CN102816891A - Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter - Google Patents

Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter Download PDF

Info

Publication number
CN102816891A
CN102816891A CN2012103022484A CN201210302248A CN102816891A CN 102816891 A CN102816891 A CN 102816891A CN 2012103022484 A CN2012103022484 A CN 2012103022484A CN 201210302248 A CN201210302248 A CN 201210302248A CN 102816891 A CN102816891 A CN 102816891A
Authority
CN
China
Prior art keywords
section
converter
evaporated flue
main
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103022484A
Other languages
Chinese (zh)
Other versions
CN102816891B (en
Inventor
朱道付
陈玉洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201210302248.4A priority Critical patent/CN102816891B/en
Publication of CN102816891A publication Critical patent/CN102816891A/en
Application granted granted Critical
Publication of CN102816891B publication Critical patent/CN102816891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to a hoisting method for overhauling and dismantling a vaporization flue fixed at the first section of a converter, belonging to a hoisting device for equipment. The hoisting method comprises the following specific steps of: firstly, arranging a hoisting jig; secondly, arranging hoisting points and a hoisting steel wire rope; thirdly, dismantling a support seat; and fourthly, dismantling the vaporization flue fixed at the first section: (1) horizontal positioning: enabling the vaporization flue fixed at the first section to be horizontally placed on a body of the converter; (2) moving the vaporization flue fixed at the first section rightwards: enabling the vaporization flue fixed at the first section and the converter to commonly rotate and move rightwards to the inside of an adding bay of the converter; and (3) lifting the vaporization flue fixed at the first section: lifting a secondary lifting rope and a main lifting rope for an adding bay traveling crane, lifting the vaporization flue fixed at the first section and moving the adding bay traveling crane to hoist the vaporization flue fixed at the first section to the designated position to finish the dismantling and hoisting work. The efficiency and the quality for overhauling and dismantling the vaporization flue fixed at the first section of the converter are effectively improved, the construction cost is reduced and the overhaul time is shortened.

