Highly roller compacted concrete dam construction management flow verification system and method Download PDFInfo
- Publication number
- CN105976159A CN105976159A CN201610276984.5A CN201610276984A CN105976159A CN 105976159 A CN105976159 A CN 105976159A CN 201610276984 A CN201610276984 A CN 201610276984A CN 105976159 A CN105976159 A CN 105976159A
- Authority
- CN
- China
- Prior art keywords
- construction management
- module
- inspection
- roller compacted
- quality evaluation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 95
- 238000009430 construction management Methods 0.000 title claims abstract description 78
- 239000011382 roller-compacted concrete Substances 0.000 title claims abstract description 26
- 238000012795 verification Methods 0.000 title claims abstract description 24
- 230000000977 initiatory effect Effects 0.000 claims abstract description 23
- 238000007689 inspection Methods 0.000 claims description 38
- 238000013441 quality evaluation Methods 0.000 claims description 31
- 238000001303 quality assessment method Methods 0.000 claims description 25
- 239000004567 concrete Substances 0.000 claims description 18
- 238000009434 installation Methods 0.000 claims description 16
- 238000010276 construction Methods 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 8
- 239000011229 interlayer Substances 0.000 claims description 8
- 238000001816 cooling Methods 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 239000004570 mortar (masonry) Substances 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 230000002159 abnormal effect Effects 0.000 claims description 2
- 238000011835 investigation Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims description 2
- 238000005070 sampling Methods 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000011156 evaluation Methods 0.000 abstract 3
- 239000003999 initiator Substances 0.000 abstract 2
- 238000007726 management method Methods 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The invention discloses a highly roller compacted concrete dam construction management flow verification system and method. The system includes an initiating module, a quality acceptance evaluation module, a camera and an electronic signature module which are arranged in a mobile terminal; the initiating module is electrically connected with the camera and the electronic signature module; the quality acceptance evaluation module is electrically connected with the camera and the electronic signature module; and the initiating module is in signal connection with the quality acceptance evaluation module. The initiator of a construction management flow inputs the content of a construction management list, takes a picture of himself or herself, carries out manual electronic signature signing, wirelessly transmits the construction management list to verifiers at each level, so that the verifiers can verify the construction management list; and the initiator inputs a verification result, takes a picture of himself or herself, and carries out manual electronic signature signing. According to the highly roller compacted concrete dam construction management flow verification system and method of the invention, the application and verification of a construction management flow are carried out based on the handheld smart terminal, and a traditional highly roller compacted concrete dam construction management flow verification method is changed. The system and method are simple and practical, and can assist in improving construction management level.
Description
Technical field
The invention belongs to construction management flow process examination & verification technical field, be specifically related to a kind of high roller compacted concrete dam construction management flow process auditing system and method.
Background technology
Traditional high roller compacted concrete dam site construction management is to be filled in construction management list by declarer, holds paper form and looks for each person approving to audit the mode of signature step by step to carry out the management of site operation flow process, inefficiency at the construction field (site).Therefore the high roller compacted concrete dam construction management flow process checking method that research and development are new it is badly in need of, to raise the management level.
Summary of the invention
For overcoming the deficiency of above-mentioned traditional construction management process checking method, the present invention provides a kind of high roller compacted concrete dam construction management flow process auditing system and method, by installing dam construction management system at handheld-type intelligent mobile terminal, handheld-type intelligent terminal is utilized to carry out typing and the examination & verification of construction management list content at the construction field (site), the camera function that person approving is carried by handheld-type intelligent terminal when auditing carries out personage and takes pictures, it is real-time that personage takes pictures, when examination & verification, system catches personage's head portrait of current handheld terminal holder by calling front-facing camera, and by the way of electronics signing by hand, ensure the verity of examination & verification, substantially increase convenience and the verity of the examination & verification of construction management flow process.
The present invention is realized by following technical proposal: a kind of high roller compacted concrete dam construction management flow process auditing system, including the initiation module arranged in the terminal, inspection of quality assessment module, photographic head and Electronic Signature module;Described initiation module electrically connects with photographic head, Electronic Signature module respectively;Described inspection of quality assessment module electrically connects with photographic head, Electronic Signature module respectively, and initiation module is connected with inspection of quality assessment module signal by wireless signal:
Mobile terminal is used for inputting and checking information;
Initiation module arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module is used for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module is for the typing of hand-written electric signature so that it is equally authentic with paper form signature.
Described mobile terminal is handheld-type intelligent terminal, including the mobile device such as mobile phone or panel computer.
