工工法流程图。
具体实施方式
下面结合施工流程图作进一步说明。
如图所示,一种混凝土预埋件施工工法,包括以下步骤:步骤S101,钢筋、钢板下料加工,预埋件施工前,应首先了解其型式、位置和数量,然后按标准要求制作预埋件,预埋件的原材料应确保合格,加工前必须检查其合格证,进行必要的力学性能试验及化学成分分析,同时观感质量必须合格,表面无明显锈蚀现象。
步骤S102,焊接,预埋件焊接前,必须检查钢筋钢板的品种是否符合设计要求及强制性标准规定,对不符合要求者,需查明原因,妥善解决。
步骤S103,组模并安装预埋件,组合模具,根据预埋件的位置选择合适的固定方式。
步骤S104,对照施工图校对预埋件尺寸和位置。
步骤S105,浇筑混凝土,采用由下至上的浇筑方式,利用液压装置把混凝土从料斗中泵入组合模具中,通过组合模具的玻璃面观测是否有气泡生成,如有气泡生成,可通过敲击组合模具去除气泡。
步骤S106,所述混凝土养护,利用组合模具自带养护装置进行养护,养护静停期间应保持环境温度不低于5℃,灌筑结束4~6h且混凝土终凝后方可升温,升温速度不宜大于10℃/h,恒温期间混凝土内部温度不宜超过60℃,最大不得超过65℃,恒温养护时间应根据构件脱模强度要求、混凝土配合比情况以及环境条件等通过试验确定,降温速度不宜大于10℃/h。
步骤S107,拆模,按利用液压装置使组合模具分离,分离的组合模具要及时进行清理,去除板面上残余的混凝土,刷油,存放好,对损坏的模板进行修复。
步骤S108,修补处理。
Claims (7)
1.一种混凝土预埋件施工工法,其特征在于:包括以下步骤:步骤S101,钢筋、钢板下料加工;步骤S102,焊接;步骤S103,组模并安装预埋件;步骤S104,对照施工图校对预埋件尺寸和位置;步骤S105,浇筑混凝土;步骤S106,混凝土养护;步骤S107,拆模;步骤S108,修补处理。
2. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述钢筋、钢板下料加工,预埋件施工前,应首先了解其型式、位置和数量,然后按标准要求制作预埋件,预埋件的原材料应确保合格,加工前必须检查其合格证,进行必要的力学性能试验及化学成分分析,同时观感质量必须合格,表面无明显锈蚀现象。
3. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述焊接,预埋件焊接前,必须检查钢筋钢板的品种是否符合设计要求及强制性标准规定,对不符合要求者,需查明原因,妥善解决。
4. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述组模并安装预埋件,组合模具,根据预埋件的位置选择合适的固定方式。
5. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述浇筑混凝土,采用由下至上的浇筑方式,利用液压装置把混凝土从料斗中泵入组合模具中,通过组合模具的玻璃面观测是否有气泡生成,如有气泡生成,可通过敲击组合模具去除气泡。
6. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述混凝土养护,利用组合模具自带养护装置进行养护,养护静停期间应保持环境温度不低于5℃,灌筑结束4~6h且混凝土终凝后方可升温,升温速度不宜大于10℃/h,恒温期间混凝土内部温度不宜超过60℃,最大不得超过65℃,恒温养护时间应根据构件脱模强度要求、混凝土配合比情况以及环境条件等通过试验确定,降温速度不宜大于10℃/h。
7. 根据权利要求1所述一种混凝土预埋件施工工法,其特征在于:所述拆模,按利用液压装置使组合模具分离,分离的组合模具要及时进行清理,去除板面上残余的混凝土,刷油,存放好,对损坏的模板进行修复。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510092449.XA CN105986623A (zh) | 2015-03-02 | 2015-03-02 | 一种混凝土预埋件施工工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510092449.XA CN105986623A (zh) | 2015-03-02 | 2015-03-02 | 一种混凝土预埋件施工工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105986623A true CN105986623A (zh) | 2016-10-05 |
Family
ID=57038528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510092449.XA Pending CN105986623A (zh) | 2015-03-02 | 2015-03-02 | 一种混凝土预埋件施工工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986623A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032769A (zh) * | 2021-10-19 | 2022-02-11 | 中铁电气化局集团北京建筑工程有限公司 | 地铁车辆段装配式混凝土轨道桥安装方法 |
CN114033087A (zh) * | 2021-11-02 | 2022-02-11 | 郑州祥和集团有限公司 | 变电站预埋件施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3881856A (en) * | 1971-12-06 | 1975-05-06 | Coignet Construct Edmond | Plant for the fabrication of parallel molded construction elements |
CN1830644A (zh) * | 2006-04-17 | 2006-09-13 | 上海隧道工程股份有限公司 | 现浇箱梁低温蒸汽养护施工方法 |
CN102051916A (zh) * | 2009-11-06 | 2011-05-11 | 中冶天工建设有限公司 | 利用混凝土模板预埋铁件的施工方法 |
CN102061746A (zh) * | 2010-11-26 | 2011-05-18 | 宝业集团浙江建设产业研究院有限公司 | 一种钢结构组合预埋件及其施工方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
CN102367704A (zh) * | 2011-06-27 | 2012-03-07 | 江苏江都建设集团有限公司 | 一种钢板埋件的混凝土浇筑施工方法 |
-
2015
- 2015-03-02 CN CN201510092449.XA patent/CN105986623A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3881856A (en) * | 1971-12-06 | 1975-05-06 | Coignet Construct Edmond | Plant for the fabrication of parallel molded construction elements |
CN1830644A (zh) * | 2006-04-17 | 2006-09-13 | 上海隧道工程股份有限公司 | 现浇箱梁低温蒸汽养护施工方法 |
CN102051916A (zh) * | 2009-11-06 | 2011-05-11 | 中冶天工建设有限公司 | 利用混凝土模板预埋铁件的施工方法 |
CN102061746A (zh) * | 2010-11-26 | 2011-05-18 | 宝业集团浙江建设产业研究院有限公司 | 一种钢结构组合预埋件及其施工方法 |
CN102134879A (zh) * | 2011-01-12 | 2011-07-27 | 陕西建工集团第六建筑工程有限公司 | 超长设备基础平台预埋件埋置精度控制施工方法 |
CN102367704A (zh) * | 2011-06-27 | 2012-03-07 | 江苏江都建设集团有限公司 | 一种钢板埋件的混凝土浇筑施工方法 |
Non-Patent Citations (2)
Title |
---|
侯永生: "《水泥混凝土施工技术问答》", 28 February 2014, 中国铁道出版社 * |
千晓樱月: "预埋件的各种知识", 《百度文库》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032769A (zh) * | 2021-10-19 | 2022-02-11 | 中铁电气化局集团北京建筑工程有限公司 | 地铁车辆段装配式混凝土轨道桥安装方法 |
CN114033087A (zh) * | 2021-11-02 | 2022-02-11 | 郑州祥和集团有限公司 | 变电站预埋件施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8806839B2 (en) | Concrete material and method for preparing the same | |
CN103015719B (zh) | 钻前工程钢筋混凝土废水池整体浇筑工艺 | |
CN104746639B (zh) | 一种在叠合墙板上安装预制飘窗的安装方法 | |
CN1210472C (zh) | 混凝土建筑物用的模板砌块及其制造装置和建造方法以及利用其建造的混凝土建筑物 | |
CN102296754A (zh) | 预制混凝土构件水平钢筋连接构件及连接施工方法 | |
CN106142324A (zh) | 一种预制混凝土构件自动化生产系统 | |
CN106808578B (zh) | 一种上下分体式预制管廊及预制方法 | |
CN106245821B (zh) | 一种轻钢结构轻混凝土预制装配墙体及其施工方法 | |
CN105386517A (zh) | 一种预制飘窗板及其安装方法 | |
EP1878854A3 (en) | Method and apparatus for attaching a lifting lug to a concrete product | |
CN107313531A (zh) | 一种装配整体式剪力墙连接节点及其体系及其施工工艺 | |
CN103568109A (zh) | 一种预制混凝土空心构件成孔方法 | |
WO2012081975A1 (en) | Controlled curing of concrete | |
CN104499498A (zh) | 一种大体积混凝土建筑的施工方法 | |
CN105986623A (zh) | 一种混凝土预埋件施工工法 | |
CN110281347A (zh) | 一种施工现场小型混凝土预制块制作方法 | |
CN205637650U (zh) | 一种混凝土池快装短节 | |
CN105984037A (zh) | 一种组合模具浇筑混凝土施工工法 | |
CN106914984A (zh) | 一种预制复合结构板的施工方法 | |
CN101603373B (zh) | 陶粒砼、陶粒砼整体预制卫生间及其生产方法 | |
CN107268755A (zh) | 一种雨水口的施工方法 | |
CN102161581B (zh) | 一种现场生产轻质墙体材料 | |
CN105003036A (zh) | 一种预制栏杆及其制造方法 | |
CN109797902A (zh) | 预制装配式建筑墙体板 | |
CN202556558U (zh) | 一种预制混凝土污水检查井钢模 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161005 |
|
WD01 | Invention patent application deemed withdrawn after publication |