Description

First section of a kind of converter is the hanging method removed of evaporated flue maintenance fixedly
Technical field
The invention belongs to the equipment hoisting method, relate in particular to the hanging method that a kind of converter evaporated flue maintenance is removed.
Background technology
At present; In metallurgical converter steel-making, run into first section fixing (promptly fixedly I section) evaporated flue and need the situation of replacing because of the production serious wear through regular meeting; But technique platform, the equipment layout flyover in converter zone are more, this first section fixedly evaporated flue be arranged in the converter movable evaporated flue and fixedly between the II section evaporated flue, solid space is very compact narrow and small; Usually change this first section fixedly during evaporated flue; The part technique platform that support and the top of need removing this flue fixedly influences on II section evaporated flue and the hoisting passage and with the first section fixing medium pipeline that be connected of evaporated flue so that let the section of informing against fixedly evaporated flue remove the passage that lifting is transported, but the defective of this common method for dismounting is: be the fixing evaporated flue of first section of dismounting replacing; Technique platform and the top flue workplace removed are big; The dismounting parts are many, not only because of the dismounting scope prolongs the repair time greatly, influence the production of owner factory; Also can be big because of removing workplace, the mechanical means increase of input maintainer and use and strengthened the input of the engineering cost of overhaul.
Summary of the invention
The purpose of this invention is to provide the fixedly hanging method removed of evaporated flue maintenance of first section of a kind of converter, safe and reliable, improve the fixedly evaporated flue maintenance efficient and the quality of removing of first section of converter effectively, reduce construction cost and reduce the repair time.
The objective of the invention is to realize like this: first section of a kind of converter is the hanging method removed of evaporated flue maintenance fixedly; Because of first section fixedly evaporated flue 5 be positioned at converter 3 fire doors directly over; Converter 3 is supported on the basis converter 1 through chock 2, and converter 3 can do 360 under the support of chock 2 0The rotation, first section fixedly evaporated flue 5 be fixedly mounted on the supporting seat 4; So first section of a kind of converter is the hanging method (abbreviation hanging method) removed of evaporated flue maintenance fixedly, its concrete steps are following:
One, hoisting machine tool is set:
1), winding plant is set:
On converter rear portion two-layer platform 7, place the windlass 8 that is used for drive pulley group 13, the power of this windlass 8 can be 15kw;
2), tackleblock is set:
Tackleblock 13 is fixed on the oxygen rifle landing beam 12; The haulage cable 17 that makes tackleblock 13 oscilaltions is installed between windlass 8 and tackleblock 13; The point of fixity of this tackleblock 13 is on-the-spot to be selected; Should guarantee that haulage cable 17 and main lifting wireline 14 on the tackleblock 13 all do not have to keep off hinders, and this tackleblock 13 can be 20t-25 t tackleblock;
Two, arrange suspension centre and lifting wireline:
1), arrange main suspension centre and main lifting wireline:
First section fixedly on the top distance of the tilting section right flank of evaporated flue 5 terminal pad (upper flange plate) upper surface 500mm place be welded otic placode with holes as main suspension centre, the main lower end section that lifts wireline 14 that the upper end is fixed on the tackleblock 13 is fixedly attached on this main suspension centre;
2), arrange secondary suspension centre and secondary lifting wireline:
First section fixedly under the middle part distance of the vertical section right flank of evaporated flue 5 terminal pad lower surface 500mm place be welded otic placode with holes as secondary suspension centre; The master on the lifting main hook 9 of inter-bank car 11 of will feeding in raw material again lifts rope 15 and is fixedly connected on this secondary suspension centre as pair lifting wireline
Drive windlass 8 and lifting main hook 9 then respectively, make main lifting wireline 14 and the main rope 15 (promptly secondary lifting wireline) that lifts be in little strained condition, remove supporting seat 4 for next step and prepare;
Three, remove supporting seat:
Main lifting wireline 14 and the main rope 15 (promptly secondary lifting wireline) that lifts hoist respectively; Until rise be raised to first section fixedly the supporting seat 4 of evaporated flue 5 do not bear first section fixedly till the gravity of evaporated flue 5; And first period of this moment fixedly the weight of evaporated flue 5 share jointly by main lifting wireline 14 and the main rope 15 (the promptly secondary wireline that lift) that lifts respectively; Use conventional instrument to remove fixing being connected and being connected this first section fixedly vaporization cooling water pipeline, the annex on the evaporated flue 5 of evaporated flue 6 of supporting seat 4 and upper flange plate and II section then, make first section fixedly evaporated flue 5 be free state;
Four, remove first section fixedly evaporated flue:
1), horizontal displacement:
Main lifting wireline 14 and the main rope 15 that lifts descend respectively; Make first section fixedly evaporated flue 5 progressively become horizontality by the primary dip state; Converter 3 simultaneously turns clockwise; Make first section fixedly evaporated flue 5 lie in a horizontal plane on the body of heater of converter 3, promptly first period of this moment fixedly evaporated flue 5 weight respectively by main lifting wireline 14, mainly lift rope 15 and converter 3 is shared jointly;
2), the first section fixedly evaporated flue that move to right:
The converter 3 that continues to turn clockwise, main simultaneously lifting wireline 14 cooperates the rotation of converters 3 wireline that descends respectively with the main rope 15 that lifts, make first section fixedly evaporated flue 5 and converter 3 together rotate move to right to converter is reinforced stride in, and make the fire door of converter 3 rotate 90 0Horizontal, make first section fixedly evaporated flue 5 maximum activity space is arranged;
3), lift first section fixedly evaporated flue:
The lifting auxiliary hook 10 of the reinforced inter-bank car 11 of decline; Make pair on the lifting auxiliary hook 10 lift rope 16 and be connected to the first section fixedly main suspension centre place on the evaporated flue 5 and being attached thereto firmly; The lifting auxiliary hook 10 that hoists makes pair lift rope 16 to be in strained condition, and the removal master lifts wireline 14, and the windlass 8 of reverse drive tackleblock 13 reclaims main lifting wireline 14 then; Make the power at this main suspension centre place transfer to pair and lift on the rope 16, continue rotation converter 3 and makes fire door rotate 120 0(from directly over); This moment first section fixedly evaporated flue 5 under the rotation of converter 3 bodies of heater; Be transferred to reinforced striding, the pair of the reinforced inter-bank car 11 that hoists lifts rope 16 and the main rope 15 that lifts, and promotes first section fixedly evaporated flue 5; Move reinforced inter-bank car 11 with first section fixedly evaporated flue 5 winch to specified location, accomplished the first section fixedly dismounting lifting work of evaporated flue 5.