The present invention also provides for a kind of high roller compacted concrete dam construction management flow process checking method, uses above-mentioned high roller compacted concrete dam construction management flow process auditing system, comprises the following steps:
(1) sponsor of construction management flow process is at the construction field (site), collection site situation with in the content of mobile terminal typing construction management list to initiation module, and carry out autodyning, carrying out by Electronic Signature module hand-written electric signature with photographic head, then by this construction management list by wireless network transmissions to inspection of quality assessment module;
(2) person approving at different levels open the construction management list transmitted to inspection of quality assessment module respectively by mobile terminal, its content is audited, and typing auditing result, then carry out autodyning, carrying out hand-written electric signature by Electronic Signature module with photographic head, it is recorded in inspection of quality assessment module, finally by this construction management list by wireless network transmissions to initiation module, make sponsor and the examination & verification at different levels per capita can the examination & verification situation of this construction management list of real time inspection.
The construction management list of described step (1) includes grinding concrete construction management list and Normal Concrete Construction management list.
Described grinding concrete construction management list includes: element project performance rating table, interlayer and seam face process and protection process quality evaluation form, reinforcing bar operation performance rating table, built-in fitting process quality evaluation form, sealing piece (carries), waterproof cloth installation procedure performance rating table, expanded joint material installation procedure performance rating table, pumping equipment process quality evaluation form, cooling line installation procedure performance rating table, ironware installation quality evaluation form, face, storehouse casting craft plan, specialty can be signed a bill, open a position card, mortar and mortar process quality evaluation form, mixture process quality evaluation form, transport making process quality evaluation form, abnormal concrete pours process quality evaluation form, concrete mixer mouth or field investigation and sampling performance rating table, outward appearance process quality evaluation form.
nullDescribed Normal Concrete Construction management list includes: element project performance rating table、Base surface or concrete construction joint process quality evaluation form、Template operation performance rating table、Reinforcing bar operation performance rating table、Inspection of steel reinforcement bars log、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Drain pipe site plan、Cooling and joint grouting pipeline installation procedure performance rating table、Cooling and joint grouting piping arrangement、Built-in fitting process quality evaluation form、Embedded part layout drawing、Ironware installation quality log、Ironware fitting arrangement、Concrete storehouse surface casting craft plan、Specialty can be signed a bill、Open a position card、Concreting process quality ranking table、Concrete appearance process quality evaluation form、Concreting process quality record table.
Described person approving at different levels includes reinspection personnel, whole inspection personnel and supervising engineer.
Described inspection of quality assessment module is according to the examination & verification of person approving at different levels order degree of establishment authority and checks order.
The advantage that the present invention possesses: the present invention possesses real-time camera function when flow process is audited, by shooting personage's head portrait of flow process person approving, it was demonstrated that the verity of examination & verification;Being also equipped with electronic handwritten signature, carry out hand-written electric signature at list examination & verification signature, its writing and papery handwritten signature possess equal authenticity.The present invention is to carry out declaring and auditing of construction management flow process based on handheld-type intelligent mobile terminal, change traditional high roller compacted concrete dam construction management flow process checking method, simply, practical, improve construction management level, beneficially job duty implement and the record of project file is put on record.
Accompanying drawing explanation
Fig. 1 is the structural representation of high roller compacted concrete dam construction management flow process auditing system;
Fig. 2 is the schematic flow sheet of high roller compacted concrete dam construction management flow process checking method.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail.
As it is shown in figure 1, high roller compacted concrete dam construction management flow process auditing system includes initiation module 1, inspection of quality assessment module 2, photographic head 3 and the Electronic Signature module 4 arranged in the terminal;Described initiation module 1 electrically connects with photographic head 3, Electronic Signature module 4 respectively;Described inspection of quality assessment module 2 electrically connects with photographic head 3, Electronic Signature module 4 respectively, and initiation module 1 is connected with inspection of quality assessment module 2 signal by wireless signal:
Mobile terminal is used for inputting and checking information;
Initiation module 1 arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module 2 is for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module 4 is for the typing of hand-written electric signature so that it is equally authentic with paper form signature.
Wherein mobile terminal is handheld-type intelligent terminal, including the mobile device such as mobile phone or panel computer.
As in figure 2 it is shown, high roller compacted concrete dam construction management flow process checking method, comprise the following steps:
(1) as a example by " interlayer and seam face process and protection process quality evaluation form ", the sponsor of construction management flow process is at the construction field (site), collection site situation and by the content of mobile terminal typing " interlayer and seam face process and protection process quality evaluation form " in initiation module 1, content includes dominant item: upper and lower interlayer interval, paving slurry, rolling layers surface state and process technique, the process of construction joint face etc.;General data: aspect or seam face protection, joint treatment, transverse joint setting, rainy day construction aspect protective treatment etc.; after typing; carry out autodyning, in initial survey signature column, carrying out hand-written electric signature by Electronic Signature module 4 with photographic head 3, then by this construction management list by wireless network transmissions to inspection of quality assessment module 2;
(2) reinspection personnel open " interlayer and seam face process and protection process quality evaluation form " transmitted to inspection of quality assessment module 2 by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey is examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in rechecking signature column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;
Whole inspection personnel open " interlayer and seam face process and protection process quality evaluation form " by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey and the result of checking of reinspection are examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in whole ticket word column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;
Supervising engineer opens " interlayer and seam face process and protection process quality evaluation form " by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey, recheck and the result of checking of inspection eventually is examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in Supervision engineering signature column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;Flow process examination & verification terminates.
Claims (8)
1. a high roller compacted concrete dam construction management flow process auditing system, it is characterised in that include initiation module, inspection of quality assessment module, photographic head and the Electronic Signature module arranged in the terminal;Described initiation module electrically connects with photographic head, Electronic Signature module respectively;Described inspection of quality assessment module electrically connects with photographic head, Electronic Signature module respectively, and initiation module is connected with inspection of quality assessment module signal:
Mobile terminal is used for inputting and checking information;
Initiation module arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module is used for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module is for the typing of hand-written electric signature.
High roller compacted concrete dam construction management flow process auditing system the most according to claim 1, it is characterised in that: described mobile terminal is handheld-type intelligent terminal, including mobile phone or panel computer.
3. a high roller compacted concrete dam construction management flow process checking method, uses the high roller compacted concrete dam construction management flow process auditing system described in claim 1 or 2, it is characterised in that comprise the following steps:
(1) sponsor of construction management flow process is at the construction field (site), collection site situation with in the content of mobile terminal typing construction management list to initiation module, and carry out autodyning, carrying out by Electronic Signature module hand-written electric signature with photographic head, then by this construction management list by wireless network transmissions to inspection of quality assessment module;
(2) person approving at different levels open the construction management list transmitted to inspection of quality assessment module respectively by mobile terminal, its content is audited, and typing auditing result, then carry out autodyning, carrying out hand-written electric signature by Electronic Signature module with photographic head, it is recorded in inspection of quality assessment module, finally this construction management list is passed through wireless network transmissions to initiation module.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: the construction management list of described step (1) includes grinding concrete construction management list and Normal Concrete Construction management list.
nullHigh roller compacted concrete dam construction management flow process checking method the most according to claim 4,It is characterized in that: described grinding concrete construction management list includes: element project performance rating table、Interlayer and seam face process and protection process quality evaluation form、Reinforcing bar operation performance rating table、Built-in fitting process quality evaluation form、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Cooling line installation procedure performance rating table、Ironware installation quality evaluation form、Face, storehouse casting craft plan、Specialty can be signed a bill、Open a position card、Mortar and mortar process quality evaluation form、Mixture process quality evaluation form、Transport making process quality evaluation form、Abnormal concrete pours process quality evaluation form、Concrete mixer mouth or field investigation and sampling performance rating table、Outward appearance process quality evaluation form.
nullHigh roller compacted concrete dam construction management flow process checking method the most according to claim 4,It is characterized in that: described Normal Concrete Construction management list includes: element project performance rating table、Base surface or concrete construction joint process quality evaluation form、Template operation performance rating table、Reinforcing bar operation performance rating table、Inspection of steel reinforcement bars log、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Drain pipe site plan、Cooling and joint grouting pipeline installation procedure performance rating table、Cooling and joint grouting piping arrangement、Built-in fitting process quality evaluation form、Embedded part layout drawing、Ironware installation quality log、Ironware fitting arrangement、Concrete storehouse surface casting craft plan、Specialty can be signed a bill、Open a position card、Concreting process quality ranking table、Concrete appearance process quality evaluation form、Concreting process quality record table.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: described person approving at different levels include reinspection personnel, whole inspection personnel and supervising engineer.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: described inspection of quality assessment module is according to the examination & verification of person approving at different levels order degree of establishment authority and checks order.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610276984.5A CN105976159A (en) | 2016-04-29 | 2016-04-29 | Highly roller compacted concrete dam construction management flow verification system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610276984.5A CN105976159A (en) | 2016-04-29 | 2016-04-29 | Highly roller compacted concrete dam construction management flow verification system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105976159A true CN105976159A (en) | 2016-09-28 |
