CN105986620A - 铝合金焊接空心球节点 - Google Patents
铝合金焊接空心球节点 Download PDFInfo
- Publication number
- CN105986620A CN105986620A CN201610519803.7A CN201610519803A CN105986620A CN 105986620 A CN105986620 A CN 105986620A CN 201610519803 A CN201610519803 A CN 201610519803A CN 105986620 A CN105986620 A CN 105986620A
- Authority
- CN
- China
- Prior art keywords
- wall thickness
- aluminum alloy
- hollow ball
- node
- hollow sphere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
- E04B1/1903—Connecting nodes specially adapted therefor
- E04B1/1906—Connecting nodes specially adapted therefor with central spherical, semispherical or polyhedral connecting element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
- E04B1/1903—Connecting nodes specially adapted therefor
- E04B2001/1921—Connecting nodes specially adapted therefor with connecting nodes having radial connecting stubs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种铝合金焊接空心球节点,包括空心球和与其焊接的壁厚加强管,所述空心球是由两半球对焊而成的,所述壁厚加强管沿所述空心球的径向设置,所述壁厚加强管与圆形铝合金杆件采用螺纹连接,所述壁厚加强管的壁厚大于所述圆形铝合金杆件的壁厚。本发明能够降低焊接热影响区对节点承载力的影响,实现圆形铝合金杆件与空心球之间的有效连接,使焊接空心球节点的承载力高于铝合金杆件的承载力,从而实现结构设计中“强节点、弱杆件”的要求,解决由于焊接热影响区材料性能降低,导致铝合金焊接空心球节点结构承载力大幅度下降的难题。并且本发明构造简单,传力明确,连接方便,适应性强,有利于推动铝合金空间网格结构的应用。
Description
技术领域
本发明涉及一种铝合金焊接空心球节点,主要应用在建筑领域中铝合金空间网格结构及铝合金桁架结构。
背景技术
铝储量丰富,通过添加其他合金元素和热处理强化可大幅度改善其机械性能,在上世纪30年代,铝合金便已应用在建筑结构中。与钢材相比,铝合金具有自重轻、耐腐蚀等优良特性,在大跨度空间结构中有独特的优势。目前国内外已有一定数量的铝合金空间网格结构的代表性工程。由于铝合金在焊接过程中材料的组织和性能会发生很大的变化,使得铝合金焊接后热影响区材料强度明显降低,因此目前铝合金结构杆件的连接多为螺栓连接。
钢结构焊接空心球节点适用于连接圆管杆件,适用于单层及双层网格结构。空心球与圆管构件的连接构造简单,传力明确。对于圆管,只要切割面垂直于杆件轴线,杆件就能在空心球体上自然对中而不产生偏心。由于球体无方向性,可与任意方向杆件相连,当节点汇交杆件较多时其优点更为突出。钢结构焊接空心球节点适应性强,可用于各种形式的双层网格,同时在构造上比较接近于刚接计算模型,因而也可在单层网格中应用。但要在铝合金空间网格中使用空心球节点,需要解决由于焊接热影响区材料性能降低,导致结构承载力大幅度下降的难题。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种铝合金焊接空心球节点,该节点能够降低焊接热影响区对节点承载力的影响,实现圆形铝合金杆件与空心球之间的有效连接,使焊接空心球节点的承载力高于圆形铝合金杆件的承载力。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种铝合金焊接空心球节点,包括空心球和与其焊接的壁厚加强管,所述空心球是由两半球对焊而成的,所述壁厚加强管沿所述空心球的径向设置,所述壁厚加强管与圆形铝合金杆件采用螺纹连接,所述壁厚加强管的壁厚大于所述圆形铝合金杆件的壁厚。
所述壁厚加强管的壁厚与所述圆形铝合金杆件的壁厚之比为2.5~3.0。
所述空心球的壁厚与所述圆形铝合金杆件的壁厚之比为3.0~6.0。
所述壁厚加强管露出在所述圆形铝合金杆件之外的长度为30~50mm。
在两个所述半球的焊接处设有弧形肋板。
在所述壁厚加强管内靠近所述空心球的端部设有焊接衬管。
所述壁厚加强管通过内螺纹与所述圆形铝合金杆件连接。
所述壁厚加强管通过外螺纹与所述圆形铝合金杆件连接。
本发明具有的优点和积极效果是:通过与空心球焊接、与圆形铝合金杆件螺纹连接的壁厚加强管将空心球和圆形铝合金杆件连接在一起,降低了焊接热影响区对节点承载力的影响,实现了圆形铝合金杆件与空心球之间的有效连接,使焊接空心球节点的承载力高于铝合金杆件的承载力,从而实现了结构设计中“强节点、弱杆件”的要求,解决了由于焊接热影响区材料性能降低,导致铝合金焊接空心球节点结构承载力大幅度下降的难题。并且本发明构造简单,传力明确,连接方便,适应性强,有利于推动铝合金空间网格结构的应用。
附图说明
图1为本发明实施例1在分离状态的三维示意图;
图2为本发明实施例1在连接状态的三维示意图;
图3为本发明实施例1在分离状态的剖面图;
图4为本发明实施例1在连接状态的剖面图;
图5为本发明实施例2在分离状态的三维示意图;
图6为本发明实施例2在连接状态的三维示意图;
图7为本发明实施例2在分离状态的剖面图;
图8为本发明实施例2在连接状态的剖面图。
图中:1、空心球,2、焊接衬管,3、壁厚加强管,4、圆形铝合金杆件。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
本发明为丰富铝合金空间网格结构的节点形式并改善其结构力学性能,提出了一种铝合金焊接空心球节点,请参阅图1~图8,包括空心球1和与其焊接的壁厚加强管3,所述空心球1是由两半球对焊而成的,所述壁厚加强管3沿所述空心球1的径向设置,所述壁厚加强管3与圆形铝合金杆件4采用螺纹连接,所述壁厚加强管3的壁厚大于所述圆形铝合金杆件4的壁厚。所述壁厚加强管3的螺纹连接长度应满足同圆形铝合金杆件4等强的要求,所述壁厚加强管3露出在所述圆形铝合金杆件4之外的长度宜取30~50mm。上述铝合金焊接空心球节点适用于连接圆形铝合金杆件,可用于铝合金单层及双层网格结构。
上述铝合金焊接空心球节点的实施例1,请参阅图1~图4,上述壁厚加强管3通过内螺纹与所述圆形铝合金杆件4连接。实施例2,请参阅图5~图8,上述壁厚加强管3通过外螺纹与所述圆形铝合金杆件4连接。
在本发明中,所述壁厚加强管3的壁厚与所述圆形铝合金杆件4的壁厚之比宜取2.5~3.0。所述空心球1的壁厚应根据其承载力计算值增加2.5~3.0倍,以抵消铝合金焊接后的强度损失,所述空心球1的壁厚与所述圆形铝合金杆件4的壁厚之比宜取3.0~6.0。从而降低焊接热影响区对节点承载力的影响,实现圆形铝合金杆件4与空心球1之间的有效连接,使焊接空心球节点的承载力高于铝合金杆件4的承载力,从而实现结构设计中“强节点、弱杆件”的要求。当空心球1球径较大时,为提高球体承载力,可在两个所述半球的焊接处设置弧形肋板,形成加肋空心球。加肋空心球的肋板应设置在空间网格结构最大杆件与主要受力杆件组成的轴线平面内。空心球的两半球在焊接处应预留坡口,焊缝要焊透,保证其承载力。壁厚加强管3与空心球1焊接时,应在壁厚加强管3与空心球1之间留2~6mm的空隙,并在壁厚加强管3与空心球1上开坡口,剖口角度以60°为宜,焊缝要焊透,保证同圆形铝合金杆件4等强。为保证焊缝质量,方便焊接,在所述壁厚加强管3内靠近所述空心球1的端部设有焊接衬管2。焊接衬管2为圆形铝合金管件,其壁厚不宜太薄,应大于3mm,长度宜取30~50mm。为方便安装,外径应比圆形铝合金杆件的内径小0.1mm。当焊接工艺可以保证焊接质量时,也可不加焊接衬管2。
上述铝合金焊接空心球节点各部件宜选择相同的铝合金材料。施工时首先完成空心球1两半球的焊接及壁厚加强管3与圆形铝合金杆件4的螺纹连接。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围的情况下,还可以作出很多形式,这些均属于本发明的保护范围之内。
Claims (8)
1.一种铝合金焊接空心球节点,其特征在于,包括空心球和与其焊接的壁厚加强管,所述空心球是由两半球对焊而成的,所述壁厚加强管沿所述空心球的径向设置,所述壁厚加强管与圆形铝合金杆件采用螺纹连接,所述壁厚加强管的壁厚大于所述圆形铝合金杆件的壁厚。
2.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,所述壁厚加强管的壁厚与所述圆形铝合金杆件的壁厚之比为2.5~3.0。
3.根据权利要求1或2所述的铝合金焊接空心球节点,其特征在于,所述空心球的壁厚与所述圆形铝合金杆件的壁厚之比为3.0~6.0。
4.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,所述壁厚加强管露出在所述圆形铝合金杆件之外的长度为30~50mm。
5.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,在两个所述半球的焊接处设有弧形肋板。
6.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,在所述壁厚加强管内靠近所述空心球的端部设有焊接衬管。
7.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,所述壁厚加强管通过内螺纹与所述圆形铝合金杆件连接。
8.根据权利要求1所述的铝合金焊接空心球节点,其特征在于,所述壁厚加强管通过外螺纹与所述圆形铝合金杆件连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610519803.7A CN105986620A (zh) | 2016-07-01 | 2016-07-01 | 铝合金焊接空心球节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610519803.7A CN105986620A (zh) | 2016-07-01 | 2016-07-01 | 铝合金焊接空心球节点 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105986620A true CN105986620A (zh) | 2016-10-05 |
Family
ID=57044422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610519803.7A Pending CN105986620A (zh) | 2016-07-01 | 2016-07-01 | 铝合金焊接空心球节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986620A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545085A (zh) * | 2017-01-18 | 2017-03-29 | 华电重工股份有限公司 | 一种空间钢结构及其连接节点 |
CN106638988A (zh) * | 2017-01-20 | 2017-05-10 | 天津大学 | 一种可焊接的铝合金构件 |
CN109226773A (zh) * | 2018-08-20 | 2019-01-18 | 北京科技大学 | 钛合金空心节点球及其制备方法 |
CN115012520A (zh) * | 2022-07-22 | 2022-09-06 | 河北省建筑工程质量检测中心有限公司 | 一种用于焊接空心球节点的加固系统及方法 |
CN116220195A (zh) * | 2023-05-08 | 2023-06-06 | 山西六建集团有限公司 | 焊接空心球节点及其加工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0053582A1 (fr) * | 1980-12-03 | 1982-06-09 | Ettore Ventrella | Système de construction modulé composé par des joints et des hampes pour structures aux grillages spatiaux |
CN1450232A (zh) * | 2003-04-23 | 2003-10-22 | 北京太空板业股份有限公司 | 一种网架球结构及其生产制造方法 |
JP2009084816A (ja) * | 2007-09-28 | 2009-04-23 | Michiho Sato | 床支持脚 |
CN204940534U (zh) * | 2015-07-21 | 2016-01-06 | 华南理工大学 | 一种可快速装拆的多维多尺度桁架结构 |
CN105386524A (zh) * | 2015-12-03 | 2016-03-09 | 东南大学 | 一种钢网架螺栓连接空心球节点 |
CN105484370A (zh) * | 2016-01-04 | 2016-04-13 | 多维联合集团有限公司 | 管桁架连接套管节点结构及其安装方法 |
CN205776731U (zh) * | 2016-07-01 | 2016-12-07 | 天津大学 | 铝合金焊接空心球节点 |
-
2016
- 2016-07-01 CN CN201610519803.7A patent/CN105986620A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0053582A1 (fr) * | 1980-12-03 | 1982-06-09 | Ettore Ventrella | Système de construction modulé composé par des joints et des hampes pour structures aux grillages spatiaux |
CN1450232A (zh) * | 2003-04-23 | 2003-10-22 | 北京太空板业股份有限公司 | 一种网架球结构及其生产制造方法 |
JP2009084816A (ja) * | 2007-09-28 | 2009-04-23 | Michiho Sato | 床支持脚 |
CN204940534U (zh) * | 2015-07-21 | 2016-01-06 | 华南理工大学 | 一种可快速装拆的多维多尺度桁架结构 |
CN105386524A (zh) * | 2015-12-03 | 2016-03-09 | 东南大学 | 一种钢网架螺栓连接空心球节点 |
CN105484370A (zh) * | 2016-01-04 | 2016-04-13 | 多维联合集团有限公司 | 管桁架连接套管节点结构及其安装方法 |
CN205776731U (zh) * | 2016-07-01 | 2016-12-07 | 天津大学 | 铝合金焊接空心球节点 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545085A (zh) * | 2017-01-18 | 2017-03-29 | 华电重工股份有限公司 | 一种空间钢结构及其连接节点 |
CN106638988A (zh) * | 2017-01-20 | 2017-05-10 | 天津大学 | 一种可焊接的铝合金构件 |
CN109226773A (zh) * | 2018-08-20 | 2019-01-18 | 北京科技大学 | 钛合金空心节点球及其制备方法 |
CN115012520A (zh) * | 2022-07-22 | 2022-09-06 | 河北省建筑工程质量检测中心有限公司 | 一种用于焊接空心球节点的加固系统及方法 |
CN116220195A (zh) * | 2023-05-08 | 2023-06-06 | 山西六建集团有限公司 | 焊接空心球节点及其加工方法 |
CN116220195B (zh) * | 2023-05-08 | 2023-07-07 | 山西六建集团有限公司 | 焊接空心球节点及其加工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105986620A (zh) | 铝合金焊接空心球节点 | |
CN205776731U (zh) | 铝合金焊接空心球节点 | |
CN205475686U (zh) | 一种装配式空心毂节点 | |
CN208329155U (zh) | 一种应用于索撑网壳的装配式空心毂节点 | |
CN205382565U (zh) | 一种高强螺栓空心毂节点 | |
CN205777812U (zh) | 含对拉索结构的钢结构冷却塔 | |
CN205637116U (zh) | 一种抗拉焊接空心球节点 | |
CN201574613U (zh) | 一种输电铁塔的杆件 | |
CN201574612U (zh) | 一种输电铁塔的杆件 | |
CN209243960U (zh) | 一种柱梁连体空间钢结构组合连接节点构造 | |
CN105484945A (zh) | 一种多边形风电塔架及其制造方法 | |
CN101988312A (zh) | 一种建筑组合构件及组合型钢 | |
CN105019560B (zh) | 网壳节点 | |
CN204826226U (zh) | 一种适用于矩形钢管单层网壳的螺栓连接节点 | |
CN206521829U (zh) | 一种可用焊缝连接的铝合金构件 | |
CN207176937U (zh) | 一种应用于铝合金孔径结构的装配式空间节点 | |
CN205857407U (zh) | 内圆外方中空夹层带预应力筋钢管混凝土桁架相贯节点 | |
CN215442729U (zh) | 一种用于连接钢筋与建筑构件的焊接套件 | |
CN207829578U (zh) | 一种多构件汇交大直径空心钢球 | |
CN114658099B (zh) | 一种锥管焊接球节点 | |
CN204645276U (zh) | 一种钢管与焊接球的穿芯式连接节点 | |
CN205530679U (zh) | 一种装配式圆钢管桁架相贯节点 | |
CN206769024U (zh) | 一种散热式钢结构 | |
JP2021160656A (ja) | 結合部材 | |
CN205530713U (zh) | 一种带预应力筋中空夹层圆钢管混凝土桁架节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161005 |