CN105986057A - Replacement method of heated pipe in evaporative cooling flue - Google Patents

Replacement method of heated pipe in evaporative cooling flue Download PDF

Info

Publication number
CN105986057A
CN105986057A CN201510043514.XA CN201510043514A CN105986057A CN 105986057 A CN105986057 A CN 105986057A CN 201510043514 A CN201510043514 A CN 201510043514A CN 105986057 A CN105986057 A CN 105986057A
Authority
CN
China
Prior art keywords
pipeline section
heated
heat pipe
newly
newly heated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510043514.XA
Other languages
Chinese (zh)
Other versions
CN105986057B (en
Inventor
陈建新
董志龙
张现瑞
刘志华
窦耀
韩义赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lian Feng Steel (Zhangjiagang) Co., Ltd.
Original Assignee
Jiangsu Yonggang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yonggang Group Co Ltd filed Critical Jiangsu Yonggang Group Co Ltd
Priority to CN201510043514.XA priority Critical patent/CN105986057B/en
Publication of CN105986057A publication Critical patent/CN105986057A/en
Application granted granted Critical
Publication of CN105986057B publication Critical patent/CN105986057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a replacement method of a heated pipe in an evaporative cooling flue, which includes the following steps: 1) firstly, shutting down the furnace, and relieving the pressure of a steam drum and releasing water; 2) cleaning slag in the evaporative cooling flue; 3) determining whether a cracked heated pipe section needs to replace or not; 4) measuring size and drawing mark lines; 5) when water exists in the cracked heated pipe section, cutting the ridges at the two side; 6) cutting the cracked heated pipe section; 7) plugging the opening, which is butt jointed to the lower opening of the cracked heated pipe section, of a heated pipe with an iron plate; 8) punching the bottom of a lower bended pipe to form a washing hole; 9) selecting a new heated pipe section and cutting a window at a position being closed to each of an upper opening and a lower opening of the new heated pipe section; 10) welding the new heated pipe section to the heated pipe and plugging the windows; 11) cleaning the new heated pipe section; 12) plugging the washing hole; 13) filling the new heated pipe section with water; 14) welding the new heated pipe section to adjacent heating pipes by means of ridges; and 15) continuously filling the heated pipe section with water and inspecting leakage situation. The replacement method has high safety.

