CN105976159A - Highly roller compacted concrete dam construction management flow verification system and method - Google Patents

Highly roller compacted concrete dam construction management flow verification system and method Download PDF

Info

Publication number
CN105976159A
CN105976159A CN201610276984.5A CN201610276984A CN105976159A CN 105976159 A CN105976159 A CN 105976159A CN 201610276984 A CN201610276984 A CN 201610276984A CN 105976159 A CN105976159 A CN 105976159A
Authority
CN
China
Prior art keywords
construction management
module
inspection
roller compacted
quality evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610276984.5A
Other languages
Chinese (zh)
Inventor
袁湘华
郑爱武
彭华
孙卫
周华
肖海斌
陈江
南冠群
林恩德
吴立
张攀峰
卢吉
邓拥军
曹学兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN INS ENGINEERING TECHNOLOGY Corp
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
WUHAN INS ENGINEERING TECHNOLOGY Corp
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN INS ENGINEERING TECHNOLOGY Corp, Huaneng Lancang River Hydropower Co Ltd filed Critical WUHAN INS ENGINEERING TECHNOLOGY Corp
Priority to CN201610276984.5A priority Critical patent/CN105976159A/en
Publication of CN105976159A publication Critical patent/CN105976159A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)

Abstract

The invention discloses a highly roller compacted concrete dam construction management flow verification system and method. The system includes an initiating module, a quality acceptance evaluation module, a camera and an electronic signature module which are arranged in a mobile terminal; the initiating module is electrically connected with the camera and the electronic signature module; the quality acceptance evaluation module is electrically connected with the camera and the electronic signature module; and the initiating module is in signal connection with the quality acceptance evaluation module. The initiator of a construction management flow inputs the content of a construction management list, takes a picture of himself or herself, carries out manual electronic signature signing, wirelessly transmits the construction management list to verifiers at each level, so that the verifiers can verify the construction management list; and the initiator inputs a verification result, takes a picture of himself or herself, and carries out manual electronic signature signing. According to the highly roller compacted concrete dam construction management flow verification system and method of the invention, the application and verification of a construction management flow are carried out based on the handheld smart terminal, and a traditional highly roller compacted concrete dam construction management flow verification method is changed. The system and method are simple and practical, and can assist in improving construction management level.

Description

A kind of high roller compacted concrete dam construction management flow process auditing system and method
Technical field
The invention belongs to construction management flow process examination & verification technical field, be specifically related to a kind of high roller compacted concrete dam construction management flow process auditing system and method.
Background technology
Traditional high roller compacted concrete dam site construction management is to be filled in construction management list by declarer, holds paper form and looks for each person approving to audit the mode of signature step by step to carry out the management of site operation flow process, inefficiency at the construction field (site).Therefore the high roller compacted concrete dam construction management flow process checking method that research and development are new it is badly in need of, to raise the management level.
Summary of the invention
For overcoming the deficiency of above-mentioned traditional construction management process checking method, the present invention provides a kind of high roller compacted concrete dam construction management flow process auditing system and method, by installing dam construction management system at handheld-type intelligent mobile terminal, handheld-type intelligent terminal is utilized to carry out typing and the examination & verification of construction management list content at the construction field (site), the camera function that person approving is carried by handheld-type intelligent terminal when auditing carries out personage and takes pictures, it is real-time that personage takes pictures, when examination & verification, system catches personage's head portrait of current handheld terminal holder by calling front-facing camera, and by the way of electronics signing by hand, ensure the verity of examination & verification, substantially increase convenience and the verity of the examination & verification of construction management flow process.
The present invention is realized by following technical proposal: a kind of high roller compacted concrete dam construction management flow process auditing system, including the initiation module arranged in the terminal, inspection of quality assessment module, photographic head and Electronic Signature module;Described initiation module electrically connects with photographic head, Electronic Signature module respectively;Described inspection of quality assessment module electrically connects with photographic head, Electronic Signature module respectively, and initiation module is connected with inspection of quality assessment module signal by wireless signal:
Mobile terminal is used for inputting and checking information;
Initiation module arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module is used for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module is for the typing of hand-written electric signature so that it is equally authentic with paper form signature.
Described mobile terminal is handheld-type intelligent terminal, including the mobile device such as mobile phone or panel computer.
The present invention also provides for a kind of high roller compacted concrete dam construction management flow process checking method, uses above-mentioned high roller compacted concrete dam construction management flow process auditing system, comprises the following steps:
(1) sponsor of construction management flow process is at the construction field (site), collection site situation with in the content of mobile terminal typing construction management list to initiation module, and carry out autodyning, carrying out by Electronic Signature module hand-written electric signature with photographic head, then by this construction management list by wireless network transmissions to inspection of quality assessment module;
(2) person approving at different levels open the construction management list transmitted to inspection of quality assessment module respectively by mobile terminal, its content is audited, and typing auditing result, then carry out autodyning, carrying out hand-written electric signature by Electronic Signature module with photographic head, it is recorded in inspection of quality assessment module, finally by this construction management list by wireless network transmissions to initiation module, make sponsor and the examination & verification at different levels per capita can the examination & verification situation of this construction management list of real time inspection.
The construction management list of described step (1) includes grinding concrete construction management list and Normal Concrete Construction management list.
Described grinding concrete construction management list includes: element project performance rating table, interlayer and seam face process and protection process quality evaluation form, reinforcing bar operation performance rating table, built-in fitting process quality evaluation form, sealing piece (carries), waterproof cloth installation procedure performance rating table, expanded joint material installation procedure performance rating table, pumping equipment process quality evaluation form, cooling line installation procedure performance rating table, ironware installation quality evaluation form, face, storehouse casting craft plan, specialty can be signed a bill, open a position card, mortar and mortar process quality evaluation form, mixture process quality evaluation form, transport making process quality evaluation form, abnormal concrete pours process quality evaluation form, concrete mixer mouth or field investigation and sampling performance rating table, outward appearance process quality evaluation form.
nullDescribed Normal Concrete Construction management list includes: element project performance rating table、Base surface or concrete construction joint process quality evaluation form、Template operation performance rating table、Reinforcing bar operation performance rating table、Inspection of steel reinforcement bars log、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Drain pipe site plan、Cooling and joint grouting pipeline installation procedure performance rating table、Cooling and joint grouting piping arrangement、Built-in fitting process quality evaluation form、Embedded part layout drawing、Ironware installation quality log、Ironware fitting arrangement、Concrete storehouse surface casting craft plan、Specialty can be signed a bill、Open a position card、Concreting process quality ranking table、Concrete appearance process quality evaluation form、Concreting process quality record table.
Described person approving at different levels includes reinspection personnel, whole inspection personnel and supervising engineer.
Described inspection of quality assessment module is according to the examination & verification of person approving at different levels order degree of establishment authority and checks order.
The advantage that the present invention possesses: the present invention possesses real-time camera function when flow process is audited, by shooting personage's head portrait of flow process person approving, it was demonstrated that the verity of examination & verification;Being also equipped with electronic handwritten signature, carry out hand-written electric signature at list examination & verification signature, its writing and papery handwritten signature possess equal authenticity.The present invention is to carry out declaring and auditing of construction management flow process based on handheld-type intelligent mobile terminal, change traditional high roller compacted concrete dam construction management flow process checking method, simply, practical, improve construction management level, beneficially job duty implement and the record of project file is put on record.
Accompanying drawing explanation
Fig. 1 is the structural representation of high roller compacted concrete dam construction management flow process auditing system;
Fig. 2 is the schematic flow sheet of high roller compacted concrete dam construction management flow process checking method.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail.
As it is shown in figure 1, high roller compacted concrete dam construction management flow process auditing system includes initiation module 1, inspection of quality assessment module 2, photographic head 3 and the Electronic Signature module 4 arranged in the terminal;Described initiation module 1 electrically connects with photographic head 3, Electronic Signature module 4 respectively;Described inspection of quality assessment module 2 electrically connects with photographic head 3, Electronic Signature module 4 respectively, and initiation module 1 is connected with inspection of quality assessment module 2 signal by wireless signal:
Mobile terminal is used for inputting and checking information;
Initiation module 1 arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module 2 is for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module 4 is for the typing of hand-written electric signature so that it is equally authentic with paper form signature.
Wherein mobile terminal is handheld-type intelligent terminal, including the mobile device such as mobile phone or panel computer.
As in figure 2 it is shown, high roller compacted concrete dam construction management flow process checking method, comprise the following steps:
(1) as a example by " interlayer and seam face process and protection process quality evaluation form ", the sponsor of construction management flow process is at the construction field (site), collection site situation and by the content of mobile terminal typing " interlayer and seam face process and protection process quality evaluation form " in initiation module 1, content includes dominant item: upper and lower interlayer interval, paving slurry, rolling layers surface state and process technique, the process of construction joint face etc.;General data: aspect or seam face protection, joint treatment, transverse joint setting, rainy day construction aspect protective treatment etc.; after typing; carry out autodyning, in initial survey signature column, carrying out hand-written electric signature by Electronic Signature module 4 with photographic head 3, then by this construction management list by wireless network transmissions to inspection of quality assessment module 2;
(2) reinspection personnel open " interlayer and seam face process and protection process quality evaluation form " transmitted to inspection of quality assessment module 2 by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey is examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in rechecking signature column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;
Whole inspection personnel open " interlayer and seam face process and protection process quality evaluation form " by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey and the result of checking of reinspection are examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in whole ticket word column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;
Supervising engineer opens " interlayer and seam face process and protection process quality evaluation form " by mobile terminal, its content is audited, inspection (survey) result submitted to for initial survey, recheck and the result of checking of inspection eventually is examined the most one by one, and typing auditing result, then autodyne with photographic head 3, in Supervision engineering signature column, hand-written electric signature is carried out by Electronic Signature module 4, it is recorded in inspection of quality assessment module 2, again this construction management list is passed through wireless network transmissions to initiation module 1, make sponsor and other examination & verifications per capita can the examination & verification situation of this construction management list of real time inspection;Flow process examination & verification terminates.

Claims (8)

1. a high roller compacted concrete dam construction management flow process auditing system, it is characterised in that include initiation module, inspection of quality assessment module, photographic head and the Electronic Signature module arranged in the terminal;Described initiation module electrically connects with photographic head, Electronic Signature module respectively;Described inspection of quality assessment module electrically connects with photographic head, Electronic Signature module respectively, and initiation module is connected with inspection of quality assessment module signal:
Mobile terminal is used for inputting and checking information;
Initiation module arranges construction management list, after collection in worksite, fills in the content in construction management list;
Inspection of quality assessment module is used for Remote Open construction management list, it is achieved multistage auditing;
Electronic Signature module is for the typing of hand-written electric signature.
High roller compacted concrete dam construction management flow process auditing system the most according to claim 1, it is characterised in that: described mobile terminal is handheld-type intelligent terminal, including mobile phone or panel computer.
3. a high roller compacted concrete dam construction management flow process checking method, uses the high roller compacted concrete dam construction management flow process auditing system described in claim 1 or 2, it is characterised in that comprise the following steps:
(1) sponsor of construction management flow process is at the construction field (site), collection site situation with in the content of mobile terminal typing construction management list to initiation module, and carry out autodyning, carrying out by Electronic Signature module hand-written electric signature with photographic head, then by this construction management list by wireless network transmissions to inspection of quality assessment module;
(2) person approving at different levels open the construction management list transmitted to inspection of quality assessment module respectively by mobile terminal, its content is audited, and typing auditing result, then carry out autodyning, carrying out hand-written electric signature by Electronic Signature module with photographic head, it is recorded in inspection of quality assessment module, finally this construction management list is passed through wireless network transmissions to initiation module.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: the construction management list of described step (1) includes grinding concrete construction management list and Normal Concrete Construction management list.
nullHigh roller compacted concrete dam construction management flow process checking method the most according to claim 4,It is characterized in that: described grinding concrete construction management list includes: element project performance rating table、Interlayer and seam face process and protection process quality evaluation form、Reinforcing bar operation performance rating table、Built-in fitting process quality evaluation form、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Cooling line installation procedure performance rating table、Ironware installation quality evaluation form、Face, storehouse casting craft plan、Specialty can be signed a bill、Open a position card、Mortar and mortar process quality evaluation form、Mixture process quality evaluation form、Transport making process quality evaluation form、Abnormal concrete pours process quality evaluation form、Concrete mixer mouth or field investigation and sampling performance rating table、Outward appearance process quality evaluation form.
nullHigh roller compacted concrete dam construction management flow process checking method the most according to claim 4,It is characterized in that: described Normal Concrete Construction management list includes: element project performance rating table、Base surface or concrete construction joint process quality evaluation form、Template operation performance rating table、Reinforcing bar operation performance rating table、Inspection of steel reinforcement bars log、Sealing piece (carries)、Waterproof cloth installation procedure performance rating table、Expanded joint material installation procedure performance rating table、Pumping equipment process quality evaluation form、Drain pipe site plan、Cooling and joint grouting pipeline installation procedure performance rating table、Cooling and joint grouting piping arrangement、Built-in fitting process quality evaluation form、Embedded part layout drawing、Ironware installation quality log、Ironware fitting arrangement、Concrete storehouse surface casting craft plan、Specialty can be signed a bill、Open a position card、Concreting process quality ranking table、Concrete appearance process quality evaluation form、Concreting process quality record table.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: described person approving at different levels include reinspection personnel, whole inspection personnel and supervising engineer.
High roller compacted concrete dam construction management flow process checking method the most according to claim 3, it is characterised in that: described inspection of quality assessment module is according to the examination & verification of person approving at different levels order degree of establishment authority and checks order.
CN201610276984.5A 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction management flow verification system and method Pending CN105976159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610276984.5A CN105976159A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction management flow verification system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610276984.5A CN105976159A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction management flow verification system and method

Publications (1)

Publication Number Publication Date
CN105976159A true CN105976159A (en) 2016-09-28

Family

ID=56994834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610276984.5A Pending CN105976159A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction management flow verification system and method

Country Status (1)

Country Link
CN (1) CN105976159A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106910003A (en) * 2017-01-13 2017-06-30 河北长宽网络服务有限公司 A kind of material is examined and made cuts method online
CN106980950A (en) * 2017-03-23 2017-07-25 云南电网有限责任公司昆明供电局 A kind of materials storage management method and system based on mobile social activity
CN108510173A (en) * 2018-03-23 2018-09-07 长江勘测规划设计研究有限责任公司 Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method
CN108984858A (en) * 2018-06-26 2018-12-11 贵州省水利水电勘测设计研究院 A kind of Construction of Rolled Concrete Dam intelligent management system
CN112907200A (en) * 2021-01-27 2021-06-04 中信国安建工集团有限公司 Pouring order monitoring system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070005412A1 (en) * 2005-07-02 2007-01-04 Martinez David F Electronic requirement management system with checklists on a handheld computer
CN101058495A (en) * 2007-05-25 2007-10-24 武永新 Micro-slump concrete for roller compacted concrete dam and construction method thereof
CN104536421A (en) * 2014-12-31 2015-04-22 天津大学 Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070005412A1 (en) * 2005-07-02 2007-01-04 Martinez David F Electronic requirement management system with checklists on a handheld computer
CN101058495A (en) * 2007-05-25 2007-10-24 武永新 Micro-slump concrete for roller compacted concrete dam and construction method thereof
CN104536421A (en) * 2014-12-31 2015-04-22 天津大学 Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time
CN204791127U (en) * 2015-03-25 2015-11-18 裴正广 Job site quality control information system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴斌平: "水利水电工程施工控制学——以碾压混凝土坝为例", 《中国优秀博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106910003A (en) * 2017-01-13 2017-06-30 河北长宽网络服务有限公司 A kind of material is examined and made cuts method online
CN106980950A (en) * 2017-03-23 2017-07-25 云南电网有限责任公司昆明供电局 A kind of materials storage management method and system based on mobile social activity
CN106980950B (en) * 2017-03-23 2023-09-29 云南电网有限责任公司昆明供电局 Material supply management method and system based on mobile social contact
CN108510173A (en) * 2018-03-23 2018-09-07 长江勘测规划设计研究有限责任公司 Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method
CN108984858A (en) * 2018-06-26 2018-12-11 贵州省水利水电勘测设计研究院 A kind of Construction of Rolled Concrete Dam intelligent management system
CN112907200A (en) * 2021-01-27 2021-06-04 中信国安建工集团有限公司 Pouring order monitoring system and method
CN112907200B (en) * 2021-01-27 2024-02-09 中信国安建工集团有限公司 Pouring order monitoring system and method

Similar Documents

Publication Publication Date Title
CN105976159A (en) Highly roller compacted concrete dam construction management flow verification system and method
CN106097223B (en) Certificate declaration management system and certificate declaration management method
JP6910615B2 (en) Construction data management method and program
CN103473772B (en) Method and device for detecting mosaic image
JP5867881B2 (en) Field management device and system
CN107122641A (en) Smart machine owner recognition methods and owner's identifying device based on use habit
CN102589443B (en) System and method for intelligently detecting duct piece splicing quality based on image identification
KR102513608B1 (en) Smart inspection system for quality control of construction
CN103942477A (en) Smart phone authentication method based on touch screen pressure sensing
CN103077458A (en) ATM (automated teller machine) secure transaction authentication method based on position
US9609172B2 (en) Approval device, approval system, and recording medium that ensure simplified approval operation of electronic document
CN113239339A (en) Certificate shooting method and device, computer equipment and storage medium
CN114511296A (en) High-standard farmland construction project management platform
CN106068012A (en) A kind of intelligent terminal's localization method and device
CN105574598A (en) Hotel reservation realization method and hotel reservation realization system based on intelligent handset door unlocking
JP2007213409A (en) Login method and login system
CN107689085A (en) A kind of ticket-checking system of urban track traffic
CN108437182A (en) Mobile fog room and its application method
CN205541045U (en) Quick -witted ticket checking system of subway ticket checking
JP5188945B2 (en) Management method in tunnel construction area
CN108062447A (en) A kind of method predicted diving precipitation and influenced on building settlement
CN103761464A (en) Touch device and touch control method
CN204360478U (en) The device of other people bank card is usurped in a kind of blocking-up
CN207571800U (en) Identification of Images wellhead detecting device
CN211479184U (en) Face recognition ticketing and certification equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928