CN105972215B - The preparation method of high ferro hub bearing sealing ring - Google Patents

The preparation method of high ferro hub bearing sealing ring Download PDF

Info

Publication number
CN105972215B
CN105972215B CN201610297820.0A CN201610297820A CN105972215B CN 105972215 B CN105972215 B CN 105972215B CN 201610297820 A CN201610297820 A CN 201610297820A CN 105972215 B CN105972215 B CN 105972215B
Authority
CN
China
Prior art keywords
sealing ring
preparation
sucting tube
high ferro
wind sucting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610297820.0A
Other languages
Chinese (zh)
Other versions
CN105972215A (en
Inventor
谢云州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiangyu seal Co.,Ltd.
Original Assignee
XIANGYU SEAL PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIANGYU SEAL PARTS CO Ltd filed Critical XIANGYU SEAL PARTS CO Ltd
Priority to CN201610297820.0A priority Critical patent/CN105972215B/en
Publication of CN105972215A publication Critical patent/CN105972215A/en
Application granted granted Critical
Publication of CN105972215B publication Critical patent/CN105972215B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/16Sealings between relatively-moving surfaces
    • F16J15/32Sealings between relatively-moving surfaces with elastic sealings, e.g. O-rings
    • F16J15/328Manufacturing methods specially adapted for elastic sealings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D1/00Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor
    • B26D1/01Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work
    • B26D1/04Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member
    • B26D1/06Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member wherein the cutting member reciprocates
    • B26D1/08Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member wherein the cutting member reciprocates of the guillotine type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/18Means for removing cut-out material or waste
    • B26D7/1845Means for removing cut-out material or waste by non mechanical means
    • B26D7/1863Means for removing cut-out material or waste by non mechanical means by suction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/22Safety devices specially adapted for cutting machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/26Means for mounting or adjusting the cutting member; Means for adjusting the stroke of the cutting member
    • B26D7/2614Means for mounting the cutting member
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L21/00Compositions of unspecified rubbers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/72Sealings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/72Sealings
    • F16C33/76Sealings of ball or roller bearings
    • F16C33/78Sealings of ball or roller bearings with a diaphragm, disc, or ring, with or without resilient members
    • F16C33/7816Details of the sealing or parts thereof, e.g. geometry, material
    • F16C33/7833Special methods of manufacture

Abstract

The invention provides a kind of preparation method of high ferro hub bearing sealing ring, belong to field of mechanical technique.The problems such as producing efficiency is poor, service life is disconnected be present in the preparation method that it solves existing seal.The preparation method of this high ferro hub bearing sealing ring, it is characterised in that this method comprises the following steps:A, prepare raw material, prepare following material by weight:Rubber 70%, accelerator 1.5%, carbon black 10%, calcium carbonate 5% 8%, zinc oxide 2% 3%, Tissuemat E 1.5%, talcum powder 1%, iron powder 5% 9%;B, sulfidization molding;The raw material prepared in step a is poured into vulcanizer, in the presence of vulcanizer, raw material is become into a sealing strip;C, sealing ring is cut into;Sealing strip cut into by bale splitter a bit of;D, cost high ferro hub bearing sealing ring is processed to the sealing strip for cutting into segment by mould.The present invention has producing efficiency height, and the sealing ring service life that the preparation method is made is longer.