Description

A kind of gasification cooling flue heat pipe replacing options
Technical field
The present invention relates to pneumatic steelmaking equipment, be specifically related to a kind of online replacing options of gasification cooling flue heat pipe.
Background technology
On steelwork converter equipment, gasification cooling flue is one of main corollary equipment of pneumatic steelmaking, the high-temperature flue gas produced when being mainly used in collecting converter smelting the flue-gas temperature reducing high-temperature flue gas.The structure of gasification cooling flue is: include gasification cooling flue body, described gasification cooling flue body is surrounded by some circumferentially spaced heat pipes, between adjacent heat pipe, gap uses rib to seal respectively, the upper orifice of all heat pipes is connected with the vapour endless tube that goes out of connection drum, the lower nozzle of every heat pipe is connected to lower bend pipe, every lower bend pipe is connected with the water inlet manifold being located on gasification cooling flue body by connection straight tube respectively, is provided with blowoff valve on water inlet manifold.In use, after gasification cooling flue is vertically installed on above converter mouth, then cooling water is injected heat pipe from water inlet manifold, the high-temperature flue gas so produced during converter smelting in uphill process can and the cooling water generation heat exchange in heat pipe, and cool down the steam-water mixed steam that water produces after heat exchange and can be passed through drum through entering vapour house steward.Periodicity due to converter smelting, the effect that gasification cooling flue can frequently be expanded with heat and contract with cold, thus cause gasification cooling flue its heat pipe after using certain furnace life to there will be fatigue cracking in various degree, and then generation drainage, bury bigger potential safety hazard for normal production thed bessemerize.And be heated pipeline section for the cracking of heat pipe in gasification cooling flue, at present not by the method that pipeline section is replaced of being heated that ftractures of heat pipe, present stage mainly uses and directly carries out repair welding or the method subsidizing welding at the cracking of the pipeline section that is heated to ftractureing, but repair welding or the weld seam after subsidizing welding easily occur weld cracking or booster phenomenon after converter again blow-on.
Summary of the invention
It is an object of the invention to provide a kind of gasification cooling flue heat pipe replacing options that a kind of safety is high.
For achieving the above object, present invention employs following technical scheme: described a kind of gasification cooling flue heat pipe replacing options, comprise the following steps:
(1) first make converter blowing out, the most again pressure in drum is unloaded to normal pressure and the hot water in drum is bled off;
(2) the most again gasification cooling flue inwall is carried out scarfing cinder;
(3) after cooling stack inwall scarfing cinder to be vaporized, then according to leaking and heat pipe cracking situation judges to have ftractureed and be heated pipeline section the need of being replaced, serious or when having above crackle at 3 on the heat pipe surface of 10cm length when leaking, then judge that this pipeline section that is heated of having ftractureed needs to be replaced;
(4), after the pipeline section that is heated when judging to have ftractureed needs to be replaced, measuring has ftractureed is heated the size of pipeline section, and ftracture be heated pipeline section size positions at draw mark line and lower mark line respectively;
(5) when the heat pipe section that ftractures is positioned at the lower section of blowoff valve, first opening blowoff valve, then cutting off with cutting machine ftractures is heated the rib of pipeline section both sides;When the pipeline section that is heated when ftractureing has part be positioned at the top of blowoff valve or be entirely located in the top of blowoff valve, first use cutting machine to cut off the rib of pipeline section both sides of being heated that ftractures, open blowoff valve the most again;
(6) then with cutter alignment lower mark line cutting heat pipe, until being heated ftractureing, the lower nozzle of pipeline section is separated with the heat pipe at place, it is heated after the lower nozzle of pipeline section flows to end from ftractureing wait the hot water being positioned in the heat pipe above lower mark line, again with cutter alignment upper mark line cutting heat pipe, until the pipeline section that is heated ftractureing excises from heat pipe;
(7) then will block with the mouth of pipe that the lower nozzle of pipeline section docks mutually that is heated of ftractureing on heat pipe with iron plate;
(8) then excise ftracture be heated pipeline section heat pipe lower bend pipe bottom offer flushing hole;
(9) then select and the pipeline section that is newly heated of pipeline section consistent size of being heated that ftractureed, and offer skylight at the nearly upper orifice of this pipeline section that is newly heated, at the nearly lower nozzle of this pipeline section that is newly heated, offer lower skylight;
(10) then the pipeline section that is newly heated is put in heat pipe and replaces the cracking excised and be heated pipeline section, and upper orifice and the lower nozzle of the pipeline section that is newly heated are docked mutually with heat pipe respectively, then DC welder is stretched into, from upper skylight, the pipeline section that is newly heated, then heat pipe interfaced for the upper orifice of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of upper skylight;The most again DC welder is stretched into, from lower skylight, the pipeline section that is newly heated, then heat pipe interfaced for the lower nozzle of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of lower skylight;