Family
ID=56994834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610276984.5A Pending CN105976159A (en) | 2016-04-29 | 2016-04-29 | Highly roller compacted concrete dam construction management flow verification system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105976159A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106910003A (en) * | 2017-01-13 | 2017-06-30 | 河北长宽网络服务有限公司 | A kind of material is examined and made cuts method online |
CN106980950A (en) * | 2017-03-23 | 2017-07-25 | 云南电网有限责任公司昆明供电局 | A kind of materials storage management method and system based on mobile social activity |
CN108510173A (en) * | 2018-03-23 | 2018-09-07 | 长江勘测规划设计研究有限责任公司 | Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method |
CN108984858A (en) * | 2018-06-26 | 2018-12-11 | 贵州省水利水电勘测设计研究院 | A kind of Construction of Rolled Concrete Dam intelligent management system |
CN112907200A (en) * | 2021-01-27 | 2021-06-04 | 中信国安建工集团有限公司 | Pouring order monitoring system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070005412A1 (en) * | 2005-07-02 | 2007-01-04 | Martinez David F | Electronic requirement management system with checklists on a handheld computer |
CN101058495A (en) * | 2007-05-25 | 2007-10-24 | 武永新 | Micro-slump concrete for roller compacted concrete dam and construction method thereof |
CN104536421A (en) * | 2014-12-31 | 2015-04-22 | 天津大学 | Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time |
CN204791127U (en) * | 2015-03-25 | 2015-11-18 | 裴正广 | Job site quality control information system |
-
2016
- 2016-04-29 CN CN201610276984.5A patent/CN105976159A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070005412A1 (en) * | 2005-07-02 | 2007-01-04 | Martinez David F | Electronic requirement management system with checklists on a handheld computer |
CN101058495A (en) * | 2007-05-25 | 2007-10-24 | 武永新 | Micro-slump concrete for roller compacted concrete dam and construction method thereof |
CN104536421A (en) * | 2014-12-31 | 2015-04-22 | 天津大学 | Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time |
CN204791127U (en) * | 2015-03-25 | 2015-11-18 | 裴正广 | Job site quality control information system |
Non-Patent Citations (1)
Title |
---|
吴斌平: "水利水电工程施工控制学——以碾压混凝土坝为例", 《中国优秀博士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106910003A (en) * | 2017-01-13 | 2017-06-30 | 河北长宽网络服务有限公司 | A kind of material is examined and made cuts method online |
CN106980950A (en) * | 2017-03-23 | 2017-07-25 | 云南电网有限责任公司昆明供电局 | A kind of materials storage management method and system based on mobile social activity |
CN106980950B (en) * | 2017-03-23 | 2023-09-29 | 云南电网有限责任公司昆明供电局 | Material supply management method and system based on mobile social contact |
CN108510173A (en) * | 2018-03-23 | 2018-09-07 | 长江勘测规划设计研究有限责任公司 | Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method |
CN108984858A (en) * | 2018-06-26 | 2018-12-11 | 贵州省水利水电勘测设计研究院 | A kind of Construction of Rolled Concrete Dam intelligent management system |
CN112907200A (en) * | 2021-01-27 | 2021-06-04 | 中信国安建工集团有限公司 | Pouring order monitoring system and method |
CN112907200B (en) * | 2021-01-27 | 2024-02-09 | 中信国安建工集团有限公司 | Pouring order monitoring system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105976159A (en) | Highly roller compacted concrete dam construction management flow verification system and method | |
CN106097223B (en) | Certificate declaration management system and certificate declaration management method | |
JP6910615B2 (en) | Construction data management method and program | |
CN103473772B (en) | Method and device for detecting mosaic image | |
JP5867881B2 (en) | Field management device and system | |
CN107122641A (en) | Smart machine owner recognition methods and owner's identifying device based on use habit | |
CN102589443B (en) | System and method for intelligently detecting duct piece splicing quality based on image identification | |
KR102513608B1 (en) | Smart inspection system for quality control of construction | |
CN103942477A (en) | Smart phone authentication method based on touch screen pressure sensing | |
CN103077458A (en) | ATM (automated teller machine) secure transaction authentication method based on position | |
US9609172B2 (en) | Approval device, approval system, and recording medium that ensure simplified approval operation of electronic document | |
CN113239339A (en) | Certificate shooting method and device, computer equipment and storage medium | |
CN114511296A (en) | High-standard farmland construction project management platform | |
CN106068012A (en) | A kind of intelligent terminal's localization method and device | |
CN105574598A (en) | Hotel reservation realization method and hotel reservation realization system based on intelligent handset door unlocking | |
JP2007213409A (en) | Login method and login system | |
CN107689085A (en) | A kind of ticket-checking system of urban track traffic | |
CN108437182A (en) | Mobile fog room and its application method | |
CN205541045U (en) | Quick -witted ticket checking system of subway ticket checking | |
JP5188945B2 (en) | Management method in tunnel construction area | |
CN108062447A (en) | A kind of method predicted diving precipitation and influenced on building settlement | |
CN103761464A (en) | Touch device and touch control method | |
CN204360478U (en) | The device of other people bank card is usurped in a kind of blocking-up | |
CN207571800U (en) | Identification of Images wellhead detecting device | |
CN211479184U (en) | Face recognition ticketing and certification equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||