Description

The preparation method of high ferro hub bearing sealing ring
Technical field
The invention belongs to field of mechanical technique, is related to a kind of high ferro hub bearing sealing ring, particularly a kind of high ferro wheel hub The preparation method of bearing sealed ring.
Background technology
The circular cowling that sealing ring is made up of one or several parts, be fixed on the lasso or packing ring of bearing and with it is another One lasso or washer contacts form narrow labyrinth clearance, prevent that lubricating oil from spilling and foreign object invades.Sealing ring is a kind of section For the rubber ring of circle, because its section is O-shaped, therefore O-ring seal is called.It is using most wide in hydraulic and pneumatic transmission system General one kind.
At present, Chinese high ferro cause flourishes, and is also required to use sealing ring, at present, market on the wheel hub of high ferro The preparation method of the sealing ring of upper high ferro wheel hub is all comparatively laborious, and the sealing ring service life made is also shorter, The development of high ferro cause is not utilized.
The content of the invention
The present invention be directed to above mentioned problem existing for existing technology, there is provided a kind of making of high ferro hub bearing sealing ring The characteristics of method, the preparation method have that producing efficiency is high, and the sealing ring service life made of the preparation method is longer.
The purpose of the present invention can be realized by following technical proposal:
The preparation method of high ferro hub bearing sealing ring, it is characterised in that this method comprises the following steps:A, prepare former Material, prepares following material by weight:Rubber 70%, accelerator 1.5%, carbon black 10%, calcium carbonate 5%-8%, zinc oxide 2%-3%, Tissuemat E 1.5%, talcum powder 1%, iron powder 5%-9%;Above material percentage sum is 100 percent;
B, sulfidization molding;The raw material prepared in step a is poured into vulcanizer, in the presence of vulcanizer, by raw material Become a sealing strip;
C, sealing ring is cut into;Sealing strip cut into by bale splitter a bit of;
D, cost high ferro hub bearing sealing ring is processed to the sealing strip for cutting into segment by mould.
Bale splitter in described step c includes base, and conveyer belt, the both sides point of the base are provided with the base A column is not provided with, and a cross bar is provided between two columns;The bale splitter also includes:
Cutter device, the cutter device include mounting seat, and this can be driven by being provided between the mounting seat and cross bar The driving source of mounting seat lifting, the both ends of the mounting seat are connected with the movable block for installing cutter head by elastic component respectively, The elastic component is vertically set;
Cutter head, the cutter head include the square tool rest in a section, and the both ends of the tool rest, which rotate, is arranged at two institutes State on movable block, and can be relatively fixed and release between tool rest and movable block, four sides of the tool rest are respectively arranged with shape The different cutter of shape;
Dust exhaust apparatus, the dust exhaust apparatus include wind sucting tube, fixed air intake duct and mobile air intake duct, the wind sucting tube and set In on base, the inner of the fixed air intake duct is connected with the wind sucting tube, and the outer end of the fixed air intake duct is described in The lower section of cutter head, the mobile air intake duct is flexible pipe, and the inner of the movement air intake duct is connected with wind sucting tube, the movement air-breathing The outer end of pipe is free end;
Wind-force adjustment structure, the wind-force adjustment structure include the fixed disk and rotating disc being arranged in the wind sucting tube, The fixed disk is fixed on the end of wind sucting tube, and the turn disc is arranged on the fixed disk, the fixed disk and turn Several interior air admission holes and external admission hole, the intracavity inter-connection of the interior air admission hole and wind sucting tube, institute are offered on Moving plate respectively External admission hole is stated towards the air inlet for stating wind sucting tube.
Sealing strip can be delivered to below cutter device by conveyer belt, driving source drives mounting seat to decline, band dynamic cutter head It is synchronous to decline, so as to which sealing strip be cut off.Due to flexible part, thus cutting when, cutter by sealing strip cut off and conveyer belt During contact, elastic component can deform upon, can avoid cutter because the rigid collision between conveyer belt and caused by wear, improve cutter Service life;Because the tool rest in cutter head is to rotate to be arranged on movable block, and four sides of tool rest are provided with difference Cutter, therefore tool rest can be rotated and select corresponding cutter, so as to improve the versatility of bale splitter according to being actually needed;Due to It is designed with dust exhaust apparatus, the fixation air intake duct in dust exhaust apparatus can siphon away the waste material of cut place, and move air intake duct and be available for operating Person grips the place for being moved to and needing to clean, and so as to improve the tidiness of complete machine, avoids the motion vice division chief of machine from clamping stagnation occur;By It is designed with wind-force adjustment structure in bale splitter, can be as needed during use, rotary motion disk, air admission hole and external admission in regulation Intersecting area between hole, so as to play energy-conserving action.
As a kind of scheme, the driving source includes the cylinder vertically set, and the cylinder body of the cylinder is fixed on On cross bar, the piston rod of the cylinder is connected with the mounting seat.
Alternatively, the driving source includes electromagnet, and the body of the electromagnet is fixed on the cross bar, The mandrel of the electromagnet is connected with the mounting seat.
The elastic component includes stage clip, and the upper end of the stage clip is fixed in mounting seat, the lower end of the stage clip with it is described Movable block is connected.
The cutter device also includes guide rod, and the upper end of the guide rod through the stage clip and is fixed in mounting seat, institute The lower end for stating guide rod is located in stage clip.
As a kind of scheme, mounting hole is offered on the movable block, the rotation that is provided at both ends with of the tool rest is arranged at Damping shaft in the mounting hole.
Alternatively, the both ends of tool rest are rotatablely connected by a rotational pin and the movable block respectively, and described Ratchet is arranged with rotational pin, the ratchet being meshed with the ratchet is provided with the movable block.
Circular scale is provided with the movable block, the finger corresponding with the circular scale is provided with the ratchet Pin.
The side of the tool rest offers screwed hole, and the bar shaped corresponding with the screwed hole is offered on the cutter Fastening bolt is plugged with hole, the screwed hole and bar hole corresponding thereto simultaneously.
The side wall of the base is provided with a semiorbicular elastic clamping jaw, and the wind sucting tube can be connected in the elastic clip In pawl.
The bottom of the wind sucting tube offers rubbish pour spout, and is additionally provided with the wind sucting tube and inclines for closing the rubbish The cover plate of mouth.
The cover plate is rounded, and one end of the cover plate is articulated with the wind sucting tube, the other end of the cover plate and suction Air duct is detachably connected.
Length direction of the side wall of the wind sucting tube along wind sucting tube is provided with transparent observation window.
The lateral wall of the fixed disk is arranged with a sealing ring, makes to be formed between the madial wall of the fixed disk and wind sucting tube Sealing.
Several grooves are offered on the lateral wall of the rotating disc.
The circle centre position of the rotating disc is vertically and fixedly provided with a circular shaft, and the lower end of the circular shaft is arranged with a polygonal resilient set Cylinder, the circle centre position of the fixed disk are vertically and fixedly provided with an axle sleeve, and the axle sleeve is sheathed on the polygonal resilient sleeve.
A gap is offered in the side wall of the polygonal resilient sleeve.
Compared with prior art, the present invention has advantages below:
1st, using rubber 70%, accelerator 1.5%, carbon black 10%, calcium carbonate 5%-8%, zinc oxide 2%-3%, poly- second Alkene wax 1.5%, talcum powder 1%, the service life of the sealing ring made by iron powder 5%-9% are longer.
2nd, due to being provided with elastic component, therefore in cutting, when cutter contacts sealing strip cut-out with conveyer belt, elastic component Can deform upon, can avoid cutter because the rigid collision between conveyer belt and caused by wear, improve cutting-tool's used life;
3rd, because tool rest is to rotate to be arranged on movable block, and four sides of tool rest are provided with different cutters, because This can rotate tool rest and select corresponding cutter, so as to improve the versatility of bale splitter according to being actually needed;
4th, due to being designed with dust exhaust apparatus, the fixation air intake duct in dust exhaust apparatus can siphon away the waste material of cut place, and move Air intake duct is available for operator to grip the place for being moved to and needing to clean, and so as to improve the tidiness of complete machine, avoids the motion of machine There is clamping stagnation in vice division chief;
5th, can be as needed due to being designed with wind-force adjustment structure, during use, rotary motion disk, in regulation air admission hole with it is outer Intersecting area between air admission hole, so as to play energy-conserving action.
Brief description of the drawings
Fig. 1 is the structural representation of bale splitter in embodiment.
Fig. 2 is the structural representation of cutter device in embodiment.
Fig. 3 is the schematic diagram of wind-force adjustment structure in embodiment.
In figure, 1, base;2nd, column;3rd, cross bar;4th, mounting seat;5th, movable block;6th, tool rest;7th, cutter;8th, wind sucting tube;9、 Fixed air intake duct;10th, mobile air intake duct;11st, fixed disk;12nd, rotating disc;13rd, interior air admission hole;14th, external admission hole;15th, cylinder; 16th, stage clip;17th, guide rod;18th, rotational pin;19th, ratchet;20th, ratchet;21st, circular scale;22nd, pointer;23rd, bar hole;24th, it is tight Fixing bolt;25th, elastic clamping jaw;26th, rubbish pour spout;27th, cover plate;28th, observation window;29th, groove;30th, circular shaft;31st, polygon Resilient sleeve;32nd, axle sleeve;33rd, gap;34th, conveyer belt.
Embodiment
It is the specific embodiment of the present invention and with reference to accompanying drawing below, technical scheme is further described, But the present invention is not limited to these embodiments.
The preparation method of high ferro hub bearing sealing ring, this method comprise the following steps:A, raw material is prepared, by weight accurate Standby following material:Rubber 70%, accelerator 1.5%, carbon black 10%, calcium carbonate 5%-8%, zinc oxide 2%-3%, Tissuemat E 1.5%, talcum powder 1%, iron powder 5%-9%;Above material percentage sum is 100 percent;
B, sulfidization molding;The raw material prepared in step a is poured into vulcanizer, in the presence of vulcanizer, by raw material Become a sealing strip;
C, sealing ring is cut into;Sealing strip cut into by bale splitter a bit of;
D, cost high ferro hub bearing sealing ring is processed to the sealing strip for cutting into segment by mould.
In the present embodiment, rubber 72%, accelerator 1.5%, carbon black 10%, calcium carbonate 5%, zinc oxide 3%, polyethylene Wax 1.5%, talcum powder 1%, iron powder 6%.
As shown in Figure 1, Figure 2, Figure 3 shows, the bale splitter in step c includes base 1, and conveyer belt 34, base are provided with base 1 1 both sides are respectively arranged with a column 2, and a cross bar 3 is provided between two root posts 2.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes:Cutter device, cutter device include mounting seat 4, mounting seat 4 with The driving source that the mounting seat 4 can be driven to lift is provided between cross bar 3, the both ends of mounting seat 4 are connected by elastic component respectively There is the movable block 5 for installing cutter head, elastic component is vertically set.
Specifically, in the present embodiment, driving source includes the cylinder 15 vertically set, and the cylinder body of cylinder 15 is fixed In on cross bar 3, the piston rod of cylinder 15 is connected with mounting seat 4.As other schemes, driving source includes electromagnet, electromagnet Body be fixed on cross bar 3, the mandrel of electromagnet is connected with mounting seat 4.
Preferably, elastic component includes stage clip 16, the upper end of stage clip 16 is fixed in mounting seat 4, the lower end of stage clip 16 with Movable block 5 is connected;Cutter device also includes guide rod 17, and the upper end of guide rod 17 through stage clip 16 and is fixed in mounting seat 4, led The lower end of bar 17 is located in stage clip 16.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes cutter head, and cutter head includes the square tool rest 6 in a section, tool rest 6 both ends rotate and are arranged on two movable blocks 5, and can be relatively fixed and release between tool rest 6 and movable block 5, and the four of tool rest 6 Individual side is respectively arranged with variform cutter 7.
Specifically, in the present embodiment, the both ends of tool rest 6 are rotatablely connected by a rotational pin 18 with movable block 5 respectively, and Ratchet 19 is arranged with rotational pin 18, the ratchet 20 being meshed with ratchet 19 is provided with movable block 5.As other schemes, move Mounting hole is offered on motion block 5, tool rest 6 is provided at both ends with the damping shaft for rotating and being arranged in mounting hole.
As further preferred, circular scale 21 is provided with movable block 5, is provided with ratchet 19 and the phase of circular scale 21 Corresponding pointer 22;Offer the bar hole 23 corresponding with screwed hole on cutter 7, screwed hole and bar hole corresponding thereto Fastening bolt 24 is plugged with 23 simultaneously.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes dust exhaust apparatus, and dust exhaust apparatus includes wind sucting tube 8, fixed air intake duct 9 are arranged on base 1 with mobile air intake duct 10, wind sucting tube 8, and the inner of fixed air intake duct 9 is connected with wind sucting tube 8, fixed suction The outer end of tracheae 9 is towards the lower section of cutter head, and mobile air intake duct 10 be flexible pipe, and the inner of the movement air intake duct 10 and wind sucting tube 8 It is connected, the outer end of the movement air intake duct 10 is free end.
Specifically, the side wall of base 1 is provided with a semiorbicular elastic clamping jaw 25, and wind sucting tube 8 can be connected in elasticity In clamping jaw 25;The bottom of wind sucting tube 8 offers rubbish pour spout 26, and is additionally provided with the wind sucting tube 8 for closing the rubbish The cover plate 27 of pour spout 26;Cover plate 27 is rounded, and one end of cover plate 27 is articulated with wind sucting tube 8, the other end of cover plate 27 and suction Air duct 8 is detachably connected;Length direction of the side wall of wind sucting tube 8 along wind sucting tube 8 is provided with transparent observation window 28.
As shown in Figure 1, Figure 2, Figure 3 shows, bale splitter also includes wind-force adjustment structure, and wind-force adjustment structure includes being arranged at air draught Fixed disk 11 and rotating disc 12 in cylinder 8, fixed disk 11 are fixed on the end of wind sucting tube 8, and rotating disc 12 rotates and is arranged at fixation On disk 11, several interior air admission holes 13 and external admission hole 14, interior air admission hole 13 are offered on fixed disk 11 and rotating disc 12 respectively With the intracavity inter-connection of wind sucting tube 8, external admission hole 14 is towards the air inlet for stating wind sucting tube 8.The lateral wall of fixed disk 11 is arranged with One sealing ring, make to form sealing between the madial wall of fixed disk 11 and wind sucting tube 8;Offered on the lateral wall of rotating disc 12 some Individual groove 29.The circle centre position of rotating disc 12 is vertically and fixedly provided with a circular shaft 30, and the lower end of circular shaft 30 is arranged with a polygonal resilient set Cylinder 31, the circle centre position of fixed disk 11 is vertically and fixedly provided with an axle sleeve 32, and axle sleeve 32 is sheathed on polygonal resilient sleeve 31;Polygon A gap 33 is offered in the side wall of resilient sleeve 31.The operation principle of the present invention is as follows:Support member, bottom plate and bottle in the application Lid riser three combine to be formed a framework triangular in shape and it is adjacent be hinged between the two, can be according to difference The riko cover demand of height bottle cap, rotate handwheel and drive screw mandrel to rotate, so as to drive framework to be slided with respect to connecting plate, so as to adjust branch The overall length of support member, and then the corner dimension between bottle cap riser and bottom plate is adjusted, so that this capping machine can adapt to The riko cover demand of different height bottle cap.
Sealing strip can be delivered to below cutter device, driving source drives installation by bale splitter in cutting by conveyer belt Seat declines, and band dynamic cutter head synchronously declines, so as to which sealing strip be cut off.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.

Claims (10)

1. the preparation method of high ferro hub bearing sealing ring, it is characterised in that this method comprises the following steps:A, raw material is prepared, By weight the following material of preparation:Rubber 70%, accelerator 1.5%, carbon black 10%, calcium carbonate 5%-8%, zinc oxide 2%- 3%th, Tissuemat E 1.5%, talcum powder 1%, iron powder 5%-9%;Above material percentage sum is 100 percent;
B, sulfidization molding;The raw material prepared in step a is poured into vulcanizer, in the presence of vulcanizer, raw material become A piece sealing strip;
C, sealing ring is cut into;Sealing strip cut into by bale splitter a bit of;The bale splitter includes base (1), described Conveyer belt (34) is provided with base (1), the both sides of the base (1) are respectively arranged with a column (2), two columns (2) cross bar (3) is provided between;The bale splitter also includes:Cutter device, the cutter device include mounting seat (4), institute The driving source for being provided between mounting seat (4) and cross bar (3) and the mounting seat (4) being driven to lift is stated, the mounting seat (4) Both ends are connected with the movable block (5) for installing cutter head by elastic component respectively, and the elastic component is vertically set;Knife Head, the cutter head include the square tool rest (6) in a section, and the both ends of the tool rest (6), which rotate, is arranged at two shiftings On motion block (5), and it can be relatively fixed and release between tool rest (6) and movable block (5), four sides difference of the tool rest (6) It is provided with variform cutter (7);Dust exhaust apparatus, the dust exhaust apparatus include wind sucting tube (8), fixed air intake duct (9) and moved Dynamic air intake duct (10), the wind sucting tube (8) are arranged on base (1), the inner and wind sucting tube of the fixed air intake duct (9) (8) it is connected, towards the lower section of the cutter head, the mobile air intake duct (10) is flexible pipe for the outer end of the fixed air intake duct (9), And the inner of the movement air intake duct (10) is connected with wind sucting tube (8), the outer end of the movement air intake duct (10) is free end;Wind-force Adjustment structure, the wind-force adjustment structure include the fixed disk (11) and rotating disc (12) being arranged in the wind sucting tube (8), institute The end that fixed disk (11) is fixed on wind sucting tube (8) is stated, the rotating disc (12) rotates and is arranged on the fixed disk (11), institute State and offer several interior air admission holes (13) and external admission hole (14) on fixed disk (11) and rotating disc (12) respectively, it is described in enter The intracavity inter-connection of stomata (13) and wind sucting tube (8), external admission hole (14) direction state the air inlet of wind sucting tube (8);
D, cost high ferro hub bearing sealing ring is processed to the sealing strip for cutting into segment by mould.
2. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the driving source bag The cylinder (15) vertically set is included, the cylinder body of the cylinder (15) is fixed on cross bar (3), the work of the cylinder (15) Stopper rod is connected with the mounting seat (4).
3. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the driving source bag Electromagnet is included, the body of the electromagnet is fixed on the cross bar (3), the mandrel of the electromagnet and the mounting seat (4) It is connected.
4. the preparation method of the high ferro hub bearing sealing ring according to claim 1 or 2 or 3, it is characterised in that the bullet Property part includes stage clip (16), and the upper end of the stage clip (16) is fixed in mounting seat (4), the lower end of the stage clip (16) with it is described Movable block (5) is connected;The cutter device also includes guide rod (17), and the upper end of the guide rod (17) passes through the stage clip (16) And be fixed in mounting seat (4), the lower end of the guide rod (17) is located in stage clip (16).
5. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the movable block (5) mounting hole is offered on, the tool rest (6) is provided at both ends with the damping shaft for rotating and being arranged in the mounting hole.
6. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the two of tool rest (6) End is rotatablely connected by a rotational pin (18) and the movable block (5) respectively, and is arranged with ratchet on the rotational pin (18) (19) ratchet (20) being meshed with the ratchet (19), is provided with the movable block (5).
7. the preparation method of high ferro hub bearing sealing ring according to claim 6, it is characterised in that the movable block (5) circular scale (21) is provided with, the pointer corresponding with the circular scale (21) is provided with the ratchet (19) (22);The side of the tool rest (6) offers screwed hole, and the bar corresponding with the screwed hole is offered on the cutter (7) Fastening bolt (24) is plugged with shape hole (23), the screwed hole and bar hole (23) corresponding thereto simultaneously.
8. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the base (1) Side wall be provided with a semiorbicular elastic clamping jaw (25), the wind sucting tube (8) can be connected in the elastic clamping jaw (25); The bottom of the wind sucting tube (8) offers rubbish pour spout (26), and is additionally provided with the wind sucting tube (8) for closing the rubbish The cover plate (27) of pour spout (26);The cover plate (27) is rounded, and one end of the cover plate (27) is articulated with the wind sucting tube (8) On, the other end and the wind sucting tube (8) of the cover plate (27) are detachably connected;The side wall of the wind sucting tube (8) is along wind sucting tube (8) Length direction is provided with transparent observation window (28).
9. the preparation method of high ferro hub bearing sealing ring according to claim 1, it is characterised in that the fixed disk (11) lateral wall is arranged with a sealing ring, makes to form sealing between the madial wall of the fixed disk (11) and wind sucting tube (8);Institute State and several grooves (29) are offered on the lateral wall of rotating disc (12).
10. the preparation method of high ferro hub bearing sealing ring according to claim 9, it is characterised in that the rotating disc (12) circle centre position is vertically and fixedly provided with a circular shaft (30), and the lower end of the circular shaft (30) is arranged with a polygonal resilient sleeve (31), the circle centre position of the fixed disk (11) is vertically and fixedly provided with an axle sleeve (32), and the axle sleeve (32) is sheathed on the polygon On resilient sleeve (31);A gap (33) is offered in the side wall of the polygonal resilient sleeve (31).
CN201610297820.0A 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring Active CN105972215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610297820.0A CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610297820.0A CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Publications (2)

Publication Number Publication Date
CN105972215A CN105972215A (en) 2016-09-28
CN105972215B true CN105972215B (en) 2017-12-22

Family

ID=56991981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610297820.0A Active CN105972215B (en) 2016-05-06 2016-05-06 The preparation method of high ferro hub bearing sealing ring

Country Status (1)

Country Link
CN (1) CN105972215B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0976510B1 (en) * 1998-07-29 2005-03-30 Aichele Werkzeuge GmbH Rotary cutting device
CN104151737A (en) * 2014-07-30 2014-11-19 广州亮健文具有限公司 Preparation method of composite board
CN204566193U (en) * 2015-04-08 2015-08-19 河北长丰橡塑制品有限公司 Weather strip for automobile end device for excising
CN104910454A (en) * 2015-06-05 2015-09-16 浙江翔宇密封件有限公司 Automobile hub bearing seal ring and manufacturing technique thereof
CN104987561A (en) * 2015-07-09 2015-10-21 安徽嘉阳塑胶有限公司 Production method for thermoplastic elastomer based on ethylene propylene rubber reclaimed rubber
CN204712108U (en) * 2015-06-11 2015-10-21 河北贵航鸿图汽车零部件有限公司 A kind of sealing strip cutter sweep of improvement
CN105237826A (en) * 2015-11-11 2016-01-13 鲁一军 Seal ring manufacturing technology
CN204976844U (en) * 2015-08-05 2016-01-20 领胜电子科技(成都)有限公司 Automatic cross cutting machine of wasting discharge

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0976510B1 (en) * 1998-07-29 2005-03-30 Aichele Werkzeuge GmbH Rotary cutting device
CN104151737A (en) * 2014-07-30 2014-11-19 广州亮健文具有限公司 Preparation method of composite board
CN204566193U (en) * 2015-04-08 2015-08-19 河北长丰橡塑制品有限公司 Weather strip for automobile end device for excising
CN104910454A (en) * 2015-06-05 2015-09-16 浙江翔宇密封件有限公司 Automobile hub bearing seal ring and manufacturing technique thereof
CN204712108U (en) * 2015-06-11 2015-10-21 河北贵航鸿图汽车零部件有限公司 A kind of sealing strip cutter sweep of improvement
CN104987561A (en) * 2015-07-09 2015-10-21 安徽嘉阳塑胶有限公司 Production method for thermoplastic elastomer based on ethylene propylene rubber reclaimed rubber
CN204976844U (en) * 2015-08-05 2016-01-20 领胜电子科技(成都)有限公司 Automatic cross cutting machine of wasting discharge
CN105237826A (en) * 2015-11-11 2016-01-13 鲁一军 Seal ring manufacturing technology

Also Published As

Publication number Publication date
CN105972215A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105835102B (en) A kind of bale splitter of sealing ring
CN105922314B (en) A kind of bale splitter of improved sealing ring
CN208964501U (en) One kind grabbing lid cap rotating device
CN105840663B (en) The preparation method of automobile gearbox bearing sealed ring
CN105972215B (en) The preparation method of high ferro hub bearing sealing ring
CN207014231U (en) A kind of grip device for being used to clamp machine components
CN105922305B (en) The preparation method of low temperature resistant bearing sealed ring
CN203956694U (en) A kind of construction packaged type abrasive wheel cutting machine
CN205600810U (en) Bale splitter of sealing washer
CN207015680U (en) One kind pushes away box support film device
CN206912662U (en) A kind of sleeve conversion head steel ball spring automated assembling equipment
CN205572508U (en) Cutting device in bale splitter of sealing washer
CN102990353B (en) Valve close cover grasping mechanism
CN208500307U (en) A kind of bottled water production and processing Jar opening sealer equipment
CN206345424U (en) The transposer printed for flexible pipe pipe shaft
CN107336852A (en) A kind of and automatic packing device of logistics line locking
CN204387238U (en) A kind of 3D model lifting jar of 3D printer
CN105196285B (en) Pneumatic sampling device
CN209125912U (en) A kind of bottleneck trimming device
CN203791834U (en) Dust removal windshield mechanism of laser cutting machine tool
CN209381147U (en) Perforating device with dust collection function
CN105773651A (en) Multi-functional cover-taking manipulator equipment
CN208535286U (en) A kind of separate type driving butterfly valve apparatus with guide rod
CN206317625U (en) Spacing shovel device of tyre
CN206617125U (en) Beam-pumping unit packing dress takes utility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.26 Xinxing Road, Haining Agricultural Comprehensive Development Zone, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Xiangyu seal Co.,Ltd.

Address before: No.26 Xinxing Road, Haining Agricultural Comprehensive Development Zone, Jiaxing City, Zhejiang Province

Patentee before: XIANGYU SEAL PARTS Co.,Ltd.

CP01 Change in the name or title of a patent holder