(11) after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 15-25 minute, water flowing in heat pipe the most again, the impurity such as the welding slag in heat pipe are washed away from flushing hole;
(12), after rinsing in the heat pipe having the pipeline section that is newly heated to be replaced, re-use DC welder and closure is welded in the flushing hole bottom lower bend pipe;
(13) until lower bend pipe flushing hole weld closure after 9-11 minute, to replacing water flowing in the heat pipe of pipeline section that is newly heated, be filled with water until having changed in the heat pipe of pipeline section that is newly heated;
(14) gap rib welding closure between the heat pipe that the pipeline section that is newly heated is adjacent by DC welder is then re-used;
(15) then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 400mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
Further, aforesaid a kind of gasification cooling flue heat pipe replacing options, wherein: when the upper orifice of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, this weld seam is tapped two to three times with hammer, when the lower nozzle of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer.
Further, aforesaid a kind of gasification cooling flue heat pipe replacing options, wherein: use room for manoeuvre welding method by rib segmentation and the both sides being welded in the pipeline section that is newly heated symmetrically, after every section of rib welds mutually with adjacent heat pipe, tap this section of weld seam two to three times with hammer.
Further, aforesaid a kind of gasification cooling flue heat pipe replacing options, wherein: after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 20 minutes, the outer surface of the pipeline section that is newly heated is rinsed again, until the cleaning of outer surface of the pipeline section that is newly heated is clean with water;
Further, aforesaid a kind of gasification cooling flue heat pipe replacing options, wherein: after closure is welded in the flushing hole of lower bend pipe 10 minutes, to changing water flowing in the heat pipe of pipeline section that is newly heated, it is filled with water until having changed in the heat pipe of pipeline section that is newly heated;
Further, aforesaid a kind of gasification cooling flue heat pipe replacing options, wherein: then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 400mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
By the enforcement of technique scheme, the invention has the beneficial effects as follows: simple to operate, safe to use, the pipeline section that can be heated the cracking of heat pipe in gasification cooling flue is replaced, and the heat pipe after replacing does not haves weld cracking or booster phenomenon after converter again blow-on.
Detailed description of the invention
Below in conjunction with specific embodiment, the invention will be further described.
Embodiment one
Described a kind of gasification cooling flue heat pipe replacing options, comprises the following steps:
(1) first make converter blowing out, the most again pressure in drum is unloaded to normal pressure and the hot water in drum is bled off;
(2) the most again gasification cooling flue inwall being carried out scarfing cinder, when scarfing cinder, maintainer prepares to overhaul spare part in advance;
(3) after cooling stack inwall scarfing cinder to be vaporized, then according to leaking and heat pipe cracking situation judges to have ftractureed and be heated pipeline section the need of being replaced, serious or when having above crackle at 3 on the heat pipe surface of 10cm length when leaking, then judge that this pipeline section that is heated of having ftractureed needs to be replaced;
(4), after the pipeline section that is heated when judging to have ftractureed needs to be replaced, measuring has ftractureed is heated the size of pipeline section, and ftracture be heated pipeline section size positions at draw mark line and lower mark line respectively;
(5) when the heat pipe section that ftractures is positioned at the lower section of blowoff valve, first open blowoff valve, then cutting off with cutting machine ftractures is heated the rib of pipeline section both sides, because owing to the heat pipe section that ftractures is positioned at the lower section of blowoff valve, after blowoff valve is opened, it is positioned under external and internal pressure effect in the pipeline section that is heated below blowoff valve and has water, it is ensured that cut off rib when ftractureing and being heated in pipeline section and have water, thus alleviate the deflection of heat pipe in rib cutting process;When the pipeline section that is heated when ftractureing has part be positioned at the top of blowoff valve or be entirely located in the top of blowoff valve, cutting machine is first used to cut off the rib of pipeline section both sides of being heated that ftractures, open blowoff valve the most again, so also ensure that and cut off rib when ftractureing and being heated in pipeline section and have water, thus alleviate the deflection of heat pipe in rib cutting process;
(6) then with cutter alignment lower mark line cutting heat pipe, until being heated ftractureing, the lower nozzle of pipeline section is separated with the heat pipe at place, it is heated after the lower nozzle of pipeline section flows to end from ftractureing wait the hot water being positioned in the heat pipe above lower mark line, again with cutter alignment upper mark line cutting heat pipe, until the pipeline section that is heated ftractureing excises from heat pipe;
(7) then will block with the mouth of pipe that the lower nozzle of pipeline section docks mutually that is heated of ftractureing on heat pipe with iron plate, it is to avoid foreign material enter from this mouth of pipe and block heat pipe;
(8) then excise ftracture be heated pipeline section heat pipe lower bend pipe bottom offer flushing hole;
(9) then select and the pipeline section that is newly heated of pipeline section consistent size of being heated that ftractureed, and offer skylight at the nearly upper orifice of this pipeline section that is newly heated, at the nearly lower nozzle of this pipeline section that is newly heated, offer lower skylight;
(10) then the pipeline section that is newly heated is put in heat pipe and replaces the cracking excised and be heated pipeline section, and upper orifice and the lower nozzle of the pipeline section that is newly heated are docked mutually with heat pipe respectively, then DC welder is stretched into, from upper skylight, the pipeline section that is newly heated, then heat pipe interfaced for the upper orifice of the pipeline section that is newly heated is welded mutually, when the upper orifice of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;The most again by the welding closure of upper skylight;The most again DC welder is stretched into, from lower skylight, the pipeline section that is newly heated, then heat pipe interfaced for the lower nozzle of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of lower skylight, when the lower nozzle of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;
(11) after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 20 minutes, water flowing in heat pipe the most again, the impurity such as the welding slag in heat pipe are washed away from flushing hole;
(12), after rinsing in the heat pipe having the pipeline section that is newly heated to be replaced, re-use DC welder and closure is welded in the flushing hole bottom lower bend pipe;
(13) until lower bend pipe flushing hole weld closure after 10 minutes, to replacing water flowing in the heat pipe of pipeline section that is newly heated, be filled with water until having changed in the heat pipe of pipeline section that is newly heated;
(14) then use room for manoeuvre welding method by using DC welder by rib segmentation and the both sides being welded in the pipeline section that is newly heated symmetrically, after every section of rib welds mutually with adjacent heat pipe, tap this section of weld seam two to three times with hammer;
(15) then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 400mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
Embodiment two
Described a kind of gasification cooling flue heat pipe replacing options, comprises the following steps:
(1) first make converter blowing out, the most again pressure in drum is unloaded to normal pressure and the hot water in drum is bled off;
(2) the most again gasification cooling flue inwall is carried out scarfing cinder;
(3) after cooling stack inwall scarfing cinder to be vaporized, then according to leaking and heat pipe cracking situation judges to have ftractureed and be heated pipeline section the need of being replaced, serious or when having above crackle at 3 on the heat pipe surface of 10cm length when leaking, then judge that this pipeline section that is heated of having ftractureed needs to be replaced;
(4), after the pipeline section that is heated when judging to have ftractureed needs to be replaced, measuring has ftractureed is heated the size of pipeline section, and ftracture be heated pipeline section size positions at draw mark line and lower mark line respectively;
(5) when the heat pipe section that ftractures is positioned at the lower section of blowoff valve, first opening blowoff valve, then cutting off with cutting machine ftractures is heated the rib of pipeline section both sides;When the pipeline section that is heated when ftractureing has part be positioned at the top of blowoff valve or be entirely located in the top of blowoff valve, first use cutting machine to cut off the rib of pipeline section both sides of being heated that ftractures, open blowoff valve the most again;
(6) then with cutter alignment lower mark line cutting heat pipe, until being heated ftractureing, the lower nozzle of pipeline section is separated with the heat pipe at place, it is heated after the lower nozzle of pipeline section flows to end from ftractureing wait the hot water being positioned in the heat pipe above lower mark line, again will be with cutter alignment upper mark line cutting heat pipe, until the pipeline section that is heated ftractureing excises from heat pipe;
(7) then will block with the mouth of pipe that the lower nozzle of pipeline section docks mutually that is heated of ftractureing on heat pipe with iron plate;
(8) then excise ftracture be heated pipeline section heat pipe lower bend pipe bottom offer flushing hole;
(9) then select and the pipeline section that is newly heated of pipeline section consistent size of being heated that ftractureed, and offer skylight at the nearly upper orifice of this pipeline section that is newly heated, at the nearly lower nozzle of this pipeline section that is newly heated, offer lower skylight;
(10) then the pipeline section that is newly heated is put in heat pipe and replaces the cracking excised and be heated pipeline section, and upper orifice and the lower nozzle of the pipeline section that is newly heated are docked mutually with heat pipe respectively, then DC welder is stretched into, from upper skylight, the pipeline section that is newly heated, then heat pipe interfaced for the upper orifice of the pipeline section that is newly heated is welded mutually, when the upper orifice of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;The most again by the welding closure of upper skylight;The most again DC welder is stretched into, from lower skylight, the pipeline section that is newly heated, then heat pipe interfaced for the lower nozzle of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of lower skylight, when the lower nozzle of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;
(11) after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 15 minutes, water flowing in heat pipe the most again, the impurity such as the welding slag in heat pipe are washed away from flushing hole;
(12), after rinsing in the heat pipe having the pipeline section that is newly heated to be replaced, re-use DC welder and closure is welded in the flushing hole bottom lower bend pipe;
(13) until lower bend pipe flushing hole weld closure after 9 minutes, to replacing water flowing in the heat pipe of pipeline section that is newly heated, be filled with water until having changed in the heat pipe of pipeline section that is newly heated;
(14) then use room for manoeuvre welding method by using DC welder by rib segmentation and the both sides being welded in the pipeline section that is newly heated symmetrically, after every section of rib welds mutually with adjacent heat pipe, tap this section of weld seam two to three times with hammer;
(15) then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 390mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
Embodiment three
Described a kind of gasification cooling flue heat pipe replacing options, comprises the following steps:
(1) first make converter blowing out, the most again pressure in drum is unloaded to normal pressure and the hot water in drum is bled off;
(2) the most again gasification cooling flue inwall is carried out scarfing cinder;
(3) after cooling stack inwall scarfing cinder to be vaporized, then according to leaking and heat pipe cracking situation judges to have ftractureed and be heated pipeline section the need of being replaced, serious or when having above crackle at 3 on the heat pipe surface of 10cm length when leaking, then judge that this pipeline section that is heated of having ftractureed needs to be replaced;
(4), after the pipeline section that is heated when judging to have ftractureed needs to be replaced, measuring has ftractureed is heated the size of pipeline section, and ftracture be heated pipeline section size positions at draw mark line and lower mark line respectively;
(5) when the heat pipe section that ftractures is positioned at the lower section of blowoff valve, first opening blowoff valve, then cutting off with cutting machine ftractures is heated the rib of pipeline section both sides;When the pipeline section that is heated when ftractureing has part be positioned at the top of blowoff valve or be entirely located in the top of blowoff valve, first use cutting machine to cut off the rib of pipeline section both sides of being heated that ftractures, open blowoff valve the most again;
(6) then with cutter alignment lower mark line cutting heat pipe, until being heated ftractureing, the lower nozzle of pipeline section is separated with the heat pipe at place, it is heated after the lower nozzle of pipeline section flows to end from ftractureing wait the hot water being positioned in the heat pipe above lower mark line, again with cutter alignment upper mark line cutting heat pipe, until the pipeline section that is heated ftractureing excises from heat pipe;
(7) then will block with the mouth of pipe that the lower nozzle of pipeline section docks mutually that is heated of ftractureing on heat pipe with iron plate;
(8) then excise ftracture be heated pipeline section heat pipe lower bend pipe bottom offer flushing hole;
(9) then select and the pipeline section that is newly heated of pipeline section consistent size of being heated that ftractureed, and offer skylight at the nearly upper orifice of this pipeline section that is newly heated, at the nearly lower nozzle of this pipeline section that is newly heated, offer lower skylight;
(10) then the pipeline section that is newly heated is put in heat pipe and replaces the cracking excised and be heated pipeline section, and upper orifice and the lower nozzle of the pipeline section that is newly heated are docked mutually with heat pipe respectively, then DC welder is stretched into, from upper skylight, the pipeline section that is newly heated, then heat pipe interfaced for the upper orifice of the pipeline section that is newly heated is welded mutually, when the upper orifice of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;The most again by the welding closure of upper skylight;The most again DC welder is stretched into, from lower skylight, the pipeline section that is newly heated, then heat pipe interfaced for the lower nozzle of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of lower skylight, when the lower nozzle of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer;
(11) after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 25 minutes, water flowing in heat pipe the most again, the impurity such as the welding slag in heat pipe are washed away from flushing hole;
(12), after rinsing in the heat pipe having the pipeline section that is newly heated to be replaced, re-use DC welder and closure is welded in the flushing hole bottom lower bend pipe;
(13) until lower bend pipe flushing hole weld closure after 11 minutes, to replacing water flowing in the heat pipe of pipeline section that is newly heated, be filled with water until having changed in the heat pipe of pipeline section that is newly heated;
(14) then use room for manoeuvre welding method by using DC welder by rib segmentation and the both sides being welded in the pipeline section that is newly heated symmetrically, after every section of rib welds mutually with adjacent heat pipe, tap this section of weld seam two to three times with hammer;
(15) then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 410mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
The invention have the advantage that simple to operate, safe to use, the pipeline section that can be heated the cracking of heat pipe in gasification cooling flue is replaced, and the heat pipe after replacing does not haves weld cracking or booster phenomenon after converter again blow-on.

Claims (6)

1. a gasification cooling flue heat pipe replacing options, it is characterised in that: comprise the following steps:
(1) first make converter blowing out, the most again pressure in drum is unloaded to normal pressure and the hot water in drum is bled off;
(2) the most again gasification cooling flue inwall is carried out scarfing cinder;
(3) after cooling stack inwall scarfing cinder to be vaporized, then according to leaking and heat pipe cracking situation judges to have ftractureed and be heated pipeline section the need of being replaced, serious or when having above crackle at 3 on the heat pipe surface of 10cm length when leaking, then judge that this pipeline section that is heated of having ftractureed needs to be replaced;
(4), after the pipeline section that is heated when judging to have ftractureed needs to be replaced, measuring has ftractureed is heated the size of pipeline section, and ftracture be heated pipeline section size positions at draw mark line and lower mark line respectively;
(5) when the heat pipe section that ftractures is positioned at the lower section of blowoff valve, first opening blowoff valve, then cutting off with cutting machine ftractures is heated the rib of pipeline section both sides;When the pipeline section that is heated when ftractureing has part be positioned at the top of blowoff valve or be entirely located in the top of blowoff valve, first use cutting machine to cut off the rib of pipeline section both sides of being heated that ftractures, open blowoff valve the most again;
(6) then with cutter alignment lower mark line cutting heat pipe, until being heated ftractureing, the lower nozzle of pipeline section is separated with the heat pipe at place, it is heated after the lower nozzle of pipeline section flows to end from ftractureing wait the hot water being positioned in the heat pipe above lower mark line, again with cutter alignment upper mark line cutting heat pipe, until the pipeline section that is heated ftractureing excises from heat pipe;
(7) then will block with the mouth of pipe that the lower nozzle of pipeline section docks mutually that is heated of ftractureing on heat pipe with iron plate;
(8) then excise ftracture be heated pipeline section heat pipe lower bend pipe bottom offer flushing hole;
(9) then select and the pipeline section that is newly heated of pipeline section consistent size of being heated that ftractureed, and offer skylight at the nearly upper orifice of this pipeline section that is newly heated, at the nearly lower nozzle of this pipeline section that is newly heated, offer lower skylight;
(10) then the pipeline section that is newly heated is put in heat pipe and replaces the cracking excised and be heated pipeline section, and upper orifice and the lower nozzle of the pipeline section that is newly heated are docked mutually with heat pipe respectively, then DC welder is stretched into, from upper skylight, the pipeline section that is newly heated, then heat pipe interfaced for the upper orifice of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of upper skylight;The most again DC welder is stretched into, from lower skylight, the pipeline section that is newly heated, then heat pipe interfaced for the lower nozzle of the pipeline section that is newly heated is welded mutually, the most again by the welding closure of lower skylight;
(11) after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 15-25 minute, water flowing in heat pipe the most again, the impurity such as the welding slag in heat pipe are washed away from flushing hole;
(12), after rinsing in the heat pipe having the pipeline section that is newly heated to be replaced, re-use DC welder and closure is welded in the flushing hole bottom lower bend pipe;(13) until lower bend pipe flushing hole weld closure after 9-11 minute, to replacing water flowing in the heat pipe of pipeline section that is newly heated, be filled with water until having changed in the heat pipe of pipeline section that is newly heated;
(14) gap rib welding closure between the heat pipe that the pipeline section that is newly heated is adjacent by DC welder is then re-used;
(15) then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 390-410mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
A kind of gasification cooling flue heat pipe replacing options the most according to claim 1, it is characterized in that: when the upper orifice of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, this weld seam is tapped two to three times with hammer, when the lower nozzle of the pipeline section that is newly heated is heated after the heat pipe of pipeline section welds mutually with excising to ftracture, tap this weld seam two to three times with hammer.
A kind of gasification cooling flue heat pipe replacing options the most according to claim 1, it is characterized in that: use room for manoeuvre welding method by rib segmentation and the both sides being welded in the pipeline section that is newly heated symmetrically, after every section of rib welds mutually with adjacent heat pipe, tap this section of weld seam two to three times with hammer.
A kind of gasification cooling flue heat pipe replacing options the most according to claim 1, it is characterized in that: after the pipeline section that is newly heated is weldingly fixed on that excising ftractures and is heated the heat pipe of pipeline section, first place cooling 20 minutes, the outer surface of the pipeline section that is newly heated is rinsed again, until the cleaning of outer surface of the pipeline section that is newly heated is clean with water.
A kind of gasification cooling flue heat pipe replacing options the most according to claim 1, it is characterized in that: until lower bend pipe flushing hole weld closure after 10 minutes, to changing water flowing in the heat pipe of pipeline section that is newly heated, it is filled with water until having changed in the heat pipe of pipeline section that is newly heated.
A kind of gasification cooling flue heat pipe replacing options the most according to claim 1, it is characterized in that: then continue to changing water flowing in the heat pipe of pipeline section that is newly heated, treat that liquid level of steam drum reaches 400mm, and observe the leakage scenarios of weld seam between the heat pipe that the pipeline section that is newly heated welds with its phase.
CN201510043514.XA 2015-01-29 2015-01-29 A kind of gasification cooling flue heat pipe replacing options Active CN105986057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510043514.XA CN105986057B (en) 2015-01-29 2015-01-29 A kind of gasification cooling flue heat pipe replacing options

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510043514.XA CN105986057B (en) 2015-01-29 2015-01-29 A kind of gasification cooling flue heat pipe replacing options

Publications (2)

Publication Number Publication Date
CN105986057A true CN105986057A (en) 2016-10-05
CN105986057B CN105986057B (en) 2017-10-20

Family

ID=57035628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510043514.XA Active CN105986057B (en) 2015-01-29 2015-01-29 A kind of gasification cooling flue heat pipe replacing options

Country Status (1)

Country Link
CN (1) CN105986057B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108817841A (en) * 2018-07-17 2018-11-16 迁安首钢设备结构有限公司 Mammoth conveter waste heat boiler evaporated flue uses later period maintenance, local replacing technique
CN113414543A (en) * 2021-08-04 2021-09-21 广东韶钢松山股份有限公司 Method for quickly replacing heating pipe of array type converter waste heat boiler and arc-shaped clamp

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586173A (en) * 2009-06-24 2009-11-25 重庆钢铁(集团)有限责任公司 The method of repairing and assembling of the vaporization gas hood of converter vaporization cooling boiler
CN101749689A (en) * 2008-12-10 2010-06-23 中冶赛迪工程技术股份有限公司 Evaporation cooling flue
CN101804501A (en) * 2010-04-01 2010-08-18 中国二十二冶集团有限公司 Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
CN102703640A (en) * 2012-04-17 2012-10-03 中国十七冶集团有限公司 Method of maintenance and lifting for moving section flue at converter mouth
CN102816891A (en) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter
CN203451556U (en) * 2013-07-08 2014-02-26 江阴海陆冶金设备制造有限公司 Pitch-varying flow guide structural heating pipe of evaporative cooling smoke channel for steel converter
CN203625415U (en) * 2013-12-05 2014-06-04 江阴海陆冶金设备制造有限公司 Evaporative cooling flue for steelmaking converter

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749689A (en) * 2008-12-10 2010-06-23 中冶赛迪工程技术股份有限公司 Evaporation cooling flue
CN101586173A (en) * 2009-06-24 2009-11-25 重庆钢铁(集团)有限责任公司 The method of repairing and assembling of the vaporization gas hood of converter vaporization cooling boiler
CN101804501A (en) * 2010-04-01 2010-08-18 中国二十二冶集团有限公司 Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
CN102703640A (en) * 2012-04-17 2012-10-03 中国十七冶集团有限公司 Method of maintenance and lifting for moving section flue at converter mouth
CN102816891A (en) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter
CN203451556U (en) * 2013-07-08 2014-02-26 江阴海陆冶金设备制造有限公司 Pitch-varying flow guide structural heating pipe of evaporative cooling smoke channel for steel converter
CN203625415U (en) * 2013-12-05 2014-06-04 江阴海陆冶金设备制造有限公司 Evaporative cooling flue for steelmaking converter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108817841A (en) * 2018-07-17 2018-11-16 迁安首钢设备结构有限公司 Mammoth conveter waste heat boiler evaporated flue uses later period maintenance, local replacing technique
CN113414543A (en) * 2021-08-04 2021-09-21 广东韶钢松山股份有限公司 Method for quickly replacing heating pipe of array type converter waste heat boiler and arc-shaped clamp
CN113414543B (en) * 2021-08-04 2022-06-21 广东韶钢松山股份有限公司 Method for quickly replacing heating pipe of array type converter waste heat boiler and arc-shaped clamp

Also Published As

Publication number Publication date
CN105986057B (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN104801839B (en) The welding procedure of austenitic stainless steel and chrome molybdenum heat resisting steel
CN203811016U (en) Sealing plug
JP6315869B2 (en) Atmospheric distillation equipment tower top oil gas heat exchange device and heat exchange method
CN102554550B (en) Method for rapidly repairing defects of finned tube module of waste heat boiler
CN104438249B (en) Gas piping on-line cleaning device and method
CN105986057A (en) Replacement method of heated pipe in evaporative cooling flue
CN111041142B (en) Method for repairing water pipe of cooling wall of blast furnace
CN104551525A (en) Processing method used after cracking of furnace shell of blast furnace
CN203820812U (en) Device for repairing copper cooling stave of blast furnace
CN102284772B (en) Argon arc back sealing welding method for housing of low-pressure water supply heater of third-generation nuclear power steam turbine
CN109305709A (en) A kind of ammonia still process reboiler and its processing method and application method for supercritical water oxidation system
CN106338076B (en) High steam pipeline purges target apparatus
CN101701657B (en) Device and method for repairing expansion joint of gas pipeline
CN104227251B (en) The pipeline welding method that puts in a skylight
JP6114726B2 (en) Exhaust gas heat exchanger
CN103361467B (en) Method for online repairing furnace-wall water cooling block of arc furnace
CN211311508U (en) Oxygen lance mouth cooling device
CN205129154U (en) A pipeline water cooling plant for automatic submerged arc welding
CN103602779A (en) Construction method for blowdown system of converter vaporization flue
CN201502833U (en) Gas pipeline expansion joint repair device
CN211101485U (en) Fan-shaped section roller bearing cooling piping structure
CN207811691U (en) A kind of gasification furnace slag notch spray equipment
KR200438414Y1 (en) Dust collecting apparatus for electric furnace
CN204138682U (en) Cooling stave poling repairs coupling device
CN206794212U (en) A kind of old part cleaning device remanufactured for rail vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190710

Address after: 215600 Yonglian Village, Nanfeng Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: Lian Feng Steel (Zhangjiagang) Co., Ltd.

Address before: 215628 Yonglian Jiangsu Yonggang Group Co., Ltd., Nanfeng Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: Jiangsu Yonggang Group Co., Ltd.