First section of a kind of converter proposed by the invention is the hanging method removed of evaporated flue maintenance fixedly, and is safe and reliable, improves the fixedly evaporated flue maintenance efficient and the quality of removing of first section of converter effectively, reduces construction cost and reduced the repair time.
Now in conjunction with the accompanying drawings and embodiments to first section of a kind of converter proposed by the invention fixedly the hanging method removed of evaporated flue maintenance be described further.
Description of drawings
Fig. 1 is fixedly fixedly evaporated flue configuration and arrange synoptic diagram of first section of the converter in the hanging method removed of evaporated flue maintenance of first section of a kind of converter proposed by the invention.
Fig. 2 be first section of a kind of converter proposed by the invention fixedly suspension centre and the weight handling equipment in the hanging method removed of evaporated flue maintenance arrange synoptic diagram.
Fig. 3 is fixedly one of dismounting hoisting process synoptic diagram in the hanging method removed of evaporated flue maintenance of first section of a kind of converter proposed by the invention.
Fig. 4 be first section of a kind of converter proposed by the invention fixedly the dismounting hoisting process synoptic diagram in the hanging method removed of evaporated flue maintenance two.
Fig. 5 be first section of a kind of converter proposed by the invention fixedly the dismounting hoisting process synoptic diagram in the hanging method removed of evaporated flue maintenance three.
Fig. 6 be first section of a kind of converter proposed by the invention fixedly the dismounting hoisting process synoptic diagram in the hanging method removed of evaporated flue maintenance four.
Among Fig. 1-Fig. 6:
1, basis converter 2, chock 3, converter 4, supporting seat 5, first section fixedly evaporated flue 6, II section fixedly evaporated flue 7, converter rear portion two-layer platform 8, windlass 9, lifting main hook 10, lifting auxiliary hook 11, reinforced inter-bank car 12, oxygen rifle landing beam 13, tackleblock 14, main lifting wireline 15, mainly lift rope 16, pair lifts rope 17, haulage cable.
Embodiment
Embodiment
Remove at certain steelworks 60t converter evaporation cooling air flue and to change in engineering, this first section fixing long 13 meters, weight 10t of evaporated flue, but it is very little to remove the zone of operation; Just adopt this hanging method to construct; The operation of whole dismounting hoisting process is implemented smooth, make this first section fixedly evaporated flue remove the time of changing and advanceed to 3 days by 5 days, converter is produced and is recovered fast; Effect is fairly obvious, and dismounting efficient is high, product protection is good.Its construction procedure is:
One, hoisting machine tool is set:
1), winding plant is set:
On converter rear portion two-layer platform 7, place the windlass 8 that is used for drive pulley group 13, the power of this windlass 8 is 15kw;
2), tackleblock is set:
Tackleblock 13 is fixed on the oxygen rifle landing beam 12; The haulage cable 17 that makes tackleblock 13 oscilaltions is installed between windlass 8 and tackleblock 13; The point of fixity of this tackleblock 13 is on-the-spot to be selected; The main lifting wireline 14 that should guarantee haulage cable 17 and tackleblock 13 does not all have to keep off and hinders, and this tackleblock 13 is the 20t tackleblock;
Two, arrange suspension centre and lifting wireline:
1), arrange main suspension centre and main lifting wireline:
First section fixedly on the top distance of the tilting section right flank of evaporated flue 5 terminal pad (upper flange plate) upper surface 500mm place be welded otic placode with holes as main suspension centre; The lower end section that the upper end is fixed on the main lifting wireline 14 on the tackleblock 13 is fixedly attached on this main suspension centre
2), arrange secondary suspension centre and secondary lifting wireline:
First section fixedly under the middle part distance of the vertical section right flank of evaporated flue 5 terminal pad lower surface 500mm place be welded otic placode with holes as secondary suspension centre; The master on the lifting main hook 9 of inter-bank car 11 of will feeding in raw material again lifts rope 15 and is fixedly connected on this secondary suspension centre as pair lifting wireline
Start windlass 8 and lifting main hook 9 then respectively, make main lifting wireline 14 and the main rope 15 (promptly secondary lifting wireline) that lifts be in little strained condition, remove supporting seat 4 for next step and prepare;
Three, remove supporting seat:
Main lifting wireline 14 and the main rope 15 (promptly secondary lifting wireline) that lifts hoist respectively; Until rise be raised to first section fixedly the supporting seat 4 of evaporated flue 5 do not bear first section fixedly till the gravity of evaporated flue 5; And first period of this moment fixedly the weight of evaporated flue 5 share jointly by main lifting wireline 14 and the main rope 15 (the promptly secondary wireline that lift) that lifts respectively; Use conventional instrument to remove fixing being connected and being connected this first section fixedly vaporization cooling water pipeline, the annex on the evaporated flue 5 of evaporated flue 6 of supporting seat 4 and upper flange plate and II section then, make first section fixedly evaporated flue 5 be free state;
Four, remove first section fixedly evaporated flue:
1), horizontal displacement:
Main lifting wireline 14 and the main rope 15 that lifts descend respectively; Make first section fixedly evaporated flue 5 progressively become horizontality by the primary dip state; Converter 3 simultaneously turns clockwise; Make first section fixedly evaporated flue 5 lie in a horizontal plane on the body of heater of converter 3, promptly first period of this moment fixedly evaporated flue 5 weight respectively by main lifting wireline 14, mainly lift rope 15 and converter 3 is shared jointly;
2), the first section fixedly evaporated flue that move to right:
The converter 3 that continues to turn clockwise, main simultaneously lifting wireline 14 cooperates the rotation of converters 3 wireline that descends respectively with the main rope 15 that lifts, make first section fixedly evaporated flue 5 and converter 3 together rotate move to right to converter is reinforced stride in, and make the fire door of converter 3 rotate 90 0Horizontal, make first section fixedly evaporated flue 5 maximum activity space is arranged;
3), lift first section fixedly evaporated flue:
The lifting auxiliary hook 10 of the reinforced inter-bank car 11 of decline; Make pair on the lifting auxiliary hook 10 lift rope 16 and be connected to the first section fixedly main suspension centre place on the evaporated flue 5 and being attached thereto firmly; The lifting auxiliary hook 10 that hoists makes pair lift rope 16 to be in strained condition, and the removal master lifts wireline 14, and the windlass 8 of reverse drive tackleblock 13 reclaims main lifting wireline 14 then; Make the power of this main suspension centre transfer to pair and lift on the rope 16, continue rotation converter 3 and also makes fire door rotate 120 0(from directly over); This moment first section fixedly evaporated flue 5 under the rotation of converter 3 bodies of heater; Be transferred to reinforced striding, the pair of the reinforced inter-bank car 11 that hoists lifts rope 16 and the main rope 15 that lifts, and promotes first section fixedly evaporated flue 5; Move reinforced inter-bank car 11 with first section fixedly evaporated flue 5 winch to specified location, accomplished the first section fixedly dismounting lifting work of evaporated flue 5.

Claims (1)

1. the fixing hanging method removed of evaporated flue maintenance of first section an of converter, its concrete steps are following:
One, hoisting machine tool is set:
1), winding plant is set:
Two-layer platform (7) is gone up and is placed the windlass (8) that is used for drive pulley group (13) at the converter rear portion, and the power of this windlass (8) is 15kw;
2), tackleblock is set:
Tackleblock (13) is fixed on the oxygen rifle landing beam (12); The haulage cable (17) that makes tackleblock (13) oscilaltion is installed between windlass (8) and tackleblock (13); The point of fixity of this tackleblock (13) is on-the-spot to be selected; The main lifting wireline (14) that should guarantee haulage cable (17) and tackleblock (13) does not all have to keep off and hinders, and this tackleblock (13) is a 20t-25 t tackleblock;
Two, arrange suspension centre and lifting wireline:
1), arrange main suspension centre and main lifting wireline:
First section fixedly the last terminal pad upper surface 500mm of the top distance place of the tilting section right flank of evaporated flue (5) be welded otic placode with holes as main suspension centre, the main lower end section that lifts wireline (14) that the upper end is fixed on the tackleblock (13) is fixedly attached on this main suspension centre;
2), arrange secondary suspension centre and secondary lifting wireline:
First section fixedly under the middle part distance of the vertical section right flank of evaporated flue (5) terminal pad lower surface 500mm place be welded otic placode with holes as secondary suspension centre; The master on the lifting main hook (9) on the inter-bank car (11) of will feeding in raw material again lifts rope (15) and is fixedly connected on this secondary suspension centre as pair lifting wireline
Start windlass (8) and lifting main hook (9) then respectively, make main lifting wireline (14) and master lift rope (15) and be in little strained condition, remove supporting seat (4) for next step and prepare;
Three, remove supporting seat:
Main lifting wireline (14) and the main rope (15) that lifts hoist respectively; Until rise be raised to first section fixedly the supporting seat (4) of evaporated flue (5) do not bear first section fixedly till the gravity of evaporated flue (5); And first period of this moment fixedly the weight of evaporated flue (5) lift rope (15) and share jointly with leading by main lifting wireline (14) respectively; Use conventional instrument to remove fixing being connected and being connected this first section fixedly vaporization cooling water pipeline, the annex on the evaporated flue (5) of evaporated flue (6) of supporting seat (4) and upper flange plate and II section then, make first section fixedly evaporated flue (5) be free state;
Four, remove first section fixedly evaporated flue:
1), horizontal displacement:
Main lifting wireline (14) and the main rope (15) that lifts descend respectively; Make first section fixedly evaporated flue (5) progressively become horizontality by the primary dip state; Converter (3) simultaneously turns clockwise; Make first section fixedly evaporated flue (5) lie in a horizontal plane on the body of heater of converter (3), promptly first period of this moment fixedly evaporated flue (5) weight respectively by main lifting wireline (14), the master lifts rope (15) and converter (3) shares jointly;
2), the first section fixedly evaporated flue that move to right:
Converter (3) continues to turn clockwise; Main simultaneously lifting wireline (14) cooperates the rotation of converter (3) wireline that descends respectively with the main rope (15) that lifts; Make first section fixedly evaporated flue (5) and converter (3) together rotate move to right to converter is reinforced stride in, and make the fire door of converter (3) rotate 90 0Horizontal, make first section fixedly evaporated flue (5) maximum activity space is arranged;
3), lift first section fixedly evaporated flue:
The lifting auxiliary hook (10) of the reinforced inter-bank car (11) of decline; Make pair on the lifting auxiliary hook (10) lift rope (16) and be connected to the first section fixedly main suspension centre place on the evaporated flue (5) and being attached thereto firmly; The lifting auxiliary hook (10) that hoists makes pair lift rope (16) to be in strained condition; And the removal master lifts wireline (14); The windlass (8) of reverse drive tackleblock (13) reclaims main lifting wireline (14) then, makes the power of this main suspension centre transfer to pair and lifts on the rope (16), continues to rotate converter (3) and also makes fire door rotate to 120 0This moment first section fixedly evaporated flue (5) under the rotation of converter (3) body of heater; Be transferred to reinforced striding, the pair of the reinforced inter-bank car (11) that hoists lifts rope (16) and the master lifts rope (15), promotes first section fixedly evaporated flue (5); Move reinforced inter-bank car (11) with first section fixedly evaporated flue (5) winch to specified location, accomplished the first section fixedly dismounting lifting work of evaporated flue (5).
CN201210302248.4A 2012-08-23 2012-08-23 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter Active CN102816891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210302248.4A CN102816891B (en) 2012-08-23 2012-08-23 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210302248.4A CN102816891B (en) 2012-08-23 2012-08-23 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter

Publications (2)

Publication Number Publication Date
CN102816891A true CN102816891A (en) 2012-12-12
CN102816891B CN102816891B (en) 2014-02-12

Family

ID=47301335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210302248.4A Active CN102816891B (en) 2012-08-23 2012-08-23 Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter

Country Status (1)

Country Link
CN (1) CN102816891B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060102A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Method for mounting large-sized flash smelting furnace
CN104418240A (en) * 2013-08-27 2015-03-18 中国五冶集团有限公司 Large flue lifting and assembly method
CN105907921A (en) * 2016-04-14 2016-08-31 中国十七冶集团有限公司 Relay hoisting method for gas cooler
CN105986057A (en) * 2015-01-29 2016-10-05 江苏永钢集团有限公司 Replacement method of heated pipe in evaporative cooling flue
CN106015729A (en) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 Reverse in-position method for vaporization flue in closed plant
CN106435087A (en) * 2016-08-29 2017-02-22 中国十七冶集团有限公司 Sectional assembling and mounting method for converter vaporization flue
CN107267708A (en) * 2017-07-07 2017-10-20 莱芜钢铁集团有限公司 The replacing options of converter alloy rotating disk tremie pipe
CN108728605A (en) * 2018-08-20 2018-11-02 攀钢集团工程技术有限公司 Converter trunnion ring replacing options
CN108946470A (en) * 2018-07-09 2018-12-07 莱芜钢铁集团有限公司 A kind of replacing options for converter entirety flue
CN109022672A (en) * 2018-08-24 2018-12-18 中国二十冶集团有限公司 The installation method of converter evaporation cooling air flue when a kind of maintenance

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201089776Y (en) * 2007-09-26 2008-07-23 首钢总公司 Convertor flue maintenance equipment
CN101671761A (en) * 2008-09-10 2010-03-17 中冶赛迪工程技术股份有限公司 Vaporization cooling device
CN101812564A (en) * 2010-04-27 2010-08-25 武汉一冶机电工程有限责任公司 Method for installing converter in plug-in mode

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201089776Y (en) * 2007-09-26 2008-07-23 首钢总公司 Convertor flue maintenance equipment
CN101671761A (en) * 2008-09-10 2010-03-17 中冶赛迪工程技术股份有限公司 Vaporization cooling device
CN101812564A (en) * 2010-04-27 2010-08-25 武汉一冶机电工程有限责任公司 Method for installing converter in plug-in mode

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王茂伙: "福建三钢1号转炉汽化烟道炉口段拆除更换施工技术", 《南方金属》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104418240A (en) * 2013-08-27 2015-03-18 中国五冶集团有限公司 Large flue lifting and assembly method
CN104418240B (en) * 2013-08-27 2016-06-22 中国五冶集团有限公司 The lifting of a kind of flue and group are to method
CN104060102B (en) * 2014-07-08 2016-01-20 七冶建设有限责任公司 A kind of large-scale flash smelting furnace installation method
CN104060102A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Method for mounting large-sized flash smelting furnace
CN105986057B (en) * 2015-01-29 2017-10-20 江苏永钢集团有限公司 A kind of gasification cooling flue heat pipe replacing options
CN105986057A (en) * 2015-01-29 2016-10-05 江苏永钢集团有限公司 Replacement method of heated pipe in evaporative cooling flue
CN105907921A (en) * 2016-04-14 2016-08-31 中国十七冶集团有限公司 Relay hoisting method for gas cooler
CN105907921B (en) * 2016-04-14 2018-01-02 中国十七冶集团有限公司 A kind of method of relay lifting gas cooler
CN106015729A (en) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 Reverse in-position method for vaporization flue in closed plant
CN106015729B (en) * 2016-06-08 2018-03-06 中国十七冶集团有限公司 A kind of reverse method in place of evaporated flue under sealing power house
CN106435087A (en) * 2016-08-29 2017-02-22 中国十七冶集团有限公司 Sectional assembling and mounting method for converter vaporization flue
CN107267708A (en) * 2017-07-07 2017-10-20 莱芜钢铁集团有限公司 The replacing options of converter alloy rotating disk tremie pipe
CN107267708B (en) * 2017-07-07 2019-04-05 莱芜钢铁集团有限公司 The replacing options of converter alloy turntable feeder pipe
CN108946470A (en) * 2018-07-09 2018-12-07 莱芜钢铁集团有限公司 A kind of replacing options for converter entirety flue
CN108728605A (en) * 2018-08-20 2018-11-02 攀钢集团工程技术有限公司 Converter trunnion ring replacing options
CN109022672A (en) * 2018-08-24 2018-12-18 中国二十冶集团有限公司 The installation method of converter evaporation cooling air flue when a kind of maintenance

Also Published As

Publication number Publication date
CN102816891B (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN102816891B (en) Hoisting method for overhauling and dismantling vaporization flue fixed at first section of converter
CN102703640B (en) Method of maintenance and lifting for moving section flue at converter mouth
CN104762438A (en) A converter device replacing and installing method
CN201756416U (en) Lifting device for overhaul of furnace top material distribution device of blast furnace
CN203269442U (en) Auxiliary suspension device for electric hoist
MY162224A (en) Method and arrangement for moving a heavy load
CN110760634A (en) Blast furnace shell installation method
CN102049335B (en) Installation and construction method of large-sized ball mill
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN201647834U (en) Device for mounting tower equipment in narrow spaces
CN204958963U (en) Jacking device that converter trunnion ring was changed
CN202070884U (en) Traversing sleeve replacing device
CN202390116U (en) High-intensity small-tonnage hoist
CN103342321A (en) Integral replacing and hoisting method of steam generator of in-service nuclear power plant
CN203903823U (en) Modular boiler barrel lifting device
CN109622932B (en) Method for quickly replacing rotary bearing of large continuous casting ladle turret
CN202643086U (en) Hoisting tool of hydroxylation reactor
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN203638979U (en) Device for mounting tank floor in low-temperature storage tank
CN203021213U (en) Rotary one-arm crane
CN101215616A (en) Upper repairing method for mammoth converter lining
CN202279833U (en) Simple converter flue transition carriage
CN102515030A (en) Construction process for replacement for steam pocket in narrow condition
CN101537983B (en) Hoisting method of large-scale equipment in factory building for high-altitude positioning
CN203373386U (en) RH vacuum refining device capable of lifting vacuum chamber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant