CN105976155A - Science and technology network information service system for improving efficiency of scientific research - Google Patents

Science and technology network information service system for improving efficiency of scientific research Download PDF

Info

Publication number
CN105976155A
CN105976155A CN201610255531.4A CN201610255531A CN105976155A CN 105976155 A CN105976155 A CN 105976155A CN 201610255531 A CN201610255531 A CN 201610255531A CN 105976155 A CN105976155 A CN 105976155A
Authority
CN
China
Prior art keywords
technical
subsystem
data
technology
supplier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610255531.4A
Other languages
Chinese (zh)
Inventor
阮仕荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610255531.4A priority Critical patent/CN105976155A/en
Publication of CN105976155A publication Critical patent/CN105976155A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Abstract

A science and technology network information service system comprises a technical project database, a technical side database, a user side database, a supplier database, a technical dictionary library, a technical side operation management subsystem, a user side operation management subsystem, a supplier operation management subsystem, and a management review subsystem. The system is provided in order to promote technical project trading, increase the reuse rate of rarely-used technologies through millions to tens of millions of samples in the whole region and across disciplines, reduce the technical project developing and operating costs through large-scale use, form a market compensation mechanism to stimulate the work initiative and creativity of technical workers, and accelerate the topic research progress of users.

Description

A kind of scientific and technological Network Information Service improving scientific research efficiency
The invention belongs to Internet Information Service field, in particular for improving the scientific and technological Network Information Service of scientific research efficiency.
Background technology
Research work relates to founding new scientific theory and sets up two aspects of new key technology method, the most interrelated but also be separated from each other, on the one hand, forming new scientific theory needs the experimental result using a large amount of different technologies method to obtain to support, on the other hand, each new technical method creates from method, stablizes to technology maturation and obtain strict quality control and need to expend huge man power and material.Current research unit is generally taken as the leading factor by scientific theory man, these scientific theory men had both grasped research funding, serve as again administrative function, technological staff often lays under tribute, each set up some technical methods being of little use around research unit isolated one by one that chief scientist sets up the usually from a certain specific scientific theory problem of solution temporarily, on the one hand, it not daily regular service project due to these technical methods, it is difficult to periodically obtained economy return by market;On the other hand, owing to it is of little use, expend technology and method that the biggest energy is set up, just go out of use after completing an interim task, cause huge waste.And for researcher self, be both unfamiliar with, the new method that is also of little use is set up is a very time-consuming process, once method is set up to meet with and is hindered, and will result in scientific research can not complete on schedule.For this situation is in terms of big, scientific theory man forms the unvalued social atmosphere of technical staff to the control of whole intelligentsia, froming the perspective of in terms of little, scientific theory man have impact on technological staff work initiative and creative performance to the universal control of unit technological staff.Cause tackling problems in key technologies to be obstructed the most again to delay the theoretical project research progress of scientist.
Owing to the overall process of scientific and technical innovation and final result are full of uncertainty, the research funding application that project is traction presided over scientist is with to transfer be forced arrangement.Planning to build vertical key technology market prospect to fail to understand, the project that scientist presides over the most also is to promote new technique tackling key problem and the original power founded.Disregard cost-push technical innovation platform with administrative planning and top scientist and constitute the core competitiveness of China's key area, but these can only relate to extremely limited field.Transfer all technological staff work initiative and creativeness, only with the compensation of market mechanism as fundamental driving force.
Www.stcay.com and the www.stcay.cn domain name to this end, the present inventor has applied for the registration of, is the abbreviation of " science and technique clouds assist you " (cloud of science and technology assists you) service aim and advertising slogan initial.The present invention intends under this domain name, sets up based on non-common technology, takes into account the cloud service network of common technology.
The principle of the present invention is: non-common technology belongs to, from the point of view of a certain period of a certain local or professional field, the project that rare people makes inquiries, statistics utilization rate is less than 1% or 1 ‰, but when universe and multi-disciplinary millions of to tens million of large sample amount, non-common technology potential user over any time period will remain above more than 2.The reusing of technology just can be substantially reduced technological project exploitation operation cost, is even expected to rely on market to make technology itself get a profit, and market compensation mechanism will excitation technique worker work initiative and creativeness.And for technology user (such as abstract science man), can use at any time owing to being suitable for the key technology of oneself target direction and research topic, the speed of scientific theoretic innovation will be greatly speeded up.
Summary of the invention
It is an object of the invention to be calculated as basis with big data cloud, promote the foundation of non-common technology, maturation with market mechanism and use, realizing cost control by the scale of common technology, reducing innovation cost.
Below in conjunction with Figure of description, embodiment of the present invention are described in detail as follows:
Fig. 1 is technical side's operation management subsystem flow chart of the scientific and technological Network Information Service improving scientific research efficiency
Fig. 2 is user side's operation management subsystem flow chart of the scientific and technological Network Information Service improving scientific research efficiency
Fig. 3 is supplier's operation management subsystem flow chart of the scientific and technological Network Information Service improving scientific research efficiency
Fig. 4 is manager's operation management subsystem task schematic diagram of the scientific and technological Network Information Service improving scientific research efficiency
Science and technology Network Information Service composition: Database Systems include technological project data base, technical side data base, user side data base, supplier database, technology dictionary library;Operating system includes technical side's operation management subsystem, user side's operation management subsystem, supplier's operation management subsystem, management examination & verification management subsystem.
Technological project data base: serial number, technology for encoding, technical name+maneuver, technology brief introduction, Technical Reference document, involved trade name, involved vendor number, vendor name, the type of skill (certification and non-authentication), technical side numbers, technical side's postcode, technical side GPS positions information, open initial time, close (yes/no), certification price, non-authentication price, technology is by access times, once the user side's numbering used, once the user side's unit used.
Technical side data base: technical side's numbering, login name, log-in password, unit, address, postcode, technical side GPS position information, telephone number, contact person, phone number, e-mail address, QQ, wechat, network address.
User side data base: user side's numbering, login name, log-in password, unit, address, postcode, technical side GPS position information, telephone number, contact person, phone number, e-mail address, QQ, wechat, network address.
Supplier database: vendor number, login name, log-in password, unit, address, postcode, supplier GPS position information, sold goods title, sold goods unit price, sold goods production unit, telephone number, contact person, phone number, e-mail address, QQ, wechat, network address.
Administrator data storehouse: manager's numbering, login name, log-in password, management category, unit, address, postcode, GPS position information, telephone number, contact person, phone number, e-mail address, QQ, wechat, network address.
Technology dictionary library: include serial number, technology for encoding, technical name+maneuver, technology brief introduction, reference non-authentication price, reference certification price, manager's numbering, administrator name.Wherein technology for encoding is edited according to certain rules with maneuver by technical name and is formed.
Technical side's operation management subsystem: include login name and log-in password security module, technical side's data inputting, modified module, technological project Input of Data, amendment, module.
User side's operation management subsystem: including login name and log-in password security module, user side data base increases typing, modified module, technological project database query module, technological project online trading module newly.
Supplier's operation management subsystem: include login name and log-in password security module, supplier data typing, modified module.
Manager's operation management subsystem: including login name and log-in password security module, administrator data storehouse increases typing, modified module newly.
Shown in Fig. 1, technical side is registered by technical side's operation management subsystem, after manager audits, by logging into this subsystem, after entering this subsystem, (1) technical side selects when modifying oneself technical side's data, and these technical side's data are all called in subsystem from technical side data base by subsystem, and technical side restores after modifying technical side data base;null(2) when technical side selects newly-increased or amendment technological project data,Then subsystem is by (the technical side's numbering in technical side data base、Technical side's postcode、Technical side GPS positions information) call in operation management system,And articulated technique dictionary and supplier database,Technical side's numbering in a certain technological project data increased newly or revise、Technical side's postcode、Technical side GPS location information automatic input or amendment,Involved commodity in these technological project data、Involved vendor number、Involved vendor name,Revised by Select input after supplier database fuzzy query,Technology for encoding in these technological project data、Technical name+maneuver、Technology brief introduction、Technical Reference document、After reference price is selected by technology dictionary fuzzy query, typing is revised,If corresponding technical name and maneuver are not found in technical name fuzzy query and selection,Then click on newly-increased dictionary item option,The technical name of input technology side's establishment and maneuver,Dictionary it is stored in after preservation,Selected again,Notify that manager carries out dictionary maintenance simultaneously,Determine without duplicate keys when safeguarding,Determine the coding of standard,Statistics covering price average is as reference price.After technological project typing completes, by save button, if newly-increased technological project, then when being stored in, data base is using serial number+1 as newly-increased entry, and serial number can show the technological project number of current database.This platform application early stage, owing to the energy of technical side is affected relatively big by our unit's key task, when technological project is safeguarded, the technological project stopping externally servicing should be closed in time, in order to avoid causing the invalid retrieval of user, cause user's complaint to platform and the complaint to technical side.
Shown in Fig. 2, user side is registered by user side's operation management subsystem, audit without manager, can be by logging into this subsystem, after entering this subsystem, (1) user selects when modifying oneself user's data, then these user side's data are all called in subsystem from user side data base by subsystem, and user side restores after modifying user side data base;(2) when user side selects inquiring technology project, subsystem is by (the user side's postcode in user side data base, user side GPS positions information) call in operation management system, user side is by the standard technique title+maneuver in selection technique dictionary after technical name fuzzy query, retrieval technique project database is encoded by standard technique, if technology dictionary no this item mesh, or retrieval result shows that this technological project is in closed mode (the most having stopped open service) at present, then enter demand bulletin board and issue demand information, on the one hand this bulletin board is reminded unit of having ready conditions newly-increased or restarts this technical service open, or by many ways advising that user side retrieves again with substitute technology project.If preliminary search result is less, the most all list, if preliminary search result is more, then user can select the geographic distance (by the postcode computing of user side and technical side, or being judged by cellphone GPS location) with technical side from the close-by examples to those far off to sort;If user only need to obtain PRELIMINARY RESULTS, can select non-authentication price for reduction expense, price sorts from low to high;If user is higher to data accuracy requirement, then certification price is selected to be traded.To the transport needing cold preservation sample, it is recommended that user selection technique side nearby, and do not pursue low price simply.Once user side selects to use a certain technological project of a certain technical side, and after selecting to complete transaction by online trading module, then naive user (inquiry user) is upgraded to star user by platform automatically, and is automatically saved by Transaction Information in technological project data base;If selection off-line transaction, then conclusion of the business situation need to carry out customer upgrade after manager checks and preserve with technological project, these technological project access times+1, the user side once used numbering, user side's unit of once using are stored in data base, customer upgrade can improve the credit worthiness of user, and increases the data-base content showing it.
Shown in Fig. 3, supplier is registered by supplier's operation management subsystem, after manager audits, by logging into this subsystem, after entering this subsystem, when supplier selects to modify oneself supplier's data, then this supplier data is all called in subsystem by subsystem from supplier database, supplier restores after modifying supplier database, and during amendment, the commodity that oneself can be sold by supplier increase and decrease.
Shown in Fig. 4, manager is after obtaining mechanism's accreditation, registered by manager's operation management subsystem, after mechanism audits, by logging into this subsystem, when manager selects to modify oneself technical side's data, this administrator data is all called in subsystem from administrator data storehouse by subsystem, after manager modifies, need to audit, through mechanism, administrator data storehouse of restoring.Manager completes all or part of management role shown in Fig. 4 according to management category mandate, and such as technology, dictionary class manager carries out maintenance management to technology dictionary, corrects coding, the nonstandard title of mistake;Bulletin board is only managed by edition owner class manager, to delete flame, advises certain technological service project newly-increased to technical side targetedly, or recommends substitute technology project to user;Technological project class database manager needs Professional knowledge, checks identical repetition data item, and the price of same technological project units all in data base carried out carries out statistical computation, releases reference price with meansigma methods;User side's data base administrator focuses on database auditing, deletes identical repetition data item, experiences upgrading user class according to the use of user side and authority is checked in retrieval;Supplier database class manager is responsible for supplier data examination & verification, manages maintenance provider data base, system operation manager then supervisory control system running state, processing system operation troubles at any time, optimizes program circuit.
For any entity or individual, can be according to oneself needing to register the corresponding operation management subsystem of login with different identity simultaneously, such as, when it intends the technical service opening oneself, register with the identity registration login techniques side operation management subsystem of technical side, after manager audits, the technological project of open service is intended in and amendment newly-increased by login techniques side's operation management subsystem;If be intended that the technological project service with other people, then carry out registration with the identity of user side by user side's operation management subsystem and log in, select the technological project service oneself needed;If his laboratory sells the products such as the antibody of oneself production simultaneously, then can carry out registering and logging with the identity of supplier by supplier's operation management subsystem.So everyone, each unit can sell technological project and the product oneself having superiority and having intellectual property, buys oneself required technological project and product simultaneously, thus promotes sharing out the work and helping one another of science and technology.This information service system platform encourages to have people and the unit of this multiple identities, and gives higher evaluation and mandate, with the exchange of facilitated technique with share.

Claims (6)

1. a scientific and technological Network Information Service, is characterized in that: Database Systems include technological project data base, technical side data base, User side data base, supplier database, technology dictionary library;Operating system includes technical side's operation management subsystem, user side Operation management subsystem, supplier's operation management subsystem, management examination & verification subsystem.
2. a science and technology Network Information Service described in claim 1, is characterized in that: its technological project data base: serial number, skill Art coding, technical name+maneuver, technology brief introduction, Technical Reference document, involved trade name, involved vendor number, confession Business's title, the type of skill (certification and non-authentication), technical side's numbering, technical side's postcode, technical side GPS is answered to position letter Breath, open initial time, close (yes/no), certification price, non-authentication price, technology by access times, the use that once uses Family side's numbering, the user side's unit once used;Technical side data base: technical side's numbering, login name, log-in password, unit, Address, postcode, technical side GPS location information, telephone number, contact person, phone number, e-mail address, QQ, Wechat, network address;User side data base: user side's numbering, login name, log-in password, unit, address, postcode, skill Art side GPS positions information, telephone number, contact person, phone number, e-mail address, QQ, wechat, network address;Supply Answer quotient data storehouse: vendor number, login name, log-in password, unit, address, postcode, supplier GPS position letter Breath, sold goods title, sold goods unit price, sold goods production unit, telephone number, contact person, phone number, electricity Sub-addresses of items of mail, QQ, wechat, network address;Administrator data storehouse: manager's numbering, login name, log-in password, management category, Unit, address, postcode, GPS location information, telephone number, contact person, phone number, e-mail address, QQ, Wechat, network address;Technology dictionary library: include serial number, technology for encoding, technical name+maneuver, technology brief introduction, recognize with reference to non- Card price, reference certification price, manager's numbering, administrator name.Wherein technology for encoding is pressed one by technical name with maneuver Set pattern rule editor form.
3. a science and technology Network Information Service described in claim 1, is characterized in that: technical side's operation management subsystem includes registration Name and log-in password security module, technical side's data inputting, modified module, technological project Input of Data, amendment, module; Technical side is registered by technical side's operation management subsystem, after manager audits, by logging into this subsystem, After entering this subsystem: (1) technical side selects when modifying oneself technical side's data, subsystem by these technical side's data from Technical side data base all calls in subsystem, and technical side restores after modifying technical side data base;(2) technical side selects newly Increase or amendment technological project data time, then subsystem by technical side data base (technical side's numbering, technical side's postcode, Technical side GPS positions information) call in operation management system, and articulated technique dictionary and supplier database, newly-increased or amendment Technical side's numbering, technical side's postcode, technical side GPS location information automatic input or amendment in a certain technological project data, Involved commodity, involved vendor number, involved supplier, trade name in these technological project data, by supplier database mould Stick with paste Select input amendment after inquiry, the technology for encoding in these technological project data, technical name+maneuver, technology brief introduction, technology After list of references, reference price are selected by technology dictionary fuzzy query, typing is revised, if technical name fuzzy query and selection are not Find corresponding technical name and maneuver, then click on newly-increased dictionary item option, the technical name of input technology side's establishment and behaviour The practice, is saved into dictionary, then is selected, and notifies that manager carries out dictionary maintenance simultaneously, safeguards and determine that without duplicate keys, really The coding that calibration is accurate, statistics covering price average is as reference price;After technological project typing completes, by save button, if Be newly-increased technological project, then when being stored in, serial number+1 can be shown current database as newly-increased entry, serial number by data base Technological project number;When technological project is safeguarded by technical side, the technological project stopping externally servicing should be closed in time.
4. a science and technology Network Information Service described in claim 1, is characterized in that: user side's operation management subsystem: include note Volume name and log-in password security module, user side data base increases typing, modified module newly, technological project database query module, Technological project selects transaction modules;User side is registered by user side's operation management subsystem, it is not necessary to manager audits, i.e. Can be by logging into this subsystem, after entering this subsystem: when (1) user side selects to modify oneself user side's data, These user side's data are all called in subsystem from technical side data base by subsystem, and user side restores after modifying user's number formulary According to storehouse;(2) when user side selects inquiring technology project, subsystem by user side data base (user side's postcode, User side GPS positions information) call in operation management system, user side is by selection technique dictionary after technical name fuzzy query Standard technique title+maneuver, by standard technique encode retrieval technique project database, if technology dictionary no this item mesh, Or retrieval result shows that this technological project is in closed mode (the most having stopped open service) at present, then enter demand bulletin board and send out Cloth demand information, on the one hand this bulletin board remind unit of having ready conditions newly-increased or restart this technical service open, or by many ways advising User side retrieves again with substitute technology project;If preliminary search result is less, the most all list;If preliminary search result More, then user side can select from the close-by examples to those far off to sort according to the geographic distance with technical side;Or select non-authentication price by low to High sequence;Or select certification price to sort from low to high;Once user side selects to use a certain technological project of a certain technical side, And after selecting to complete transaction by online trading module, then naive user (inquiry user) is upgraded to star user by platform automatically, And Transaction Information is automatically saved in technological project data base;If selection off-line transaction, then conclusion of the business situation need to be through manager Carry out customer upgrade and technological project after inspection to preserve, this technological project access times+1 during preservation, the user side's numbering once used, Once the user side's unit used is stored in data base, customer upgrade can improve the credit worthiness of user, and increases and show it Data-base content.
5. a science and technology Network Information Service described in claim 1, is characterized in that: supplier's operation management subsystem: include note Volume name and log-in password security module, supplier data typing, modified module;Supplier passes through supplier's operation management subsystem Registering, after manager audits, by logging into this subsystem, after entering this subsystem, supplier selects certainly When own technical side's data are modified, this supplier data is all called in subsystem, supplier by subsystem from supplier database Restoring after modifying supplier database, during amendment, the commodity that oneself can be sold by supplier increase and decrease.
6. a science and technology Network Information Service described in claim 1, is characterized in that: manager's operation management subsystem: include note Volume name and log-in password security module, administrator data storehouse increases typing, modified module newly;Manager obtain mechanism accreditation after, Being registered by manager's operation management subsystem, after mechanism audits, by logging into this subsystem, manager selects Selecting when modifying oneself technical side's data, this administrator data is all called in subsystem from administrator data storehouse by subsystem, After manager modifies, need to audit, through mechanism, administrator data storehouse of restoring;Manager completes phase according to management category mandate Answering management role, such as technology, dictionary class manager carries out maintenance management to technology dictionary, coding, the nonstandard title to mistake Correct;Bulletin board is only managed by edition owner class manager, to delete flame, advises to technical side targetedly Certain technological service project newly-increased, or recommend substitute technology project to user;Technological project class database manager checks identical Repeating data item, the price of same technological project units all in data base carried out carries out statistical computation, releases with meansigma methods Reference price;User side's data base administrator checks user side data base, deletes identical repetition data item, according to user side's Experience upgrading user class and retrieval is used to check authority;Supplier database class manager is responsible for supplier data examination & verification, management Maintenance provider data base, system operation manager then supervisory control system running state, processing system operation troubles at any time, optimize journey Sequence flow process.
CN201610255531.4A 2016-04-25 2016-04-25 Science and technology network information service system for improving efficiency of scientific research Pending CN105976155A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610255531.4A CN105976155A (en) 2016-04-25 2016-04-25 Science and technology network information service system for improving efficiency of scientific research

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610255531.4A CN105976155A (en) 2016-04-25 2016-04-25 Science and technology network information service system for improving efficiency of scientific research

Publications (1)

Publication Number Publication Date
CN105976155A true CN105976155A (en) 2016-09-28

Family

ID=56993105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610255531.4A Pending CN105976155A (en) 2016-04-25 2016-04-25 Science and technology network information service system for improving efficiency of scientific research

Country Status (1)

Country Link
CN (1) CN105976155A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1376997A (en) * 2001-03-27 2002-10-30 李英元 Bidirectinoally coupled electronic commerce system
CN101751642A (en) * 2008-12-03 2010-06-23 清华大学 Electronic commerce market product/service information management and monitoring platform

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1376997A (en) * 2001-03-27 2002-10-30 李英元 Bidirectinoally coupled electronic commerce system
CN101751642A (en) * 2008-12-03 2010-06-23 清华大学 Electronic commerce market product/service information management and monitoring platform

Similar Documents

Publication Publication Date Title
AU2003274987B2 (en) Deploying multiple enterprise planning models across clusters of applications servers
CN110175788A (en) A kind of smart city energy cloud platform
US20040064433A1 (en) Real-time aggregation of data within an enterprise planning environment
WO2004032013A1 (en) Node-level modification during execution of an enterprise planning model
CA2417765A1 (en) Budget planning
Sheu et al. Service process design flexibility and customer waiting time
CN101127101A (en) Label information supervision system and method
EP1546962A2 (en) Selective deployment of software extensions within an enterprise modeling environment
US20150161555A1 (en) Scheduling tasks to operators
CN102542515A (en) Real estate information management system
Xue et al. Computational experiment-based evaluation on context-aware O2O service recommendation
CN102208057A (en) Method, platform and system for processing audit information
Du et al. Dynamic decision support framework for production scheduling using a combined genetic algorithm and multiagent model
Faisal et al. E-government in India: modelling the barriers to its adoption and diffusion
KR101254720B1 (en) System for linking hs code of trade simulation, the method thereof and the computer readable recording medium for excuting said method program
Mory-Alvarado et al. Green IT in small and medium-sized enterprises: A systematic literature review
EP1573451A4 (en) Inline compression of a network communication within an enterprise planning environment
Subulan et al. Metaheuristic-based simulation optimization approach to network revenue management with an improved self-adjusting bid price function
CN110196949A (en) Information-pushing method, device, electronic equipment and computer-readable medium
CN105976155A (en) Science and technology network information service system for improving efficiency of scientific research
Yu et al. Buffer allocation in a flow shop with capacitated batch transports
Ganichev et al. Rethinking Russian digital economy development under sunctions
CN110069838A (en) A kind of horizontal method for predicting of electronic product reliability
CN101174268A (en) Software search method
Landum et al. A framework for the alignment of ICT with Green IT

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication