CN105986544A - Combined beam connecting structure with welding studs and application thereof - Google Patents

Combined beam connecting structure with welding studs and application thereof Download PDF

Info

Publication number
CN105986544A
CN105986544A CN201510046832.1A CN201510046832A CN105986544A CN 105986544 A CN105986544 A CN 105986544A CN 201510046832 A CN201510046832 A CN 201510046832A CN 105986544 A CN105986544 A CN 105986544A
Authority
CN
China
Prior art keywords
splice plate
combination beam
attachment structure
concrete
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510046832.1A
Other languages
Chinese (zh)
Inventor
苏庆田
蒋垠茏
杨国涛
陈轶迪
万小霞
李�雨
韩旭
杨荣荣
王瑞雪
于文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510046832.1A priority Critical patent/CN105986544A/en
Publication of CN105986544A publication Critical patent/CN105986544A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a combined beam connecting structure with welding studs and application thereof. The connecting structure comprises a splice plate set and a bolt set, wherein the splice plate set at least includes a large splice plate and two small splice plates, and a plurality of welding stud connectors are welded to the large splice plate; the bolt set at least includes two bolt assemblies each including a threaded shank, a fixing nut connected to the surface of the small splice plates, a fastening nut connected to the surface of the large splice plate and an anchor nut connected to the free end of the threaded shank. The bolt set ensures that steel structures of key stress-bearing parts in a combined beam are connected effectively, the free end shanks and anchor nuts in the bolt set and the welding studs on the large splice plate ensure that steel and concrete are connected effectively, the usage of connecting materials for the combined beam can be reduced, welding at a worksite is eliminated, manufacturing cost is reduced, engineering construction speed is increased, total engineering manufacturing cost is reduced, and durability of the structure is improved.

Description

The combination beam attachment structure of a kind of tape welding nail and application thereof
Technical field
The present invention relates to combinative structure field, especially relate to the combination beam attachment structure of a kind of tape welding nail and answer With.
Background technology
The most same cross section of combinative structure or each rod member have the structure that two or more material makes, because of its material profit With rationally, the advantage such as convenient of constructing, extensively applied in road and bridge and building field.In recent years, combinative structure is even Continuous beam gradually replaces simply supported beam because of the advantages such as comfortable, building height is little, good integrity of driving a vehicle, and becomes combinative structure beam The main expression-form of formula bridge.
At present, in steel performance, girder steel joint area typically has two kinds of versions, welding and bolt Connect.Welding can produce bigger construction error;And residual stress can be produced, for girder steel part fatigue extremely Unfavorable.But latching mechanism is simple, it is reliable to connect, quick construction, be convenient to mount and dismount.Therefore, many employings in engineering Bolt carries out the connection of girder steel.
But, in steel performance, girder steel joint area bolt typically has two kinds of versions, at knot Structure position is not provided with shear connector and welds shear connector on the upper splice plate of structure position.If in structure Position is not provided with shear connector, and steel at this can be caused more weak with the combination of concrete, and girder steel can bear bigger lotus Carry so that original weak jointing stress is the most unfavorable.Cut if welded on the upper splice plate of joint area Power connector, often have influence on high-strength bolt tightens operation, causes the layout quantity of shear connector to be limited System.And under load action, the stress of shear connector will be transferred directly to splice plate so that upper splice plate Bear bigger Local Loads, the local of upper splice plate can be caused to start or lever up, the lever starting or levering up Effect can produce bigger effect at high-strength bolt position, splice plate may be caused directly to come to nothing with girder steel, cause Both are made directly to produce relative slip or the changing of the relative positions.As fruit structure bears bigger load width or steel and concrete Between bear bigger tension load, the shear connector of joint area there will be fatigue rupture phenomenon.
Therefore, a kind of novel steel and concrete combination beam joint construction are developed for ensureing between steel and concrete Effectively connect and the fatigue strength tool of raising connecting portion is of great significance.
Summary of the invention
Defect that the purpose of the present invention is contemplated to overcome above-mentioned prior art to exist and provide one to be particularly suited for Prefabricated combined beam building-site connect tape welding nail combination beam attachment structure and application.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of combination beam attachment structure of tape welding nail, including
Splice plate group: at least include one piece of big splice plate and two pieces of little splice plates, described big splice plate welds number Individual weldering nail connector;
Bolt group: at least including two set bolt pairs, often set bolt pair includes a threaded screw rod, is connected to little spelling The fixing nut on fishplate bar surface, be connected to big splice plate surface clamp nut and be connected to threaded screw rod from By the anchoring nut held.
Preferably, two pieces of parallel lower surfaces being located at girder steel top flange plate of little splice plate, big splice plate is located on girder steel Flange plate upper surface, splice plate group is connected with girder steel upper flange through bolt group.
Preferably, the free end of threaded screw rod has certain length to stretch into the section of watering after combination beam concrete.
Preferably, this attachment structure also includes two sections of girder steels, is connected with splice plate group through bolt group.
It is further preferred that described girder steel is plate girder, steel box-girder or steel truss girder.
The application of the combination beam attachment structure of tape welding nail, this attachment structure is applied in combination beam, at girder steel upper Concrete, the fixing end of the bolt group in attachment structure is positioned at the lower surface of girder steel top board, and free end passes girder steel top Plate and splice plate group after being embedded in described combination beam concrete in the section of watering.
Preferably, cast concrete use scene the most cast-in-place, on-the-spot pour stage by stage or partial precast with Part is cast-in-place.
Combination beam uses following methods to construct:
(1) weldering nail connector is welded on big splice plate;
(2) two sections of girder steel parts are spliced by splice plate group and bolt group;
(3) free end in bolt group installs anchoring nut;
(4) casting concrete in the section of watering after combination beam concrete, makes concrete wrap the free end of bolt group With anchoring nut, carry out the health preserving of concrete and reach intended strength grade, so far completing Prefabricated composite girder segment Connection, and ensure that girder steel between beam section connects and the connection of steel and concrete.
Further, the connector that the bolt comprising free end and anchoring nut acts also as between steel and concrete, protect Card steel is effectively connected with concrete.
Compared with prior art, the invention have the advantages that
One, the splicing of this combination beam connects without fielding welding, reduces fabrication and installation cost, accelerates engineering Speed of application, reduce the total cost of engineering, improve the durability of structure.
Two, ensure effective connection of the steel construction of crucial force part in combination beam by bolt group, pass through bolt Free end screw rod and the weldering nail anchored on nut and big splice plate in group with certain length ensure steel and coagulation Soil effectively connects, and can reduce the connecting material consumption of combination beam relative to other traditional form connecting structure.
Three, weldering nail connector further enhances the connection of girder steel and concrete, thus strengthens combination beam and connect The intensity of structure and reliability.
Accompanying drawing explanation
Fig. 1 is the section structure schematic diagram of the present invention in embodiment 1;
Fig. 2 is the facade structures schematic diagram of the present invention in embodiment 1;
Fig. 3 is the section structure schematic diagram of the present invention in embodiment 2;
Fig. 4 is the facade structures schematic diagram of the present invention in embodiment 2;
Fig. 5 is the section structure schematic diagram of the present invention in embodiment 3;
Fig. 6 is the facade structures schematic diagram of the present invention in embodiment 3;
Fig. 7 is the constructing structure schematic diagram in embodiment 4 in step (1);
Fig. 8 is the constructing structure schematic diagram implemented in 4 in step (1);
Fig. 9 is the constructing structure schematic diagram in embodiment 4 in step (2);
Figure 10 is the constructing structure schematic diagram in embodiment 4 in step (3);
Figure 11 is the constructing structure schematic diagram implemented in 4 in step (3).
Detailed description of the invention
The combination beam attachment structure of a kind of tape welding nail present invention proposed below in conjunction with the drawings and specific embodiments, contain Combination beam and the construction method thereof of the combination beam attachment structure of this tape welding nail are described in further detail.According to lower mask The explanation of body embodiment, advantages and features of the invention will be apparent from.It should be noted that, accompanying drawing all uses very The form that simplifies and all use non-ratio accurately, only in order to convenient, aid in illustrating the embodiment of the present invention lucidly Purpose.
Embodiment 1
A kind of combination beam attachment structure 300 of tape welding nail, it combines section and facade is distinguished the most as depicted in figs. 1 and 2, Being mainly used in steel and concrete combination beam, it includes a splice plate group 200.Splice plate group 200 includes big splice plate 201 and little splice plate 202.It is welded with some weldering nails 203 on big splice plate.Splice plate group 200 is provided with at least Two overlap the bolt group 100 can being connected with girder steel.Above-mentioned bolt group 100 includes a threaded screw rod 101, consolidates Determine nut 102, clamp nut 103, anchoring nut 104, pad 1 and pad 2 106.Wherein, pad One 105 between fixing nut 102 and little splice plate 202, and pad 2 106 is positioned at clamp nut 103 with big Between splice plate 201.Fixing nut 102 is positioned at the lower surface of steel beam flange, threaded screw rod 101 from It is partly embedded into concrete slab through the edge of a wing of girder steel and splice plate group 200 by end.Concrete slab, splice plate group 200 be closely attached by high-strength bolt auxiliary connection 100 with girder steel together with.
When bolt group 100 bears bigger pulling capacity, can the threaded screw rod 101 of Transducers Embedded in Concrete plate from Anchoring nut 104 is set up, to increase the anchorage effect of bolt group 100 by end.
Bolt strength grade in bolt group 100 is 8.8 grades, 10.9 grades or 12.9 grades, threaded screw rod 101, Fixing nut 102 surface all carries out zinc-plated or phosphatization etc. and processes to strengthen its antiseptic power.
Embodiment 2
The combination beam attachment structure 300 followed closely the tape welding of the present invention in conjunction with sectional drawing Fig. 3 and elevation Fig. 4 is said Bright, it is with the difference of embodiment 1, the combination beam attachment structure 300 of the tape welding nail of the present embodiment also includes At least two sections of girder steels 301, splice plate group 200 is connected with girder steel 301 by least two set bolt groups 100.Girder steel 301 is section steel beam and welded steel beam, for plate girder, steel box-girder and steel truss girder.Splice plate group 200 and girder steel 301 Top plate contact face use meet the anticorrosive coating system that rubbing surface requires.
Embodiment 3
The group of the combination beam attachment structure containing tape welding nail of the present invention is described in conjunction with sectional drawing Fig. 5 and elevation Fig. 6 Closing beam 400, containing can be that on-the-spot one-time-concreting, segmentation pour or the concrete of partial precast and cast-in-place combination Plate 401, and the combination beam attachment structure 300 of the most a set of tape welding nail being positioned at concrete 401 bottom.Tape welding In the combination beam attachment structure 300 of nail, the fixing end of threaded screw rod 101 is positioned at bottom surface, girder steel 301 top flange, After the free end of threaded screw rod 101 passes girder steel 301 top flange and splice plate group 200 and is embedded in concrete In the section of watering 401.The drilling precision of splice plate group 200 and girder steel 301 bolt hole with high-strength bolt drilling requirement, When combination beam 400 is longer, can be by according to the linear deformation of the section of watering 401 after precast slab 402 and concrete Bolt hole suitably amplifies.
Embodiment 4
The construction method of combination beam of the present invention is described in conjunction with Fig. 7-11, and step is as follows:
One, as shown in sectional drawing Fig. 7 and elevation Fig. 8, girder steel 301 is installed splice plate group 200 and bolt Group 100;
Two, as shown in sectional drawing Fig. 9, set up template 500, make the upper surface of template 500 and big splice plate 201 Lower surface concordant, and the section of watering 401 after the casting concrete of template 300 upper end;
Three, as shown in sectional drawing Figure 10 and elevation Figure 11, treat that concrete slab reaches design strength and reaches the required age after date, Form removal, completes the construction of combination beam.
In addition, also after Transducers Embedded in Concrete, anchoring can be set up in the end of the threaded screw rod 101 of the section of watering 401 Nut 104, to increase the pulling test strength of bolt group 100.
Foregoing description is only the description to preferred embodiment of the present invention, not any restriction to the scope of the invention, Any change that the those of ordinary skill in field of the present invention does according to the disclosure above content, modification, belong to right and want Seek the protection domain of book.

Claims (8)

1. the combination beam attachment structure of a tape welding nail, it is characterised in that this attachment structure includes
Splice plate group: at least include one piece of big splice plate and two pieces of little splice plates, described big splice plate welds number Individual weldering nail connector;
Bolt group: at least including two set bolt pairs, often set bolt pair includes a threaded screw rod, is connected to little spelling The fixing nut on fishplate bar surface, be connected to big splice plate surface clamp nut and be connected to threaded screw rod from By the anchoring nut held.
The combination beam attachment structure of a kind of tape welding the most according to claim 1 nail, it is characterised in that two pieces The parallel lower surface being located at girder steel top flange plate of little splice plate, big splice plate is located at girder steel top flange plate upper surface, spells Fishplate bar group is connected with top flange plate through bolt group.
The combination beam attachment structure of a kind of tape welding the most according to claim 1 nail, it is characterised in that band spiral shell The free end of the screw rod of stricture of vagina has certain length to stretch into the section of watering after combination beam concrete.
The combination beam attachment structure of a kind of tape welding the most according to claim 1 nail, it is characterised in that this is even Access node structure also includes two sections of girder steels, is connected with splice plate group through bolt group.
The combination beam attachment structure of a kind of tape welding the most according to claim 4 nail, it is characterised in that described Girder steel be plate girder, steel box-girder or steel truss girder.
6. the application of the combination beam attachment structure followed closely according to the tape welding according to any one of claim 1-5, it is special Levying and be, this attachment structure is applied in combination beam, in girder steel upper concrete, the bolt group in attachment structure Fixing end be positioned at the lower surface of girder steel top board, free end is through girder steel top board and splice plate group and is embedded in described group After conjunction beam concrete in the section of watering.
The application of the combination beam attachment structure of a kind of tape welding the most according to claim 6 nail, it is characterised in that Cast concrete uses that scene is the most cast-in-place, on-the-spot to be poured or partial precast is cast-in-place with part stage by stage.
The application of the combination beam attachment structure of a kind of tape welding the most according to claim 6 nail, it is characterised in that Described combination beam uses following methods to construct:
(1) weldering nail connector is welded on big splice plate;
(2) two sections of girder steel parts are spliced by splice plate group and bolt group;
(3) free end in bolt group installs anchoring nut;
(4) casting concrete in the section of watering after combination beam concrete, makes concrete wrap the free end of bolt group With anchoring nut, carry out the health preserving of concrete and reach intended strength grade, so far completing Prefabricated composite girder segment Connection.
CN201510046832.1A 2015-01-29 2015-01-29 Combined beam connecting structure with welding studs and application thereof Pending CN105986544A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510046832.1A CN105986544A (en) 2015-01-29 2015-01-29 Combined beam connecting structure with welding studs and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510046832.1A CN105986544A (en) 2015-01-29 2015-01-29 Combined beam connecting structure with welding studs and application thereof

Publications (1)

Publication Number Publication Date
CN105986544A true CN105986544A (en) 2016-10-05

Family

ID=57034377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510046832.1A Pending CN105986544A (en) 2015-01-29 2015-01-29 Combined beam connecting structure with welding studs and application thereof

Country Status (1)

Country Link
CN (1) CN105986544A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894431A (en) * 2018-07-26 2018-11-27 广西大学 Friction shear resisting fashioned iron-precast concrete combination beam preparation and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11166208A (en) * 1997-12-04 1999-06-22 Ishikawajima Harima Heavy Ind Co Ltd Composite steel floor slab girder and execution thereof
CN202248283U (en) * 2011-08-09 2012-05-30 同济大学 Connecting piece of joint part of steel and concrete combined structure
KR20120078945A (en) * 2011-01-03 2012-07-11 권오근 Prestressed concrete composite girder having corrugated steel plate web
CN102926505A (en) * 2011-08-09 2013-02-13 同济大学 Combination beam member
CN103590322A (en) * 2013-11-05 2014-02-19 上海市政工程设计研究总院(集团)有限公司 Shear force connecting part, combination beam comprising same and construction method of combination beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11166208A (en) * 1997-12-04 1999-06-22 Ishikawajima Harima Heavy Ind Co Ltd Composite steel floor slab girder and execution thereof
KR20120078945A (en) * 2011-01-03 2012-07-11 권오근 Prestressed concrete composite girder having corrugated steel plate web
CN202248283U (en) * 2011-08-09 2012-05-30 同济大学 Connecting piece of joint part of steel and concrete combined structure
CN102926505A (en) * 2011-08-09 2013-02-13 同济大学 Combination beam member
CN103590322A (en) * 2013-11-05 2014-02-19 上海市政工程设计研究总院(集团)有限公司 Shear force connecting part, combination beam comprising same and construction method of combination beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894431A (en) * 2018-07-26 2018-11-27 广西大学 Friction shear resisting fashioned iron-precast concrete combination beam preparation and its construction method

Similar Documents

Publication Publication Date Title
CN203603029U (en) Shearing force connecting piece and composite beam with same
CN103590322B (en) A kind of shear connector, combination beam and its construction method containing the shear connector
CN204571092U (en) Prefabricated composite girder segment syndeton and the compound beam containing syndeton
CN105986631A (en) Combined beam connecting structure with orifice plates and application thereof
JP5388753B2 (en) Steel slab reinforcement method and steel-concrete composite panel used in the method
CN113774781A (en) Shear part joint composite structure of composite beam bridge and construction method thereof
CN105986544A (en) Combined beam connecting structure with welding studs and application thereof
JP6642884B2 (en) Bridge steel deck slab reinforcement structure and bridge steel deck slab reinforcement method
KR20020021747A (en) Composite beam with prestressed precast concrete panel
CN105986545A (en) Prefabricated composite beam segment connecting structure and application thereof
CN205576761U (en) Prestressing force carbon fiber plate consolidates bridge
CN204571093U (en) The compound beam syndeton of tape welding nail and the compound beam containing this syndeton
CN204570450U (en) Compound beam syndeton with perforated panel and the compound beam containing this syndeton
KR100555246B1 (en) The bridge construction method of having used honeycomb girder type prestressed concrete composite beam and this
CN210596967U (en) Set up prefabricated simple-supported box girder bridge of wet seam connecting piece of steel construction
JP4106317B2 (en) Joint structure of steel / concrete composite slab
JP2007009517A (en) Continuous girder structure of multispan girder bridge
JP2006169927A (en) Prefabricated steel floor slab and steel girder bridge by on-site bonding and joint
CN205653709U (en) Reinforced (rfd) a chain of cuff device of hollow slab bridge
JP2019148141A (en) Sheath joint with shear key function, pc member, pc floor slab, pc member connection method, and pc floor slab connection method
CN216405063U (en) Joint composite structure of combined beam bridge
JP4885327B1 (en) Steel material repair structure and steel material repair method
JPH01105807A (en) Connection structure of precast concrete floor panel
AZOUWIN et al. UOB-IEASMA-129: Damage and Rehabilitation Issues in Box Girder Bridges
CN105862609A (en) Steel belt and bolt interlined hooping method for reinforcing hollow slab bridges and hooping system thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161005

RJ01 Rejection of invention patent application after publication